This document contains quality requirements for a federal construction contract to upgrade the cooling towers at the National Institute of Standards and Technology Building 42 Central Utility Plant. The contractor must provide all labor, materials and equipment for the design and renovation of the cooling towers. The quality requirements specify that the contractor must submit a quality control plan identifying quality assurance and control personnel and procedures, including submittal review processes, testing and inspection schedules, continuous workmanship inspections, and documentation of corrective actions. The plan must be reviewed and approved by the Contracting Officer's Representative. The contract also includes delegated design requirements specifying qualifications for professional engineers performing engineering services, requirements for seals and signatures on drawings, and certification that all drawings and calculations have been properly sealed.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NIST BOULDER B42 - Cooling Tower Capacity Upgrade
1333ND21RNB190002 1
QUALITY REQUIREMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for quality assurance and quality control.
1.2 DEFINITIONS
A. Experienced: When used with an entity or individual, "experienced" unless otherwise further described means having successfully completed a minimum of five previous projects similar in nature, size, and extent to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction.
B. CONTRACTOR'S QUALITY-CONTROL PLAN
1. Quality-Control Plan, General: Submit quality-control plan.
2. Identify personnel, procedures, controls, instructions, tests, records, and forms to be used to carry out Contractor's quality-assurance and quality-control responsibilities.
3. Quality-Control Personnel resume and qualifications appropriate to project: Engage qualified personnel trained and experienced in managing and executing quality-assurance and quality-control procedures similar in nature and extent to those required for Project.
4. Submittal Procedure: Describe procedures for ensuring compliance with requirements through review and management of submittal process. Indicate qualifications of personnel responsible for submittal review.
5. Testing and Inspection: In quality-control plan, include a comprehensive schedule of Work requiring testing or inspection, including the following:
a. Contractor-performed tests and inspections including Subcontractor-performed tests and inspections. Include required tests and inspections and Contractor-elected tests and inspections. Distinguish source quality-control tests and inspections from field quality-control tests and inspections.
6. Continuous Inspection of Workmanship: Describe process for continuous inspection during construction to identify and correct deficiencies in workmanship in addition to testing and inspection specified. Indicate types of corrective actions to be required to bring work into compliance with standards of workmanship established by Contract requirements.
7. Monitoring and Documentation: Maintain testing and inspection reports including log of approved and rejected results. Include work COR has indicated as nonconforming or defective. Indicate corrective actions taken to bring nonconforming work into compliance with requirements. Comply with requirements of authorities having jurisdiction.
NIST BOULDER B42 - Cooling Tower Capacity Upgrade
1333ND21RNB190002 2
1.3 DELEGATED-DESIGN SERVICES
A. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. Engineering services are defined as those performed for installations of the system, assembly, or product that are similar in material, design, and extent to those indicated for this Project.
B. Each Contract Drawing shall bear the seal and signature of the registered professional architect or engineer responsible for its design. The seal and signature shall be affixed for the final Construction Documents.
C. Before the final contract documents are issued, the DB contractor is required to provide a signed certification that all drawings and calculations have been properly signed and sealed by the appropriate individual for each discipline, in accordance with the rules and regulations of the local State licensing authority. This certification shall be forwarded to the COR upon the completion of the Contract Documents.
D. Delegated-Design Services Submittal: Shop Drawings, Product Data, and other required submittals, shall be reviewed by the responsible design professional, for each product and system specifically assigned to Contractor to be designed or certified by a design professional, indicating that the products and systems are in compliance with performance and design criteria indicated. Include list of codes, loads, and other factors used in performing these services.
END OF SECTION
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section includes administrative and procedural requirements for quality assurance and quality control. |
| 1.2 DEFINITIONS |
| A. Experienced: When used with an entity or individual, "experienced" unless otherwise further described means having successfully completed a minimum of five previous projects similar in nature, size, and extent to this Project; being familiar with s... |
| B. CONTRACTOR'S QUALITY-CONTROL PLAN |
| 1. Quality-Control Plan, General: Submit quality-control plan. |
| 2. Identify personnel, procedures, controls, instructions, tests, records, and forms to be used to carry out Contractor's quality-assurance and quality-control responsibilities. |
| 3. Quality-Control Personnel resume and qualifications appropriate to project: Engage qualified personnel trained and experienced in managing and executing quality-assurance and quality-control procedures similar in nature and extent to those required... |
| 4. Submittal Procedure: Describe procedures for ensuring compliance with requirements through review and management of submittal process. Indicate qualifications of personnel responsible for submittal review. |
| 5. Testing and Inspection: In quality-control plan, include a comprehensive schedule of Work requiring testing or inspection, including the following: |
| a. Contractor-performed tests and inspections including Subcontractor-performed tests and inspections. Include required tests and inspections and Contractor-elected tests and inspections. Distinguish source quality-control tests and inspections from f... |
| 6. Continuous Inspection of Workmanship: Describe process for continuous inspection during construction to identify and correct deficiencies in workmanship in addition to testing and inspection specified. Indicate types of corrective actions to be req... |
| 7. Monitoring and Documentation: Maintain testing and inspection reports including log of approved and rejected results. Include work COR has indicated as nonconforming or defective. Indicate corrective actions taken to bring nonconforming work into c... |
| 1.3 DELEGATED-DESIGN SERVICES |
| A. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. Engineering services are def... |
| B. Each Contract Drawing shall bear the seal and signature of the registered professional architect or engineer responsible for its design. The seal and signature shall be affixed for the final Construction Documents. |
| C. Before the final contract documents are issued, the DB contractor is required to provide a signed certification that all drawings and calculations have been properly signed and sealed by the appropriate individual for each discipline, in accordanc... |
| D. Delegated-Design Services Submittal: Shop Drawings, Product Data, and other required submittals, shall be reviewed by the responsible design professional, for each product and system specifically assigned to Contractor to be designed or certified b... |
File details come from the government source that posted it. Updated .