DLA Aviation Operations Center, Phase II, Defense Supply Center Richmond (DSCR) (Amendments: 1, 2, 3, 5, 6, and 7)

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W91235620R2005
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Richmond Va Usa

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks design-build construction services for Phase II of the Defense Logistics Agency Aviation Operations Center located at the Defense Supply Center Richmond site in Virginia. The Department of the Army Corps of Engineers Norfolk District is procuring these services. Key requirements include demolishing an existing warehouse and constructing a new 281,075 square foot office building to accommodate 1,622 employees. Proposals will be evaluated using best value tradeoff criteria including past performance, technical approach, small business participation plan, and price. Proposals are due no later than July 10, 2020 through the DoD SAFE system.

There is no set-aside designated. The main NAICS code is 236220 with a PSC code of V499. The incumbent is the Department of the Army Corps of Engineers Engineering District Norfolk. The estimated value is $89 million and the period of performance is 1,020 calendar days from notice to proceed. The place of performance will be at the Defense Supply Center Richmond facility in Virginia.

Notice text

9 versions

Update #9 · Latest ·

Please read the following carefully before proceeding:

Amendment 7 (SF30 - 0007) is now available

Amendment 6 (SF30 - 0006) is available; please note that the attachments (dated 20 July) are for Amendment 6, although several attachment  decscriptions contain language 'Amend 4' within the title.

Amendment 5 (SF30 - 0005) was not previously posted, but is now available. see attachments

 Amendment 4 does not exist. 

Amendment 3 (SF30 - 0004) is available at the following link: https://beta.sam.gov/opp/7249882650224beaacf2f43347aac93d/view?keywords=%22DLA%20Aviation%20Operations%20Center,%20Phase%20II,%20Defense%20Supply%20Center%20Richmond%20(DSCR)%20(Amendments:%22&sort=-relevance&index=&is_active=true&page=1

Amendment 2 (SF30 - 0002) is available. see attachments

Amendment 1 (SF30 - 0001) is available. see attachments

The DLA Aviation Operations Center Phase II project requirements will construct a multi-story office building of 281,075 SF to accommodate 1,622 employees in an administrative operations center. The Operations Center includes: open and individual administrative office and support areas (mail distribution, packing, shipping, reception space, reproduction area, unclassified conference and Video Tele-Conference (VTC) space, law library, kitchenette/break, restrooms, storage, equipment and supply rooms, passenger and service elevators, lightning protection, fire suppression, fire alarm, mass notification systems, Intrusion Detection System (IDS) and energy management control system (EMCS), and building information systems.

The project will utilize conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), DLA, and Defense Supply Center, Richmond design standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01. The project also includes emergency generators, site improvements, special foundations, parking and all necessary supporting facilities.

Update #8 ·

Please read the following carefully before proceeding:

Amendment 6 (SF30 - 0006) is available; please note that the attachments (dated 20 July) are for Amendment 6, although the several attachment  decscriptions contain language 'Amend 4' within the title.

Amendment 5 (SF30 - 0005) was not previously posted, but is now available. see attachments

 Amendment 4 does not exist. 

Amendment 3 (SF30 - 0004) is available at the following link: https://beta.sam.gov/opp/7249882650224beaacf2f43347aac93d/view?keywords=%22DLA%20Aviation%20Operations%20Center,%20Phase%20II,%20Defense%20Supply%20Center%20Richmond%20(DSCR)%20(Amendments:%22&sort=-relevance&index=&is_active=true&page=1. 

Amendment 2 (SF30 - 0002)is available. see attachments

Amendment 1 (SF30 - 0001) is available. see attachments

The DLA Aviation Operations Center Phase II project requirements will construct a multi-story office building of 281,075 SF to accommodate 1,622 employees in an administrative operations center. The Operations Center includes: open and individual administrative office and support areas (mail distribution, packing, shipping, reception space, reproduction area, unclassified conference and Video Tele-Conference (VTC) space, law library, kitchenette/break, restrooms, storage, equipment and supply rooms, passenger and service elevators, lightning protection, fire suppression, fire alarm, mass notification systems, Intrusion Detection System (IDS) and energy management control system (EMCS), and building information systems.

The project will utilize conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), DLA, and Defense Supply Center, Richmond design standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01. The project also includes emergency generators, site improvements, special foundations, parking and all necessary supporting facilities.

Update #7 ·

Please read the following carefully before proceeding:

Amendment 6 (SF30 - 0006) is available; please note that the attachments (dated 20 July) are for Attachment 6, although the several attachment  decscriptions contain language 'Amend 4' within the title.

Amendment 5 (SF30 - 0005) was not previously posted, but is now available. see attachments

 Amendment 4 does not exist. 

Amendment 3 (SF30 - 0004) is available at the following link: https://beta.sam.gov/opp/7249882650224beaacf2f43347aac93d/view?keywords=%22DLA%20Aviation%20Operations%20Center,%20Phase%20II,%20Defense%20Supply%20Center%20Richmond%20(DSCR)%20(Amendments:%22&sort=-relevance&index=&is_active=true&page=1. 

Amendment 2 (SF30 - 0002)is available. see attachments

Amendment 1 (SF30 - 0001) is available. see attachments

The DLA Aviation Operations Center Phase II project requirements will construct a multi-story office building of 281,075 SF to accommodate 1,622 employees in an administrative operations center. The Operations Center includes: open and individual administrative office and support areas (mail distribution, packing, shipping, reception space, reproduction area, unclassified conference and Video Tele-Conference (VTC) space, law library, kitchenette/break, restrooms, storage, equipment and supply rooms, passenger and service elevators, lightning protection, fire suppression, fire alarm, mass notification systems, Intrusion Detection System (IDS) and energy management control system (EMCS), and building information systems.

The project will utilize conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), DLA, and Defense Supply Center, Richmond design standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01. The project also includes emergency generators, site improvements, special foundations, parking and all necessary supporting facilities.

Update #6 ·

Amendment 0006 is issued to provide the following:

1. To provide ProjNet Inquiries.

2. To provide additional attachments.

All other terms and conditions remain unchanged.

(Amendment 5 available)

(Amendment 4 available)

(Amendment 2 available)

(Amendment 1 available)

The DLA Aviation Operations Center Phase II project requirements will construct a multi-story office building of 281,075 SF to accommodate 1,622 employees in an administrative operations center. The Operations Center includes: open and individual administrative office and support areas (mail distribution, packing, shipping, reception space, reproduction area, unclassified conference and Video Tele-Conference (VTC) space, law library, kitchenette/break, restrooms, storage, equipment and supply rooms, passenger and service elevators, lightning protection, fire suppression, fire alarm, mass notification systems, Intrusion Detection System (IDS) and energy management control system (EMCS), and building information systems.

The project will utilize conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), DLA, and Defense Supply Center, Richmond design standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01. The project also includes emergency generators, site improvements, special foundations, parking and all necessary supporting facilities.

Update #5 ·

(Amendment 2 available)

(Amendment 1 available)

The DLA Aviation Operations Center Phase II project requirements will construct a multi-story office building of 281,075 SF to accommodate 1,622 employees in an administrative operations center. The Operations Center includes: open and individual administrative office and support areas (mail distribution, packing, shipping, reception space, reproduction area, unclassified conference and Video Tele-Conference (VTC) space, law library, kitchenette/break, restrooms, storage, equipment and supply rooms, passenger and service elevators, lightning protection, fire suppression, fire alarm, mass notification systems, Intrusion Detection System (IDS) and energy management control system (EMCS), and building information systems.

The project will utilize conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), DLA, and Defense Supply Center, Richmond design standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01. The project also includes emergency generators, site improvements, special foundations, parking and all necessary supporting facilities.

Update #4 ·

(Amendment 1 available)

The DLA Aviation Operations Center Phase II project requirements will construct a multi-story office building of 281,075 SF to accommodate 1,622 employees in an administrative operations center. The Operations Center includes: open and individual administrative office and support areas (mail distribution, packing, shipping, reception space, reproduction area, unclassified conference and Video Tele-Conference (VTC) space, law library, kitchenette/break, restrooms, storage, equipment and supply rooms, passenger and service elevators, lightning protection, fire suppression, fire alarm, mass notification systems, Intrusion Detection System (IDS) and energy management control system (EMCS), and building information systems.

The project will utilize conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), DLA, and Defense Supply Center, Richmond design standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01. The project also includes emergency generators, site improvements, special foundations, parking and all necessary supporting facilities.

Update #3 ·

(Site Visit Attendance List Available)

The DLA Aviation Operations Center Phase II project requirements will construct a multi-story office building of 281,075 SF to accommodate 1,622 employees in an administrative operations center. The Operations Center includes: open and individual administrative office and support areas (mail distribution, packing, shipping, reception space, reproduction area, unclassified conference and Video Tele-Conference (VTC) space, law library, kitchenette/break, restrooms, storage, equipment and supply rooms, passenger and service elevators, lightning protection, fire suppression, fire alarm, mass notification systems, Intrusion Detection System (IDS) and energy management control system (EMCS), and building information systems.

The project will utilize conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), DLA, and Defense Supply Center, Richmond design standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01. The project also includes emergency generators, site improvements, special foundations, parking and all necessary supporting facilities.

Update #2 ·

The DLA Aviation Operations Center Phase II project requirements will construct a multi-story office building of 281,075 SF to accommodate 1,622 employees in an administrative operations center. The Operations Center includes: open and individual administrative office and support areas (mail distribution, packing, shipping, reception space, reproduction area, unclassified conference and Video Tele-Conference (VTC) space, law library, kitchenette/break, restrooms, storage, equipment and supply rooms, passenger and service elevators, lightning protection, fire suppression, fire alarm, mass notification systems, Intrusion Detection System (IDS) and energy management control system (EMCS), and building information systems.

The project will utilize conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), DLA, and Defense Supply Center, Richmond design standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01. The project also includes emergency generators, site improvements, special foundations, parking and all necessary supporting facilities.

Update #1 ·

Upload of solicitation for DLA Aviation OPs Center, Phase II

Files

File Type Posted
DLA Ops Center CLIN Schedule (Rev.2).pdf PDF
Attachment 6 - Small Business Participation Plan (Rev.1).pdf PDF
W9123620R2005P0007 - Amendment 7.pdf PDF
DLA Ops Center CLIN Schedule Rev1.pdf PDF
W91236-20-R-2005 Amendment 5 DLA Ops Center.pdf PDF
Attachment 154 Amend4_DLA_OPS_PH II_Spec_08 41 13 page8.pdf PDF
Attachment 143 AMEND4_DLA_OPS_PH II_A-118.pdf PDF
Attachment 136 2020-07-17_DLA OPS II_CG601.pdf PDF
Attachment 140 AMEND4_DLA_OPS_PH II_A-107.pdf PDF
Attachment 134 2020-07-17_DLA OPS II_CG101-CG106.pdf PDF
Attachment 133 2020-07-17_DLA OPS II_CD101.pdf PDF
Attachment 152 Amend4_DLA_OPS_PH II_Spec_01 50 02-00 50 page6.pdf PDF
Attachment 145 AMEND4_DLA_OPS_PH II_A-416.pdf PDF
Attachment 142 AMEND4_DLA_OPS_PH II_A-114.pdf PDF
Attachment 151 AMEND4_DLA_OPS_PH II_A-517.pdf PDF
Attachment 132 2020-07-17_DLA OPS II_C-513.pdf PDF
Attachment 137 2020-07-17_DLA OPS II_CU102-CU103.pdf PDF
W91236-20-R-0005 0006 DLA Ops Center ProjNet.pdf PDF
Attachment 147 AMEND4_DLA_OPS_PH II_A-506.pdf PDF
Attachment 156 Amend4_DLA_OPS_PH II_Spec_32 05 33.pdf PDF
Attachment 153 Amend4_DLA_OPS_PH II_Spec_03 36 00.pdf PDF
Attachment 139 AMEND4_DLA_OPS_PH II_A-106.pdf PDF
Attachment 144 AMEND4_DLA_OPS_PH II_A-144.pdf PDF
Attachment 150 AMEND4_DLA_OPS_PH II_A-514.pdf PDF
Attachment 141 AMEND4_DLA_OPS_PH II_A-113.pdf PDF
Attachment 146 AMEND4_DLA_OPS_PH II_A-417.pdf PDF
Attachment 155 Amend4_DLA_OPS_PH II_Spec_08 44 00 page11.pdf PDF
Attachment 149 AMEND4_DLA_OPS_PH II_A-513.pdf PDF
Attachment 135 2020-07-17_DLA OPS II_CG201.pdf PDF
Attachment 138 AMEND4_DLA_OPS_PH II-_A-103.pdf PDF
Attachment 148 AMEND4_DLA_OPS_PH II_A-507.pdf PDF
20-R-2005 Amend 2.pdf PDF
Att 51 - DLA_OPS_PH II_Spec_31 63 29 - First Page (003).pdf PDF
Att 54 - DLA OPS PH-2 SPECIFICATIONS 10 11 00.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-110 - FIRST FLOOR PLAN - AREA E1.pdf PDF
Att 56 - DLA OPS PH-2 SPECIFICATIONS 10 21 13.pdf PDF
Att 55 - DLA OPS PH-2 SPECIFICATIONS 10 14 00-10.pdf PDF
Att 43 - DLA_OPS_PH II_Arch_A-609 - CURTAIN WALL ELEV.pdf PDF
Att 48 - DLA_OPS_PH II_Civil_CS101.pdf PDF
Att 39 - DLA_OPS_PH II_Arch_A-601 - DOOR SCHEDULE.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-422 - EXT SIGNAGE PLAN ELEVATIONS.pdf PDF
Amend1_DLA_OPS_PH II_Civil_CP104.pdf PDF
Att 31 - DLA_OPS_PH II_Arch_A-120 - FOURTH FLOOR PLAN - AREA D4.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-106 - FIRST FLOOR PLAN - AREA A1.pdf PDF
Att 21 - DLA_OPS_PH II_Arch_A-108 - FIRST FLOOR PLAN - AREA C1.pdf PDF
Att 30 - DLA_OPS_PH II_Arch_A-118 - THIRD FLOOR PLAN - AREA D3.pdf PDF
Att 29 - DLA_OPS_PH II_Arch_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-116 - SECOND FLOOR PLAN - AREA G2.pdf PDF
Att 46 - DLA_OPS_PH II_Civil_C-504.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-112 - FIRST FLOOR PLAN - AREA G1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
INDUSTRY DAY - Richmond Army Reserve Center - MILCON Richmond, Virginia, United States · NAICS 236220 ENDIST Louisville No set-aside
ICD-705 Controlled Spaces Modernization and Sustainment Program - (Progressive Design-build (PDB) Other Transaction Agreement (OTA) Osan Air Base Korea, South · NAICS 236220 ENDIST Far East No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors