NIST Building 42 Central Utility Plant - Cooling Tower Upgrade
Solicitation number
1333ND21RNB190002
Issued by

About this file

This attachment provides a resume form template for key personnel proposed for the NIST Building 42 Central Utility Plant - Cooling Tower Upgrade project. The form requests information on the individual's name, proposed key position, authority regarding position responsibilities, current and previous work experience including descriptions of responsibilities and dates of employment, educational background, professional registrations if any, pertinent training courses completed including organization and dates, and relevant projects completed including contract details, scope of work, position and responsibilities. Offerors must expand the form as needed and include a letter of commitment if the individual is not a current employee. The related federal contract opportunity is solicitation number 1333ND21RNB190002 for renovating the Building 42 Cooling Towers in accordance with the statement of work and attached documents. The requirement was initially synopsized under 1333ND20RNB190037. The agency is the Department of Commerce National Institute of Standards and Technology.

View the file

Other files

File Type Posted
Attach 30 CUP Elec One-Lines Amend 003.pdf PDF
Attach 29 CUP Control Modifications Amend 003.pdf PDF
1333ND21RNB190002 0003.pdf PDF
Attach 31 Variable Frequency Drive Requirements Amend 0003.pdf PDF
Attach 3 Project Summary-Amend 0003.pdf PDF
Attach 27 chilled water enhancements- amend 003.pdf PDF
Attach 1 SOW Amend 3 1.15.21_ (002).pdf PDF
Attach 9 Chiller Plant Commissioning Requirements amend 0003.pdf PDF
Attach 8 Demonstration and Training-Amend 0003.pdf PDF
Attach 11 Cooling Tower Requirements Amend 0003.pdf PDF
Attach 28 COOLING TOWER FOUNDATION AND SUMP LAYOUT Amend 003.pdf PDF
Attach 10 Direct Digital Control (DDC) System for HVAC-amend 0003.pdf PDF
Attach 25 NIST CUP PHASE 2 CONSTRUCTION DRAWING PDFS.zip ZIP file
Attach 24 NIST CUP PHASE 1 CONSTRUCTION DRAWING PDFs.zip ZIP file
1333ND21RNB190002 0002.pdf PDF
Attach 26 NIST CUP PHASE 3 CONSTRUCTION DRAWING PDFS.zip ZIP file
Attach 1 SOW 11DEC2020 FINAL.docx DOCX document
1333ND21RNB190002 0001.pdf PDF
Attach 4 PROJECT DESIGN AND CONSTRUCTION SUBMITTAL PROCEDURES_Rev 1_28AUG20.pdf PDF
Attach 5 Quality Requirements R5-2020-10-2.pdf PDF
Attach 20 existing cooling tower support evaluation.pdf PDF
Attach 18 SITE UTILITY DISTRIBUTION SYSTEM ENHANCED CHILLER CAPACITY.pdf PDF
Attach 9 chiller plant commisioning.pdf PDF
Attach 14 SITE UTILITY DISTRIBUTION SYSTEM NIST PHASE 2.pdf PDF
Attach 3 Project Summary REV2-2020-09-10.pdf PDF
Attach 13 PRELIMINARY COOLING TOWER LAYOUT.pdf PDF
Attach 1 SOW 22OCT2020.pdf PDF
Attach A Cons and Design Exp Proj-Data-Sheet.pdf PDF
Attach 23 PUMP PACKAGE FACTORY TEST.pdf PDF
Attach 8 Demonstration and Training.pdf PDF
Attach B_NIST AMD Boulder PPQ Form.pdf PDF
Attach 17 PHASE 2 CHILLER SUBMITTAL.pdf PDF
Attach 2 General Instructions for Conducting Work at NIST Boulder 19NOV19 Rev C.pdf PDF
Attach 12 Identification for Electrical Systems.pdf PDF
Attach 7 Project Record Documents.pdf PDF
Attach 19 SITE UTILITY DISTRIBUTION SYSTEM ENHANCED CHILLER CAPACITY-ELECTRICAL.pdf PDF
Attach 15 chilled water schematic .pdf PDF
Attach 11 cooling tower REV 2.pdf PDF
Attach 16 cond water schematic.pdf PDF
Attach 6 Operation and Maintenance Data.pdf PDF
Attach 22 PUMP PACKAGE WITH HX SUBMITTAL.pdf PDF
Attach 10 Direct Digital Control (DDC) System for HVAC.pdf PDF
1333ND21RNB190002.pdf PDF
Attach 21 PHASE 2 COOLING TOWER SUBMITTAL.pdf PDF
Attach D_KeyPersonnelStatement.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP ATTACHMENT (C)

RESUME FORM FOR KEY PERSONNEL

Provide the following sheet for each proposed individual for each Key Personnel position to demonstrate the individual’s education, professional registrations, certifications, and work experience.

Name:

Proposed Key Position assigned for this project:

Individual’s authority in regards to fulfilling the responsibilities of the Key Position.

Current Position Held: Name of Firm, Dates of Employment, description of responsibilities of position held.

Previous Positions: Number of Years with other firms; Positions held, responsibilities of the positions and dates of employment:

Educational Background: (Year, Degree and Specialization)

Professional Registration (if any):

Year and discipline:

Pertinent Training Courses Completed: (Name of training, training organization, and dates of training.

Provide a list of projects completed by the individual as related to the key personnel position. Provide the contract no., title, contract amount, scope and type of work of work, and the position and responsibility the individual held when appropriate. Describe significant accomplishments of the individual in regards to the project/position.

Note 1: This sheet can be expanded as necessary.

Note 2: If the individual is not a current employee, the offeror shall include an attachment of a letter of commitment to the prime contractor or subcontractor (as appropriate) for the project.

File details come from the government source that posted it. Updated .