Attch_7-Section_01_35_50-Site_Security_0004.pdf

PDF 126 KB Posted

Attached to
Stampede Penstock and Butterfly Valve Rehab
Solicitation number
140R2026R0006
Issued by

About this file

This is a Site Security specification section for the Stampede Penstock and Butterfly Valve Rehabilitation project at the Washoe Project in California (Specifications No. 20-C0943). The document outlines security requirements, personnel access protocols, and site entry controls that the contractor must implement and maintain throughout the construction period until work acceptance by the Contracting Officer.

Security requirements are based on Homeland Security Presidential Directive (HSPD) 12 and Reclamation Manual Directives and Standards (SSLE 01-01). All site security costs must be included in prices offered in the Price Schedule for other work items. Contractors must complete required Personnel Identification Verification (PIV) paperwork and fingerprinting at least 30 days before the anticipated start date. The contractor must submit RSN 01 35 50-1 listing all authorized employees with full names, dates of birth, job titles, and estimated access duration, along with all contractor vehicles and equipment specifications. This list must be updated and resubmitted monthly or whenever employees or vehicles are added or deleted. The contractor is responsible for protecting work and existing facilities from unauthorized entry, theft, and vandalism. Entry control requirements include requiring photo identification for all employees entering the site, limiting access to authorized personnel and vehicles, and maintaining a continuous log of workmen and visitors available to the Government upon request. Site access keys are issued to supervisory-level employees only after PIV process completion and favorable adjudication. PIV-ID cards must be collected from authorized personnel upon completion of their site work and surrendered to the Contracting Officer Representative (COR).

View the file

Other files

File Type Posted
Sol_140R2026R0006_Amd_0005.pdf PDF
Amdt_0005-Attch_1-Questions_and_Answers_0005.pdf PDF
Amdt_0005-Section_J-Attch-6-Yaskawa_650_KW_Generator_Drawings_0005.pdf PDF
Attch_3-Section_00_01_10-Table_of_Contents_0004.pdf PDF
Attch_6-Section_01_35_20-Safety_and_Health_0004.pdf PDF
Attch_14-Questions_and_Answers_0004.pdf PDF
Attch_13-New_For_Information_Only_(FIO)_Drawings_0004.pdf PDF
Attch_8-Section_01_57_30-Water_Pollution_Control_0004.pdf PDF
Attch_1_-_Revised_Specifications_0004.pdf PDF
Attch_5-Section_01_33_00-Submittals_0004.pdf PDF
Attch_11-Section_31_03_33-Removal_and_Control_of_Water_0004.pdf PDF
Attch_12-Section_52_00_00-Drawings_0004.pdf PDF
Sol_140R2026R0006_Amd_0004.pdf PDF
Attch_2-Section_00_00_50-Section_B___0004.pdf PDF
Attch_9-Section_01_57_70-Fire_Protection_and_Prevention_0004.pdf PDF
Attch_4-Section_01_14_10-Use_of_Site_0004.pdf PDF
Attch_10-Section_26_05_20-Grounding_and_Bonding_0004.pdf PDF
Att__1_Site_Visit_Attendance_Record_0003.pdf PDF
Sol_140R2026R0006_Amd_0003.pdf PDF
Sol_140R2026R0006_Amd_0002.pdf PDF
C05_04_Solicitation_140R2026R00006_0002.pdf PDF
Non-Disclosure_Agreement_(NDA_-_Stampede_Penstock_and_Butterfly_Valve_Rehab_0001.pdf PDF
Sol_140R2026R0006_Amd_0001.pdf PDF
Section_L_Amendment_0001_0001.pdf PDF
General_Decision_Number_CA20260007_Dated_01232026.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Offeror_Responsibility_Information.pdf PDF
Release_of_Claims.pdf PDF
Sol_140R2026R0006.pdf PDF
Solicitation_140R2026R00006.pdf PDF
Notice_to_Contractors.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Stampede Penstock and Butterfly Valve Rehab

Washoe Project, California Specifications No. 20-C0943

Site Security

01 35 50 - 1

SECTION 01 35 50

SITE SECURITY

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 REQUIREMENTS FOR WORKING

A. Security requirements at Stampede Dam and facility are based on Homeland Security

Presidential Directive (HSPD) 12; and Reclamation Manual Directives and Standards, SSLE 01-01, Personnel Security and Suitability.

B. Personnel Access Requirements:

1. In so far as is practicable, the Contractor shall complete the required PIV paperwork and fingerprinting process at least 30 days before their anticipated start work date so as not to impact scheduled work.

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 35 50-1, List of Authorized Employees, Vehicles and Equipment:

1. Provide list of employees.

a. Include full name, date of birth, purpose or job title, and the estimated duration of access.

2. Provide list of Contractor vehicles and equipment. Include vehicle description, license number and state as applicable, year, make, and model.

3. Update and resubmit RSN 01 35 50-1 monthly, or as employees and/or vehicles are added or deleted.

1.04 DEFINITIONS

A. Critical areas: All areas inside the dam and powerplant.

B. Controlled Access Areas: Contractor use areas outside of the dam and powerplant as shown on the drawings.

Stampede Penstock and Butterfly Valve Rehab

Washoe Project, California Specifications No. 20-C0943

Site Security

01 35 50 - 2

1.05 RESPONSIBILITIES

A. Protect work and existing facilities from unauthorized entry, theft, and vandalism.

Contractor is responsible for security of Contractor’s own property.

B. Maintain security throughout construction period until acceptance of work by the CO.

1.06 ENTRY CONTROL

A. Photo ID required for each employee entering site.

B. Entrance to site will be limited to authorized personnel and vehicles.

C. Maintain a continuous log of workmen and visitors and make available to the

Government on request.

D. A limited number of site access keys shall be issued to supervisory level employees as needed upon the start of onsite work provided the PIV process has been completed and favorably adjudicated.

1.07 PERSONNEL IDENTIFICATION VERIFICATION IDENTIFICATION (PIV-ID)

A. Follow requirements as stipulated in WBR 1452.237-80 Security Requirements Contract

Clause, (c) Contractor Employee Suitability and Issuance of Government Identification

Cards.

B. The Contractor designated individuals shall provide the required PIV paperwork to the

COR.

C. Maintain a list of authorized persons issued a PIV-ID and provide a copy to the COR.

D. Collect PIV-ID card from authorized persons at completion of their work at site and surrender to the COR.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

END OF SECTION