This document is Section 01 57 30 of the specifications for the Stampede Penstock and Butterfly Valve Rehab project on the Washoe Project in California (Specifications No. 20-C0943), addressing water pollution control requirements for the construction contract.
The specification establishes comprehensive water pollution control obligations for the contractor, including preparation and implementation of a Stormwater Pollution Prevention Plan (SWPPP) developed by a Qualified SWPPP Developer (QSD) and implemented by a Qualified SWPPP Practitioner (QSP). The contractor assumes full responsibility for site stormwater management from issuance of the Notice of Intent (NOI), including monitoring sediment and erosion control measures, taking corrective actions, submitting required reports, and filing notice of termination upon final site stabilization. Key regulatory frameworks include Clean Water Act Sections 401, 402, and 404; California's Construction General Permit Order No. 2009-0009-DWQ; 40 CFR Parts 112, 122, 123, 230, and 231; and standards from the Bureau of Reclamation, California Department of Fish and Wildlife, and CALTRANS. The contractor must implement sediment and erosion controls, wastewater and stormwater management, spill prevention measures, and construction site management practices. Specific requirements include establishing stabilized construction entrances, performing street sweeping, using concrete washout areas, implementing turbidity prevention methods, maintaining petroleum product storage tanks at least 100 feet from water sources with appropriate diking and liners, and covering inactive stockpiles. The contractor must perform pre-storm, daily-storm, post-storm, weekly, and quarterly inspections; conduct water quality sampling for pH and turbidity at discharge points; and retain all records for three years. Water pollution control costs are included in prices for other contract items and do not receive separate payment.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Stampede Penstock and Butterfly Valve Rehab
Washoe Project, California Specifications No. 20-C0943
Water Pollution Control
01 57 30 - 1
SECTION 01 57 30
WATER POLLUTION CONTROL
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedule for other items of work.
1.02 PERMIT DEFINITIONS
A. Clean Water Act Section 401: Water Quality Certification:
1. Purpose: Regional requirements to discharge dredged or fill material into waters of the State.
B. Clean Water Act Section 402: National Pollutant Discharge Elimination System:
1. Purpose: Discharge of Storm Water associated with construction that results in disturbance of one acre or more land.
C. Clean Water Act Section 404: Discharge of Dredged or Fill Material into the Waters of the US”:
1. Purpose: Federal requirements to discharge dredged or fill material into waters of the United States (including wetlands).
1.03 REFERENCE STANDARDS
A. Bureau of Reclamation (Reclamation)
1. RSHS Reclamation Safety and Health Standards, including revisions posted at:
www.usbr.gov/safety/rshs/index.html
B. State of California
1. California Department of Fish and Wildlife (CDFW)
a. DFG Code Section 5650 Division 6: Fish, Chapter 2: Pollution
2. California Department of Transportation (CALTRANS).
3. CALTRANS SWPPP/WPCP Preparation Manual, March 2011:
a. Storm Water Quality Handbooks - Storm Water Pollution Prevention Plan (SWPPP) and Water Pollution Control Program (WPCP) Preparation
Manual.
01 57 30 - 2
4. California Stormwater Quality Association (CASQA):
a. CASQA Construction Handbook (2015) Stormwater Best Management
Practice (BMP) Handbooks – Construction Handbook.
2. California State Water Resources Control Board (SWRCB):
a. Construction General Permit – Construction General Permit Order No.
2009-0009-DWQ, as amended by 2010-0014-DWQ and 2012-0006-DWQ
C. Code of Federal Regulations (CFR):
1. 40 CFR, Part 112 Oil Pollution Prevention
2. 33 CFR, Part 323 Permits for Discharges of Dredged or Fill
Material into the Waters of the United States
3. 40 CFR, Part 122 EPA Administered Permit Programs: The National Pollutant Discharge Elimination
System
4. 40 CFR, Part 123 State Program Requirements
5. 40 CFR, Part 230 Section 404(b)(1) Guidelines for Specifications of Disposal Sites for Dredged or Fill Material
6. 40 CFR, Part 231 Section 404(c) Procedures
D. Public Law:
1. Sections 311, 401, 402, and 404 Clean Water Act (Public Law 92-500, as amended)
1.04 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 - Submittals.
B. RSN 01 57 30-1, Stormwater Pollution Prevention Plan (SWPPP):
1. Submit SWPPP with Permit Registration Documents (PRDs), in accordance with Construction General Permit (CGP).
2. SWPPP shall show location for discharging removed water and outline discharged water testing procedures.
3. Upon Reclamations approval of RSN 01 57 30-1:
a. Electronically submit PRDs to Stormwater Multi-Application Report Tracking System (SMARTS) and Legally Responsible Person (LRP), which is Reclamation for this project.
b. Reclamation will sign Contractor prepared Notice of Intent (NOI).
01 57 30 - 3
C. RSN 01 57 30-2, Spill Prevention, Control, and Countermeasure (SPCC) Plan:
1. Submit when SPCC Plan is required in accordance with 40 CFR, Part 112:
a. Generally, an SPCC Plan is required where release of oil and oil products could reasonably be expected to enter into or upon navigable waters of the
United States or adjoining shorelines in quantities that may be harmful (40 CFR, Part 110), and aggregate on site oil storage capacity is over 1,320 gallons. Only containers with capacity of 55 gallons and greater are included in determining on site aggregate storage capacity.
2. Reviewed and certified by a registered professional engineer in accordance with
40 CFR, Part 112, as required by section 311 of the Clean Water Act (Public Law 92-500 as amended).
D. RSN 01 57 30-3, Qualified SWPPP Personnel Resumes:
1. Individual responsible for developing and certifying SWPPP.
2. Individual responsible for implementing SWPPP.
E. RSN 01 57 30-4, Notice of Termination (NOT) Report:
1. Prepare final NOT per requirements of SWRCB CGP.
1.05 QUALIFICATIONS
A. Qualified SWPPP Development (QSD) and Qualified SWPPP Practitioner (QSP) shall have minimum qualifications listed in SWRCB CGP:
1. QSP shall perform field monitoring.
2. QSD shall develop SWPPP.
1.06 REGULATORY REQUIREMENTS
A. Construction Safety Standards:
1. Comply with sanitation and potable water requirements of Section 7 of RSHS.
B. Laws, Regulations, and Permits:
1. Perform construction operations to comply, and ensure subcontractors comply, with:
a. Applicable Federal, State, and local laws, orders, regulations, and Water Quality Standards and Plans concerning control and abatement of water pollution; and terms and conditions of applicable permits issued by permit issuing authority.
b. When conflict occurs between Federal, State, and local laws, regulations, and requirements, the most stringent shall apply.
01 57 30 - 4
C. Contractor Violations:
1. When noncompliance occurs, immediately (verbally) report noncompliance to
COR. Submit specific information within 2-days.
2. Violation of applicable Federal, State, or local laws, orders, regulations, or Water
Quality Standards may result in CO stopping site activity until compliance is ensured.
3. Contractor shall not be entitled to extension of time, claim for damage, or additional compensation by reason of such a work stoppage.
4. Corrective measures required to bring activities into compliance shall be at
Contractor's expense.
1.07 REQUIRED PERMITS
Table 01 57 30A – Permits
Permit information Applicable Section Clean Water Act (Public Law 92-500 as amended)
Section 401 Section 402 N/A
Permit title(s) Water Quality Certification
California Storm Water Construction
General Permit
N/A
Permit obtained by Government Contractor N/A
Permit compliance, sampling, testing, and monitoring
Contractor Contractor N/A
Agency issuing permits
Regional Water
Quality Control Board
SWRCBs N/A
A. Sections 401 and 404, Water Quality Certification and Dredge and Fill Permit:
1. Reclamation has obtained a Section 401: Water Quality Certification.
2. Reclamation has obtained a Section 404 Dredge and Fill Permit.
3. Comply with terms and conditions as stated in the permits. Copies of permits may be obtained from Reclamation’s Lahontan Basin Area Office
705 North Plaza Street, Carson City NV 89701.
B. Section 402, California Storm Water Construction General Permit:
1. General:
a. Contractor shall be prepared to assume full responsibility of the site’s storm water management from issuance of NOI including but not limited to; monitoring sediment and erosion control measures, taking corrective actions if a violation occurs, submitting reports, and filing notice of termination when final site stabilization has been achieved.
01 57 30 - 5
2. Contact:
a. Contact SWRCB for administrative type questions, such as; using
SMARTS and obtaining NOI:
1) Email: stormwater@waterboards.ca.gov
3. Permit Registration Documents (PRDs:
a. Register in SMARTS as data submitter and prepare and submit all PRDs in SMARTS as required by CGP.
b. Notice of Intent (NOI): Prepare NOI and coordinate with Reclamation to have NOI electronically signed by LRP in SMARTS. Submit NOI and all PRDs to SWRCB through SMARTS.
c. Risk Assessment (Standard or Site Specific): Prepare Risk Assessment supporting all construction activities required by this contract. Provide all supporting documents and calculations for Risk Level determination.
d. Site Map: Prepare site map to include as minimum all items listed in Attachment B of CGP.
e. Storm Water Pollution Prevention Plan (SWPPP):
1) SWPPP shall be developed by Qualified SWPPP Developer (QSP) and implemented by Qualified SWPPP Practitioner as required by
CGP.
2) Prepare site specific SWPPP as required by CGP.
4. Permit Fees:
a. Hand deliver or mail all fees associated with CGP to SWRCB including but not limited to NOI fees, annual fees and penalties over term of this contract.
5. Electronic Submission of Required Reports:
a. Contractor shall register in SMARTS and user name shall be provided to Reclamation so LRP can data Contractor as data submitter.
b. Contractor shall be responsible for completing and electronically submitting all required reports on SMARTS. Reclamation’s LRP will certify reports upon review. Refer to CGP requirements for required monitoring.
6. Terms and Conditions:
a. Comply with terms and conditions as stated in the permit.
7. Monitoring and Inspection:
a. Contractor shall describe in SWPPP and implement Construction Site Monitoring Program (CSMP) as required by CGP and requirements on project’s assessed Risk Level. CSMP shall include at minimum:
1) Monitoring and inspection procedures and instructions, location maps, forms and checklists.
01 57 30 - 6
b. Inspections: As required by CGP. Contractor shall perform the following inspections including but not limited to:
1) Pre-Storm Inspections: Performed 48-hours prior to each qualifying event.
2) Daily-Storm Inspections: Perform at least one inspection during each 24-hour period of an extended storm event.
3) Post-Storm Inspections: Per 48-hours after each qualifying storm event.
4) Weekly Inspections: Perform weekly.
5) Quarterly Inspections: Perform in each of the following time periods:
a) January to March.
b) April to June.
c) July to September.
d) October to December.
6) Rain Event Action Plan (REAP): Developed 48-hours prior to likely precipitation event.
c. All inspection reports must always be kept onsite and made available for Government review upon request.
d. Water Quality Sampling and Analysis: Collect and analyze for pH and turbidity at all discharge points and at least 3 samples per qualifying event:
1) All monitoring instruments should be calibrated and maintained in accordance with manufacturer’s specifications to ensure accurate measurements.
e. Disturbed areas shall either be regraded and revegetated prior to flood season or BMPs will be installed and maintained during flood season pending final restoration efforts.
8. Retention of Records:
a. As a requirement of CGP Contractor shall retain records of all inspection forms, monitoring information, copies of all reports required by the permit, and records of all data used to complete NOI for all construction activities covered by the permit for a period of at least 3-years from date generated.
PART 2 PRODUCTS
2.01 EROSION CONTROL
A. Conform to CASQA Construction Handbook.
01 57 30 - 7
B. Waddles, if used: Certified weed free straw.
C. Erosion and sedimentation control fabrics: Woven non-filament-jointed.
PART 3 EXECUTION
3.01 POLLUTION CONTROLS
A. Control pollutants by use of sediment and erosion controls, wastewater and stormwater management controls, construction site management practices, and other controls including State and local control requirements.
B. Sediment and Erosion Controls:
1. Refer to CGP for required minimum BMPs.
2. Establish methods for controlling sediment and erosion which address vegetative practices, structural control, silt fences, straw dikes, sediment controls, and operator controls as appropriate.
3. Institute stormwater management measures as required, including velocity dissipaters, and solid waste controls which address controls for building materials and offsite tracking of sediment.
4. Establish stabilized construction entrances and exits to sufficiently control sediment discharge from site.
5. Perform street sweeping at entrances and exits to prevent track out of sediment as needed.
6. Use concrete washout areas to ensure no discharge to underlying soil and surrounding areas.
C. Wastewater and Stormwater Management Controls:
1. Pollution Prevention Measures:
a. Use methods of dewatering, unwatering, excavating, or stockpiling earth and rock materials which include prevention measures to control silting and erosion, and which will intercept and settle any runoff of sediment-ladened waters.
b. Prevent wastewater from general construction activities such as drainwater collection, aggregate processing, concrete batching, and drilling, grouting, or other construction operations, from entering flowing or dry watercourses without the use of approved turbidity control methods.
c. Divert stormwater runoff from upslope areas away from disturbed areas.
2. Turbidity Prevention Measures:
a. Use methods for prevention of excess turbidity which include, but are not restricted to, intercepting ditches, settling ponds, gravel filter entrapment dikes, flocculating processes, recirculation, combinations thereof, or other approved methods that are not harmful to aquatic life.
01 57 30 - 8
b. Wastewaters discharged into surface waters shall meet conditions of the Section 401 and Section 402.
c. Do not operate mechanized equipment in waterbodies that have not been cleared by Section 404 permit and then only as necessary to perform required construction.
D. SPCC Plan and Requirements:
1. Pursuant to Section 311 of Clean Water Act, Contractor shall prepare SPCC whenever locations of construction site are such that oil from an accidental spillage could reasonably be expected to enter into or upon navigable waters of the United States or adjoining shorelines and aggregate storage of oil at site is over 1,320-gallons or a single container has capacity in excess of 660-gallons.
2. SPCC shall be reviewed and certified by a registered professional engineer.
3. Prevent contamination of streamside soil and watercourse from cement; concrete or concrete washing, asphalt, paint or other coating materials, oil or other petroleum products and hazardous materials.
4. Clean up spills and notify COR immediately of any spill and cleanup procedures.
5. Provide staging and storage areas outside stream zone for equipment, construction materials, fuels, lubricants, solvents, and any other possible contaminates.
6. Perform refueling and vehicle maintenance at least 100-feet from potential receiving waters.
7. Inspect equipment to ensure seals prevent any fuel, engine oil or other fluids from leaking.
8. Soils contaminated with fuels or chemicals shall be disposed of in suitable location to prevent discharge to surface waters and in accordance with rules and regulations of U.S. Department of Transportation, U.S. Environmental Protection Agency, and California Environmental Protection Agency.
9. Cement and concrete delivery and transfer equipment shall be washed in contained areas protected from direct runoff until material sets to prevent contamination of streamside soil and watercourses.
E. Construction Site Management:
1. Contractor Construction Operations:
a. All elements of SWPPP shall be implemented by QSP.
b. Perform construction activities by methods that will prevent entrance, or accidental spillage, of solid matter, contaminants, debris, or other pollutants or wastes into streams, flowing or dry watercourses, lakes, wetlands, reservoirs, or underground water sources:
1) Pollutants and wastes include, but are not restricted to: sediment, refuse, garbage, cement, sanitary waste, industrial waste, hazardous materials, radioactive substances, oil and other
01 57 30 - 9 petroleum products, aggregate processing tailings, mineral salts, and thermal pollution.
2. Stockpiled or Deposited Materials:
a. Stockpile or deposit excavated materials or other construction materials in designated areas. Do not stockpile or deposit excavated materials or other construction materials, near or on, stream banks, lake shorelines, or other watercourse perimeters where they can be washed away by high water or storm runoff or can in any way encroach upon the watercourse.
b. Cover inactive stockpiles with plastic. Inactive is defined as not scheduled to be re-disturbed for 14-days or more.
c. Install straw waddles around all stockpiles.
3. Petroleum Product Storage Tanks Management:
a. Place oil or other petroleum product storage tanks at least 100-feet from streams, flowing or dry watercourses, lakes, wetlands, reservoirs, and any other water source.
b. Do not use underground storage tanks.
c. Construct storage area dikes at least 12-inches high or graded and sloped to permit safe containment of leaks and spills equal to storage tank capacity located in the area plus sufficient freeboard to contain the 25-year rainstorm:
1) Line diked areas with an impermeable barrier at least 50 mils thick.
d. Areas for refueling operations: Lined with impermeable barrier at least
10 mils thick covered with 2- to 4-inches of soil.
END OF SECTION