Att 54 - DLA OPS PH-2 SPECIFICATIONS 10 11 00.pdf

PDF 127 KB Posted

Attached to
DLA Aviation Operations Center, Phase II, Defense Supply Center Richmond (DSCR) (Amendments: 1, 2, 3, 5, 6, and 7)
Solicitation number
W91235620R2005
Issued by

About this file

This document provides specifications for visual display units required for the Defense Logistics Agency Aviation Operations Center, Phase II project. The specifications cover a range of products including marker boards, tack boards, display track systems, and horizontal sliding units. Key materials outlined include porcelain enamel writing surfaces, natural cork, woven polyester fabric, and aluminum frames. Indoor air quality certifications are required. Color and size requirements are indicated in the drawings. Installation details are provided including placement schedules and mounting heights.

View the file

Other files

File Type Posted
DLA Ops Center CLIN Schedule (Rev.2).pdf PDF
W9123620R2005P0007 - Amendment 7.pdf PDF
Attachment 6 - Small Business Participation Plan (Rev.1).pdf PDF
W91236-20-R-2005 Amendment 5 DLA Ops Center.pdf PDF
DLA Ops Center CLIN Schedule Rev1.pdf PDF
Attachment 138 AMEND4_DLA_OPS_PH II-_A-103.pdf PDF
Attachment 156 Amend4_DLA_OPS_PH II_Spec_32 05 33.pdf PDF
Attachment 148 AMEND4_DLA_OPS_PH II_A-507.pdf PDF
Attachment 153 Amend4_DLA_OPS_PH II_Spec_03 36 00.pdf PDF
Attachment 152 Amend4_DLA_OPS_PH II_Spec_01 50 02-00 50 page6.pdf PDF
Attachment 147 AMEND4_DLA_OPS_PH II_A-506.pdf PDF
Attachment 150 AMEND4_DLA_OPS_PH II_A-514.pdf PDF
Attachment 133 2020-07-17_DLA OPS II_CD101.pdf PDF
Attachment 154 Amend4_DLA_OPS_PH II_Spec_08 41 13 page8.pdf PDF
Attachment 151 AMEND4_DLA_OPS_PH II_A-517.pdf PDF
Attachment 140 AMEND4_DLA_OPS_PH II_A-107.pdf PDF
Attachment 136 2020-07-17_DLA OPS II_CG601.pdf PDF
Attachment 144 AMEND4_DLA_OPS_PH II_A-144.pdf PDF
Attachment 143 AMEND4_DLA_OPS_PH II_A-118.pdf PDF
Attachment 132 2020-07-17_DLA OPS II_C-513.pdf PDF
Attachment 134 2020-07-17_DLA OPS II_CG101-CG106.pdf PDF
Attachment 145 AMEND4_DLA_OPS_PH II_A-416.pdf PDF
Attachment 137 2020-07-17_DLA OPS II_CU102-CU103.pdf PDF
W91236-20-R-0005 0006 DLA Ops Center ProjNet.pdf PDF
Attachment 142 AMEND4_DLA_OPS_PH II_A-114.pdf PDF
Attachment 155 Amend4_DLA_OPS_PH II_Spec_08 44 00 page11.pdf PDF
Attachment 146 AMEND4_DLA_OPS_PH II_A-417.pdf PDF
Attachment 149 AMEND4_DLA_OPS_PH II_A-513.pdf PDF
Attachment 141 AMEND4_DLA_OPS_PH II_A-113.pdf PDF
Attachment 139 AMEND4_DLA_OPS_PH II_A-106.pdf PDF
Attachment 135 2020-07-17_DLA OPS II_CG201.pdf PDF
20-R-2005 Amend 2.pdf PDF
Att 40 - DLA_OPS_PH II_Arch_A-602 - DOOR SCHEDULE.pdf PDF
Att 41 - DLA_OPS_PH II_Arch_A-605 - WINDOW AND CURTAINWALL ELEVATIONS.pdf PDF
Att 38 - DLA_OPS_PH II_Arch_A-527 - MISCELLANEOUS DETAILS.pdf PDF
Att 32 - DLA_OPS_PH II_Arch_A-121 - FIFTH FLOOR PLAN - AREA A5.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-114 - SECOND FLOOR PLAN - AREA D2.pdf PDF
Att 29 - DLA_OPS_PH II_Arch_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Att 25 - DLA_OPS_PH II_Arch_A-112 - FIRST FLOOR PLAN - AREA G1.pdf PDF
Att 27 - DLA_OPS_PH II_Arch_A-114 - SECOND FLOOR PLAN - AREA D2.pdf PDF
A.07.15 Attachment 7 - CLIN Schedule.pdf PDF
Att 55 - DLA OPS PH-2 SPECIFICATIONS 10 14 00-10.pdf PDF
Att 33 - DLA_OPS_PH II_Arch_A-122 - FIFTH FLOOR PLAN - AREA D5.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-601 - DOOR SCHEDULE.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-609 - CURTAIN WALL ELEVATIONS.pdf PDF
Att 26 - DLA_OPS_PH II_Arch_A-113 - SECOND FLOOR PLAN - AREA A2.pdf PDF
Att 20 - DLA_OPS_PH II_Arch_A-107 - FIRST FLOOR PLAN - AREA B1.pdf PDF
Att 53 - DLA OPS PH-2 SPECIFICATIONS 06 20 00.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Att 42 - DLA_OPS_PH II_Arch_A-608 - CURTAIN WALL ELEVA.pdf PDF
Show 40 more

Latest 50 of 127 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DLA OPS CENTER PHASE 2 W91236-17-D-002

DEFENSE SUPPLY CENTER RICHMOND (DSCR), RICHMOND, VA

SECTION 10 11 00

VISUAL DISPLAY UNITS

08/17

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM B221 (2014) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes

ASTM E84 (2018a) Standard Test Method for Surface Burning Characteristics of Building Materials

ASTM F152 (1995; R 2009) Tension Testing of Nonmetallic Gasket Materials

SCIENTIFIC CERTIFICATION SYSTEMS (SCS)

SCS SCS Global Services (SCS) Indoor Advantage

UNDERWRITERS LABORATORIES (UL)

UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED NC (2009) Leadership in Energy and Environmental Design(tm) New Construction Rating System

1.2 DEFINITIONS OR ADMINISTRATIVE REQUIREMENTS

The term visual display board when used herein includes presentation boards, marker boards, tackboards, board cases, display track system and horizontal sliding units; submit manufacturer's descriptive data and catalog cuts plus manufacturer's installation instructions, and cleaning and maintenance instructions. Visual display boards must be from manufacturer's standard product line. Submit certificate of compliance signed by Contractor attesting that visual display boards conform to the requirements specified.

1.3 SUSTAINABILITY REQUIREMENTS

Materials in this technical specification may contribute towards contract

SECTION 10 11 00 Page 3 compliance with sustainability requirements.

1.3.1 LEED Requirements

See Section 01 33 29 LEED(TM) DOCUMENTATION for project LEED NC local/regional materials, low-emitting materials, and recycled content requirements.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 LEED(TM) DOCUMENTATION. Submit the following in accordance with Section

01 33 00.00 50 SUBMITTAL PROCEDURES:

SD-03 Product Data

Visual Display Board

SD-04 Samples

Aluminum; G

Porcelain Enamel; G

Materials; G

SD-07 Certificates

Indoor air quality for markerboards

Indoor air quality for tackboards

1.5 CERTIFICATIONS

1.5.1 Indoor Air Quality

1.5.1.1 Indoor Air Quality for Visual Display Products

Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party program that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.

1.6 DELIVERY, STORAGE, AND HANDLING

Deliver materials to the building site in the manufacturer's original unopened containers and store them in a clean dry area with temperature maintained above 50 degrees F. Stack materials according to manufacturer's recommendations. Visual display boards must be allowed to acclimate to the building temperature for 24 hours prior to installation.

SECTION 10 11 00 Page 4 richter Text Box Televisions

1.7 WARRANTY

Provide manufacturer's standard performance guarantees or warranties that extend beyond a one year period.

PART 2 PRODUCTS

2.1 MATERIALS

Submit section of core material showing the lamination of natural cork, woven fabric, non-woven fabric, and vinyl wall covering. Submit sample of hardwood and plastic laminate finish, and glass type. Samples must be minimum 4 by 4 inches and show range of color.

2.1.1 Porcelain Enamel

Provide marker board writing surface composed of porcelain enamel fused to a nominal 28 gauge thick steel, laminated to a minimum 1/4 inch thick core material with a steel or foil backing sheet. Writing surface must be capable of supporting paper by means of magnets. Marker board surface for display track system may be a powder paint dry erase surface adhered to a nominal 18 gauge thick steel. Submit section showing porcelain enamel coating, steel, core material and backing.

2.1.2 Cork

Cork must be a continuous resilient sheet made from soft, clean, granulated cork relatively free from hardback and dust and bonded with a binder suitable for the purpose intended. The wearing surface must be free from streaks, spots, cracks or other imperfections that would impair its usefulness or appearance. The material must be seasoned, and a clean cut made not less than 1/2 inch from the edge must show no evidence of soft sticky binder.

2.1.2.1 Natural Cork

Material must be a single layer of pure grain natural cork without backing or facing. The color must be light tan. The cork sheet must have a tensile strength of not less than 40 psi when tested in accordance with

ASTM F152.

2.1.3 Woven Fabric

Provide plain weave fabric. Fiber content must be 100 percent polyester.

Minimum total weight must be 16 oz. plus or minus 0.5 oz. per lineal yard.

Fabric must have a Class A flame spread rating of 0-50 and smoke development rating of 0-450 in accordance with ASTM E84.

2.1.4 Aluminum

Aluminum frame extrusions must be alloy 6063-T5 or 6063-T6, conform to ASTM B221, and be a minimum 0.06 inches thick. Exposed aluminum must have an anodized, satin finish. Straight, single lengths must be used wherever possible. Joints must be kept to a minimum. Corners must be mitered and must have a hairline closure. Submit sections of frame, map rail, and chalktray, and map hooks.

SECTION 10 11 00 Page 5

2.2 MARKERBOARD

Markerboard must have a porcelain enamel writing surface and a chalktray.

Markerboard must be a factory assembled unit complete in one piece, without joints whenever possible. When markerboard dimensions require delivery in separate sections, components must be prefit at the factory, disassembled for delivery and jointed at the site. Frame must be aluminum.

Chalktray must be the same material as the frame and extend the full length of the liquid markerboard. The markerboard must have a map rail.

The map rail with a tackable insert must extend the full length of the liquid chalkboard, and must have map hooks with clips for holding sheets of paper. Two map hooks must be provided for each 4 foot of map rail.

Dry erase markings must be removable with a felt eraser or dry cloth without ghosting. Each unit must come complete with an eraser and four different color compatible dry erase markers. The size must be as shown in the drawings.

Provide certification or validation of indoor air quality for markerboards.

2.3 TACKBOARDS

Provide certification or validation of indoor air quality for tackboards.

2.3.1 Fabric Covered

Tackboard must have a woven fabric covering laminated to a minimum 1/4 inch thick cork laminated to a minimum 1/4 inch thick hardboard or particleboard, and must have an aluminum frame. The size must be as shown on the drawings.

2.4 COLOR

Finish colors for required items must be as indicated on drawings.

PART 3 EXECUTION

3.1 PLACEMENT SCHEDULE

Location and mounting height of visual display boards must be as shown on the drawings.

Mounting height is defined as distance from finished floor to top of the display board frame.

3.2 INSTALLATION

Do not install items that show visual evidence of biological growth.

Perform installation and assembly in accordance with manufacturer's printed instructions. Use concealed fasteners. Visual display boards must be attached to the walls with suitable devices to anchor each unit.

furnish and install trim items, accessories and miscellaneous items in total, including but not limited to hardware, grounds, clips, backing materials, adhesives, brackets, and anchorages incidental to or necessary for a sound, secure, complete and finished installation. Installation must not be initiated until completion of room painting and finishing operations. Visual display boards must be installed in locations and at mounting heights indicated. Visual display boards must be installed level and plumb, and if applicable doors must be aligned and hardware must be adjusted. Damaged units must be repaired or replaced as directed by the

SECTION 10 11 00 Page 6 richter Arrow richter Text Box

2.4 TELEVISIONS

richter Text Box insert paragraph at end of section richter Line richter

2.5 COLOR

Contracting Officer.

3.3 CLEANING

Writing surfaces must be cleaned in accordance with manufacturer's instructions.

-- End of Section --

SECTION 10 11 00 Page 7 richter Image richter Text Box

INSERT ABOVE:

richter Image richter

2.4

File details come from the government source that posted it. Updated .