About this opportunity

Marion County Board of County Commissioners in Florida is requesting bids on the Silver Creek and Silver Creek 1st Addition Road Improvement Project (26B-096), a reclamation and resurfacing of approximately 0.91 miles of subdivision local road, with bids due June 18, 2026.

The scope includes reclaiming and resurfacing road sections, removing high shoulders and sod, installing thermoplastic striping, providing maintenance of traffic (MOT), and performing construction layout surveying by a licensed Florida Professional Land Surveyor. Work must comply with FDOT Standard Specifications for Road and Bridge Construction, Marion County Land Development Code, and UTCD. Construction is restricted to Monday through Friday, 8:00 A.M. to 5:00 P.M., with no weekend or holiday work and all equipment removed from roadways by 5:00 P.M. daily.

The subgrade must be stabilized to 8 inches (LBR 40), the limerock base course must be 6 inches (LBR 100), and the asphalt surface course must be minimum 1.25 inches Type SP 9.5 with maximum 15% reclaim mix. The contract term is 60 calendar days from the Notice to Proceed, with roadwork completion required within the first 30 days and thermoplastic striping in the final 30 days. Liquidated damages are assessed at $500 per day for failure to substantially complete work on schedule.

All submissions must be made through Marion County's Bonfire e-procurement portal at https://marionfl.bonfirehub.com. A bid bond or five percent cashier's check is required. Performance and payment bonds are required. Bidders must provide at least three references of similar work completed on time, within budget, and in a professional manner. Marion County will conduct quality-control testing at county expense; failed tests are back-charged to the contractor. Retainage up to five percent may be withheld until final completion and submission of final waivers of lien from all subcontractors. The project is subject to final public hearing before the Board of County Commissioners following bid opening. Contractors must register with Marion County's PaymentWorks vendor portal for payment processing.

Opportunity text

Reclaim and resurface approximately .91 miles of subdivision local road sections within the subdivision limits of Silver Creek/Silver Creek 1st Add.. Work also includes the removal of high shoulders, sod, thermoplastic striping, MOT and construction layout.