SUBASENLONINST 5090.25B Enclosure 3.pdf

PDF 307 KB Posted

Attached to
DESIGN-BID-BUILD, P1044, PIER 31 EXTENSION NAVAL SUBMARINE BASE NEW LONDON, GROTON, CONNECTICUT
Solicitation number
N4008524R2503
Issued by

About this file

This document is Enclosure (3) to SUBASENLONINST 5090.25B, dated 8 July 20, related to the federal contract opportunity for the DESIGN-BID-BUILD, P1044, PIER 31 EXTENSION NAVAL SUBMARINE BASE NEW LONDON, GROTON, CONNECTICUT solicitation number N4008524R2503.

The solicitation is for design-bid-build services for the pier 31 extension at the Naval Submarine Base New London in Groton, Connecticut. The solicitation is being issued by the Department of the Navy Naval Facilities Engineering Command. The document does not provide specific details on the required products or services, response dates, award dates, pricing terms, or set asides. It appears to be an appendix or related document that does not directly address the requirements of the federal contract opportunity.

View the file

Other files

File Type Posted
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
2024 Dig Permit - (Purpose) Template.pdf PDF
Final Pier 32 Sediment Sampling Results Report January 2014.pdf PDF
MW Pier 31.pdf PDF
Amendment 0005.pdf PDF
S-533A STAIR FOR AIR COMP ACCESS (BID OPTION 5).pdf PDF
APPROVAL of SIUGP RegistrationCTSIU0026.pdf PDF
MW Pier 10.pdf PDF
Basewide LUC map.pdf PDF
REV CN102 RELOCATED FLOATING SECURITY BARRIER PLAN.pdf PDF
E-601 - UNIT SUBSTATION P31N SWITCHGEAR SCHEDULES.pdf PDF
Rev 3 - Attachment H- Price Proposal Form.pdf PDF
Amendment 0004.pdf PDF
Pier 31 - Crane Weight Test Area-E-108.pdf PDF
Amendment 0003.pdf PDF
Rev 2 - Attachment H- Price Proposal Form.docx DOCX document
Amendment 0002.pdf PDF
Revised Attachment H - Price Proposal Form.docx DOCX document
Amendment 0001.pdf PDF
Attachment J - Site Visit Log.pdf PDF
dwg p1044 final 100 pct plans sat date.pdf PDF
spc P1044 Final 100 pct rev1 Appendix G - Pier 31 Existing Substation Shop drawings.pdf PDF
spc P1044 Final 100 pct rev1 Appendix F - Stormwater Management Plan and Permit 2 of 2.pdf PDF
Attachment E Historical Small Business Utilization.docx DOCX document
Solicitation N4008524R2503.pdf PDF
spc P1044 Final 100 pct rev1 Appendix D - HazMat Report.pdf PDF
Attachment I Base map.pdf PDF
spc P1044 Final 100 pct rev1 Appendix C - Environmental permits placeholder.pdf PDF
spc P1044 Final 100 pct rev1 Appendix F - Stormwater Management Plan and Permit 1 of 2.pdf PDF
spc P1044 Final rev1 Appendix H marina dwgs.pdf PDF
Attachment H Price Proposal Form.pdf PDF
spc P1044 Final 100 pct specification rev1.pdf PDF
spc P1044 Final 100 pct rev1 Appendix B - Temporary Environmental Controls.pdf PDF
spc P1044 Final 100 pct rev1 Appendix A - 1 of 2 Pier 31 Record Drawings.pdf PDF
Attachment A Pre Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment B PIEE Vendor Access Instructions.pdf PDF
Attachment C Construction Experience Project Data.docx DOCX document
spc P1044 Final 100 pct rev1 Appendix E - Sediment Sampling results.pdf PDF
Attachment D Past Performance Questionnaire.docx DOCX document
spc P1044 Final 100 pct rev1 Appendix A - 2 of 2 Pier 10 and 17 Stub Record Drawings.pdf PDF
Attachment F Small Business Participation Commitment.docx DOCX document
Pier 31 JA Electrical Equipment Redacted.pdf PDF
Attachment G Individual Small Business Subcontracting Plan.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBASENLONINST 5090.25B

8 July 20

Enclosure (3)

File details come from the government source that posted it. Updated .