Stampede Penstock and Butterfly Valve Rehab

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140R2026R0006
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The Bureau of Reclamation seeks rehabilitation of the Stampede Penstock and Butterfly Valve at Stampede Powerplant near Truckee, California, with proposals due June 8, 2026 at 5:00 p.m. Pacific Daylight Time. This procurement is restricted to small businesses under NAICS 237110 with a $45 million size standard, foreclosing open competition.

Place of performance is Stampede Powerplant, 501 Stampede Dam Road, Truckee, California 96161. Work includes relining 54-inch, 42-inch, and 24-inch penstocks; replacing the 24-inch butterfly valve with motor operator and actuator; refurbishing the 42-inch butterfly valve with new seals; spot-repairing Unit 1 scroll case and Unit 2 components; rehabilitating 12-inch and 14-inch air-vac piping; repairing the 90-inch outlet works headgate; and replacing wicket gate mechanism components. The estimated cost range is $1 million to $5 million.

Performance begins within 12 calendar days of notice to proceed and must be completed within 600 calendar days. Work is constrained to April 1 through November 30, with all interior penstock and valve work operational by September 30. Work hours are Monday through Friday, 7:00 a.m. to 7:00 p.m. Public roadways must remain open throughout construction.

Extensive hazardous materials abatement is required for coatings containing regulated metals and asbestos. The contractor must design and implement water removal and control systems for the 90-inch outlet works, deliver and maintain minimum river flow of 30 cubic feet per second downstream, and maintain river temperature between 45°F and 65°F. Comprehensive safety, environmental, and fire protection plans are mandatory. All site security personnel must complete Personnel Identification Verification per Homeland Security Presidential Directive 12. Performance and payment bonds are required within 10 calendar days of award. Pricing structure combines lump-sum items (mobilization, water management, valve work) with unit-price items for blast-and-recoat surface preparations measured in square feet. Evaluation criteria and weighting are not specified in available documents. Amendment 0005, effective June 1, incorporates revised specifications and Questions and Answers. Questions are due five days after the April 15, 2026 site visit at Stampede Powerplant.

Notice text

Stampede Penstock and Butterfly Valve Rehab

Files

File Type Posted
Amdt_0005-Attch_1-Questions_and_Answers_0005.pdf PDF
Sol_140R2026R0006_Amd_0005.pdf PDF
Amdt_0005-Section_J-Attch-6-Yaskawa_650_KW_Generator_Drawings_0005.pdf PDF
Sol_140R2026R0006_Amd_0004.pdf PDF
Attch_12-Section_52_00_00-Drawings_0004.pdf PDF
Attch_1_-_Revised_Specifications_0004.pdf PDF
Attch_8-Section_01_57_30-Water_Pollution_Control_0004.pdf PDF
Attch_7-Section_01_35_50-Site_Security_0004.pdf PDF
Attch_5-Section_01_33_00-Submittals_0004.pdf PDF
Attch_11-Section_31_03_33-Removal_and_Control_of_Water_0004.pdf PDF
Attch_3-Section_00_01_10-Table_of_Contents_0004.pdf PDF
Attch_14-Questions_and_Answers_0004.pdf PDF
Attch_2-Section_00_00_50-Section_B___0004.pdf PDF
Attch_9-Section_01_57_70-Fire_Protection_and_Prevention_0004.pdf PDF
Attch_10-Section_26_05_20-Grounding_and_Bonding_0004.pdf PDF
Attch_4-Section_01_14_10-Use_of_Site_0004.pdf PDF
Attch_13-New_For_Information_Only_(FIO)_Drawings_0004.pdf PDF
Attch_6-Section_01_35_20-Safety_and_Health_0004.pdf PDF
Sol_140R2026R0006_Amd_0003.pdf PDF
Att__1_Site_Visit_Attendance_Record_0003.pdf PDF
C05_04_Solicitation_140R2026R00006_0002.pdf PDF
Sol_140R2026R0006_Amd_0002.pdf PDF
Non-Disclosure_Agreement_(NDA_-_Stampede_Penstock_and_Butterfly_Valve_Rehab_0001.pdf PDF
Sol_140R2026R0006_Amd_0001.pdf PDF
Section_L_Amendment_0001_0001.pdf PDF
Sol_140R2026R0006.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Solicitation_140R2026R00006.pdf PDF
Release_of_Claims.pdf PDF
Offeror_Responsibility_Information.pdf PDF
General_Decision_Number_CA20260007_Dated_01232026.pdf PDF
Notice_to_Contractors.pdf PDF
Show all 32

Notice history

Notice Type Posted
Stampede Penstock and Butterfly Valve Rehab Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
LB Lateral Water Line and Facilities Replacement for Wastewater System NAICS 237110 — No set-aside
East Bear Creek Pumping Plant and Pipeline Moderni NAICS 237990 — No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors