This solicitation is for construction services for Phase II of the Defense Logistics Agency Aviation Operations Center located at Defense Supply Center Richmond. Key work includes construction of a new 140,000 square foot building, site utilities, roadways, and parking areas. Proposals were due on July 10, 2020 with contract award anticipated by September 2020. The completion period is 1020 calendar days from notice to proceed. The solicitation includes base bid line items and options for additional site work, security systems, audiovisual equipment, and generator relocation.

View the file

Other files

File Type Posted
DLA Ops Center CLIN Schedule (Rev.2).pdf PDF
W9123620R2005P0007 - Amendment 7.pdf PDF
Attachment 6 - Small Business Participation Plan (Rev.1).pdf PDF
W91236-20-R-2005 Amendment 5 DLA Ops Center.pdf PDF
DLA Ops Center CLIN Schedule Rev1.pdf PDF
Attachment 138 AMEND4_DLA_OPS_PH II-_A-103.pdf PDF
Attachment 156 Amend4_DLA_OPS_PH II_Spec_32 05 33.pdf PDF
Attachment 148 AMEND4_DLA_OPS_PH II_A-507.pdf PDF
Attachment 153 Amend4_DLA_OPS_PH II_Spec_03 36 00.pdf PDF
Attachment 152 Amend4_DLA_OPS_PH II_Spec_01 50 02-00 50 page6.pdf PDF
Attachment 147 AMEND4_DLA_OPS_PH II_A-506.pdf PDF
Attachment 150 AMEND4_DLA_OPS_PH II_A-514.pdf PDF
Attachment 133 2020-07-17_DLA OPS II_CD101.pdf PDF
Attachment 154 Amend4_DLA_OPS_PH II_Spec_08 41 13 page8.pdf PDF
Attachment 151 AMEND4_DLA_OPS_PH II_A-517.pdf PDF
Attachment 140 AMEND4_DLA_OPS_PH II_A-107.pdf PDF
Attachment 136 2020-07-17_DLA OPS II_CG601.pdf PDF
Attachment 144 AMEND4_DLA_OPS_PH II_A-144.pdf PDF
Attachment 143 AMEND4_DLA_OPS_PH II_A-118.pdf PDF
Attachment 132 2020-07-17_DLA OPS II_C-513.pdf PDF
Attachment 134 2020-07-17_DLA OPS II_CG101-CG106.pdf PDF
Attachment 145 AMEND4_DLA_OPS_PH II_A-416.pdf PDF
Attachment 137 2020-07-17_DLA OPS II_CU102-CU103.pdf PDF
Attachment 142 AMEND4_DLA_OPS_PH II_A-114.pdf PDF
Attachment 155 Amend4_DLA_OPS_PH II_Spec_08 44 00 page11.pdf PDF
Attachment 146 AMEND4_DLA_OPS_PH II_A-417.pdf PDF
Attachment 149 AMEND4_DLA_OPS_PH II_A-513.pdf PDF
Attachment 141 AMEND4_DLA_OPS_PH II_A-113.pdf PDF
Attachment 139 AMEND4_DLA_OPS_PH II_A-106.pdf PDF
Attachment 135 2020-07-17_DLA OPS II_CG201.pdf PDF
20-R-2005 Amend 2.pdf PDF
Att 40 - DLA_OPS_PH II_Arch_A-602 - DOOR SCHEDULE.pdf PDF
Att 41 - DLA_OPS_PH II_Arch_A-605 - WINDOW AND CURTAINWALL ELEVATIONS.pdf PDF
Att 38 - DLA_OPS_PH II_Arch_A-527 - MISCELLANEOUS DETAILS.pdf PDF
Att 32 - DLA_OPS_PH II_Arch_A-121 - FIFTH FLOOR PLAN - AREA A5.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-114 - SECOND FLOOR PLAN - AREA D2.pdf PDF
Att 29 - DLA_OPS_PH II_Arch_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Att 25 - DLA_OPS_PH II_Arch_A-112 - FIRST FLOOR PLAN - AREA G1.pdf PDF
Att 27 - DLA_OPS_PH II_Arch_A-114 - SECOND FLOOR PLAN - AREA D2.pdf PDF
Att 54 - DLA OPS PH-2 SPECIFICATIONS 10 11 00.pdf PDF
A.07.15 Attachment 7 - CLIN Schedule.pdf PDF
Att 55 - DLA OPS PH-2 SPECIFICATIONS 10 14 00-10.pdf PDF
Att 33 - DLA_OPS_PH II_Arch_A-122 - FIFTH FLOOR PLAN - AREA D5.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-601 - DOOR SCHEDULE.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-609 - CURTAIN WALL ELEVATIONS.pdf PDF
Att 26 - DLA_OPS_PH II_Arch_A-113 - SECOND FLOOR PLAN - AREA A2.pdf PDF
Att 20 - DLA_OPS_PH II_Arch_A-107 - FIRST FLOOR PLAN - AREA B1.pdf PDF
Att 53 - DLA OPS PH-2 SPECIFICATIONS 06 20 00.pdf PDF
Amend1_DLA_OPS_PH II_Arch_A-117 - THIRD FLOOR PLAN - AREA A3.pdf PDF
Att 42 - DLA_OPS_PH II_Arch_A-608 - CURTAIN WALL ELEVA.pdf PDF
Show 40 more

Latest 50 of 127 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0006 is issued to provide the follow ing:

1. Provide ProjNet Inquiries.

2. To provide additional attachments to the solicitation package.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 191

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Jul-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123620R2005

X 9B. DATED (SEE ITEM 11)

26-May-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Jul-2020

CODE

USACE, NORFOLK DISTRICT OFFICE

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1011

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123620R2005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0006

Amendment 0006 is issued to provide the following:

1. Provide ProjNet Inquiries.

2. To provide additional attachments to the solicitation package.

All other terms and conditions remain unchanged.

1. PROJNET INQUIRIES

The Government has provided responses to all inquiries received and does not intend to issue another Amendment. The proposal due date remains unchanged.

2. The following attachments accompany this amendment:

AMENDED DRAWINGS

Attachment 132: 2020-07-17_DLA OPS II_C-513.pdf Attachment 133: 2020-07-17_DLA OPS II_CD101.pdf Attachment 134: 2020-07-17_DLA OPS II_CG101-CG106.pdf Attachment 135: 2020-07-17_DLA OPS II_CG201.pdf Attachment 136: 2020-07-17_DLA OPS II_CG601.pdf Attachment 137: 2020-07-17_DLA OPS II_CU102-CU103.pdf Attachment 138: AMEND4_DLA_OPS_PH II-_A-103.pdf Attachment 139: AMEND4_DLA_OPS_PH II_A-106.pdf Attachment 140: AMEND4_DLA_OPS_PH II_A-107.pdf Attachment 141: AMEND4_DLA_OPS_PH II_A-113.pdf Attachment 142: AMEND4_DLA_OPS_PH II_A-114.pdf Attachment 143: AMEND4_DLA_OPS_PH II_A-118.pdf Attachment 144: AMEND4_DLA_OPS_PH II_A-144.pdf Attachment 145: AMEND4_DLA_OPS_PH II_A-416.pdf Attachment 146: AMEND4_DLA_OPS_PH II_A-417.pdf Attachment 147: AMEND4_DLA_OPS_PH II_A-506.pdf Attachment 148: AMEND4_DLA_OPS_PH II_A-507.pdf Attachment 149: AMEND4_DLA_OPS_PH II_A-513.pdf Attachment 150: AMEND4_DLA_OPS_PH II_A-514.pdf Attachment 151: AMEND4_DLA_OPS_PH II_A-517.pdf

AMENDED SPECIFICATIONS

Attachment 152: Amend4_DLA_OPS_PH II_Spec_01 50 02-00 50 page6.pdf Attachment 153: Amend4_DLA_OPS_PH II_Spec_03 36 00.pdf Attachment 154: Amend4_DLA_OPS_PH II_Spec_08 41 13 page8.pdf Attachment 155: Amend4_DLA_OPS_PH II_Spec_08 44 00 page11.pdf Attachment 156: Amend4_DLA_OPS_PH II_Spec_32 05 33.pdf

0006 INQ JULY 10 - 15

AMENDMENT 06 IS THE FINAL AMENDMENT. THE GOVERNMENT HAS PROVIDED RESPONSE TO

ALL INQUIRIES RECEIVED AND DOES NOT INTEND TO ISSUE ANOTHER AMENDMENT. THE

PROPOSAL DUE DATE REMAINS UNCHANGED.

Bid Inquiry Contracting Officers Report All Inquiries

Project: DLA - Operations Center Phase II Review: DLA Operations Center Phase II (00001) (sorted by CommentID ) Displaying 594 inquiries.

Id Discipline Sheet Detail Spec 8608587 Other Attachment 12

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Attachment 12-Design Analysis Volume 2 was not included with the documents. Please provide.

Government Response. Attachment 12 - Design Analysis Volume 2 will not be provided. The Attachment list will be corrected in the upcoming Amendment.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8608604 Other Section 00 22 16 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Reference Section 00 22 16 - Supplementary Instructions to Proposers, paragraph 5.2.2 Evaluation Criteria. Please consider revising the definition of "Recent" project to one that was completed and turned over no longer than ten (10) years preceding the issuance of this Solicitation. Projects of this size and complexity are relatively rare, and lengthening the reach back period will increase competition and more fully describe offerors' relevant experience.

Government Response. The definition of 'Recent' will be revised in amendment #3.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8608605 Other Section 00 22 16 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Reference Section 00 22 16 - Supplementary Instructions to Proposers, paragraph 5.2.2 Evaluation Criteria. Please confirm the Government will consider projects greater than $150M relevant as long as other relevancy features are included in the project.

Government Response. The intent behind the criteria in 5.2.2, specifically, "The Government will evaluate the extent to which the construction value of a submitted project approximates a range from $75M to $150M," is to avoid a situation in which an arbitrary cut-off would result in a project with a substantially similar order of magnitude be evaluated as dissimilar. For example, the Government intends to avoid evaluating a project with a stated value of $150,000,001 as not similar. The Government will retain discretion to determine whether a project value approximates the stated range.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8611603 General N/A

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Is it acceptable to submit previously filled out PPQ forms provided they are on the USACE/NAVFAC format and are included in full?

Government Response. Yes, as long as they are completed and signed in accordance with the solicitation.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8614308 General 5.2.2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Can the period of experience be extended from 5 years experience 10 years

Government Response. The period of experience will be revised in Amendment #3.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8614310 General 5.2.2 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

We have a project that is to be completed on August 10, 2020.

Can this project be used as past experience?

1-2 Government Response. In order for a submitted project to be considered "Recent", it shall be completed and turned over no longer than seven (7) years preceding the issuance of the solicitation. This change will be (was) captured in Amendment 3.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8614990 Architectural D5/ A-418

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that all items indicated by dashed lines in Room 143 Sundries Shop are Government Furnished, Government Installed.

1-1 Government Response. All dashed furniture in the Sundries Shop is GFGI. By: Dianne Grimes; CECT-

NAO-M; (7572017839) On: Jun 15 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8615001 Architectural B7/ A-418

What is indicated by the closely spaced horizontal lines on Elevation Room 143

1-1 Government Response. What is indicated by the closely spaced horizontal lines on Elevation Room 143

By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jun 15 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8615045 Architectural A1 & A3/ A-419

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that Pantries 1113 and 2222 in Building Areas F1 and F2 respectively are to have the same elevation references A1 & A3/ A-419 as is found in typical pantries

1-1 Government Response. Correct. Typical Elevations apply to ALL Pantries. By: Dianne Grimes; CECT-

NAO-M; (7572017839) On: Jun 15 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8615071 Architectural A5 & A7/ A-419

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that Copy Rooms 1112 and 2221 located in Building Areas F1 and F2 respectively are to have Elevation References A5 & A7/ A-419

1-1 Government Response. Correct. Typical Elevations apply to ALL Copy Rooms.

Information for this report is procurement sensitive.

8615093 Architectural A7/ A-419 similar

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that Copy Rooms 1136, 236, 431 and 532 located in Building Areas F1, D2, D4 and D5 respectively should refer to similar Elevation A7/ A-419.

1-1 Government Response. Correct. Typical Elevations apply to ALL Copy Rooms. By: Dianne

Grimes; CECT-NAO-M; (7572017839) On: Jun 15 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8615106 Architectural A-527

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Supply Rooms 233, 327, 427, 428, 528, 529 do not have a Keynote to identify the shelving construction. Please confirm that the shelving details on A-527 will apply at these Supply Room locations

1-1 Government Response. Detail D1/A-527 applies to ALL Supply rooms. However, the coat rod and support bracket is NOT required. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jun 15 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8615158 Architectural A-111, A-113, A-115

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

It appears that the following rooms are intended to have built in shelving but there is no Keynote to identify the construction:

1) 1154 Workroom on Sheet A-111

2) 227 Storage Room on Sheet A-113

3) 2228 File Room on Sheet A-115 Please provide a detail reference for the shelving in these room.

1-0 Government Response. 1) In 1154 Workroom, provide base cabinet casework as indicated on A1/A-419 (base cabinets only, provide end panels on each end)

2) In 227 Storage Room, provide shelving as shown in detail D1/A-527 (no coat rod and support bracket required) In 2228 File Room, no shelving is required in this room.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8615289 Architectural A-418

Provide a window schedule for the windows at the Sundries Shop on D5/ A-418

1-1 Government Response. Window shown is an interior, aluminum W11, 6'-8" x 6'-8", elevated on sheet

A-605, sharing details as indicated on A-610.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8615295 Architectural A-418

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Please provide a specification for the sliding security grille at the Coffee Kiosk per Keynote 5 and Detail D4/A-418

1-1 Government Response. We detailed this similarly in Phase 1, with no specific Spec section for it. It is a specialized grille per details, and Shop Drawings will guide the final solution. Sufficient info is available for pricing. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jun 15 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8616381 Architectural AD102 Keynote 1 01 11 00.00 50 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Paragraph 1.12 in Specification Section 01 11 00.00 50 directs to salvage approximately 12,500 sf of face brick from building demolition. Keynote 1 on Sheet AD102 and paragraph 3.1.1.d in Section 02 41 00 Demolition both indicate to salvage 10,000 sf of existing brick. Please confirm the quantity of brick to be salvaged

1-1 Government Response. 10,000 SF of existing brick shall be salvaged from existing Warehouse 33 By:

Dianne Grimes; CECT-NAO-M; (7572017839) On: Jun 15 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8616593 Equipment A-421 01 11 00.00 50

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that the existing equipment identified on Sheet A-421 is the same equipment referenced in paragraph

1.18 of Section 01 11 00.00 50 Summary of Work.

1-1 Government Response. Correct. This is confirmed. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jun 15 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8616877 Architectural A-110

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Overhead Door tag 178C is indicated in the Door Schedule to be 11'-0" wide by 11'-0" high. The Type F Overhead Door on A-603 indicates an 8'-0" x 8'-0" Door. The Floor Plan on A-110 indicates a 8'-0" wide opening and the Building Elevation on A-201 appears to indicate an 11' high door. Please confirm that Overhead Door 178C is 8'-0" wide by 11'-0" high

1-1 Government Response. Door 178C shall be 8'-0" x 8'-0" By: Dianne Grimes; CECT-NAO-M;

(7572017839) On: Jun 15 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8616899 General 01 45 04.00 50

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Reference paragraph 3.4.3 in spec section 01 45 04.00 50 which currently indicates electrical, mechanical, civil CQC personnel must be employed directly by the prime Contractor. This requirement appears to differ from other recent USACE Norfolk district projects where it is acceptable that these CQC representatives can be provided through the trade partners. We request this section be modified to allow for CQC personnel participation from trade partners that are not directly employed by the prime Contractor.

1-2 Government Response. CQC personnel shall be provided in accordance with Specification Section 01 45

04.00 50, as it is currently provided in the solicitation. By: Tarik Booze; CENAO-CT Contracting Office;

(7572017103) On: Jun 17 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8617055 Specifications 10 21 13 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specification Section 10 21 13 Toilet Partitions requires a 25 year warranty to include installation. Manufacturers will provide a 25 year warranty for materials, fabrication and finish but not installation. Please reconsider the requirement that the toilet partition installation be warranted for 25 years.

1-2 Government Response. A 25 year warranty on Installation is NOT required.

Information for this report is procurement sensitive.

8617395 Architectural AD103

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Demolition Plan AD103 Keynote 2 indicates that 10,000 SF of brick is to be salvaged for reuse in new construction.

The only reference in the Architectural Drawings to using salvaged brick is at the exterior ramp walls on A-413 and the exterior signage wall on A-422. The area of brick at these walls is significantly less than 10,000 SF. Are there other areas where salvaged brick is to be used? Are we to dispose of any unused salvaged brick off site?

1-1Government Response. 10,000 SF of existing brick shall be salvaged from existing Warehouse 33, and used as noted. Unused bricks can be turned over to government. By: Dianne Grimes; CECT-NAO-M;

(7572017839) On: Jun 15 2020

8617422 Architectural A-422

Please identify where on the site, the Exterior Monumental Signage on A-422 is located

1-2 Government Response. Sign is indicated in context on Overall Signage Plan on A-422, and the parking indicated on A-422 corresponds with the parking closest to 5th Street on CS101. CS101 will be (was) corrected in Amendment 1.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8617454 Structural A-422

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

KeyNote 9 on Sheet A-422 refers to the Structural Drawings. Please indicate where in the structural drawings to locate design information for the Exterior Signage foundations.

1-2 Government Response. Structural Foundation information will be (was) published in the next amendment.

Information for this report is procurement sensitive.

8617559 Architectural A-111

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Keynote 4 on Sheet A-111 calls out Bid Option 1: Edge of Canopy. There is no Bid Option 1. Please confirm that this Keynote refers to CLIN 0008 ADDITIONAL CANOPY.

1-1 Government Response. Correct. Keynote is in reference to CLIN 0008.

Information for this report is procurement sensitive.

8617674 Civil CS102

Please provide a specification for Motorized Barrier Arm and Operator called out in Keynote 15 and Vehicle Barrier Loop called out in Keynote 20 on Sheet CS102

1-2 Government Response. Specification will be (was) in the next amendment.

Information for this report is procurement sensitive.

8619046 Civil CS101

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Keynote 14 on CS101 indicates a 20 x 25 Concrete Pad, See Sheet C-504. Sheet C-504 only provides a detail for the dumpster pad. Is this the correct detail?

Government Response. Concrete pad detail on Sheet C-504 is also the correct detail for the 20x25 concrete pad. Detail name will be revised and an amended drawing will be provided by amendment.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8619072 Civil CS102

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Keynotes 8 and 9 on CS102 call out concrete utility and equipment pads and refer Sheet C-504. Sheet C-504 only shows a detail for the Dumpster Pad. Is this the correct detail to follow for these concrete pads? We note that Structural Detail A1/S-508 appears to be a more appropriate design for these concrete pads and may be the correct reference.

Government Response. Keynotes 8 and 9 will be (was) revised to reference Structural detail A1/S-508 in the next amendment.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8619098 Civil CS102

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Keynote 22 on CS102 calls out a 16'X10' concrete utility pad and refers to Sheet C-507. Sheet C-507 includes a Concrete Pavement Detail showing 7" - 650 PSI Flexural Concrete. Is this the correct detail to follow for this concrete pad? We note that Structural Detail A1/S-508 appears to be a more appropriate design for these concrete pads and may be the correct reference.

Government Response. Reference detail on sheet C-507 is not the correct detail. Keynote 22 on CS102 will be revised to reference Structural detail A1/S-508. Amended drawings will be (was) provided.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8619118 Civil CS102

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Keynote 23 on CS102 calls out a 28'X 60' concrete utility pad and refers to Sheet CS104. Sheet CS104 does not show a concrete pad detail. Please provide a structural detail for this concrete pad. We note that Structural Detail A1/S-508 appears to be a more appropriate design for this concrete pads and may be the correct reference.

Government Response. Keynote 23 on CS102 will be revised to reference Structural detail A1/S-508. An amended drawing will be (was) provided.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8619127 Civil CS102

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

On Sheet CS102, there is a concrete pad denoted by layout control points 53 and 54. This concrete pad does not have a Keynote describing it's size or construction. Please provide.

Government Response. Keynotes 8 and 9 will be (was) revised to reference Structural detail A1/S-508 in the drawing provided in the next amendment.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8619144 Civil CS101 10 35 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Keynote 13 on Sheet CS101 appears to indicate 4 flagpoles. Specification Section 10 35 00 indicates (1) 75 foot and

(2) 70 foot flagpoles. Please confirm that only 3 flagpoles are required.

ProjNet: Logged In User Page 10 of 180 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportA... 7/20/2020

Government Response. 3 flag poles are required. By: Dianne Grimes; CECT-NAO-M; (7572017839) On:

Jun 16 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8619249 Electrical ES107

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Per Keynote 2 on Sheet ES107, CLIN 0009 Generator Relocation includes relocating the fuel tank for the (4) 1MW Generators. Please provide the following information regarding the fuel tank relocation:

• What is the Size and Volume of the existing fuel tank?

• Is there fuel in the existing tank and if so, what is to be done with it?

• Are we responsible for filling the fuel tank after it is relocated?

1-2 Government Response. The tank is 10,000 gallons. There is fuel in the tank as it is currently a working entity.

Means and methods of transfer are the responsibility of the Contractor. A full tank is expected upon completion.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8620346 Architectural 10 26 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Paragraph 3.1.3 in Spec Section 10 26 00 directs to mount corner guards on external corners of interior walls, partitions and columns and General Finish Note B. on A-701 says to Provide Corner Guards, CG1, at all Exposed Corners.

Please confirm that stainless steel corner guard CG1 is to be applied to every exposed column corner in the building.

Government Response. Yes, corner guards shall be applied to all exposed corners of columns.

Information for this report is procurement sensitive.

8620694 Architectural A-601

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Door Tag 129 is indicated in the Door Schedule as a 4'-5" High Type E Aluminum/Glass door. Please confirm.

Government Response. Door Tag 129 is correctly indicated as a 3'-0" x 7'-0", Type E aluminum door on A- 601.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8620702 Architectural A-610

Storefront Elevation SF2 on Sheet A-610 appears to indicate a 4'-5" high door. Is this typical for all doors in SF2?

ProjNet: Logged In User Page 11 of 180

Government Response. SF2 is correctly indicated as a 7'-0" high door in a 9'-0" opening on A-610.

Information for this report is procurement sensitive.

8620718 Architectural A-601, A-602

Door Tags 103, 601A, 601B in the Door Schedule do not indicate a Door Material.

Government Response. Door 103 is Type A. Doors 601A and 601B are Type B.

Information for this report is procurement sensitive.

8620728 Architectural A-602

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door Tag 616 in the Door Schedule does not appear on the Floor Plans. Only the door width and height are indicated on the Schedule

Government Response. Door 616 does not exist.

Information for this report is procurement sensitive.

8621650 Architectural A-416, A417

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Toilet accessory schedule, e.g. A416, list item MG as Mirror Glass (36"H x 24" W). Elevations such as D7 on A417 show the mirror glass as being 36" high but continuous for the length of the vanity top. Please confirm the elevations are correct and that the reference to (36"H x 24"W) on the schedule can be ignored.

Government Response. The elevations are correct.

Information for this report is procurement sensitive.

8621652 Architectural A-416

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Toilet accessory schedules, e.g. A416, lists a mop rack which we would expect to see in each Janitor's closet, however, none are currently shown.

ProjNet: Logged In User Page 12 of 180

Government Response. Mop racks shall occur in each Janitors Closet.

8621666 Architectural A-417

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The Enlarged Toilet Plan C4/A417, appears to be missing some accessory tags, e.g. soap dispensers and hand dryers. Please confirm toilet accessory fit out is identical to Enlarged Toilet Plan C1/A-417.

Government Response. Correct. C1/A-417 correctly identifies the accessories, and should be shown similarly on C4/A-417. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jun 16 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8621675 Architectural A-416

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The following items are listed on the toilet accessory schedule but are not indicated on the floor plans or elevations, please confirm they are not required:

a. HS – ADA Shower Seat

b. SCR – Shower Curtain Rod

c. SH – Soap Holder

d. TB – Towel Bar

Government Response. These items are not required. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jun 16 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8621685 Architectural 10 28 13 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) spec section 10 28 13 para 2.3.14 lists item WR – Waste Receptacle which is not indicated on either the toilet accessory schedule or the floor plans. Please confirm this item is not required

Government Response. The waste receptacle is not required. By: Dianne Grimes; CECT-NAO-M;

(7572017839) On: Jun 16 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8621711 Architectural A-702 thru A-705 10 26 00

Please clarify the height of the FRP1 wall protection in the typical Janitor's Closet

Government Response. Height of FRP in Janitor closet is 4'-0" high. By: Dianne Grimes; CECT-NAO-M;

ProjNet: Logged In User Page 13 of 180

8621716 Architectural A-702

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please clarify extent of wall protection FRP1 required in Sundries Shop 143. Finish Schedule A-702 Note 12 requires wall protection in the back storage area, however, the extent of the wall protection is not indicated.

1-1 Government Response. Height and extent of FRP in the Sundries shop- All walls to 5'-0" high.

Information for this report is procurement sensitive.

8622940 Architectural A-115

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

CW16 is indicated at 4 locations along Column Line XB.5 on Sheet A-115. Two (2) of the locations indicate a 20' wide curtain wall which aligns with the CW16 Elevation on Sheet A-608. The other 2 locations are 13'-4" wide.

Please provide a Curtain Wall elevation for these 2 locations.

Government Response. Two bays identified as 13'-4" are 13'-4 3/8", and are similar to CW16, just less wide.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8623059 Architectural A-116

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

At Col Line X15/X15.4 on Sheet A-116, there is a Curtain Wall tag CW17. The East Elevation - Overall on Sheet A-202 appears to indicate Curtain Wall CW18 at this location. Please verify the curtain wall tag at this location.

Government Response. CW18 should occur in this location.

Information for this report is procurement sensitive.

8623135 Architectural A-120

Please confirm that the CW12 tag at Col Line R/16 on Sheet A-120 should be W11.

Government Response. Window indicated is a W11.

Information for this report is procurement sensitive.

8623344 Architectural A-106

ProjNet: Logged In User Page 14 of 180

The exterior windows at the Metrology Lab and the Mylar Room on Sheet A-106 are not tagged. Please identify windows at these locations

Government Response. Windows are correctly identified as W6 (North wall) and W7 (East wall) and drawing A-106.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8625535 Specifications attachment 12 and 13

Attachments 12 and 13 are missing from the beta.Sam site.

Government Response. Attachments 12 and 13 are two volumes of the design analysis. These will not be released during solicitation.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8625661 Security 00 10 00 - Solicitation Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that pathways associated with CLIN Options 0012 CCTV and 0013 IDS/ACS are to be included in CLIN 0002 DLA Aviation Ops Center.

Government Response. The pathways for CLIN options 0012 CCTV and 0013 IDS/ACS are included in CLIN 0002 DLA Aviation Ops Center, as indicated in the current drawings.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8625689 Industrial Hygiene ES101 & ES102

Please confirm that existing transformers which are indicated to be removed are free of PCBs

Government Response. Confirmed by DSCR.

ProjNet: Logged In User Page 15 of 180

8625709 General 00 10 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please provide a specification and identify locations for Audio Visual Equipment (Televisions) to be provided per

CLIN 0014

Government Response. Locations have been added to the Architectural floor plans and Specs provided in Amendment 1.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8626485 General 00 10 00

Please provide a complete asphalt paving specification.

Government Response. Asphalt Specification will be issued in Amendment #3

8626489 Civil 31 63 29 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 31 63 29 Paragraph 1.1,a. states that, "Requirements for construction scheduling related to drilled concrete piers or shaft work are specified in Section 01 32 17.00 20 NETWORK ANALYSIS SCHEDULES (NAS)". However, this section was not provided. Please advise.

1-4 Government Response. Paragraph/Reference will be (was) removed. Schedule shall be provided by Contractor and approved by COR. Amendment will be (was) provided.

ProjNet: Logged In User Page 16 of 180

8626493 Civil 31 63 29

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 31 63 29 Paragraph 1.1,b. states that, "Requirements for price breakdown of drilled concrete piers or shaft work are specified in Section 01 22 00.00 10 MEASUREMENT AND PAYMENT". However, this section was not provided. Please advise.

Government Response. Paragraph/Reference will be removed in upcoming amendment. Cost will be in number and length, and provided in Lump Sum by Contractor.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8626502 Architectural A-106

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The Metrology Lab (Rm 150) appears to have windows on the North and West side, see elevation on E1/A-201 and elevation on A-202. This window is not identified on the plan drawing A-106. Confirm and identify the window opening at this location.

1-1 Government Response. Windows are correctly identified on drawing A-106 as type W6 (North Wall) and W7 (West Wall).

Current Request Status: Request Closed Information for this report is procurement sensitive.

8626507 Architectural A-106

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The Mylar Room (Rm 151) has what appear to be windows on the West wall. Between of line P and R and K and L.

The area in question has dimensions assigned to it. No information on the windows is given. They do show up on Elevation A-202. Please identify the window type for this location.

Government Response. Window Type W7 is indicated on Drawing A-106. By: Dianne Grimes; CECT- NAO-M; (7572017839) On: Jun 16 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8626514 Civil CP104

ProjNet: Logged In User Page 17 of 180

Bid Option Note #2 on CP104 states that, "Bid Option for the parking lot area provides asphalt to final grade in lieu of gravel as identified on sheet CP103". However, gravel is still shown at the parking spaces on CP104. Please advise.

1-2 Government Response. The hatch for the gravel parking spaces on sheet CP104 will be changed to light duty asphalt. Amended drawing will be (was) provided. By: Tarik Booze; CENAO-CT Contracting Office;

(7572017103) On: Jun 17 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8626527 Architectural A-109

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please identify the items shown on the plans for the following corridors: 132, 1116, 245, 2226, 310, 410 and 510.

Are these counters, casework, filing cabinets and if so please provide an elevation to confirm configuration of casework.

1-1 Government Response. These are each casework, with counters, similar to Casework elevation A5/A-419 and mirror imaged. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jun 16 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8626532 Architectural A-109, D4/A-418

Please identify the windows to be located in the Sundries Shop (Rm 143), North and NE side.

1-1 Government Response. Windows shown are an interior, aluminum W11, 6'-8" x 6'-8", elevated on sheet A- 605, sharing details as indicated on A-610. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jun 16 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8626536 Architectural A-111

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please identify the window types to the left of the West Window W1 (between lines X7 and X8) and to the right of East window W1 (between lines X14.2 and X15).

1-1

ProjNet: Logged In User Page 18 of 180

Government Response. Each of those are type W11, as indicated on A-605. By: Dianne Grimes; CECT-

Current Request Status: Request Closed Information for this report is procurement sensitive.

8626540 Architectural A-111, A-112

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Are there casework pieces in the following locations, the plans indicate some type of counter and or casework:, Work Room 1154, Meeting Room 1130. File Room 2228.

1-1 Government Response. 1) In 1154 Workroom, provide base cabinet casework as indicated on A1/A-419 (base cabinets only)

2) In 1130 Meeting Room, provide casework similar to A1/A-419

3) In 2228 File Room, no shelving or casework is required in this room

Current Request Status: Request Closed Information for this report is procurement sensitive.

8626542 Architectural A-115

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please identify the windows in Conference Room 2203 and 2202 (exterior face), no information is given and they are not listed on the window schedule.

1-1 Government Response. Those windows are type W12, as indicated on A-605 By: Dianne Grimes; CECT-

Current Request Status: Request Closed Information for this report is procurement sensitive.

8626552 Architectural A-115

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

On page A115, column X6, and below row XG the window is labeled as W10 and continues off the grid for F2 section and into the G2 section on page A-116. On A116, the continuation of that perimeter wall, that same window is identified as CW11. Is the window W10, CW11 or some other window for this location?

1-2 Government Response. Window designations will be revised in an amended drawing.

Information for this report is procurement sensitive.

8627017 Architectural A-111 & A-605

ProjNet: Logged In User Page 19 of 180

There are six (6) windows along Col Line XB at Building Area F1 on Sheet A-111. Two (2) of the windows are not tagged. The other four (4) windows are all tagged W1 which per the Window Elevations on A-605 is a 6 panel wide by 2 panel high window. Two of the windows tagged W1 are four (4) panels wide by 2 panels high. Please provide correct window tags for these windows.

1-1 Government Response. The 6x2 windows are each W1. The 4x2 windows are each W8. The 2x2 windows are W11. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: Jun 16 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8627263 Architectural A-114, A-118, A-120, A-122

The windows located between Column Lines 16 and 17 in Building Area D on Floors 2 - 4 are tagged W1. Per Window Elevations on A-605, Window Tag W1 is a six (6) panel, 20' wide window. The Floor Plans indicated a five

(5) panel, 16'- 8" wide window. Please provide the correct Window Tag and Elevation for these windows.

1-1 Government Response. A new window type for a 5 panel x 2 panel window will be created. 16'-8" is the correct window width.

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8627286 Architectural A-114

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The window located between Column Lines 11 and 12 on Sheet A-114 is Tagged W10. Per Window Elevations on A-605, Window Tag W10 is a seven (7) panel, 23'-4" wide window. The Floor Plans and Building Elevations indicated a five (5) panel, 16'- 8" wide window at this location. Please provide the correct Window Tag for this window.

1-1 Government Response. A new window type, 5 panel x 2 panel will need to be created. The width of 16'-

8" is correct.

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8627427 Architectural A-116

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The Windows along Column Line X7 at the 2-Story Building Area G2 on Sheet A-116 are tagged as CW11. CW11 is shown on Sheet A-607 as a four (4) story curtain wall. Please provide the correct window tags for these locations.

1-2 Government Response. New window type designations are needed in this location. Amended

Elevations/Plans will be (were) published in an amendment. By: Tarik Booze; CENAO-CT Contracting Office; (7572017103) On: Jun 17 2020

ProjNet: Logged In User Page 20 of 180

8627459 Architectural A-115

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The window located on the west elevation between Column Lines XC.2 and XD on Sheet A-115 is Tagged W1. Per Window Elevations on A-605, Window Tag W1 is a six (6) panel, 20'-0" wide window. The Floor Plans and Building Elevations indicated a five (5) panel, 16'- 8" wide window at this location. Please provide the correct Window Tag for this window.

1-2 Government Response. New window type designations are needed in this location. Amended

Elevations/Plans will be (were) published in the upcoming amendment. By: Tarik Booze; CENAO-CT Contracting Office; (7572017103) On: Jun 17 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8627557 Architectural A-120

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that the Window on the South Elevation to the right of Column Line 15 on Sheet A-120 should be Tagged W11.

1-3 Government Response. The referenced window will be identified as W11 in Amended Elevations/Plans in the next amendment. By: Tarik Booze; CENAO-CT Contracting Office; (7572017103) On: Jun 25 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8627575 Architectural A-121

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that the window tag W10 on the North Elevation between Column Lines 9 and 10 on Sheet A-121 should be removed as this is part of CW8.

1-2 Government Response. Correct. W10 references windows on the 2nd and 3rd floors. 5th floor shall be

CW8. Amended Elevations/Plans will be (were) published in the next Amendment. By: Tarik Booze; CENAO-CT Contracting Office; (7572017103) On: Jun 17 2020

ProjNet: Logged In User Page 21 of 180

8632437 General solicitation

We respectfully request that the period of experience required to be extended from 5 years to 10 years, allowing for a full representation of the contractor's experience.

Government Response. Period of experience will be revised in Amendment #3.

Information for this report is procurement sensitive.

8632443 General solicitation Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

We respectfully request to increase the potential for competitive bids; that the relevancy criteria be revised to allow for vertical new construction of a fully enclosed building with 140,000 square feet of space or greater and/or construction value of a submitted project approximates a range from $40M or greater.

Government Response. The relevancy criteria will be (was) revised in Amendment #3.

8635929 Civil CG101

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The Civil drawings do not indicate the existing grades between Building 33 and the new Phase 1 Operations Building. Please provide a plan showing existing grades

Government Response. CD and CE and V drawings do indicate grades between buildings.

Information for this report is procurement sensitive.

8635961 Civil CS101 - CS104

Can civil CAD be provided to bidders to aid in takeoff/estimating?

ProjNet: Logged In User Page 22 of 180

Government Response. CAD drawings will not be provided.

8637667 Civil C-504 & A-423

Comment Classification: UNCLASSIFIED (U)

1. Sheet C-504 Detail C1 indicates a 8" dia. Bollard detail Detail D6 indicates the bollard to be 6" diameter. Please clarify.

2) Detail D6/C-504 indicates bollards are indicated on sheet CS 103. CS 103 does not indicate any bollards. Please clarify.

3) Sheet A-423 keynote 4 states to see C-512 for bollard details, C-512 does not mention a bollard on the drawing, please clarify.

Government Response. 1. Bollard shall be 8" dia.

2. Detail D6 shall be revised to state, "Typical Concrete Bollard,"and it shall be 8" dia.

3. A-423 is referencing C-504 in Keynote 4.

The next Amendment will capture the changes stated above.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8637676 Civil CG-101, CG-102 & CG-103

Comment Classification: UNCLASSIFIED (U)

1. Refer to grading drawings CG101, CG102, and CG103. The grading drawings only show the new contour lines, and not the existing contour lines. Please provide drawings with the existing contours.

2. Please provide the CAD files for the Civil drawings.

1-1 Government Response. Existing grades, where needed, are shown on the CE and CD drawings. CAD files are not typically provided to Contractors during bidding. By: Dianne Grimes; CECT-NAO-M;

ProjNet: Logged In User Page 23 of 180

8638022 Mechanical MH103, MH104

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

On sheet MH103, the double wall 14" round duct shown in the lobby area (RM 102)changes sizing as it crosses the match line to sheet MH104. Additionally the 8" round duct in the lobby area also does not carry through to MH104.

On sheet MH104 these ducts are shown to be 10" and 12" respectively. Please clarify duct sizing.

1-2 Government Response. The current drawings are correct. The transition from 12"to 8" is hidden in the printed drawings. The 12" duct transitions to an 8" duct after the 10" take-off to VAV 1-01B. The 8" duct serves VAV 1-01A. Refer to ID 8640284 response for the 14" duct shown on MH103 and 10" duct shown on MH104.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8638030 Inform Sys Comm Attachment 7

Please provide specifications for audio-visual equipment (televisions) for CLIN 0014.

1-3 Government Response. A specification for the televisions will be provided in the next amendment.

Information for this report is procurement sensitive.

8638041 General 1.3.1 01 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Reference specification 011100 1.5.2 "Project Phasing and Performance Period". This section outlines the phasing for the DLA OPS PHASE 2 project, however the scheduled start and completion dates are not provided. Please provide.

1-2 Government Response. Scheduled start and completions dates are dependent on the contract award date. Start date will begin the day the Notice-to-Proceed is issued. The contract duration is 1020 days. By:

Tarik Booze; CENAO-CT Contracting Office; (7572017103) On: Jun 17 2020

ProjNet: Logged In User Page 24 of 180

8638047 General 1.5.2 01 11 00

Reference specification 011100 1.5.2 "Project Phasing and Performance Period". This section states project duration is NTP + 1090 calendar days, however the solicitation states NTP + 10 + 1020. Please clarify as to whether the period of performance is 1090 or 1030 calendar days.

1-2 Government Response. The solicitation is correct. The specification will be (was) corrected in an upcoming amendment.

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8638055 Equipment A-421 01 11 00

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Reference 011100 1.18 and A-421 "Existing Equipment Schedule". The specifications outline two items of OFCI equipment "1) Engineering Equipment and 2) Mylar Storage – Archived Documents" whereas A-421 outlines twenty

(20) individual pieces of OFCI equipment. Please provide approximate value for the list of equipment outlined on A-421.

1-2 Government Response. The approximate value of the list of equipment will not be provided. By: Tarik Booze; CENAO-CT Contracting Office; (7572017103) On: Jun 17 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8638057 Equipment A-421

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Reference A-421 "Existing Equipment Schedule". Please provide detailed descriptions for all OFCI equipment, including but not limited to; Make, Model, Physical size, actual weight, etc.

1-2 Government Response. Sizes, descriptions, and arrangement are indicated on A-421.

Information for this report is procurement sensitive.

8638060 General Attachment 7 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please reference Attachment 7 – Part 1 – Price Schedule and the solicitation. CLIN 0011 references specification section 26 32 15.00. This specification section is not included. Specification section 26 32 14.00 10 is included.

Please clarify which is correct and provide the missing specification section if required.

ProjNet: Logged In User Page 25 of 180

1-2 Government Response. 26 32 14.00 10 is the correct reference.

Information for this report is procurement sensitive.

8638064 Antiterrorism-Force Protection

08 51 13

Reference specification section 08 51 13, para. 1.11.2 Minimum Antiterrorism Performance. Please provide the standoff distance and charge weight requirements for the exterior glazing.

1-2 Government Response. The 2018 UFC 4-010-01 changed so the standoff distance is to the base perimeter. The standoff distance is 675' to the closest perimeter fence. Charge weight is Type II.

Current Request Status: Request Closed Information for this report is procurement sensitive.

8638081 Architectural A-609

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Reference A-609, CW22. CW22 is too wide and requires a vertical mullion. Please confirm a vertical mullion is allowed in this location.

1-4 Government Response. A middle vertical mullion shall be provided in this location. An amended drawing will be provided in the next amendment.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .