Cruise Terminal 5 Marine Improvements
Solicitation number
ITB-25-1
Issued by
Florida

About this file

Addendum #2 for ITB-25-1 is issued by the Canaveral Port Authority for the Cruise Terminal 5 Marine Improvements project, modifying the original bidding documents. The addendum updates the Notice to Bid section, changing the bid submission deadline to 2:00 PM on July 31, 2025, at the Maritime Purchasing Center located at 399 Challenger Rd, Cape Canaveral, Florida 32920. It also replaces the entire Section 00 43 27 Proposal Breakdown Table with an updated version. The proposal breakdown table details the scope of work, including mobilization, site coordination, demolition, and new construction activities such as pier deck units, concrete piles, monopile dolphins, mooring bollards, fenders, and a solar-powered lighting system.

The proposal breakdown table provides a comprehensive breakdown of project components with quantities specified in various units like linear feet (LF), square feet (SF), cubic yards (CY), and each (EA). The project includes base bid items for general site coordination, demolition, new construction, and repairs and lighting systems. While specific pricing details are left blank, the table is structured to allow bidders to input unit costs and calculate total costs for each project component. The addendum emphasizes that bidders must acknowledge receipt of this addendum on their Bid Form, with failure to do so potentially resulting in disqualification.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITB-25-1 Page 1 Addendum #2

CANAVERAL PORT AUTHORITY

CRUISE TERMINAL 5 MARINE IMPROVEMENTS

ITB-25-1

Addendum #2

June 5, 2025

This addendum is issued as part of the Bidding Documents for the above-described project. The changes incorporated in this addendum shall be considered as a part of the Bidding Documents and shall supersede, amend, add to, clarify, or subtract from those conditions shown in the original Bidding Documents. The Bidder shall take care to coordinate modifications herein with all trades and disciplines related to the work. The Bidder shall acknowledge receipt of this addendum on their Bid Form by addendum number and date. Failure to do so may subject Bidder to disqualification.

Released Via VendorLink

2 Pages Total (including attachments)

GENERAL

• Section 00 11 13 Notice to Bid – replace first paragraph with the following:

Sealed proposals will be received at the Canaveral Port Authority, Maritime Purchasing Center, 399 Challenger Rd, Cape Canaveral, Florida 32920 for CRUISE TERMINAL 5 MARINE IMPROVEMENTS, until 2:00 PM, July 31, 2025, at which time and place the bids will be publicly opened and read aloud.

SPECIFICATIONS

• Replace entire Section 00 43 27 Proposal Breakdown Table with the updated Section provided.

DRAWINGS

OTHER DOCUMENTS ISSUED WITH ADDENDUM

END OF ADDENDUM #2

Issued via VendorLink

By Authority of the Canaveral Port Authority

CRUISE TERMINAL 5 MARINE IMPROVEMENTS

PN 25-011D

ITB-25-1

25CPA002 00 43 27-1 Addendum 2 BID SET

SECTION 00 43 27

PROPOSAL BREAKDOWN TABLE

Scope Area Description Quantity Unit Unit Cost Total Cost Base Bid Item 1:

Mobilization / Demobilization 1 LS All Other Work 1 LS

General Site Coordination:

Utility Locates 1 LS Survey Work 1 LS Dive Inspections 1 LS

Demolition:

All Demolition Work 1 LS

New Construction:

Pier Deck Units SF Concrete Piles

LF

Cast-in-Place Concrete Pile Caps/Bents CY Cast-in-Place Concrete Topping CY Monopile Dolphins 5 EA Mooring Bollards 8 EA Fenders 3 EA Underwater Grout CY Catwalk Relocations & Modifications 1 LS Stainless Steel Ladders 2 LS Total Base Bid Item 1 Repairs and Lighting System Curbs 150 LF Deck 200 LF Fender Wear Strips 15 EA Solar-Powered Lighting System 1 LS

ITB-25-1 Addendum 2
June 5, 2025
Issued via VendorLink
By
Authority of the Canaveral Port Authority

00 43 27 Proposal Breakdown Table-Addendum 2