Attachment 155 Amend4_DLA_OPS_PH II_Spec_08 44 00 page11.pdf
PDF 15 KB Posted
- Solicitation number
- W91235620R2005
About this file
This document contains specifications for a curtain wall system for a Defense Logistics Agency facility. The specifications require the curtain wall to meet certain standards for water resistance, finish warranty of at least 20 years, and installation by a qualified contractor with experience on similar projects. The anchoring systems must be designed for cast-in-place concrete and masonry. Shop drawings must include layout, dimensions, material details and installation details. The related solicitation is for construction services for Phase II of the DLA Aviation Operations Center at Defense Supply Center Richmond in Virginia. It was issued by the US Army Corps of Engineers and amendments 1, 2, 3, 5, 6 and 7 have been released.
View the file
Other files
Show 40 more
Latest 50 of 127 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DLA OPS CENTER PHASE 2 W91236-17-D-002
DEFENSE SUPPLY CENTER RICHMOND (DSCR), RICHMOND, VA
curtain-wall systems that do not comply with requirements or that deteriorate as defined in this Section within specified warranty period .
d. Finish Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components on which finishes fail within specified warranty period. Warranty does not include normal weathering. Determine warranty on finish by type of finish selected, a minimum of 20 years.
e. Beneficiary: Issue warranty in the legal name of the project Owner .
f. Warranty Period: Ten years commencing on Date of Substantial Completion, covering complete curtain wall system for failure to meet specified requirements.
g. Warranty Acceptance: Owner is sole authority who will determine acceptability of manufacturer's warranty documents.
1.9 INTERPRETATION OF AWS CODE
Section 05 05 23 WELDING, STRUCTURAL applies to work specified in this section.
AWS code, when referred to herein, shall mean AWS D1.1/D1.1M , "Structural Welding Code - Steel" with the following modification:
Revise AWS code Section 1, "General Provisions," Paragraph 1.1 as follows:
References to the need for approval shall mean "Approval by the Contracting Officer" and references to the "Building Commissioner" shall mean the "Contracting Officer."
1.10 QUALIFICATIONS FOR THE CURTAIN-WALL INSTALLER
Submit a written description of the proposed curtain-wall system installer giving the name of the curtain-wall manufacturer, qualifications of personnel, years of concurrent contracting experience, lists of projects similar in scope to the specified work, and other information as may be required by the Contracting Officer.
1.11 DRAWINGS
Installation Drawings shall include the following information for curtain wall assemblies.
Drawings shall be fully coordinated with adjacent construction and materials. Curtain-wall locations in building, layout and elevations, dimensions, shapes and sizes of members, thickness of metals, types and locations of shop and field connections, details of anchorage to building construction, glazing provisions, and other pertinent construction and erection details.
Location and details of anchorage devices that are to be cast-in-place in concrete and masonry construction.
Panel dimensions, thicknesses and kinds of materials, edge details, details of installation in curtain-wall framing, and other pertinent construction and erection details.
SECTION 08 44 00 Page 11