DLA Ops Center CLIN Schedule (Rev.2).pdf
PDF 138 KB Posted
- Solicitation number
- W91235620R2005
About this file
This document is a price schedule for a federal construction contract solicitation. The solicitation requires demolition of an existing warehouse and construction of a new operations center and site work. Base line work includes demolition of Building 33, construction of the new operations center building, and associated site work. Optional line items include providing asphalt paving in the employee parking lot instead of gravel, adding a canopy connecting building sections, and relocating emergency generators. Additional optional work funded by non-MILCON sources comprises furnishing, fixtures and equipment, a new generator, and audiovisual equipment. Pricing is to be provided for each contract line item number. The statutory cost limitation for the base work is $89,013,000 and the period of performance for base line items is 1,020 days from notice to proceed.
View the file
Other files
Show 40 more
Latest 50 of 127 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 7
PART I - THE PRICE SCHEDULE - DLA OPS CENTER (PH-2)
REVISION 2 Dated 21 July 2020
SECTION 00010 - SUPPLIES OR SERVICES AND PRICES
SCHEDULE I - BASE BID
CLIN # DESCRIPTION QUANTITY
UNIT
MEASURE
UNIT
PRICE AMOUNT
BASE
BID
CLIN DEMO BLDG 33 - All costs in connection with 1 JOB $0 0001 demolition of warehouse Building 33, including removal and disposal of Hazardous Materials, all related site demolition, site improvements and site utilities complete as shown on the drawings and specified excluding the work described in CLIN 0002-
0014. Source of funds is MILCON.
CLIN CONSTRUCT OPS CTR PH2 - All costs in 1 JOB
$0 0002 connection with construction of new DLA Ops Center, building construction only, excluding all "special costs" as identified in CLIN 0006, complete as shown on the drawings and specified excluding the work described in CLIN 0001 & 0003-0014. Source of funds is MILCON.
CLIN SITE WORK - All costs in connection with 1 JOB
0003 construction of new DLA Ops Center Site Work, including all related site preparation, site improvements and site utilities complete as shown on the drawings and specified excluding the work described in CLIN 0001-0002 & 0004-0014. Source of funds is MILCON.
CLIN
WELLS IN SOIL - UNIT COST for installation of geothermal wells through SOIL (installation is as
16,280
LF
$/LF
0004 described in SPEC SECTION 23 81 47); include drilling, steel encasement, grouting and associated vertical piping. The cost of the rest of the items in SPEC SECTION 23 21 47 (including permits, heat pumps, system equipment, piping pumps, electrical equipment, controls, ground heat exchanger) shall be included in CLIN 0003. Assume total bid quantity for well installation through SOIL is 16,280 LF; in accordance with FAR 52.211-18, the UNIT PRICE in this CLIN 0004 is intended to provide for field adjustment in the case where the actual field amount drilled through SOIL varies. Complete work as shown on the drawings and specified excluding the work described in CLIN 001-0003 & 0005-0014. Source of
CLIN # DESCRIPTION QUANTITY MEASURE PRICE AMOUNT
CLIN WELLS IN ROCK - UNIT COST for installation of 93,720 LF 0005 geothermal wells through ROCK (installation is as described in SPEC SECTION 23 81 47); include drilling, grouting and associated vertical piping. The cost of the rest of the items in SPEC SECTION 23 81 47 (including permits, heat pumps, system equipment, piping pumps, electrical equipment, controls, ground heat exchanger) shall be included in CLIN 0003.
Assume total bid quantity for well installation through ROCK is 93,720 LF; in
$/LF $0
accordance with FAR 52.211-18, the UNIT PRICE in this CLIN 0005 is intended to provide for field adjustment in the case where the actual field amount drilled through ROCK varies. Complete work as shown on the drawings and specified excluding the work described in CLIN 0001-0004 & 0006-0014.
Source of funds is MILCON.
CLIN SPECIAL FOUNDATIONS (PILES AND PILE CAPS)
0006 (Informational Only)
CLIN
0006AA SPECIAL FOUNDATIONS (PILES) - 5,740 LF
Unit Cost for installation of new DLA Ops Center special foundations (piles), complete as shown on the drawings and specified excluding the work described in CLIN 0001-0005 & 0006AB, 0007-0014. Source of
CLIN SPECIAL FOUNDATIONS (PILE CAPS) - 1 JOB
$/LF
0006AB
TOTAL B
Unit Cost for installation of new DLA Ops Center special foundations (pile caps), complete as shown on the drawings and specified excluding the work described in CLIN 0001-0005 & 0006AA, 0007- 0014. Source of funds is MILCON.
ASE BID
SCHEDULE II - OPTIONAL BID ITEMS MI
PARKING LOT PAVEMENT - All costs in connection
LCON FUNDED COSTS
1 JOB $0
0007 with provision of asphalt to final grade in lieu of gravel
OPTION in employee parking lot (COST DIFFERENCE - Cost to provide gravel parking should remain in CLIN 0003
Site Work), as indicated on CP103 and CP104 and specified excluding the work described in CLIN 0001-
0006 & 0008 -0014. Source of funds is MILCON.
Option to be exercise within 180 days of Contract
Notice To Proceed in accordance with FAR 52.217-7.
CLIN ADDITIONAL CANOPY - All costs in connection with 1 JOB $0 0008 construction of a canopy that stretches from the
OPTION entrance vestibule of the two-story portion of the building to the east and west, stopping at the five-story portion and at the finished face of Building 32 complete as shown on drawings and specified excluding the work described in CLIN 0001-0007 &
0009-0014. Source of funds is MILCON. Option to be exercised within 180 days of Contract Notice To Proceed in accordance with FAR 52.217-7.
CLIN # DESCRIPTION QUANTITY MEASURE PRICE AMOUNT
OPTION
GENERATOR RELOCATION - All costs in connection with relocation of existing emergency generators, site demolition, site repair, and site preparation complete as shown on drawings and specified excluding the work described in CLIN 0001-0008 & 0010-0014. Source of funds is MILCON. Option to be exercised within 180 days of Contract Notice To Proceed in accordance with FAR 52. 217-7.
TOTAL SCHEDULE II - OPTIONAL BID ITEMS MILCON FUNDED COSTS $0
Sum of Statutory Lines $0
SCHEDULE III - OPTIONAL BID ITEMS NON-MILCON FUNDED COSTS
OPTION
FF&E - All costs in connection with providing Furniture, Fixtures & Equipment (FF&E) complete as shown on the drawings and specified excluding the work described in CLIN 0001-0009 & 0011-0014.
Sources of funds is Non-MILCON. Option to be exercised within 365 days of Contract Notice To Proceed in accordance with FAR 52.217-7.
NEW GENERATOR - All costs to procure and install all 150 KW Standby Diesel Generator per specifications SECTION 26 32 15.00 10 for the DLA Operations Center – PH-2, complete, including all work incidental thereto as shown on the drawings and as specified exclusive of CLIN 0001-0010 & 0012- 0014. Source of funds is Non-MILCON.
Option to be exercised within 365 days of Contract Notice To Proceed in accordance with FAR 52.217- 7.
PROCURE & INSTALL TVs - All costs to Procure and install all Audio-Visual Equipment (Televisions) for the DLA Operations Center – PH-2, complete, including all work incidental thereto as shown on the drawings and specified exclusive of CLIN 0001-0011. Sources of funds is Non-MILCON. Option to be exercised within 365 days of Contract Notice To Proceed in accordance with FAR 52.217.7.
TOTAL SCHEDULE III - OPTIONAL BID ITEMS NON-MILCONFUNDED COSTS $0
TOTAL SCHEDULE I, II, & III- BASE BID, OPTIONAL NON-MILCON AND OPTIONAL ITEMS $0
STATUTORY COST LIMITATION IN THIS SOLICITATION:
Per FAR 36.205 CLINS 0001 ‐ 0009 are subject to STATUTORY COST LIMITATION OF $89,013,000.
1. For purposes of source selection as referenced in Section 00 22 16 of the Solicitation, and in particular Subsection 6.1, "Price" shall mean the Total Evaluated Price which will be the sum of the pricing submitted for CLINs 0001 through 0014, inclusive. Failure to provide a price for each CLIN may be deemed a deficiency because it may prevent the Government from conducting a meaningful evaluation of price, which could result in the proposal being ineligible for award.
2. Contract Completion Date: Unless indicated otherwise, the completion date for the scope of the
CLIN is 1,020 days after notice to proceed.
File details come from the government source that posted it. Updated .