This document appears to be a design drawing, E-601 - UNIT SUBSTATION P31N SWITCHGEAR SCHEDULES, related to a federal contract opportunity for the DESIGN-BID-BUILD, P1044, PIER 31 EXTENSION NAVAL SUBMARINE BASE NEW LONDON, GROTON, CONNECTICUT project.

The drawing provides details on the 15KV switchgear and pad-mounted transformer equipment required for the industrial power distribution at the Pier 31 extension. It includes one-line diagrams, equipment details, and cabling information. The related federal contract opportunity, solicitation number N4008524R2503, is being issued by the Department of the Navy Naval Facilities Engineering Command for the design and construction work on the Pier 31 extension project at the Naval Submarine Base New London in Groton, Connecticut. The drawing appears to be part of the technical specifications or drawings included with the solicitation.

View the file

Other files

File Type Posted
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
2024 Dig Permit - (Purpose) Template.pdf PDF
Final Pier 32 Sediment Sampling Results Report January 2014.pdf PDF
MW Pier 31.pdf PDF
Amendment 0005.pdf PDF
S-533A STAIR FOR AIR COMP ACCESS (BID OPTION 5).pdf PDF
APPROVAL of SIUGP RegistrationCTSIU0026.pdf PDF
MW Pier 10.pdf PDF
Basewide LUC map.pdf PDF
REV CN102 RELOCATED FLOATING SECURITY BARRIER PLAN.pdf PDF
Rev 3 - Attachment H- Price Proposal Form.pdf PDF
Amendment 0004.pdf PDF
Pier 31 - Crane Weight Test Area-E-108.pdf PDF
SUBASENLONINST 5090.25B Enclosure 3.pdf PDF
Amendment 0003.pdf PDF
Rev 2 - Attachment H- Price Proposal Form.docx DOCX document
Amendment 0002.pdf PDF
Revised Attachment H - Price Proposal Form.docx DOCX document
Amendment 0001.pdf PDF
Attachment J - Site Visit Log.pdf PDF
dwg p1044 final 100 pct plans sat date.pdf PDF
spc P1044 Final 100 pct rev1 Appendix G - Pier 31 Existing Substation Shop drawings.pdf PDF
spc P1044 Final 100 pct rev1 Appendix F - Stormwater Management Plan and Permit 2 of 2.pdf PDF
Attachment E Historical Small Business Utilization.docx DOCX document
Solicitation N4008524R2503.pdf PDF
spc P1044 Final 100 pct rev1 Appendix D - HazMat Report.pdf PDF
Attachment I Base map.pdf PDF
spc P1044 Final 100 pct rev1 Appendix C - Environmental permits placeholder.pdf PDF
spc P1044 Final 100 pct rev1 Appendix F - Stormwater Management Plan and Permit 1 of 2.pdf PDF
spc P1044 Final rev1 Appendix H marina dwgs.pdf PDF
Attachment H Price Proposal Form.pdf PDF
spc P1044 Final 100 pct specification rev1.pdf PDF
spc P1044 Final 100 pct rev1 Appendix B - Temporary Environmental Controls.pdf PDF
spc P1044 Final 100 pct rev1 Appendix A - 1 of 2 Pier 31 Record Drawings.pdf PDF
Attachment A Pre Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment B PIEE Vendor Access Instructions.pdf PDF
Attachment C Construction Experience Project Data.docx DOCX document
spc P1044 Final 100 pct rev1 Appendix E - Sediment Sampling results.pdf PDF
Attachment D Past Performance Questionnaire.docx DOCX document
spc P1044 Final 100 pct rev1 Appendix A - 2 of 2 Pier 10 and 17 Stub Record Drawings.pdf PDF
Attachment F Small Business Participation Commitment.docx DOCX document
Pier 31 JA Electrical Equipment Redacted.pdf PDF
Attachment G Individual Small Business Subcontracting Plan.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15KV15KV 15KV

P31A

600A DEADBREAK ELBOW

CONNECTORS (TYPICAL)

FAULT INTERRUPTER

(TYPICAL)

15KV

P31B LOAD INTERRUPTER

(TYPICAL)

TO PIER 31

FEEDER M12N FROM

MAIN SUBSTATION B-463

MANHOLE 204AE

SF6 INSULATED PAD-MOUNTED

SWITCHGEAR

FEEDER M2M FROM

MAIN SUBSTATION B-463

3-1/C-250 KCMIL (15KV) & 1 #4/0

(600V) GRD. - 5"C. + 1-5"C. SPARE

3-1/C-250 KCMIL (15KV) & 1 #4/0 (600V) GRD.

- 5"C. + 1-5"C. SPARE

3-1/C-500 KCMIL (15KV) & 1 #4/0 (600V) GRD.

(NOT IN MANHOLE 204AE)

3-1/C-500 KCMIL (15KV) & 1 #4/0

(600V) GRD.

3-1/C-500 KCMIL (15KV) & 1 #4/0 (600V) GRD.

M2M

M2M

M12N

M12N FEEDER M12N

FROM MANHOLE 204E

FEEDER M12N TO POWER PLANT

13.8KV RINGBUS(MH203E)

FEEDER M2M

FROM MANHOLE 204E

FEEDER M2M TO POWER PLANT

13.8KV RING BUS(MH203E)

FEEDER M12N TO

MANHOLE 204E (PULL THRU CKT)

FEEDER M2M TO

MANHOLE 204E (INLINE SPLICE)

FEEDER P31S-T2

TO XFMR P31S-T2

FEEDER P31N-T2

TO XFMR P31N-T2

FEEDER P31N-T1

TO XFMR P31N-T1

FEEDER P31S-T1

TO XFMR P31S-T1

FDR P31S-T4 TO XFMR P31S-T4

INDUSTRIAL POWER (M12N)

FDR P31N-T3 TO

XFMR P31N-T3

INDUSTRIAL

POWER(M2M)

(M2M)

(M2M) (M12N)

(M12N)

5 6 7 8 9 10

2 3

1. 600A., 15.5KV, 95KV BIL, 5 SWITCHED WAYS, 2-600A LOAD INTERRUPTER &

3-200A FAULT INTERRUPTER EACH SWITCHED WAY IS 3 POSITION, OPEN,

CLOSED, GROUND.

2. REFER TO DRAWING E-108 FOR ADDITIONAL INFORMATION.

WORK KEYNOTE:

NOTE:

1. ALL EQUIPMENT SHOWN IS EXISTING. SEE PLANS FOR REQUIRED

FEEDERS 5, 6, 9 AND 10 DEMOLITION AND REPLACEMENT.

EXISTING 4-WAY PRIMARY SWITCH

'SW175' WITH SPARE POSITION

400A, 480V, 3PH, 4W,

NEMA 3R ENCLOSURE

5"C., 3-1/C 250KCMIL

(15KV) & 1#4/0GND (600V)

150 KVA XFMR

13.8KV-480V

3∅, 4W, 60HZ

PAD MOUNTED

TYPE

CRANE

DISCONNECT/

RECEPTACLE

CRANE

DISCONNECT/

RECEPTACLE

2"C., 4#3/0, 1#8 GND

2"C., 4#4/0 & 1#4GND

200A 200A200A200A

225A

SPARE SPARE

CURRENT TRANSFORMERS

3-POLE FUSE BLOCK

WATTHOUR DEMAND

METER WITH 10-POLE

DISCONNECT SWITCH

SECONDARY COMPARTMENT

LOW VOLTAGE CABLE

TERMINATIONS

GROUND PAD (TYP OF 2)

CONCRETE PAD

GRADE

SURGE ARRESTERSBAYONET OIL-IMMERSED

EXPULSION FUSES

PRIMARY COMPARTMENT

2 POSITION LOAD

BREAK OIL SWITCH

OIL-IMMERSED

CURRENT-LIMITING FUSES

TRANSFORMER

BUSHING WELL

BUSHING INSERT

PRIMARY NEUTRAL

LOAD BREAK

CONNECTOR

CABLE WELL

PRIMARY CIRCUIT

X0

WHD

#2 BARE

#4/0 BARE

COPPER GROUNDING CONDUCTORS

COMM CIRCUIT (NOTE 2)

SPARE CONDUIT (NOTE 1)

SECONDARY CIRCUIT

600V INSULATION

NOTES:

1. PROVIDE ONE 1-INCH SPARE CONDUIT STUBBED-OUT FIVE FEET FROM PAD. COORDINATE

WITH ACTIVITY FOR ADDITIONAL METERING INPUT (GAS, STEAM OR WATER SYSTEMS).

2. PROVIDE 1"C. AND METER WIRING FROM TRANSFORMER METER TO BUILDING 175.

EXTEND CONDUIT AND WIRING IN BUILDING 175 TO COMMUNICATIONS AREA (ASSUME 100

LINEAR FEET INSIDE BUILDING). COORDINATE METER TIE IN REQUIREMENTS WITH BASE

AND AMI SYSTEM MANUFACTURER.

#4/0 BARE COPPER GROUND LOOP

ENCIRCLING ENTIRE CONCRETE PAD. MIN

18" BELOW FINISHED GRADE.

GROUND ROD, TYP OF 4, 1

AT EACH CORNER OF

PAD.

[MULTI-GROUNDED PRIMARY SYSTEM (DELTA-WYE) - WITH SURGE ARRESTERS]

2'-0" MIN.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

LCDR Peter Fovargue FEAD

8/ 9/

:0

6:

P M

BI

M

3_

FY

_M C

O N

_P

_S

U

BM

AR

IN

E_

PI

ER

_3

1_

EX

T/

PI

ER

P1

4-

1-

E.

rv t

E-601

P1

SU

BM

AR

IN

E

PI

ER

EX

TE

NS

IO

N

UN

IT

S

UB

ST

AT

IO

N

P3 1N

S W

IT

CH

G

EA

R

SC

HE

DU

LE

S

DJS

12888148

DJS HBF

11/7/2023

JGG / RSF

1683671

GR

OT

ON

, C

T

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

EJA

JAS

DSN

C I C

O R

E -H

AM

PT

O N

R O

AD

S

E-

NOT TO SCALEA1 PARTIAL ONE-LINE DIAGRAM (15KV AT AMBERJACK ROAD)

NOT TO SCALEC2 CRANE WEIGHT HANDLING ONE-LINE DIAGRAM

NOT TO SCALEA3 DETAIL - PAD MOUNTED TRANSFORMER

E-108

E-108

SY

M

DE

S C

RI

PT

I O N

DA

TE

AP

PR

PP

I-8

/30

/24

RJ

W

Sheets
E-601 - UNIT SUBSTATION P31N SWITCHGEAR SCHEDULES
2024-08-15T16:59:02-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2024-08-15T16:59:44-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.

File details come from the government source that posted it. Updated .