Attachment 133 2020-07-17_DLA OPS II_CD101.pdf

PDF 968 KB Posted

Attached to
DLA Aviation Operations Center, Phase II, Defense Supply Center Richmond (DSCR) (Amendments: 1, 2, 3, 5, 6, and 7)
Solicitation number
W91235620R2005
Issued by

About this file

This package includes demolition plans and specifications for the Defense Supply Center Richmond Aviation Operations Center Phase II project. The plans show the demolition of various site features and underground utilities to prepare for new construction. The Army Corps of Engineers Norfolk District will manage the solicitation under number W91235620R2005 for demolition and related work with a response date of November 12, 2019. The Defense Logistics Agency Aviation will utilize the completed expansion.

View the file

Other files

File Type Posted
DLA Ops Center CLIN Schedule (Rev.2).pdf PDF
W9123620R2005P0007 - Amendment 7.pdf PDF
Attachment 6 - Small Business Participation Plan (Rev.1).pdf PDF
W91236-20-R-2005 Amendment 5 DLA Ops Center.pdf PDF
DLA Ops Center CLIN Schedule Rev1.pdf PDF
Attachment 138 AMEND4_DLA_OPS_PH II-_A-103.pdf PDF
Attachment 156 Amend4_DLA_OPS_PH II_Spec_32 05 33.pdf PDF
Attachment 148 AMEND4_DLA_OPS_PH II_A-507.pdf PDF
Attachment 153 Amend4_DLA_OPS_PH II_Spec_03 36 00.pdf PDF
Attachment 152 Amend4_DLA_OPS_PH II_Spec_01 50 02-00 50 page6.pdf PDF
Attachment 147 AMEND4_DLA_OPS_PH II_A-506.pdf PDF
Attachment 150 AMEND4_DLA_OPS_PH II_A-514.pdf PDF
Attachment 154 Amend4_DLA_OPS_PH II_Spec_08 41 13 page8.pdf PDF
Attachment 151 AMEND4_DLA_OPS_PH II_A-517.pdf PDF
Attachment 140 AMEND4_DLA_OPS_PH II_A-107.pdf PDF
Attachment 136 2020-07-17_DLA OPS II_CG601.pdf PDF
Attachment 144 AMEND4_DLA_OPS_PH II_A-144.pdf PDF
Attachment 143 AMEND4_DLA_OPS_PH II_A-118.pdf PDF
Attachment 132 2020-07-17_DLA OPS II_C-513.pdf PDF
Attachment 134 2020-07-17_DLA OPS II_CG101-CG106.pdf PDF
Attachment 145 AMEND4_DLA_OPS_PH II_A-416.pdf PDF
Attachment 137 2020-07-17_DLA OPS II_CU102-CU103.pdf PDF
W91236-20-R-0005 0006 DLA Ops Center ProjNet.pdf PDF
Attachment 142 AMEND4_DLA_OPS_PH II_A-114.pdf PDF
Attachment 155 Amend4_DLA_OPS_PH II_Spec_08 44 00 page11.pdf PDF
Attachment 146 AMEND4_DLA_OPS_PH II_A-417.pdf PDF
Attachment 149 AMEND4_DLA_OPS_PH II_A-513.pdf PDF
Attachment 141 AMEND4_DLA_OPS_PH II_A-113.pdf PDF
Attachment 139 AMEND4_DLA_OPS_PH II_A-106.pdf PDF
Attachment 135 2020-07-17_DLA OPS II_CG201.pdf PDF
20-R-2005 Amend 2.pdf PDF
Att 40 - DLA_OPS_PH II_Arch_A-602 - DOOR SCHEDULE.pdf PDF
Att 41 - DLA_OPS_PH II_Arch_A-605 - WINDOW AND CURTAINWALL ELEVATIONS.pdf PDF
Att 38 - DLA_OPS_PH II_Arch_A-527 - MISCELLANEOUS DETAILS.pdf PDF
Att 32 - DLA_OPS_PH II_Arch_A-121 - FIFTH FLOOR PLAN - AREA A5.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-114 - SECOND FLOOR PLAN - AREA D2.pdf PDF
Att 29 - DLA_OPS_PH II_Arch_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Att 25 - DLA_OPS_PH II_Arch_A-112 - FIRST FLOOR PLAN - AREA G1.pdf PDF
Att 27 - DLA_OPS_PH II_Arch_A-114 - SECOND FLOOR PLAN - AREA D2.pdf PDF
Att 54 - DLA OPS PH-2 SPECIFICATIONS 10 11 00.pdf PDF
A.07.15 Attachment 7 - CLIN Schedule.pdf PDF
Att 55 - DLA OPS PH-2 SPECIFICATIONS 10 14 00-10.pdf PDF
Att 33 - DLA_OPS_PH II_Arch_A-122 - FIFTH FLOOR PLAN - AREA D5.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-601 - DOOR SCHEDULE.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-609 - CURTAIN WALL ELEVATIONS.pdf PDF
Att 26 - DLA_OPS_PH II_Arch_A-113 - SECOND FLOOR PLAN - AREA A2.pdf PDF
Att 20 - DLA_OPS_PH II_Arch_A-107 - FIRST FLOOR PLAN - AREA B1.pdf PDF
Att 53 - DLA OPS PH-2 SPECIFICATIONS 06 20 00.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Att 42 - DLA_OPS_PH II_Arch_A-608 - CURTAIN WALL ELEVA.pdf PDF
Show 40 more

Latest 50 of 127 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 1

US Army Corps of Engineers ®

SHEET ID

U S

A

R M

Y

C

O R

P

O

F

E

N G

I N

E E

R S

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

A N

S I

D

I S

S U

E

D

A T

E

C O

N T

R A

C T

N

S O

L I C

I T

A T

I O

N

N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

1909 CYPRESS AVENUE

VIRGINIA BEACH, VA 23451

(757) 417 - 0140

D E

F E

N

E

U P

P L

Y

C

E N

T E

R

R

I C

H M

O N

D

D

S C

R

R

I C

H M

O N

D

V

I R

G I N

I A

N O

R F

O L

K

D

I S

T R

I C

T

F

R O

N

O R

F O

L K

V

A

N O

V E

M B

D L

A

O

P E

R A

T I O

N

T E

R

P

H

D E

F E

N S

E

L

O G

I S

T I C

S

A

G E

N C

Y

A

V I A

T I O

N

D S

C R

MSA, P.C.

5033 Rouse Drive, Virginia Beach, VA 23462 757-490-9264 (Ofc) 757-490-0634 (Fax) www.msaonline.com

Environmental Sciences Planning Surveying Civil & Environmental Engineering

Landscape Architecture

W A

L L

D

D

D

L E

R

A

W

O O

L P

E R

T

C

O M

P A

N Y

Y P

R E

V E

N U

E

V I R

G I N

I

B

A

C H

V

A

W

D

S J P

M J P

D M

W

D M

W

7/17/2020

OF 737

CD101

0' 30' 60' 90'

SCALE IN FEET: 1"=30'

GRAPHIC SCALE

DEMOLITION KEYNOTES:

1 REMOVE SIGN (TYP)

2 SAWCUT

3 REMOVE CURB & GUTTER TO THE NEAREST JOINT

4 REMOVE MONUMENT SIGN

5 PROTECT HYDRANT

6 REMOVE 10" WATER LINE

7 PROTECT MONITORING WELL DURING

CONSTRUCTION

8 REMOVE FLAG POLES

9 REMOVE SPOT LIGHTS (TYP OF 42)

10 REMOVE TREE (TYP)

11 REMOVE BOLLARD

12 ABANDON MONITORING WELL IN PLACE PRIOR TO

CONSTRUCTION ACTIVITIES

13 REMOVE TRANSFORMER

14 REMOVE GROUNDCOVER

15 REMOVE SHRUB (TYP)

16 REMOVE EX. DI-1 TOP UNIT AND REPLACE WITH

VDOT MH-1 TOP UNIT. ADJUST RIM ELEVATION TO

PROPOSED GRADES (SEE SHEET CG104)

D E

M O

L I T

I

P

L A

N

MATCH LINE - SEE SHEET CD102

SHEET NOTES:

1. UTILITIES SHOWN MAY NOT DEPICT ACTUAL

CONDITIONS. CONTRACTOR SHALL FIELD LOCATE ALL

UTILITIES WITHIN LIMITS OF CONSTRUCTION PRIOR TO

BEGINNING WORK. ANY DISCREPANCIES SHALL BE

BROUGHT TO THE ATTENTION OF THE CONTRACTING

OFFICER PRIOR TO CONTINUING WITH WORK WITHIN

THAT AREA.

2. REFER TO SHEET C-002 FOR LEGEND AND

ABBREVIATIONS.

3. UTILITY SERVICES TO BUILDING 32 SHALL NOT BE

INTERRUPTED.

4. FIRE LANE BETWEEN BUILDING 31 AND 32 MUST

REMAIN ACCESSIBLE AT ALL TIMES.

5. REFER TO ELECTRICAL SHEETS FOR DEMOLITION OF

ELECTRICAL AND COMMUNICATION LINES.

6. FOR BIDDING PURPOSES ASSUME ALL EXISTING

ASPHALT HAS BEEN INSTALLED ON A 12" LAYER OF

CONCRETE.

7. REFER TO SHEET V-003 FOR EXISTING STORM AND

SANITARY SEWER SCHEDULES.

DEMOLITION PLAN

SCALE: 1 IN. = 30 FT.

(TYP OF 8)

(TYP OF 7)

DEMOLITION OF UNDERGROUND

UTILITIES

DEMOLISH AND REMOVE ASPHALT

PAVEMENT SECTION AND/OR

CONCRETE SIDEWALK

2" MILL AND OVERLAY

DEMOLITION LEGEND

DEMOLISH AND REMOVE BUILDING

PROJECT LIMITS

(TYP OF 15)

(TYP OF 14)

(TYP OF 8)

(TYP OF 6)

(TYP OF 3)

(TYP OF 5)

(TYP OF 4)

M E

N D

M E

H O

W

E

X

G

R A

D E

S

M E

N D

M E

Sheets and Views
17163d-cd-demosheets-CD101
17163d-cd-demosheets-CD102

File details come from the government source that posted it. Updated .