This document package includes construction drawings and a federal contract solicitation. The drawings depict utility plans for the Defense Supply Center Richmond Aviation Operations Center Phase II project located in Virginia. The plans show details of sanitary sewer lines, manholes, cleanouts, gas lines, electrical lines, water lines and meters, fire hydrants, and geothermal wells and piping. The related solicitation is for the construction services for this DLA Aviation Operations Center Phase II project. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Norfolk and includes amendments 1, 2, 3, 5, 6 and 7. The response due date and award date are not provided in this document package.

View the file

Other files

File Type Posted
DLA Ops Center CLIN Schedule (Rev.2).pdf PDF
W9123620R2005P0007 - Amendment 7.pdf PDF
Attachment 6 - Small Business Participation Plan (Rev.1).pdf PDF
W91236-20-R-2005 Amendment 5 DLA Ops Center.pdf PDF
DLA Ops Center CLIN Schedule Rev1.pdf PDF
Attachment 138 AMEND4_DLA_OPS_PH II-_A-103.pdf PDF
Attachment 156 Amend4_DLA_OPS_PH II_Spec_32 05 33.pdf PDF
Attachment 148 AMEND4_DLA_OPS_PH II_A-507.pdf PDF
Attachment 153 Amend4_DLA_OPS_PH II_Spec_03 36 00.pdf PDF
Attachment 152 Amend4_DLA_OPS_PH II_Spec_01 50 02-00 50 page6.pdf PDF
Attachment 147 AMEND4_DLA_OPS_PH II_A-506.pdf PDF
Attachment 150 AMEND4_DLA_OPS_PH II_A-514.pdf PDF
Attachment 133 2020-07-17_DLA OPS II_CD101.pdf PDF
Attachment 154 Amend4_DLA_OPS_PH II_Spec_08 41 13 page8.pdf PDF
Attachment 151 AMEND4_DLA_OPS_PH II_A-517.pdf PDF
Attachment 140 AMEND4_DLA_OPS_PH II_A-107.pdf PDF
Attachment 136 2020-07-17_DLA OPS II_CG601.pdf PDF
Attachment 144 AMEND4_DLA_OPS_PH II_A-144.pdf PDF
Attachment 143 AMEND4_DLA_OPS_PH II_A-118.pdf PDF
Attachment 132 2020-07-17_DLA OPS II_C-513.pdf PDF
Attachment 134 2020-07-17_DLA OPS II_CG101-CG106.pdf PDF
Attachment 145 AMEND4_DLA_OPS_PH II_A-416.pdf PDF
W91236-20-R-0005 0006 DLA Ops Center ProjNet.pdf PDF
Attachment 142 AMEND4_DLA_OPS_PH II_A-114.pdf PDF
Attachment 155 Amend4_DLA_OPS_PH II_Spec_08 44 00 page11.pdf PDF
Attachment 146 AMEND4_DLA_OPS_PH II_A-417.pdf PDF
Attachment 149 AMEND4_DLA_OPS_PH II_A-513.pdf PDF
Attachment 141 AMEND4_DLA_OPS_PH II_A-113.pdf PDF
Attachment 139 AMEND4_DLA_OPS_PH II_A-106.pdf PDF
Attachment 135 2020-07-17_DLA OPS II_CG201.pdf PDF
20-R-2005 Amend 2.pdf PDF
Att 40 - DLA_OPS_PH II_Arch_A-602 - DOOR SCHEDULE.pdf PDF
Att 41 - DLA_OPS_PH II_Arch_A-605 - WINDOW AND CURTAINWALL ELEVATIONS.pdf PDF
Att 38 - DLA_OPS_PH II_Arch_A-527 - MISCELLANEOUS DETAILS.pdf PDF
Att 32 - DLA_OPS_PH II_Arch_A-121 - FIFTH FLOOR PLAN - AREA A5.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-114 - SECOND FLOOR PLAN - AREA D2.pdf PDF
Att 29 - DLA_OPS_PH II_Arch_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Att 25 - DLA_OPS_PH II_Arch_A-112 - FIRST FLOOR PLAN - AREA G1.pdf PDF
Att 27 - DLA_OPS_PH II_Arch_A-114 - SECOND FLOOR PLAN - AREA D2.pdf PDF
Att 54 - DLA OPS PH-2 SPECIFICATIONS 10 11 00.pdf PDF
A.07.15 Attachment 7 - CLIN Schedule.pdf PDF
Att 55 - DLA OPS PH-2 SPECIFICATIONS 10 14 00-10.pdf PDF
Att 33 - DLA_OPS_PH II_Arch_A-122 - FIFTH FLOOR PLAN - AREA D5.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-601 - DOOR SCHEDULE.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-609 - CURTAIN WALL ELEVATIONS.pdf PDF
Att 26 - DLA_OPS_PH II_Arch_A-113 - SECOND FLOOR PLAN - AREA A2.pdf PDF
Att 20 - DLA_OPS_PH II_Arch_A-107 - FIRST FLOOR PLAN - AREA B1.pdf PDF
Att 53 - DLA OPS PH-2 SPECIFICATIONS 06 20 00.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Att 42 - DLA_OPS_PH II_Arch_A-608 - CURTAIN WALL ELEVA.pdf PDF
Show 40 more

Latest 50 of 127 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers ®

SHEET ID

U S

A

R M

Y

C

O R

P

O

F

E

N G

I N

E E

R S

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

A N

S I

D

I S

S U

E

D

A T

E

C O

N T

R A

C T

N

S O

L I C

I T

A T

I O

N

N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

1909 CYPRESS AVENUE

VIRGINIA BEACH, VA 23451

(757) 417 - 0140

D E

F E

N

E

P

P L Y

N

T E

R

R

I C

H M

O N

D

D

S C

R

R

I C

H M

O N

D

V

I R

G I N

I A

N O

R F

O

K

D

I S

T R

I C

T

F

R O

N

O R

F O

L K

V

A

N O

V E

M B

D

E

R A

T I O

N

T E

R

P

H

D E

F E

N S

E

L O

G I S

T I C

S

A

G E

N C

Y

A

V I A

T I O

N

D S

C R

MSA, P.C.

5033 Rouse Drive, Virginia Beach, VA 23462 757-490-9264 (Ofc) 757-490-0634 (Fax) www.msaonline.com

Environmental Sciences Planning Surveying Civil & Environmental Engineering

Landscape Architecture

W A

L L E

R

T

O D

D

L E

R

A

W

O O

L P

E R

T

C

O M

P A

N Y

C

Y P

R E

V E

N U

E

V I R

G I N

B

A

C H

V

A

W D

S J P

M J P

D M

W

D M

W

7/17/2020

OF 737

GRAPHIC SCALE

CU102

T

I L

I T

Y

P

L A

N

SANITARY CLEANOUT

RIM = 123.90

INV = 117.24

120' - 6" PVC SDR35 @ 0.63%

SANITARY MANHOLE

RIM = 121.00

INV IN (W) = 116.48

INV IN (NE) = 116.48

INV OUT (SE) = 116.38

23' - 6" PVC SDR35 @ 0.63%

SANITARY MANHOLE

RIM = 120.05

INV IN (NW) = 116.37

INV IN (SW) = 115.47

INV OUT (NE) = 115.37

SANITARY CLEANOUT

RIM = 121.85

INV = 118.07

1 TO 2

1 10"X8" TEE

2 4" C900 PVC

3 2" C900 PVC; REFER TO MECHANICAL

SHEET MS101 FOR CONNECTION TO

COOLING TOWERS

4 1-1/2" GAS SERVICE LINE; REFER TO SHEET

P-105. SEE SHEET CU103 FOR POINT OF

CONNECTION.

5 GAS METER; REFER TO PLUMBING SHEET

P-105 FOR ADDITIONAL INFORMATION

6 9' X 9' CONCRETE PAD FOR ELECTRICAL

TRANSFORMER; REFER TO ELECTRICAL

SHEET ES103 FOR ADDITIONAL

INFORMATION

7 CONCRETE PAD, SEE CS102 FOR

DIMENSIONS

8 6" DUCTILE IRON PIPE, CONNECT TO

EXISTING DUCTILE IRON PIPE END

9 RELOCATED FIRE HYDRANT,SEE SHEET

CD102

10 6" DUCTILE IRON PIPE

11 8" GATE VALVE

12 10" - 45° BEND

13 RELOCATED 10" C-900 PVC, REFER TO

OBSTRUCTION BY-PASS OFFSET DETAIL

ON SHEET C-514

14 RELOCATED UNDERGROUND ELECTRICAL;

REFER TO ELECTRICAL PLANS

15 8" C900 PVC

16 6" GATE VALVE

17 8"X6" TEE

18 8"X4" TEE

19 4" WATER METER AND WATER METER

VAULT, SEE SHEET C-513

20 4" - 45° BEND

21 WATER METER BYPASS, SEE WATER

METER VAULT DETAIL ON SHEET C-513

22 INSTALL VALVE BOX TOP FOR EXISTING

MONITORING WELL.

23 POST INDICATOR VALVE

24 10" GATE VALVE

25 10"X10" TEE

26 GEOTHERMAL PIPING; REFER TO SHEET

M-402

25' - 4" PVC SDR35 @ 1.00%

SANITARY CLEANOUT

RIM = 121.80

INV = 117.91

25' - 6" PVC SDR35 @ 0.63%

SANITARY MANHOLE

RIM = 120.89

INV IN (NW) = 117.76

INV IN (NE) = 114.52

INV OUT (SW) = 114.57

5 TO 6

NEW WORK KEYNOTES:

SANITARY SEWER SCHEDULE

MATCH LINE - SEE SHEET CU101

M A

T

H

E

SHEET NOTES:

UTILITY PLAN

SCALE: 1 IN. = 30 FT.

1. UTILITIES SHOWN MAY NOT DEPICT ACTUAL

CONDITIONS. CONTRACTOR SHALL FIELD LOCATE ALL

UTILITIES WITHIN LIMITS OF CONSTRUCTION PRIOR TO

BEGINNING WORK. ANY DISCREPANCIES SHALL BE

BROUGHT TO THE ATTENTION OF THE CONTRACTING

OFFICER PRIOR TO CONTINUING WITH WORK WITHIN

THAT AREA.

2. REFER TO SHEET C-002 FOR LEGEND AND

ABBREVIATIONS.

3. REFER TO SHEET V-003 FOR EXISTING STORM AND

SANITARY SEWER SCHEDULES.

4. GAS PIPING AND GAS METER ARE TO BE PROVIDED BY

CONTRACTOR AS PART OF THIS CONTRACT.

4 TO 5

2 TO 3

28 1" CONDUIT BETWEEN MECHANICAL ROOMS OF

PHASE 1 AND PHASE 2 BUILDINGS

27 FIELD VERIFY LOCATION OF EXISTING STORM PIPING

AND LOCATE GEOTHERMAL PIPING ADJACENT,

APPROXIMATELY 24" OF SEPARATION, MINIMUM.

M E

N D

M E

E

N D

M E

W

W W W W

W W W W W W

W

W

W

C15

C14

C4

C7

C8

C9

C10

C11

C12

C13

B1

B2

B3

B4

B5

B6

B7

B8

B9

US Army Corps of Engineers ®

SHEET ID

M

Y

C

O R

F

E

N G

I N

E E

R S

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

A N

S I

D

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

1909 CYPRESS AVENUE

VIRGINIA BEACH, VA 23451

(757) 417 - 0140

D E

F E

N

P

P

Y

N

T E

R

R

I C

H M

O N

D

D

S C

R

R

I C

H M

O N

D

V

I R

G I N

I A

N O

R F

O

K

S

T R

I C

T

F

R O

N

O R

F O

L K

V

A

N O

V E

M B

D

E

R A

T I O

N

T E

R

P

H

D E

F E

N S

E

L O

G I S

T I C

S

A

G E

N C

Y

A

V I A

T I O

N

D S

C R

MSA, P.C.

5033 Rouse Drive, Virginia Beach, VA 23462 757-490-9264 (Ofc) 757-490-0634 (Fax) www.msaonline.com

Environmental Sciences Planning Surveying Civil & Environmental Engineering

Landscape Architecture

W A

L L E

R

T

O D

D

L E

R

A

W

O O

L P

E R

T

C

O M

P A

N Y

C

Y P

R E

V E

N U

E

V I R

G I N

B

A

C H

V

A

W D

S J P

M J P

D M

W

D M

W

7/17/2020

OF 737

GRAPHIC SCALE

CU103

T

I L

I T

Y

P

L A

N

M A

T

E

SHEET NOTES:

UTILITY PLAN

SCALE: 1 IN. = 30 FT.

1. UTILITIES SHOWN MAY NOT DEPICT ACTUAL

CONDITIONS. CONTRACTOR SHALL FIELD LOCATE ALL

UTILITIES WITHIN LIMITS OF CONSTRUCTION PRIOR TO

BEGINNING WORK. ANY DISCREPANCIES SHALL BE

BROUGHT TO THE ATTENTION OF THE CONTRACTING

OFFICER PRIOR TO CONTINUING WITH WORK WITHIN

THAT AREA.

2. REFER TO SHEET C-002 FOR LEGEND AND

ABBREVIATIONS.

3. REFER TO SHEET V-003 FOR EXISTING STORM AND

SANITARY SCHEDULES.

4. GAS PIPING AND GAS METER ARE TO BE PROVIDED BY

CONTRACTOR AS PART OF THIS CONTRACT.

1 GEOTHERMAL WELL (TYP.); REFER TO MECHANICAL

SHEET MS101 FOR ADDITIONAL INFORMATION

2 GEOTHERMAL WELL VAULT; REFER TO MECHANICAL

SHEET M-501 FOR DETAILS

3 6" DUCTILE IRON PIPE, CONNECT TO EXISTING DUCTILE

IRON PIPE END

4 RELOCATED FIRE HYDRANT AND VALVE, SEE SHEET

CD103

5 TIE-IN NEW 1-1/2" GAS LINE TO EXISTING 3" GAS LINE

6 RELOCATED UNDERGROUND ELECTRICAL; REFER TO

ELECTRICAL PLANS

7 FIELD VERIFY LOCATION OF EXISTING STORM PIPING

AND LOCATE GEOTHERMAL PIPING ADJACENT,

APPROXIMATELY 36" OF SEPARATION, MINIMUM.

NEW WORK KEYNOTES:

E

N D

M E

Sheets and Views
17163D-CU-UtilitySheets-CU102
17163D-CU-UtilitySheets-CU103

File details come from the government source that posted it. Updated .