Offeror_Responsibility_Information.pdf

PDF 246 KB Posted

Attached to
Stampede Penstock and Butterfly Valve Rehab
Solicitation number
140R2026R0006
Issued by

About this file

This document is an Offeror Responsibility Information attachment to solicitation 140R2026R0006 from the Department of Interior, serving as a template for contractors to demonstrate their capability to meet FAR Part 9 responsibility standards.

The attachment requires offerors to complete three primary sections. The Existing Commitments section requests detailed information on all ongoing contracts held by the offeror or major subcontractors, including contract number and amount, description and location, performing entity, performance period, and percentage subcontracted. The Equipment and Personnel section requires offerors to identify labor categories and specify the number of employees needed versus available to perform the contract work, with explanations required if availability falls short of need. Similarly, offerors must identify equipment needed and available, with explanations of how any equipment shortages will be addressed. The document emphasizes that all submitted information will be treated as confidential by the Government and serves as supporting documentation for the Contracting Officer's responsibility determination prior to contract award.

View the file

Other files

File Type Posted
Sol_140R2026R0006_Amd_0005.pdf PDF
Amdt_0005-Attch_1-Questions_and_Answers_0005.pdf PDF
Amdt_0005-Section_J-Attch-6-Yaskawa_650_KW_Generator_Drawings_0005.pdf PDF
Attch_3-Section_00_01_10-Table_of_Contents_0004.pdf PDF
Attch_6-Section_01_35_20-Safety_and_Health_0004.pdf PDF
Attch_14-Questions_and_Answers_0004.pdf PDF
Attch_13-New_For_Information_Only_(FIO)_Drawings_0004.pdf PDF
Attch_7-Section_01_35_50-Site_Security_0004.pdf PDF
Attch_8-Section_01_57_30-Water_Pollution_Control_0004.pdf PDF
Attch_1_-_Revised_Specifications_0004.pdf PDF
Attch_5-Section_01_33_00-Submittals_0004.pdf PDF
Attch_11-Section_31_03_33-Removal_and_Control_of_Water_0004.pdf PDF
Attch_12-Section_52_00_00-Drawings_0004.pdf PDF
Sol_140R2026R0006_Amd_0004.pdf PDF
Attch_2-Section_00_00_50-Section_B___0004.pdf PDF
Attch_9-Section_01_57_70-Fire_Protection_and_Prevention_0004.pdf PDF
Attch_4-Section_01_14_10-Use_of_Site_0004.pdf PDF
Attch_10-Section_26_05_20-Grounding_and_Bonding_0004.pdf PDF
Att__1_Site_Visit_Attendance_Record_0003.pdf PDF
Sol_140R2026R0006_Amd_0003.pdf PDF
Sol_140R2026R0006_Amd_0002.pdf PDF
C05_04_Solicitation_140R2026R00006_0002.pdf PDF
Non-Disclosure_Agreement_(NDA_-_Stampede_Penstock_and_Butterfly_Valve_Rehab_0001.pdf PDF
Sol_140R2026R0006_Amd_0001.pdf PDF
Section_L_Amendment_0001_0001.pdf PDF
General_Decision_Number_CA20260007_Dated_01232026.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Release_of_Claims.pdf PDF
Sol_140R2026R0006.pdf PDF
Solicitation_140R2026R00006.pdf PDF
Notice_to_Contractors.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4 Solicitation: 140R2026R0006

OFFEROR RESPONSIBILITY INFORMATION

It is the general policy of the Department of Interior that contracts shall be awarded only to contractors determined to be responsible in accordance with Part 9 of the Federal Acquisition Regulations (FAR).

No contract shall be awarded to any person or firm unless the Contracting Officer shall have in his/her possession or obtain information sufficient to satisfy himself/herself that a prospective contractor currently meets the minimum FAR Part 9 standards.

The offeror must complete schedule, (attached) to provide the offeror’s existing commitments and equipment and personnel. This is part of the information the Government will use in making its responsibility determination.

These documents shall be treated by the Government as confidential.

Attachment J11_Offeror Responsibility Information

EXISTING COMMITMENTS

Provide the information on all on-going contracts, both for the offeror and any major subcontractors. Indicate in the Contract Holder column if the contract is held by the offeror or the name of the subcontractor.

Contract Holder

CONTRACT

NO. & AMT

DESCRIPTION/

LOCATION

FOR WHOM

PERFORMED

Performance Period

Percent Subcontracted

Add additional rows if necessary

EQUIPMENT AND PERSONNEL

Provide a statement below as to the availability of plant/personnel/equipment needed in order to perform the work in accordance with the statement of work.

Labor Category Number of Employees Needed to Perform

Number of Employees Available to Perform

Insert additional rows if necessary. If "Number of Employees Available to Perform" is less than "Number of Employees Needed to Perform," explain below how the shortage will be made up.

Identification of Equipment Needed

Amount of Equipment Needed to Perform

Amount of Equipment Available to Perform

Insert additional rows if necessary. If “Amount of Equipment Available to Perform” is less than “Amount of Equipment Needed to Perform," explain below how the shortage will be made up.