DLA Aviation Operations Center, Phase II, Defense Supply Center Richmond (DSCR) (Amendments: 1, 2, 3, 5, 6, and 7)
Solicitation number
W91235620R2005
Issued by

About this file

This document provides specifications for drilled concrete piers and shafts for the Defense Logistics Agency Aviation Operations Center Phase II project. The solicitation requires the contractor to drill concrete piers and shafts and install crosshole sonic logging equipment in the first 20 piers and every 20 thereafter to test for defects. The contractor must continue testing at their own expense until they can demonstrate defect-free results. The contractor will be paid per linear foot for each diameter of pier drilled based on the number and total length installed. Separate unit prices will be paid for the removal of rock or other obstructions encountered during drilling. The specifications also include requirements for scheduling, price breakdown, and inspections of pier foundations. The related federal contract opportunity is solicitation number W91235620R2005 for the DLA Aviation Operations Center Phase II project issued by the Department of the Army Corps of Engineers Norfolk District.

View the file

Other files

File Type Posted
DLA Ops Center CLIN Schedule (Rev.2).pdf PDF
W9123620R2005P0007 - Amendment 7.pdf PDF
Attachment 6 - Small Business Participation Plan (Rev.1).pdf PDF
W91236-20-R-2005 Amendment 5 DLA Ops Center.pdf PDF
DLA Ops Center CLIN Schedule Rev1.pdf PDF
Attachment 138 AMEND4_DLA_OPS_PH II-_A-103.pdf PDF
Attachment 156 Amend4_DLA_OPS_PH II_Spec_32 05 33.pdf PDF
Attachment 148 AMEND4_DLA_OPS_PH II_A-507.pdf PDF
Attachment 153 Amend4_DLA_OPS_PH II_Spec_03 36 00.pdf PDF
Attachment 152 Amend4_DLA_OPS_PH II_Spec_01 50 02-00 50 page6.pdf PDF
Attachment 147 AMEND4_DLA_OPS_PH II_A-506.pdf PDF
Attachment 150 AMEND4_DLA_OPS_PH II_A-514.pdf PDF
Attachment 133 2020-07-17_DLA OPS II_CD101.pdf PDF
Attachment 154 Amend4_DLA_OPS_PH II_Spec_08 41 13 page8.pdf PDF
Attachment 151 AMEND4_DLA_OPS_PH II_A-517.pdf PDF
Attachment 140 AMEND4_DLA_OPS_PH II_A-107.pdf PDF
Attachment 136 2020-07-17_DLA OPS II_CG601.pdf PDF
Attachment 144 AMEND4_DLA_OPS_PH II_A-144.pdf PDF
Attachment 143 AMEND4_DLA_OPS_PH II_A-118.pdf PDF
Attachment 132 2020-07-17_DLA OPS II_C-513.pdf PDF
Attachment 134 2020-07-17_DLA OPS II_CG101-CG106.pdf PDF
Attachment 145 AMEND4_DLA_OPS_PH II_A-416.pdf PDF
Attachment 137 2020-07-17_DLA OPS II_CU102-CU103.pdf PDF
W91236-20-R-0005 0006 DLA Ops Center ProjNet.pdf PDF
Attachment 142 AMEND4_DLA_OPS_PH II_A-114.pdf PDF
Attachment 155 Amend4_DLA_OPS_PH II_Spec_08 44 00 page11.pdf PDF
Attachment 146 AMEND4_DLA_OPS_PH II_A-417.pdf PDF
Attachment 149 AMEND4_DLA_OPS_PH II_A-513.pdf PDF
Attachment 141 AMEND4_DLA_OPS_PH II_A-113.pdf PDF
Attachment 139 AMEND4_DLA_OPS_PH II_A-106.pdf PDF
Attachment 135 2020-07-17_DLA OPS II_CG201.pdf PDF
20-R-2005 Amend 2.pdf PDF
Att 40 - DLA_OPS_PH II_Arch_A-602 - DOOR SCHEDULE.pdf PDF
Att 41 - DLA_OPS_PH II_Arch_A-605 - WINDOW AND CURTAINWALL ELEVATIONS.pdf PDF
Att 38 - DLA_OPS_PH II_Arch_A-527 - MISCELLANEOUS DETAILS.pdf PDF
Att 32 - DLA_OPS_PH II_Arch_A-121 - FIFTH FLOOR PLAN - AREA A5.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-114 - SECOND FLOOR PLAN - AREA D2.pdf PDF
Att 29 - DLA_OPS_PH II_Arch_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Att 25 - DLA_OPS_PH II_Arch_A-112 - FIRST FLOOR PLAN - AREA G1.pdf PDF
Att 27 - DLA_OPS_PH II_Arch_A-114 - SECOND FLOOR PLAN - AREA D2.pdf PDF
Att 54 - DLA OPS PH-2 SPECIFICATIONS 10 11 00.pdf PDF
A.07.15 Attachment 7 - CLIN Schedule.pdf PDF
Att 55 - DLA OPS PH-2 SPECIFICATIONS 10 14 00-10.pdf PDF
Att 33 - DLA_OPS_PH II_Arch_A-122 - FIFTH FLOOR PLAN - AREA D5.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-601 - DOOR SCHEDULE.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-609 - CURTAIN WALL ELEVATIONS.pdf PDF
Att 26 - DLA_OPS_PH II_Arch_A-113 - SECOND FLOOR PLAN - AREA A2.pdf PDF
Att 20 - DLA_OPS_PH II_Arch_A-107 - FIRST FLOOR PLAN - AREA B1.pdf PDF
Att 53 - DLA OPS PH-2 SPECIFICATIONS 06 20 00.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Show 40 more

Latest 50 of 127 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DLA OPS CENTER PHASE 2 W91236-17-D-002

DEFENSE SUPPLY CENTER RICHMOND (DSCR), RICHMOND, VA

SECTION 31 63 29

DRILLED CONCRETE PIERS AND SHAFTS

11/14

PART 1 GENERAL

1.1 UNIT PRICES

a. Requirements for price breakdown of drilled concrete piers or shafts are specified Requirements for construction scheduling related to drilled concrete piers or shaft work are specified in Section

01 32 17.00 20 NETWORK ANALYSIS SCHEDULES (NAS).

b. Requirements for price breakdown of drilled concrete piers or shaft work are specified in Section 01 22 00.00 10 MEASUREMENT AND PAYMENT.

1.1.1 Basis of Bids

Base the bid on the number and total length of drilled concrete piers (lump sum). The Contractor will not receive payment for rejected concrete piers or shafts or for those not conforming to specifications.

1.1.2 Tests

1.1.2.1 Integrity Test

The Contract includescrosshole sonic logging (CSL) testing on the first 20 piers installed, and on 1 pier for each group of 20 piers thereafter.

Where defective piles are found in the testing of the first 20 piles, the Contractor, at his expense, shall continue to test each pile on the project until he can show that his methods are producing satisfactory defect free results. In addition, base of all piles shall be inspected utilizing shaft inspection devices..

1.1.3 Separate Unit Prices

1.1.3.1 Removal of Rock

Removal of rock within the limit of piers will be paid for at the contract unit price for "Removal of Rock" per linear foot, for each diameter of caisson installed. Rock excavation is defined as any hard dense material that cannot be removed with pier drilling equipment having the specified capacity and could only be removed by hand, air tools, blasting, or other specialized methods.

1.1.3.2 Removal of Obstructions Other Than Rock

Removal of obstructions other than rock within the limits of the piers which cannot be removed using standard drilling equipment with the specified capacity will be paid for at the contract unit price per linear foot for "Removal of Obstructions" for each diameter of pier installed.

SECTION 31 63 29 Page 3 computer41 Strikethrough Requirements for construction scheduling related to drilled concrete piers or shaft work are specified in Section

01 32 17.00 20 NETWORK ANALYSIS SCHEDULES (NAS).

computer41 Strikethrough

b. Requirements for price breakdown of drilled concrete piers or shaft work are specified in Section 01 22 00.00 10 MEASUREMENT AND PAYMENT.

computer41 Text Box as indicated and computer41 Text Box specified computer41 Text Box richter Cloud richter Polygon richter Text Box richter Line

File details come from the government source that posted it. Updated .