Attch_3-Section_00_01_10-Table_of_Contents_0004.pdf

PDF 107 KB Posted

Attached to
Stampede Penstock and Butterfly Valve Rehab
Solicitation number
140R2026R0006
Issued by

About this file

This document is a Table of Contents for Section C (Description/Specifications) of a federal solicitation for the Stampede Penstock and Butterfly Valve Rehabilitation project at the Washoe Project in California (Solicitation No. 20-C0943).

The specifications are organized into nine divisions covering the full scope of rehabilitation work. Division 01 (General Requirements) addresses site management, safety protocols, submittals, environmental controls, and quality procedures. Division 02 (Existing Conditions) covers equipment removal, disposal, and hazardous materials abatement, including removal of coatings with regulated metals. Division 09 (Finishes) specifies coating requirements. Division 26 (Electrical) details electrical materials, conductors, grounding, raceways, and wiring checkout procedures. Division 31 (Earthwork) addresses water removal and control. Division 35 (Waterway and Marine Construction) covers valves and equipment installation. Division 48 (Electrical Power Generation) encompasses disassembly, reassembly, alignment, commissioning, packing box refurbishment, and wicket gate mechanism work. Division 51 (Information Available to Offerors) provides photographs, reservoir elevation records, and hazardous material survey results. Division 52 addresses contract drawings. The specifications emphasize contractor safety responsibilities, coordination meetings, product testing, protection of existing installations, environmental controls, and water pollution control measures required for this hydroelectric facility rehabilitation project.

View the file

Other files

File Type Posted
Sol_140R2026R0006_Amd_0005.pdf PDF
Amdt_0005-Attch_1-Questions_and_Answers_0005.pdf PDF
Amdt_0005-Section_J-Attch-6-Yaskawa_650_KW_Generator_Drawings_0005.pdf PDF
Attch_6-Section_01_35_20-Safety_and_Health_0004.pdf PDF
Attch_14-Questions_and_Answers_0004.pdf PDF
Attch_13-New_For_Information_Only_(FIO)_Drawings_0004.pdf PDF
Attch_7-Section_01_35_50-Site_Security_0004.pdf PDF
Attch_8-Section_01_57_30-Water_Pollution_Control_0004.pdf PDF
Attch_1_-_Revised_Specifications_0004.pdf PDF
Attch_5-Section_01_33_00-Submittals_0004.pdf PDF
Attch_11-Section_31_03_33-Removal_and_Control_of_Water_0004.pdf PDF
Attch_12-Section_52_00_00-Drawings_0004.pdf PDF
Sol_140R2026R0006_Amd_0004.pdf PDF
Attch_2-Section_00_00_50-Section_B___0004.pdf PDF
Attch_9-Section_01_57_70-Fire_Protection_and_Prevention_0004.pdf PDF
Attch_4-Section_01_14_10-Use_of_Site_0004.pdf PDF
Attch_10-Section_26_05_20-Grounding_and_Bonding_0004.pdf PDF
Att__1_Site_Visit_Attendance_Record_0003.pdf PDF
Sol_140R2026R0006_Amd_0003.pdf PDF
Sol_140R2026R0006_Amd_0002.pdf PDF
C05_04_Solicitation_140R2026R00006_0002.pdf PDF
Non-Disclosure_Agreement_(NDA_-_Stampede_Penstock_and_Butterfly_Valve_Rehab_0001.pdf PDF
Sol_140R2026R0006_Amd_0001.pdf PDF
Section_L_Amendment_0001_0001.pdf PDF
General_Decision_Number_CA20260007_Dated_01232026.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Offeror_Responsibility_Information.pdf PDF
Release_of_Claims.pdf PDF
Sol_140R2026R0006.pdf PDF
Solicitation_140R2026R00006.pdf PDF
Notice_to_Contractors.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Stampede Penstock and Butterfly Valve Rehab

Washoe Project, California Solicitation No. 20-C0943

Table of Contents

00 01 10 - 1

SECTION C - DESCRIPTION / SPECIFICATIONS

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work

01 14 10 Use of Site 01 14 12 Work Restrictions

01 14 30 Interruption of Service 01 31 22 Coordination Meetings 01 31 30 Contract Document Management System

01 32 10 Construction Program 01 33 00 Submittals

01 33 26 Electrical Drawings and Data 01 35 10 Safety Data Sheets 01 35 20 Safety and Health

01 35 30 Contractor’s Onsite Safety Personnel 01 35 50 Site Security

01 42 10 Reference Standards 01 46 00 Quality Procedures 01 46 20 Testing Agency Services

01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking

01 56 10 Protection of Existing Installations 01 56 15 Protection of Existing Utilities 01 56 32 Temporary Fencing

01 57 20 Environmental Controls 01 57 30 Water Pollution Control

01 57 70 Fire Protection and Prevention 01 60 00 Product Requirements 01 64 40 Government Furnished Products

01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents

DIVISION 02 – EXISTING CONDITIONS

02 41 10 Equipment Removal and Disposal 02 80 10 General Requirements for Hazardous Materials Abatement

02 83 35 Removal and Disposal of Coatings and Equipment with Coatings Containing Regulated Metals

DIVISION 09 – FINISHES

09 96 20 Coatings

Stampede Penstock and Butterfly Valve Rehab

Washoe Project, California Solicitation No. 20-C0943

Table of Contents

00 01 10 - 2

DIVISION 26 – ELECTRICAL

26 05 02 Basic Electrical Materials and Methods 26 05 10 Conductors and Cables 26 05 20 Grounding and Bonding

26 05 33 Raceways and Boxes 26 05 90 Wiring Checkout and Tests

DIVISION 31 – EARTHWORK

31 03 33 Removal and Control of Water

DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION

35 22 14 Valves and Equipment

DIVISION 48 – ELECTRICAL POWER GENERATION

48 13 04 Disassembly and As-Found Readings 48 13 07 Reassembly and Alignment

48 13 08 Commissioning 48 13 15 Packing Box Refurbishment

48 13 26 Wicket Gate Mechanism

DIVISION 51 – INFORMATION AVAILABLE TO OFFERORS

51 00 00 Information Available to Offerors

51 00 10 Photographs 51 00 20 Reservoir Elevation Records 51 00 50 Electronic Media Release

51 02 83 Hazardous Material Survey and Analytical Results

DIVISION 52 - DRAWINGS

52 00 00 Drawings

END OF SECTION