Attachment 155 Amend4_DLA_OPS_PH II_Spec_08 44 00 page11.pdf

PDF 15 KB Posted

Attached to
DLA Aviation Operations Center, Phase II, Defense Supply Center Richmond (DSCR) (Amendments: 1, 2, 3, 5, 6, and 7)
Solicitation number
W91235620R2005
Issued by

About this file

This document contains specifications for a curtain wall system for a Defense Logistics Agency facility. The specifications require the curtain wall to meet certain standards for water resistance, finish warranty of at least 20 years, and installation by a qualified contractor with experience on similar projects. The anchoring systems must be designed for cast-in-place concrete and masonry. Shop drawings must include layout, dimensions, material details and installation details. The related solicitation is for construction services for Phase II of the DLA Aviation Operations Center at Defense Supply Center Richmond in Virginia. It was issued by the US Army Corps of Engineers and amendments 1, 2, 3, 5, 6 and 7 have been released.

View the file

Other files

File Type Posted
DLA Ops Center CLIN Schedule (Rev.2).pdf PDF
W9123620R2005P0007 - Amendment 7.pdf PDF
Attachment 6 - Small Business Participation Plan (Rev.1).pdf PDF
W91236-20-R-2005 Amendment 5 DLA Ops Center.pdf PDF
DLA Ops Center CLIN Schedule Rev1.pdf PDF
Attachment 138 AMEND4_DLA_OPS_PH II-_A-103.pdf PDF
Attachment 156 Amend4_DLA_OPS_PH II_Spec_32 05 33.pdf PDF
Attachment 148 AMEND4_DLA_OPS_PH II_A-507.pdf PDF
Attachment 153 Amend4_DLA_OPS_PH II_Spec_03 36 00.pdf PDF
Attachment 152 Amend4_DLA_OPS_PH II_Spec_01 50 02-00 50 page6.pdf PDF
Attachment 147 AMEND4_DLA_OPS_PH II_A-506.pdf PDF
Attachment 150 AMEND4_DLA_OPS_PH II_A-514.pdf PDF
Attachment 133 2020-07-17_DLA OPS II_CD101.pdf PDF
Attachment 154 Amend4_DLA_OPS_PH II_Spec_08 41 13 page8.pdf PDF
Attachment 151 AMEND4_DLA_OPS_PH II_A-517.pdf PDF
Attachment 140 AMEND4_DLA_OPS_PH II_A-107.pdf PDF
Attachment 136 2020-07-17_DLA OPS II_CG601.pdf PDF
Attachment 144 AMEND4_DLA_OPS_PH II_A-144.pdf PDF
Attachment 143 AMEND4_DLA_OPS_PH II_A-118.pdf PDF
Attachment 132 2020-07-17_DLA OPS II_C-513.pdf PDF
Attachment 134 2020-07-17_DLA OPS II_CG101-CG106.pdf PDF
Attachment 145 AMEND4_DLA_OPS_PH II_A-416.pdf PDF
Attachment 137 2020-07-17_DLA OPS II_CU102-CU103.pdf PDF
W91236-20-R-0005 0006 DLA Ops Center ProjNet.pdf PDF
Attachment 142 AMEND4_DLA_OPS_PH II_A-114.pdf PDF
Attachment 146 AMEND4_DLA_OPS_PH II_A-417.pdf PDF
Attachment 149 AMEND4_DLA_OPS_PH II_A-513.pdf PDF
Attachment 141 AMEND4_DLA_OPS_PH II_A-113.pdf PDF
Attachment 139 AMEND4_DLA_OPS_PH II_A-106.pdf PDF
Attachment 135 2020-07-17_DLA OPS II_CG201.pdf PDF
20-R-2005 Amend 2.pdf PDF
Att 40 - DLA_OPS_PH II_Arch_A-602 - DOOR SCHEDULE.pdf PDF
Att 41 - DLA_OPS_PH II_Arch_A-605 - WINDOW AND CURTAINWALL ELEVATIONS.pdf PDF
Att 38 - DLA_OPS_PH II_Arch_A-527 - MISCELLANEOUS DETAILS.pdf PDF
Att 32 - DLA_OPS_PH II_Arch_A-121 - FIFTH FLOOR PLAN - AREA A5.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-114 - SECOND FLOOR PLAN - AREA D2.pdf PDF
Att 29 - DLA_OPS_PH II_Arch_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Att 25 - DLA_OPS_PH II_Arch_A-112 - FIRST FLOOR PLAN - AREA G1.pdf PDF
Att 27 - DLA_OPS_PH II_Arch_A-114 - SECOND FLOOR PLAN - AREA D2.pdf PDF
Att 54 - DLA OPS PH-2 SPECIFICATIONS 10 11 00.pdf PDF
A.07.15 Attachment 7 - CLIN Schedule.pdf PDF
Att 55 - DLA OPS PH-2 SPECIFICATIONS 10 14 00-10.pdf PDF
Att 33 - DLA_OPS_PH II_Arch_A-122 - FIFTH FLOOR PLAN - AREA D5.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-601 - DOOR SCHEDULE.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-609 - CURTAIN WALL ELEVATIONS.pdf PDF
Att 26 - DLA_OPS_PH II_Arch_A-113 - SECOND FLOOR PLAN - AREA A2.pdf PDF
Att 20 - DLA_OPS_PH II_Arch_A-107 - FIRST FLOOR PLAN - AREA B1.pdf PDF
Att 53 - DLA OPS PH-2 SPECIFICATIONS 06 20 00.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Att 42 - DLA_OPS_PH II_Arch_A-608 - CURTAIN WALL ELEVA.pdf PDF
Show 40 more

Latest 50 of 127 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DLA OPS CENTER PHASE 2 W91236-17-D-002

DEFENSE SUPPLY CENTER RICHMOND (DSCR), RICHMOND, VA

curtain-wall systems that do not comply with requirements or that deteriorate as defined in this Section within specified warranty period .

d. Finish Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components on which finishes fail within specified warranty period. Warranty does not include normal weathering. Determine warranty on finish by type of finish selected, a minimum of 20 years.

e. Beneficiary: Issue warranty in the legal name of the project Owner .

f. Warranty Period: Ten years commencing on Date of Substantial Completion, covering complete curtain wall system for failure to meet specified requirements.

g. Warranty Acceptance: Owner is sole authority who will determine acceptability of manufacturer's warranty documents.

1.9 INTERPRETATION OF AWS CODE

Section 05 05 23 WELDING, STRUCTURAL applies to work specified in this section.

AWS code, when referred to herein, shall mean AWS D1.1/D1.1M , "Structural Welding Code - Steel" with the following modification:

Revise AWS code Section 1, "General Provisions," Paragraph 1.1 as follows:

References to the need for approval shall mean "Approval by the Contracting Officer" and references to the "Building Commissioner" shall mean the "Contracting Officer."

1.10 QUALIFICATIONS FOR THE CURTAIN-WALL INSTALLER

Submit a written description of the proposed curtain-wall system installer giving the name of the curtain-wall manufacturer, qualifications of personnel, years of concurrent contracting experience, lists of projects similar in scope to the specified work, and other information as may be required by the Contracting Officer.

1.11 DRAWINGS

Installation Drawings shall include the following information for curtain wall assemblies.

Drawings shall be fully coordinated with adjacent construction and materials. Curtain-wall locations in building, layout and elevations, dimensions, shapes and sizes of members, thickness of metals, types and locations of shop and field connections, details of anchorage to building construction, glazing provisions, and other pertinent construction and erection details.

Location and details of anchorage devices that are to be cast-in-place in concrete and masonry construction.

Panel dimensions, thicknesses and kinds of materials, edge details, details of installation in curtain-wall framing, and other pertinent construction and erection details.

SECTION 08 44 00 Page 11

File details come from the government source that posted it. Updated .