This document contains engineering drawings and specifications for upgrades to the cooling tower and associated electrical systems at the National Institute of Standards and Technology Building 42 Central Utility Plant. The contractor shall provide all labor, materials and equipment to renovate the cooling towers and upgrade the electrical distribution panels and transformers in accordance with solicitation 1333ND21RNB190002. Work includes replacing the existing cooling towers, upgrading the 480V MCC and associated motor controls, installing new 15kVA transformers, and modifying the 208V/120V distribution panels to support the upgraded systems. The solicitation was initially posted as 1333ND20RNB190037 and seeks to improve the reliability and efficiency of the cooling infrastructure supporting Building 42 at the Department of Commerce NIST campus.

View the file

Other files

File Type Posted
Attach 29 CUP Control Modifications Amend 003.pdf PDF
1333ND21RNB190002 0003.pdf PDF
Attach 31 Variable Frequency Drive Requirements Amend 0003.pdf PDF
Attach 3 Project Summary-Amend 0003.pdf PDF
Attach 27 chilled water enhancements- amend 003.pdf PDF
Attach 1 SOW Amend 3 1.15.21_ (002).pdf PDF
Attach 9 Chiller Plant Commissioning Requirements amend 0003.pdf PDF
Attach 8 Demonstration and Training-Amend 0003.pdf PDF
Attach 11 Cooling Tower Requirements Amend 0003.pdf PDF
Attach 28 COOLING TOWER FOUNDATION AND SUMP LAYOUT Amend 003.pdf PDF
Attach 10 Direct Digital Control (DDC) System for HVAC-amend 0003.pdf PDF
Attach 25 NIST CUP PHASE 2 CONSTRUCTION DRAWING PDFS.zip ZIP file
Attach 24 NIST CUP PHASE 1 CONSTRUCTION DRAWING PDFs.zip ZIP file
1333ND21RNB190002 0002.pdf PDF
Attach 26 NIST CUP PHASE 3 CONSTRUCTION DRAWING PDFS.zip ZIP file
Attach 1 SOW 11DEC2020 FINAL.docx DOCX document
1333ND21RNB190002 0001.pdf PDF
Attach 4 PROJECT DESIGN AND CONSTRUCTION SUBMITTAL PROCEDURES_Rev 1_28AUG20.pdf PDF
Attach 5 Quality Requirements R5-2020-10-2.pdf PDF
Attach 20 existing cooling tower support evaluation.pdf PDF
Attach 18 SITE UTILITY DISTRIBUTION SYSTEM ENHANCED CHILLER CAPACITY.pdf PDF
Attach 9 chiller plant commisioning.pdf PDF
Attach 14 SITE UTILITY DISTRIBUTION SYSTEM NIST PHASE 2.pdf PDF
Attach 3 Project Summary REV2-2020-09-10.pdf PDF
Attach 13 PRELIMINARY COOLING TOWER LAYOUT.pdf PDF
Attach 1 SOW 22OCT2020.pdf PDF
Attach A Cons and Design Exp Proj-Data-Sheet.pdf PDF
Attach 23 PUMP PACKAGE FACTORY TEST.pdf PDF
Attach 8 Demonstration and Training.pdf PDF
Attach B_NIST AMD Boulder PPQ Form.pdf PDF
Attach 17 PHASE 2 CHILLER SUBMITTAL.pdf PDF
Attach 2 General Instructions for Conducting Work at NIST Boulder 19NOV19 Rev C.pdf PDF
Attach 12 Identification for Electrical Systems.pdf PDF
Attach 7 Project Record Documents.pdf PDF
Attach 19 SITE UTILITY DISTRIBUTION SYSTEM ENHANCED CHILLER CAPACITY-ELECTRICAL.pdf PDF
Attach 15 chilled water schematic .pdf PDF
Attach 11 cooling tower REV 2.pdf PDF
Attach 16 cond water schematic.pdf PDF
Attach 6 Operation and Maintenance Data.pdf PDF
Attach 22 PUMP PACKAGE WITH HX SUBMITTAL.pdf PDF
Attach 10 Direct Digital Control (DDC) System for HVAC.pdf PDF
1333ND21RNB190002.pdf PDF
Attach 21 PHASE 2 COOLING TOWER SUBMITTAL.pdf PDF
Attach C_ResumeFormKeyPersonnel.pdf PDF
Attach D_KeyPersonnelStatement.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PANELBOARD NO: LC4

SECTION: ONE VOLTAGE: 120/208

MOUNTING: MCC C4, POSITION 4B PHASE: 3 MAIN BREAKER 50A

LINE TO LINE VOLTAGE: 208 WIRE: 4

TYPE: LIGHTING AND APPLIANCE

TRANSFORMER KVA: 15

LOAD CIRCUIT CIRCUIT LOAD

CKT DESCRIPTION (VA) BREAKER BREAKER (VA) DESCRIPTION CKT

NO. LTS REC M/A MISC AMPS POLES AMPS POLES LTS REC M/A MISC NO

1 Chilled Wtr Ctrl Valve, FV-024 50 20 1 A 20 1 50 Filter Drain Valve FLT-049 2

3 Condenser Wtr Ctrl Valve, FV-024A 50 20 1 B 20 1 50 Filter Drain Valve FLT-050 4

5 Cooling Fan 1, CUP-4 XFMR 75 20 2 C 1 Space 6

7 75 X A 1 Space 8

9 Cooling Fan 2, CUP-4 XFMR 75 20 2 B 1 Space 10

11 75 X C 1 Space 12

13 Spare 20 1 A 1 Space 14

15 Spare 20 1 B 1 Space 16

17 Spare 20 1 C 1 Space 18

MOTOR CONTROL CENTER SCHEDULE

NAME MCC C4 LOCATION

TYPE FUSE VOLTS 480 SHORT CIRCUIT: 65 kA

CURRENT 800 A PHASE 3

MAIN MLO WIRE 3

CKT NAME PLATE HP FLA STARTER CONTROLS O/C PROTECTION CONDUCTORS CONDUIT NOTES

NO SIZE PB HOA PL AMPS POLES PHASE NEUT GRD (mm)

1A INCOMING LINE

1B HOIST 5 7.6 20 3 #12 NONE #12 21

1C PMP-014 (VFD-014) 125 156 250 3 3 #3/0 NONE #4 53

2A CT-044A (VFD-044A) 50 65 100 3 3 #2 NONE #8 41

2B CT-044B (VFD-044B) 50 65 100 3 3 #2 NONE #8 41

2C PMP-033 (VFD-033) 250 300 375 3 3 #500 NONE # 3 91

3A SF-113 (AHU-113) 5 7.6 1 X X 20 3 3 #12 NONE #12 21

3B SPACE

4A SPACE

4B DISTRIBUTION PANEL 208Y/120, 3PH, 4W

DPL-C4 50A MCB, 100A, 18C

4C TRANSFORMER 4807/277:208Y/120

XFR-C4 15 kVA

CHILLER ROOM

CUP Chiller 4 MCC
CUP Elec One-Lines 2013-9-18