Design-bid-build, P1044, pier 31 extension naval submarine base new london, groton, connecticut

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
N4008524R2503
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
New London, Connecticut, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Navy Naval Facilities Engineering Command is procuring design-bid-build construction services for the Pier 31 Extension at the Naval Submarine Base New London in Groton, Connecticut. This major infrastructure project involves constructing a concrete-filled steel pipe pile supported pier extension with a concrete deck, mooring fittings, mechanical and electrical utilities, an integrated composite fender system, and specialized equipment including composite camels. The work also includes demolition of existing Piers 10 and 17, dredging operations, and environmental mitigation requirements, along with multiple bid options for additional pier reconstruction work and compressed air system installation. The government will evaluate proposals on a best value tradeoff basis considering technical factors, past performance, and small business utilization as key criteria. Following multiple amendments extending the deadline, proposals are now due by July 30, 2025, with Amendment 0007 recently incorporating requirements for a Project Labor Agreement for this large-scale construction project.

This solicitation does not include any set-aside designations and is open to full and open competition. The project is classified as a large-scale construction project with an estimated total cost between $100 million to $250 million, reflecting the substantial scope of marine construction work required. The contract will be awarded as a firm-fixed-price arrangement with a base period and multiple bid options that can be exercised within 365 days of contract award. Construction work will be performed at the Naval Submarine Base New London in Groton, Connecticut, with the pier extension specifically located at Pier 31. The project includes extensive technical requirements for marine construction, including pile installation, dredging approximately 50,000 cubic yards of sediment, and installation of sophisticated berthing infrastructure to support submarine operations.

Notice text

7 versions

Update #7 · Latest ·

Please see solicitation, amendments, and all applicable attachments.

** Please note that due to size constraints, Attachment O&M Manual Volume I to VIII Full - February 2021 is ONLY provided on PIEE. 

Update #6 ·

Please see solicitation, amendments, and all applicable attachments.

Update #5 ·

Please see solicitation, amendments, and all applicable attachments.

Update #4 ·

Please see solicitation and all applicable attachments.

****PLEASE NOTE- Due to size, Attachment Pier P1044-Amend 0002- Amended Drawings that is provided with Amendment 0002 and Pier P1044-Amend 0002- Amended Drawings - Signed that is provided with Amendment 0003 is uploaded within PIEE. Please look on PIEE for that attachment. 

****PLEASE NOTE - Due to file type, the 19 Drawing Files associated with PPI #41 that is provided with Amendment 0003 is uploaded within PIEE. Please look on PIEE for those attachments. 

Update #3 ·

Please see solicitation and all applicable attachments.

****PLEASE NOTE- Attachment Pier P1044-Amend 0002- Amended Drawings that is provided with Amendment 0002 is uploaded within PIEE. Please look on PIEE for that attachment. 

Update #2 ·

Please see solicitation and all applicable attachments.

Update #1 ·

Please see solicitation and all applicable attachments.

Files

File Type Posted
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
S-533A STAIR FOR AIR COMP ACCESS (BID OPTION 5).pdf PDF
APPROVAL of SIUGP RegistrationCTSIU0026.pdf PDF
MW Pier 31.pdf PDF
REV CN102 RELOCATED FLOATING SECURITY BARRIER PLAN.pdf PDF
Final Pier 32 Sediment Sampling Results Report January 2014.pdf PDF
Basewide LUC map.pdf PDF
2024 Dig Permit - (Purpose) Template.pdf PDF
MW Pier 10.pdf PDF
Amendment 0004.pdf PDF
E-601 - UNIT SUBSTATION P31N SWITCHGEAR SCHEDULES.pdf PDF
Pier 31 - Crane Weight Test Area-E-108.pdf PDF
SUBASENLONINST 5090.25B Enclosure 3.pdf PDF
Rev 3 - Attachment H- Price Proposal Form.pdf PDF
Rev 2 - Attachment H- Price Proposal Form.docx DOCX document
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Revised Attachment H - Price Proposal Form.docx DOCX document
Amendment 0001.pdf PDF
Attachment J - Site Visit Log.pdf PDF
Attachment A Pre Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment D Past Performance Questionnaire.docx DOCX document
spc P1044 Final 100 pct rev1 Appendix A - 1 of 2 Pier 31 Record Drawings.pdf PDF
spc P1044 Final 100 pct rev1 Appendix E - Sediment Sampling results.pdf PDF
spc P1044 Final 100 pct rev1 Appendix F - Stormwater Management Plan and Permit 1 of 2.pdf PDF
spc P1044 Final rev1 Appendix H marina dwgs.pdf PDF
Attachment C Construction Experience Project Data.docx DOCX document
Attachment H Price Proposal Form.pdf PDF
dwg p1044 final 100 pct plans sat date.pdf PDF
spc P1044 Final 100 pct rev1 Appendix F - Stormwater Management Plan and Permit 2 of 2.pdf PDF
Solicitation N4008524R2503.pdf PDF
Attachment E Historical Small Business Utilization.docx DOCX document
Attachment F Small Business Participation Commitment.docx DOCX document
Attachment G Individual Small Business Subcontracting Plan.docx DOCX document
spc P1044 Final 100 pct rev1 Appendix A - 2 of 2 Pier 10 and 17 Stub Record Drawings.pdf PDF
Pier 31 JA Electrical Equipment Redacted.pdf PDF
spc P1044 Final 100 pct rev1 Appendix G - Pier 31 Existing Substation Shop drawings.pdf PDF
Attachment B PIEE Vendor Access Instructions.pdf PDF
Attachment I Base map.pdf PDF
spc P1044 Final 100 pct rev1 Appendix B - Temporary Environmental Controls.pdf PDF
spc P1044 Final 100 pct rev1 Appendix C - Environmental permits placeholder.pdf PDF
spc P1044 Final 100 pct rev1 Appendix D - HazMat Report.pdf PDF
spc P1044 Final 100 pct specification rev1.pdf PDF
Show all 45

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Building 141 Generator Replacement Groton, Connecticut 06349, United States · NAICS 236220 Naval Facilities Engineering Command Competitive 8(a)
Building 434 Roof Repair Groton, Connecticut 06340, United States · NAICS 236220 Naval Facilities Engineering Command Competitive 8(a)
P084 next generation torpedo integration lab, naval station newport, newport RI Newport, Rhode Island 02841, United States · NAICS 236220 Naval Facilities Engineering Command No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors