This solicitation seeks design and construction services to upgrade the cooling towers at the National Institute of Standards and Technology Building 42 Central Utility Plant in Boulder, Colorado. The Department of Commerce National Institute of Standards and Technology is procuring these services and seeks a contractor to provide all labor, materials, and equipment to replace four existing cooling towers with larger capacity towers, install a new free cooling system, and perform associated upgrades. Evaluation criteria include experience with similar projects, technical approach, past performance, and price. Proposals are due February 5, 2021 and the period of performance is 365 calendar days from notice to proceed.

This requirement has an 8(a) small business set-aside designation. The primary NAICS code is 238220 - Plumbing, Heating, and Air-Conditioning Contractors and the dominant PSC code is W-F-S-W. Work is to be performed at the National Institute of Standards and Technology campus located in Boulder, Colorado and involves removing four existing cooling towers with a combined capacity of 4,000 tons and replacing them with new towers providing 6,000 total tons of cooling.

Notice text

The contractor shall provide all labor, materials and equipment for the design and renovation of Building 42 Cooling Towers, in accordance with solicitation 1333ND21RNB190002, the Statement of Work and other attached documents.  This requirement was initially synopsized under 1333ND20RNB190037.

Files

File Type Posted
Attach 27 chilled water enhancements- amend 003.pdf PDF
Attach 11 Cooling Tower Requirements Amend 0003.pdf PDF
Attach 30 CUP Elec One-Lines Amend 003.pdf PDF
Attach 9 Chiller Plant Commissioning Requirements amend 0003.pdf PDF
Attach 31 Variable Frequency Drive Requirements Amend 0003.pdf PDF
Attach 8 Demonstration and Training-Amend 0003.pdf PDF
Attach 1 SOW Amend 3 1.15.21_ (002).pdf PDF
1333ND21RNB190002 0003.pdf PDF
Attach 28 COOLING TOWER FOUNDATION AND SUMP LAYOUT Amend 003.pdf PDF
Attach 10 Direct Digital Control (DDC) System for HVAC-amend 0003.pdf PDF
Attach 29 CUP Control Modifications Amend 003.pdf PDF
Attach 3 Project Summary-Amend 0003.pdf PDF
Attach 26 NIST CUP PHASE 3 CONSTRUCTION DRAWING PDFS.zip ZIP file
Attach 1 SOW 11DEC2020 FINAL.docx DOCX document
1333ND21RNB190002 0002.pdf PDF
Attach 25 NIST CUP PHASE 2 CONSTRUCTION DRAWING PDFS.zip ZIP file
Attach 24 NIST CUP PHASE 1 CONSTRUCTION DRAWING PDFs.zip ZIP file
1333ND21RNB190002 0001.pdf PDF
Attach 11 cooling tower REV 2.pdf PDF
Attach 9 chiller plant commisioning.pdf PDF
Attach 5 Quality Requirements R5-2020-10-2.pdf PDF
Attach 2 General Instructions for Conducting Work at NIST Boulder 19NOV19 Rev C.pdf PDF
Attach 17 PHASE 2 CHILLER SUBMITTAL.pdf PDF
Attach 16 cond water schematic.pdf PDF
Attach 20 existing cooling tower support evaluation.pdf PDF
Attach 13 PRELIMINARY COOLING TOWER LAYOUT.pdf PDF
Attach 6 Operation and Maintenance Data.pdf PDF
Attach 4 PROJECT DESIGN AND CONSTRUCTION SUBMITTAL PROCEDURES_Rev 1_28AUG20.pdf PDF
Attach 3 Project Summary REV2-2020-09-10.pdf PDF
Attach 15 chilled water schematic .pdf PDF
Attach D_KeyPersonnelStatement.pdf PDF
Attach C_ResumeFormKeyPersonnel.pdf PDF
Attach 21 PHASE 2 COOLING TOWER SUBMITTAL.pdf PDF
1333ND21RNB190002.pdf PDF
Attach A Cons and Design Exp Proj-Data-Sheet.pdf PDF
Attach 22 PUMP PACKAGE WITH HX SUBMITTAL.pdf PDF
Attach 14 SITE UTILITY DISTRIBUTION SYSTEM NIST PHASE 2.pdf PDF
Attach 18 SITE UTILITY DISTRIBUTION SYSTEM ENHANCED CHILLER CAPACITY.pdf PDF
Attach 12 Identification for Electrical Systems.pdf PDF
Attach 10 Direct Digital Control (DDC) System for HVAC.pdf PDF
Attach 8 Demonstration and Training.pdf PDF
Attach 7 Project Record Documents.pdf PDF
Attach 19 SITE UTILITY DISTRIBUTION SYSTEM ENHANCED CHILLER CAPACITY-ELECTRICAL.pdf PDF
Attach 1 SOW 22OCT2020.pdf PDF
Attach 23 PUMP PACKAGE FACTORY TEST.pdf PDF
Attach B_NIST AMD Boulder PPQ Form.pdf PDF
Show all 46

Notice history

Notice Type Posted
NIST Building 42 Central Utility Plant - Cooling Tower Upgrade Award Award Notice
This notice Latest solicitation Solicitation
NIST Building 42 Central Utility Plant - Cooling Tower Upgrade Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Cooling Tower Refurbishment - Three (3) Cells Winterhaven, California 92283, United States · NAICS 238220 Indian Health Service Indian Small Business Economic Enterprise
Cooling Tower, Roofing, and Structural Construction District of Columbia 20024, United States · NAICS 236220 Bureau of Engraving and Printing Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors