This is a drawings specification section for the Stampede Penstock and Butterfly Valve Rehabilitation project on the Washoe Project in California (Specifications No. 20-C0943). The document establishes guidelines for handling and interpreting project drawings rather than specifying products or services to be procured.
The specification contains procedural requirements for managing discrepancies, errors, and omissions in contract drawings. Key provisions include: written specifications take precedence over drawings in case of conflicts per FAR 52.236-21; the Contracting Officer (CO) must be informed of any drawing discrepancies; where differences exist between drawing details and actual existing jobsite features, the contractor must use the existing features at the jobsite; specification drawings showing fabrication details not applicable to the contract work should be disregarded; information-only drawings depict existing features necessary for contract performance but do not represent work to be performed; and standard drawings may contain details not applicable to the contract. The document includes comprehensive tables listing 104 drawings organized by category (General, MSE and Embankment Crest Structures, Roadways, Geology, Demolition, Powerplant, Penstock, Mechanical Turbine, Valves, Metalwork, Electrical, and Standard Drawings), with drawing numbers and sheet references. Drawings reference components including the spillway crest structure, outlet works, steel penstock, high-pressure gates, turbine assemblies, butterfly valves, and electrical installations for a hydroelectric power generation facility.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Stampede Penstock and Butterfly Valve Rehab
Washoe Project, California Specifications No. 20-C0943
Drawings
52 00 00 - 1
SECTION 52 00 00
DRAWINGS
PART 1 GENERAL
1.01 DISCREPANCIES, ERRORS, OR OMISSIONS
A. Inform CO of discrepancies discovered on drawings in accordance with clause at FAR 52.236-21, Specifications and Drawings for Construction.
B. In accordance with clause at FAR 52.236-21, Specifications and Drawings for
Construction, in case of discrepancies, written specifications take precedence over drawings unless otherwise specified.
1.02 PROJECT CONDITIONS
A. Where there are differences as determined by CO between details and dimensions shown on drawings and details and dimensions of existing features at jobsite, use details and dimensions of existing features at jobsite.
1.03 SPECIFICATION DRAWINGS
A. Some drawings show details of fabrication or other details and specifications which are not a part of work under this contract. Disregard specifications and details shown on these drawings which are not applicable to work under this contract.
B. Reference drawings referred to on specification drawings and not considered necessary for contract purposes are not included in specifications.
C. Parts of work for which dimensions are not shown have been drawn to scale as nearly to final dimensions as possible before purchase of machinery or equipment and development of final general and detailed designs.
1.04 INFORMATION DRAWINGS
A. Drawings marked "For Information Only" in the drawing list are included to show existing features about which knowledge is required to perform work under this contract.
These drawings do not show work to be performed under this contract.
B. If there are differences as determined by CO between details and dimensions shown on these drawings and those of existing features at jobsite, use details and dimensions of existing features at jobsite.
52 00 00 - 2
1.05 STANDARD DRAWINGS
A. Standard drawings may show details which are not a part of work under this contract.
Disregard details shown on these drawings which are not applicable to work under this contract.
1.06 LIST OF DRAWINGS
A. Drawings listed in Table 52 00 00A - List of Drawings are made a part of Section C - Description/Specifications.
1.07 DRAWING NUMBERS IN NUMERICAL ORDER
A. Specification drawings are listed in numerical order in Table 52 00 00B - Drawings in
Numerical Order.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
General:
1 320-D-218 Location and Vicinity Map
2 320-D-60146 Stampede Penstock and Butterfly Valve Rehab – Contractor
Use Area – Overview – Sheet 1
3 320-D-60147 Stampede Penstock and Butterfly Valve Rehab – Contractor Use Area – Gates and Fences – Sheet 2
4 320-D-60148 Stampede Penstock and Butterfly Valve Rehab – Contractor Use Area – Power Plant – Sheet 3
5 320-D-60149 Stampede Penstock and Butterfly Valve Rehab – Contractor
Use Area Spillway Crest – Sheet 4
6 320-D-60150 Stampede Penstock and Butterfly Valve Rehab – Outlet Works and Penstock System - Schematic
MSE and Embankment Crest Structures:
52 00 00 - 3
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
7 320-D-232 MSE and Embankment Crest Structures – Instrumentation
Plan
Roadways and Vista Point:
8 320-D-261 Dog Valley Road – Plan and Profile – Sta. 28+00 to 39+00 – Sheet 3 of 5
Geology Drawing:
9 320-D-268 Main Dam and Dike Embankments – Test Pit Location Map
Information Drawings:
Civil:
Demolition:
10 320-D-245 Spillway Crest Structure – Demolition – Plan and Sections
Powerplant and Switchyard:
11 949-D-301 Stampede Powerplant and Switchyard – Location Map
12 949-D-302 Stampede Powerplant – Site Plan and Sections
13 949-D-303 Stampede Powerplant – General Arrangement – Plans and Sections
14 949-D-304 Stampede Powerplant – General Arrangement – Plan and
Sections
15 949-D-305 Stampede Powerplant – General Arrangement – Elevations, Sections, Details and Door Schedule
16 949-D-306 Stampede Powerplant – Plans and Sections
17 949-D-307 Stampede Powerplant – Concrete Outline – Plan, Sections and Details
18 949-D-308 Stampede Powerplant – Concrete Outline and Reinforcement Design – Plan, Sections and Details
19 949-D-309 Stampede Powerplant – Structural Design Data Sheet
20 949-D-310 Stampede Powerplant – Reinforcement Design – Plans
21 949-D-311 Stampede Powerplant – Reinforcement Design – Sections 1, 2, & 3
52 00 00 - 4
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
22 949-D-312 Stampede Powerplant – Reinforcement Design – Sections 4
Thru 8
Penstock and Outlet Works:
23 320-D-246 Spillway Crest Structure – Plan, Profile, and Sections – Sheet 1 of 2
24 320-D-247 Spillway Crest Structure – Plan, Profile, and Sections – Sheet 2 of 2
25 320-D-252 Spillway Crest Structure – Debris Boom
26 949-D-1 Stampede Dam – Spillway and Outlet Works – Plan, Profiles and Sections
27 949-D-2 Stampede Dam – Spillway – Inlet Walls, Crest and Bridge
28 949-D-3 Stampede Dam – Spillway – Chute
29 949-D-4 Stampede Dam – Spillway – Stilling Basin
30 949-D-7 Stampede Dam – Outlet Works – Control Structure – First Stage
31 949-D-8 Stampede Dam – Outlet Works – Control Structure – Second
Stage – Sheet 1 of 2
32 949-D-9 Stampede Dam – Outlet Works – Control Structure – Second Stage – Sheet 2 of 2
33 949-D-10 Stampede Dam – Outlet Works – Stilling Basin
34 949-D-11 Stampede Dam – Outlet Works – By-Pass Stilling Basin
35 949-D-17 Stampede Dam – Outlet Works – Steel Outlet Pipe – Plan – Elevations – Details
36 949-D-18 Stampede Dam – Outlet Works – Steel Outlet Pipe – Support
Rings – Flange - Drain
37 949-D-19 Stampede Dam – Outlet Works – Steel Outlet Pipe – Lateral
– Wye – Transitions – Bends
38 949-D-20 Stampede Dam – Outlet Works – Steel Outlet Pipe –
By-Pass Piping Drains
39 949-D-21 Stampede Dam – Outlet Works – Steel Outlet Pipe – By-Pass, Air and Drain Piping
52 00 00 - 5
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
40 949-D-122 Stampede Dam – Outlet Works – 6’- 0” x 7’- 6” High-
Pressure Gate – Assembly with Hoist – List of Parts – Sheet 1 of 10
41 949-D-123 Stampede Dam – Outlet Works – 6’ - 0” x 7’- 6” High-Pressure Gate – Upstream Frame – Sheet 2 of 10
42 949-D-124 Stampede Dam – Outlet Works – 6’- 0” x 7’- 6”
High-Pressure Gate – Downstream Frame – Sheet 3 of 10
43 949-D-125 Stampede Dam – Outlet Works – 6’- 0” x 7’- 6” High-Pressure Gate – Bonnet – Sheet 4 of 10
44 949-D-126 Stampede Dam – Outlet Works – 6’- 0” x 7’- 6”
High-Pressure Gate – Bonnet Cover – Sheet 5 of 10
45 949-D-127 Stampede Dam – Outlet Works – 6’- 0” x 7’- 6” High-Pressure Gate – Leaf and Seats – Sheet 6 of 10
46 949-D-128 Stampede Dam – Outlet Works – 6’- 0” x 7’- 6” High-Pressure Gate – Hydraulic Hoist – Assembly – List of
Parts – Sheet 7 of 10
47 949-D-129 Stampede Dam – Outlet Works – 6’- 0” x 7’- 6” High-Pressure Gate – Hydraulic Hoist – Details – Sheet 8 of 10
48 949-D-130 Stampede Dam – Outlet Works – 6’- 0” x 7’- 6” High-Pressure Gate – Transitions – Sheet 9 of 10
49 949-D-131 Stampede Dam – Outlet Works – 6’- 0” x 7’- 6” High-Pressure Gate – Hydraulic Hoist – Assembly – List of
Parts – Sheet 10 of 10
50 949-D-137 Stampede Dam – Outlet Works – Control for 4’x5’ Outlet Gates and 6.0’x7.5’ H.P. Gate – Installation – Piping – List of Drawings
51 949-D-313 Stampede Powerplant – Penstock Thrust Blocks – Concrete Outline and Reinforcement Design – Plans, Sections, and Details
52 949-D-491 Stampede Powerplant – Piping Layout – Plans and Sections
53 949-D-947 Stampede Powerplant – Steel Penstock and Discharge Line –
Plan and Sections
52 00 00 - 6
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
54 949-D-948 Stampede Powerplant – Steel Penstock and Discharge Line –
Sections and Details
Mechanical - Turbine:
55 0107T-1000A Stampede – Unit 2 – Sectional Assy of Turbine
56 0107T-1004A Stampede – Spiral Casing and Stay Ring Assy 1 of 2
57 0107T-1004A Stampede – Spiral Casing and Stay Ring Assy 2 of 2
58 0107T-1006A Stampede – Plan Assembly
59 0107T-1006A Stampede – Sectional Assembly
60 0107T-1010A Stampede – Assy of Draft Tube Unit 1 and 2
61 0107T-1017 Stampede – Runner 1 of 2
62 0107T-1017 Stampede – Runner 2 of 2
63 0107T-1020 Stampede – Unit 2 – Packing Box (In Halves)
64 0107T-1021 Stampede – Unit 2 – Gland Follower (In Halves)
65 0107T-1022 Stampede – Unit 2 – Lantern Ring
66 0107T-1026A Stampede – Unit 2 – Assy of Lower Cover & Wearing Ring
67 0107T-1032A Stampede – Unit 2 – Assy. of Inner Head Cover, Runner & Packing Box – Sheet 1 of 2
68 0107T-1032A Stampede – Unit 2 – Assy. of Inner Cover, Runner & Packing Box – Sheet 2 of 2
69 0107T-1037A Stampede – Unit 2 – Assy of Guide Apparatus & Head
Cover
70 0107T-1038 Stampede – Unit 2 – Head Cover
71 0107T-1042 Stampede – Unit 2 – Lever for Wicket Gare
72 0107T-1043 Stampede – Unit 2 – Gate Stop
73 0107T-1044 Stampede – Unit 2 – Clamping Plate
74 0107T-1045 Stampede – Unit 2 – Seal Retaining Plate
75 0107T-1046 Stampede – Unit 2 – Link for Gate
76 0107T-1050 Stampede – Unit 2 – Gate Retaining Plate
52 00 00 - 7
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
77 0107T-1055A Stampede – Unit 2 – Gate Opening Ring Servomotor
Arrangement
78 0107T-1056 Stampede – Turbine Shaft – Unit 2
79 0107T-1057 Stampede – Unit 2 – Intermediate Shaft
80 0107T-1060A Stampede – Unit 2 – Main Shaft and Main Bearing Assy.
81 0107T-1067A Assembly of Spiral Casing Feet and Foundation Bolts-Unit 2
81A 320M-D-2158 UN 2-Gate Retaining Plate
81B 320M-D-2270 Gland Sleeve Unit-2
Mechanical – Valves:
82 24-473 BS 24” – 473 Bare Stem Flanged Butterfly Valve
83 42-473 BS 42” – 473 Bare Stem Flanged Butterfly Valve
Metalwork:
84 949-D-477 Stampede Power Plant – Miscellaneous Metalwork – Frames, Covers and Gratings
85 949-D-478 Stampede Power Plant – Miscellaneous Metalwork – Ladders, Grab Bar, and Guardrails
86 949-D-479 Stampede Power Plant – Miscellaneous Metalwork - Stair
87 949-D-480 Stampede Powerplant – Miscellaneous Metalwork – Cable
Trays and Supports
Electrical:
88 949-D-1001 Stampede Powerplant – Electrical Installation – Unit No. 1 120 VAC Control – Schematic Diagram (Sht. 1 of 2)
89 949-D-1002 Stampede Powerplant – Electrical Installation – Unit No. 1
120 VAC Control – Schematic Diagram (Sht. 2 of 2)
90 949-D-1003 Stampede Powerplant – Electrical Installation – Unit No. 1 460 VAC Auxiliaries – Schematic Diagram
91 949-D-1004 Stampede Powerplant – Electrical Installation – Unit No. 2 120 VAC Control – Schematic Diagram (Sht. 1 of 2)
92 949-D-1005 Stampede Powerplant – Electrical Installation – Unit No. 2
120 VAC Control – Schematic Diagram (Sht. 2 of 2)
52 00 00 - 8
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
93 949-D-1006 Stampede Powerplant – Electrical Installation – Unit No. 2
460 VAC Auxiliaries – Schematic Diagram
94 949-D-1008 Stampede Powerplant – Electrical Installation – 480 VAC Distribution Panel DCB – Three Line Diagram
95 949-D-1009 Stampede Powerplant – Electrical Installation – 480 VAC Distribution Panel DIA – Three Line Diagram
Standard Drawings:
95A 40-D-4334 Electrical Installation – Typical Grounding Details – Sheet 1 of 2
96 40-D-4335 Electrical Installation – Typical Grounding Details – Sheet 2 of 2
97 40-D-4753 Electrical Installation – Typical Grounding Details for
Switchyards and Substations
98 40-D-5370 Switchyards and Substations – Electrical Installation – Buried Insulated Cables – Typical
99 40-D-6234 Standard Nameplates
100 40-D-7094 Electrical Installation – Conduit Clamp and Conduit Supports – Typical Details
101 40-D-7102 Government Drawing Format - Drawing Border, Sample
Title Block, and Signature Lines
102 104-D-757 Pumping Plant – Electrical Installations – Designations and Symbols
103 104-D-1165 Design Data Typical – Powerplant_Pumping Plant –
Electrical Installation – Main Control Board – CSA – Panel 7R – Wiring Diagram
104 104-D-60005 Design Data – Electrical – Electrical Government Format - Standards
52 00 00 - 9
Table 52 00 00B - Drawings in
Numerical Order
Drawing No. Sheet No.
320-D-
320-D-218 1
320-D-232 7
320-D-246 23
320-D-247 24
320-D-252 25
320-D-261 8
320-D-268 9
320-D-245 10
320-D-60146 2
320-D-60147 3
320-D-60148 4
320-D-60149 5
320-D-60150 6
320M-D
320M-D-2158 81A
320M-D-2270 81B
863-D-
863-D-60031 96
863-D-60033 97
863-D-60034 98
949-D-
949-D-1 26
949-D-2 27
949-D-3 28
949-D-4 29
52 00 00 - 10
Table 52 00 00B - Drawings in Numerical Order
Drawing No. Sheet No.
949-D-7 30
949-D-8 31
949-D-9 32
949-D-10 33
949-D-11 34
949-D-17 35
949-D-18 36
949-D-19 37
949-D-20 38
949-D-21 39
949-D-122 40
949-D-123 41
949-D-124 42
949-D-125 43
949-D-126 44
949-D-127 45
949-D-128 46
949-D-129 47
949-D-130 48
949-D-131 49
949-D-137 50
949-D-301 11
949-D-302 12
949-D-303 13
949-D-304 14
949-D-305 15
949-D-306 16
52 00 00 - 11
Table 52 00 00B - Drawings in Numerical Order
Drawing No. Sheet No.
949-D-307 17
949-D-308 18
949-D-309 19
949-D-310 20
949-D-311 21
949-D-312 22
949-D-313 51
949-D-477 84
949-D-478 85
949-D-479 86
949-D-480 87
949-D-491 52
949-D-947 53
949-D-948 54
949-D-1001 88
949-D-1002 89
949-D-1003 90
949-D-1004 91
949-D-1005 92
949-D-1006 93
949-D-1008 94
949-D-1009 95
0107T-
0107T-1000A 55
0107T-1004A
52 00 00 - 12
Table 52 00 00B - Drawings in Numerical Order
Drawing No. Sheet No.
0107T-1004A
0107T-1006A
0107T-1006A
0107T-1010A 60
0107T-1017
0107T-1017
0107T-1020 63
0107T-1021 64
0107T-1022 65
0107T-1026A 66
0107T-1032A
0107T-1032A
0107T-1037A 69
0107T-1038 70
0107T-1042 71
0107T-1043 72
0107T-1044 73
0107T-1045 74
0107T-1046 75
0107T-1050 76
0107T-1055A 77
0107T-1056 78
52 00 00 - 13
Table 52 00 00B - Drawings in Numerical Order
Drawing No. Sheet No.
0107T-1057 79
0107T-1060A 80
0107T-1067A 81
24-
24-473 BS 82
42-
42-473 BS 83
40-D-
40-D-4334 95A
40-D-4335 96
40-D-4753 97
40-D-5370 98
40-D-6234 99
40-D-7094 100
40-D-7102 101
104-D-757 102
104-D-1165 103
104-D-60005 104
END OF SECTION