This document is Appendix B - Temporary Environmental Controls, which is part of the solicitation for the Design-Bid-Build, P1044, Pier 31 Extension project at the Naval Submarine Base New London in Groton, Connecticut (Solicitation Number N4008524R2503).
Appendix B provides technical specifications for temporary environmental controls required during the construction project. Key details include requirements for air pollution control, water pollution control, and noise and vibration control. The controls must meet all applicable federal, state, and local environmental regulations. Contractors are required to submit plans detailing their proposed temporary environmental control measures for government review and approval prior to construction. Specific requirements are provided for air monitoring, wastewater treatment, and noise mitigation. This appendix outlines the temporary environmental management and compliance obligations for the selected contractor on this construction project.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
eProject No. P-1044 Submarine Pier 31 Extension Naval Submarine Base New London - Groton, CT
Appendix B
APPENDIX 'B'
Temporary Environmental Controls
Attachments
1683671
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X13MW2
13MW1
FOMW13
FOMW15
TMW4
TMW3
13MW20
13MW21
13MW19
MW1-1PD
TMW5
1MW4
1MW2
1MW1S
TMW2
1MW5
13MW61MW3
13MW10
13MW11
FOMW16
FOMW14
TMW3
29490
X X
X X
X X
X X
X X
SITE
FORMER
UST
FORMER
UST
SITE 11
ACTIVE
UST
ZONE 1
ZONE 2
TMW1
1MW6
1MW7
1MW8
1MW9
1MW10
1MW11
BUILDING 89
FORMER UST
IRP 10:
FUEL STORAGE TANKS
AND TANK 54 H
IRP 11:
POWER PLANT
OIL TANKS
N U
M
BE
R D
R
AW
IN
G
-A
O
FF
IC
E
M
ID
-A
TL
AN
TI
C
ZO
N
ES
A N
D
L O
W
ER
S U
BB
AS
E, O
PE
R
AB
LE
U N
IT
SI
TE
L
AY
O U
T R
E V
I S
I O N
S
A P
TI
M
F ed er al
S er vi ce s
LL
C
B ou sh
S tre et , S ui te
N or fo lk
, V irg in ia
13MW11
X X
X X
X X
13MW2
13MW1
FOMW13
FOMW15
TMW4
TMW3
13MW20
13MW21
13MW19
MW1-1PD
TMW5
1MW4
1MW2
1MW1S
TMW2
1MW5
1MW3
FOMW16FOMW14
TMW3
SITE10
FORMERUST
FORMERUST
SITE 11
ACTIVEUST
ZONE 1
ZONE 2
1MW6
1MW7
1MW8
1MW9
1MW10
1MW11
N U
M
BE
R D
R
AW
IN
G
-A
O
FF
IC
E
M
ID
-A
TL
AN
TI
C
ZO
N
ES
A N
D
L O
W
ER
S U
BB
AS
E, O
PE
R
AB
LE
U N
IT
M O
N
IT
O R
IN
G
W E
LL
L
O C
AT
IO
N S
R E
V I
S I O
N S
A P
TI
M
F ed er al
S er vi ce s
LL
C
B ou sh
S tre et , S ui te
N or fo lk
, V irg in ia
13MW11
AUXILIARY MANIFOLD
BIOSPARGE
TREATMENT SYSTEM
1MW6
joseph.mccloud Callout Additional Well is proposed to be installed based on discussions with EPA
Bureau of Materials Management and Compliance Assurance DEEP-WPED-GP-012 Page 1 of 66 Rev. 05/03/18
General Permit for Miscellaneous Discharges of
Sewer Compatible (MISC) Wastewater
Effective Date: May 3, 2018 Expiration Date: October 30, 2020
Water Permitting and Enforcement Division
860-424-3025
79 Elm Street • Hartford, CT 06106-5127 www.ct.gov/deep Affirmative Action/Equal Opportunity Employer
DEEP-WPED-GP-012 Page 2 of 66 Rev. 05/03/18
General Permit for Miscellaneous Discharges of
Table of Contents
Section 1. Authority Section 2. Definitions……………………………………………………………………………….. .4 Section 3. Authorization Under This General Permit
(a) Eligible Activities
(b) Requirements for Authorization
(c) Geographic Area
(d) Effective Date and Expiration Date of this General Permit
(e) Effective Date of Authorization
(f) Transition to and from an Individual Permit
Section 4. Registration Requirements
(a) Who Must File a Registration
(b) Renewal Registration Timeline and Fee…………
(c) Contents of Registration
(d) Scope of Registration
(e) Contents of a Modified Registration
(f) Where to File a Registration or Modified Registration
(g) Additional Information
(h) Action by Commissioner
Section 5. Conditions of This General Permit
(a) Effluent Limits and Conditions
(b) Monitoring Requirements
(c) Reporting Requirements
(d) Recording and Reporting Violations
(e) Operating Conditions
(f) Additional Specific Operating Conditions and BMP’s by Type of Wastewater
(g) Regulations of CT State Agencies Incorporated into this General Permit
Section 6. General Conditions
(a) Reliance on Registration
(b) Duty to Correct and Report Violations
(c) Duty to Provide Information
(d) Certification of Documents
(e) Date of Filing
(f) False Statements
(g) Correction of Inaccuracies
(h) Transfer of Authorization
(i) Other Applicable Law
(j) Other Rights
DEEP-WPED-GP-012 Page 3 of 66 Rev. 05/03/18
Section 7. Commissioner’s Powers
(a) Minor Variance Provision
(b) Abatement of Violations
(c) General Permit Revocation, Suspension, or Modification
(d) Public Notice of Facilities in Significant Noncompliance
(e) Filing of an Individual Permit Application
Appendix A: General Definitions Appendix B: Operation and Maintenance Plan Appendix C: Spill Prevention and Control Plan Appendix D: POTW- Specific Effluent Limits Appendix E: Section 22a-430-4 RCSA, Appendix B, Tables II, III, V and Appendix D
DEEP-WPED-GP-012 Page 4 of 66 Rev. 05/03/18
General Permit for Miscellaneous Discharges of
Section 1. Authority
This general permit is issued under the authority of section 22a-430b of the General Statutes.
Section 2 Definitions
The definitions of terms used in this general permit shall be the same as the definitions contained in section 22a-423 of the General Statutes and section 22a-430-3(a) of the Regulations of State Agencies. Additional definitions associated with this general permit are included in Appendix A.
Section 3. Authorization under This General Permit
(a) Eligible Activities This general permit authorizes the discharge of MISC wastewater, as defined in this general permit, to a publicly owned treatment works (POTW):
by sanitary sewer; or when transported by a licensed waste hauler in accordance with Section 5(e)(4) of this general permit.
(b) Requirements for Authorization
This general permit authorizes the activity listed in Section 3(a) of this general permit provided:
(1) Such activity is in compliance with registration requirements of Section 4 of this general permit.
(2) Coastal Area Management
Such activity is consistent with all-applicable goals and policies in section 22a- 92 of the General Statutes, and will not cause adverse impacts to coastal resources as defined in section 22a-93 of the General Statutes.
(3) Endangered and Threatened Species
Such activity does not threaten the continued existence of any species listed pursuant to section 26-306 of the General Statutes as endangered or threatened and will not result in the destruction or adverse modification of habitat designated as essential to such species.
(4) Aquifer Protection
Such activity, if it is located within an aquifer protection area as mapped under section 22a-354b of the General Statutes, complies with regulations adopted pursuant to section 22a-354i of the General Statutes.
DEEP-WPED-GP-012 Page 5 of 66 Rev. 05/03/18
(5) Conservation and Preservation Restrictions Such activity, if located on or may affect property subject to a conservation or preservation restriction, pursuant to section 47-42d of the Connecticut General Statutes, proof of written notice to the holder of such restriction of the proposed activity’s registration pursuant to this general permit or a letter from the holder of such restriction verifying that the proposed activity is in compliance with the terms of the restriction shall have been provided to the commissioner.
(6) Such wastewater is discharged to a POTW either directly via a sanitary sewer or by a properly licensed transporter in accordance with Section 5(e)(4) of this
(7) The registrant has certified in writing to the commissioner that a completed copy of the registration has been submitted to the applicable POTW Authority and the registrant has received written approval to discharge from such authority.
(8) Professional Certifications
If required by Section 4(c)(2)(Q) or Section 4(c)(2)(R) of this general permit, the registrant has submitted to the commissioner a written certification which, at a minimum, complies with the following requirements:
(A) such certification was signed by a Professional Engineer, Qualified
Professional Engineer, Certified Hazardous Materials Manager or Qualified Certified Hazardous Materials Manager as defined in this general permit;
(B) such certification is not the subject of an audit as described under section
22a-430b of the Connecticut General Statutes;
(C) the Professional Engineer or Qualified Professional Engineer or Certified Hazardous Materials Manager or Qualified Certified Hazardous Materials Manager signing the certification has, at a minimum, completely and thoroughly reviewed this general permit and the following regarding the discharges to be authorized under such general permit: (i) all registration information provided in accordance with Section 4(c)(2) of such general permit, (ii) the facility, based on a visual site inspection, (iii) compliance records, (iv) the Operation and Maintenance Plan, if required, (v) the Spill Prevention and Control Plan, (if required), (vi) all wastewater collection and treatment systems and monitoring equipment, including any plans and specifications, operating records and any Department approvals regarding such wastewater collection and treatment systems and monitoring equipment;
(D) (i) the professional engineer or qualified professional engineer signing the certification has made an affirmative determination, based on the review described in section 3(b)(8)(C) of this general permit, that: (i) the Operation and Maintenance Plan, if required, and the Spill Prevention and Control Plan, if required, which have been prepared in accordance with
DEEP-WPED-GP-012 Page 6 of 66 Rev. 05/03/18 this general permit are adequate to assure that the activity authorized under this general permit, if implemented in accordance with such plans, will comply with the terms and conditions of such general permit; and (ii) all wastewater collection and treatment systems and monitoring equipment: (aa) have been designed and installed to control pollution to the maximum extent achievable using measures that are technologically available and economically practicable; (bb) will function properly as designed based on visual inspection, compliance and operating records and implementation of the Operation and Maintenance Plan; , and (cc) are adequate to ensure compliance with the terms and conditions of this general permit;
(ii) the Certified Hazardous Materials Manager or Qualified Certified
Hazardous Materials Manager signing the certification has made an affirmative determination, based on the review described in section 3(b)(8)(C) of this general permit, that: (i) the Operation and Maintenance Plan, if required, and the Spill Prevention and Control Plan, if required, which have been prepared in accordance with this general permit are adequate to assure that the activity authorized under this general permit, if implemented in accordance with such plans, will comply with the terms and conditions of such general permit; and (ii) all wastewater collection and treatment systems and monitoring equipment: (aa) have been installed to control pollution to the maximum extent achievable using measures that are technologically available and economically practicable; (bb) will function properly based on visual inspection, compliance and operating records and implementation of the Operation and Maintenance Plan; and
(cc) are adequate to ensure compliance with the terms and conditions of this general permit;
(E) (i) the Professional Engineer or Qualified Professional Engineer certifies, provided it is true and accurate, to the following statement: “I hereby certify that I am a Professional Engineer or Qualified Professional Engineer as defined in the General Permit for Miscellaneous Discharges of Sewer Compatible (MISC) Wastewater. I am making this certification in connection with a registration under such general permit, submitted to the commissioner by [INSERT NAME OF REGISTRANT] for an activity located at [INSERT ADDRESS OF PROJECT OR ACTIVITY]. I have personally examined and am familiar with the information that provides the basis for this certification, including but not limited to all information described in Section 3(b)(8)(C) of such general permit, and I certify, based on reasonable investigation, including my inquiry of those individuals responsible for obtaining such information, that the information upon which this certification is based is true, accurate and complete to the best of my knowledge and belief. I further certify that I have made the affirmative determination required in accordance with Section 3(b)(8)(D)(i) of this general permit and that my signing this certification constitutes conclusive evidence of my having made such affirmative determination. I understand that this certification may be subject to an audit by the commissioner in accordance with Section 22a-430b of the Connecticut General Statutes, and I agree to cooperate with the
DEEP-WPED-GP-012 Page 7 of 66 Rev. 05/03/18 commissioner should such an audit be required, including, but not limited to providing information as may be requested in writing by the commissioner in connection with any such audit. I also understand that knowingly making any false statement in this certification may be punishable as a criminal offense, including the possibility of fine and imprisonment, under section 53a-157b of the Connecticut General Statutes and any other applicable law.”
(ii) the Certified Hazardous Materials Manager or Qualified Certified
Hazardous Materials Manager certifies, provided it is true and accurate, to the following statement: “I hereby certify that I am a Certified Hazardous Materials Manager or Qualified Certified Hazardous Materials Manager as defined in the General Permit for Miscellaneous Discharges of Sewer Compatible (MISC) Wastewater and as further specified in Section 3(b)(8) of such general permit. I am making this certification in connection with a registration under such general permit, submitted to the commissioner by [INSERT NAME OF REGISTRANT] for an activity located at [INSERT ADDRESS OF PROJECT OR ACTIVITY]. I have personally examined and am familiar with the information that provides the basis for this certification, including but not limited to all information described in Section 3(b)(8)(C) of such general permit, and I certify, based on reasonable investigation, including my inquiry of those individuals responsible for obtaining such information, that the information upon which this certification is based is true, accurate and complete to the best of my knowledge and belief. I further certify that I have made the affirmative determination required in accordance with Section 3(b)(8)(D)(ii) of this general permit and that my signing this certification constitutes conclusive evidence of my having made such affirmative determination. I understand that this certification may be subject to an audit by the commissioner in accordance with Section 22a-430b of the Connecticut General Statutes, and I agree to cooperate with the commissioner should such an audit be required, including, but not limited to providing information as may be requested in writing by the commissioner in connection with any such audit. I also understand that knowingly making any false statement in this certification may be punishable as a criminal offense, including the possibility of fine and imprisonment, under section 53a-157b of the Connecticut General Statutes and any other applicable law.”
(9) Certification Requirements for Registrants and other Individuals
As part of the registration for this general permit, the registrant and any other individual or individuals responsible for preparing the registration submits to the commissioner a written certification which, at a minimum, complies with the following requirements:
(A) The registrant and any other individual or individuals responsible for preparing the registration and signing the certification has completely and thoroughly reviewed, at a minimum, this general permit and the following regarding the activities to be covered under such general permit: (i) all
DEEP-WPED-GP-012 Page 8 of 66 Rev. 05/03/18 registration information provided in accordance with Section 4(c)(2) of such general permit, (ii) the facility, based on a visual site inspection, (iii) compliance records, (iv) the Operation and Maintenance Plan, if applicable (v) the Spill Prevention and Control Plan, if applicable, and
(vi) all wastewater collection and treatment systems and monitoring equipment, including any plans and specifications, operating records and any Department approvals regarding such wastewater collection and treatment systems and monitoring equipment;
(B) the registrant has, based on the review described in section 3(b)(9)(A) of this general permit, made an affirmative determination to: (i) comply with the terms and conditions of this general permit; (ii) maintain compliance with all plans and documents prepared pursuant to this general permit including, but not limited to, the Operation and Maintenance Plan, if applicable, and the Spill Prevention and Control Plan, if applicable, and
(iii) properly operate and maintain all wastewater collection and treatment systems and monitoring equipment in compliance with the terms and conditions of this general permit to protect the waters of the state from pollution;
(C) such registrant certifies to the following statement: “I hereby certify that
I am making this certification in connection with a registration under such general permit, submitted to the commissioner by [INSERT NAME OF REGISTRANT] for an activity located at [INSERT ADDRESS OF PROJECT OR ACTIVITY] and that such activity is eligible for authorization under such permit. I certify that the registration filed pursuant to this general permit is on complete and accurate forms as prescribed by the commissioner without alteration of their text. I certify that I have personally examined and am familiar with the information that provides the basis for this certification, including but not limited to all information described in Section 3(b)(9)(A) of such general permit, and I certify, based on reasonable investigation, including my inquiry of those individuals responsible for obtaining such information, that the information upon which this certification is based is true, accurate and complete to the best of my knowledge and belief. I further certify that I have made the affirmative determination required in accordance with Section 3(b)(9)(B) of this general permit and that my signing this certification constitutes conclusive evidence of my having made such affirmative determination.
I certify that written approval from the POTW Authority with jurisdiction over the receiving POTW has been granted on a form provided by the commissioner.
I certify that our facility does not use products or chemicals that may result in a discharge of mercury.
I understand that the registration filed in connection with such general permit may be denied, revoked or suspended for engaging in professional misconduct, including but not limited to the submission of false or
DEEP-WPED-GP-012 Page 9 of 66 Rev. 05/03/18 misleading information, or making a false or inaccurate certification. I understand that the certification made pursuant to Section 3(b)(8) of this general permit may be subject to an audit by the commissioner in accordance with section 22a-430b of the Connecticut General Statutes, and that I will be required to provide additional information as may be requested in writing by the commissioner in connection with such audit, and the registration filed in connection with such general permit may be denied, revoked or suspended as a result of such audit. As part of such audit, I understand the commissioner may require that any information prepared in accordance with this general permit be independently certified by a Qualified Professional Engineer or Qualified Certified Hazardous Materials Manager in accordance with this general permit and that such independent certification shall be at the registrant’s expense. I understand that the reasonable cost of any such audit that reveals that a false certification was submitted to the commissioner may be charged to the registrant for this general permit for which such certification was made. I also understand that knowingly making any false statement in the submitted information and in this certification may be punishable as a criminal offense, including the possibility of fine and imprisonment, under section 53a-157b of the Connecticut General Statutes and any other applicable law.”
(D) any other individual or individuals responsible for preparing the registration certifies to the following statement: “I hereby certify that I am making this certification in connection with a registration under such general permit, submitted to the commissioner by [INSERT NAME OF REGISTRANT] for an activity located at [INSERT ADDRESS OF PROJECT OR ACTIVITY] and that such activity is eligible for authorization under such permit. I certify that the registration filed pursuant to this general permit is on complete and accurate forms as prescribed by the commissioner without alteration of their text. I certify that I have personally examined and am familiar with the information that provides the basis for this certification, including but not limited to all information described in Section 3(b)(9)(A) of such general permit, and I certify, based on reasonable investigation, including my inquiry of those individuals responsible for obtaining such information, that the information upon which this certification is based is true, accurate and complete to the best of my knowledge and belief. I understand that the registration filed in connection with such general permit may be denied, revoked or suspended for engaging in professional misconduct, including but not limited to the submission of false or misleading information, or making a false or inaccurate certification. I understand that knowingly making any false statement in the submitted information and in this certification may be punishable as a criminal offense, including the possibility of fine and imprisonment, under section 53a-157b of the Connecticut General Statutes and any other applicable law.”
(10) Such discharge is not subject to any provision of 40 CFR 403.6 (National
Pretreatment Standards: Categorical Standards) for which a regulation containing pollutant discharge limits has been promulgated.
DEEP-WPED-GP-012 Page 10 of 66 Rev. 05/03/18
(11) The discharge of tumbling and/or cleaning discharges are not from facilities that engage in activities that are subject to the Electroplating Point Source Category (40 CFR Part 413) or the Metal Finishing Point Source Category (40 CFR Part 433), regardless of whether any discharges exist from such point source categories.
(c) Geographic Area
This general permit applies throughout the State of Connecticut.
(d) Effective Date and Expiration Date of this General Permit This general permit is effective on the date it is issued by the commissioner and expires on October 30, 2020.
(e) Effective Date of Authorization
(1) For those persons not required to submit a registration, pursuant to Section 4(a) of this general permit, the effective date of authorization under this general permit is the same as the effective date of the general permit or the date the subject discharge is initiated, whichever is later.
(2) For those persons required to submit a registration, pursuant to Section 4(a) of this general permit, the effective date of authorization under this general permit is the date a registration which meets the requirements of Section 4 of this general permit is received by the commissioner.
(3) (A) For new facilities required to submit a registration and receive approval of authorization from the commissioner, pursuant to Section 4(a)(2) of this general permit, the effective date of authorization of this general permit is the date the commissioner issues a written approval of registration.
(B) For facilities previously permitted by an individual pretreatment permit, an activity is authorized by this general permit on the 1st day of the month following the date of the approval of registration. The Permittee shall continue to comply with the terms and conditions of the previously issued permit until this effective date.
(4) For a facility previously permitted under the General Permit for Miscellaneous
Discharges of Sewer Compatible Wastewater effective October 31, 2013, an activity is authorized by this general permit on the date it becomes effective.
(f) Transition to and from an Individual Permit
No person shall operate or conduct an activity authorized by both an individual permit and this general permit. The requirements for transitioning authorization are as follows:
(1) Transition from an Individual Permit to Authorization under this General
Permit. If an activity meets the requirements of authorization of this general permit and such operation or activity is presently authorized by an individual
DEEP-WPED-GP-012 Page 11 of 66 Rev. 05/03/18 permit, the permittee may seek a modification to the permit to exclude such operation or activity from the individual permit or if the operation or activity is the sole operation or activity authorized by such permit, the permittee shall surrender its permit in writing to the commissioner. In either event, such permittee’s individual permit shall continue to apply and remain in effect until authorization of such operation or activity under this general permit takes effect.
(2) Transition from Authorization under this General Permit to an Individual Permit. If an activity or operation is authorized under this general permit and the commissioner subsequently issues an individual permit for the same activity, then on the date any such individual permit is issued by the commissioner, the authorization issued under this general permit shall automatically expire.
Section 4. Registration Requirements
(a) Who Must File a Registration
(1) For the purposes of determining registration requirements in Section 4(a)(2) of this general permit, all discharges authorized under this general permit shall be categorized as follows:
Group I Discharges Air compressor condensate & blowdown Boiler blowdown Contact cooling & heating water Cutting and grinding wastewater Non-destruct testing rinsewater Printing and photo processing wastewater Tumbling and cleaning wastewater Water treatment wastewater Other processing wastewater
Group II Discharges
Non-contact cooling water Hydrostatic pressure testing wastewater Commercial laundry wastewater Food processing wastewater Reverse osmosis reject water
Group III Discharges
Building maintenance wastewater Fire suppression testing wastewater Swimming pool wastewaters Potable water system maintenance or sampling wastewaters
Group IV Discharges
Discharges of Group I, II, or III which are hauled by a Connecticut licensed transporter to a POTW that has been approved by the commissioner to accept over-the-road wastewater.
DEEP-WPED-GP-012 Page 12 of 66 Rev. 05/03/18
(2) Based on the category of MISC wastewater determined in Section 4(a)(1) above (e.g. boiler blowdown or non-contact cooling water), the cumulative maximum daily flow of all wastewaters in each discharge group to be covered by this general permit (Discharge Group I, Group II, Group III, Group IV) as listed in Section 4(a)(1) above), and whether any of the wastewater will require treatment to meet the effluent limits and conditions of Section 5(a) of this general permit, registration and requisite fees shall be determined in accordance with Table 4-1, below:
DEEP-WPED-GP-012 Page 13 of 66 Rev. 05/03/18
Table 4-1. Summary of Registration and Fee Requirements
1Municipalities will receive a 50% discount on fees.
2If the sum of flows from Discharge Groups I and II (excluding noncontact cooling water and reverse osmosis reject water) are greater than or equal to 25,000 gpd, then the registration must be certified by a Qualified PE or Qualified CHMM.
(b) Renewal Registration and Fee Any person previously permitted under the General Permit for Miscellaneous Discharges of Sewer Compatible Wastewater effective October 31, 2013 need not
Registration Requirements
Discharge Group
Total Maximum Daily Flow Thresholds
Certification Requirements
Fees1
No Registration I < 1,000 gpd
No
$0 II <5,000 gpd III All Flows
Registration Only
I (w/o treatment) 1,000 < Flow < 25,000 gpd
$500.00
II (w/o treatment, excluding noncontact cooling water, reverse osmosis reject water)
5,000 < Flow < 25,000 gpd
II (noncontact cooling water, reverse osmosis reject water)
Flow > 5,000 gpd
IV (w/o treatment) All Flows
Registration with Approval
All discharges requiring variance
All Flows
Yes, by PE (or CHMM if treatment is as referenced in Section 4(c)(2)(Q))
$1,000.00
I (w/treatment)
1,000 < Flow < 25,000 gpd
II
(w/treatment excluding noncontact cooling water, reverse osmosis reject water)
5,000 < Flow < 25,000 gpd
IV
(w/treatment) All Flows I and II2
(with or without treatment excluding noncontact cooling water, reverse osmosis reject water)
Flow > 25,000
Yes, by Qualified P.E. (or Qualified CHMM if no treatment or treatment is as referenced in Section
4(c)(2)(Q))
DEEP-WPED-GP-012 Page 14 of 66 Rev. 05/03/18 file a registration or pay a fee to continue authorization under this general permit.
(c) Contents of Registration
(1) Fees
(A) A registration shall not be deemed complete and no discharge shall be authorized by this general permit unless the registration fee has been paid in full.
(B) The registration fees must be submitted with a completed registration form.
(C) The registration fee shall be paid by check or money order payable to the Department of Energy and Environmental Protection.
(D) The registration fee is non-refundable.
(2) Registration Form A registration shall be filed on forms prescribed and provided by the commissioner and shall include but not be limited to the following:
(A) Legal name, address, and telephone number of the registrant. If the registrant is an entity transacting business in Connecticut and is required to register with the Connecticut Secretary of the State, provide the exact name as registered with the Connecticut Secretary of the State.
(B) Legal name, address, and telephone number of the owner of the property on which the subject activity is to take place.
(C) Legal name, address, and telephone number of the registrant’s attorney or other representative, if applicable.
(D) Legal name, address, and telephone number of any consultant(s) or engineer(s) retained by the registrant to prepare the registration or to design or construct the subject activity.
(E) Location address of the site for which the registration is being submitted.
(F) Name of the public, private or state-owned sewage treatment works which receives or will be receiving the discharge.
(G) The estimated duration of the subject activity.
(H) Total maximum daily flow in gallons per day, the maximum instantaneous flow rate in gallons per minute, and the method of flow measurement of such discharge (e.g. estimation, flow meter, etc.)
(I) An estimated date of when such discharge began or will begin.
DEEP-WPED-GP-012 Page 15 of 66 Rev. 05/03/18
(J) A detailed description of the process or activity generating the discharge and the type(s) of wastewater to be discharged.
(K) A list of the substances used or added to the wastewater, including but not limited to those substances for which effluent limits are specified in Section 5(a) of this general permit and those substances listed in Appendix B Table II, III and V or Appendix D of section 22a-430-4 of the Regulations of Connecticut State Agencies. Any such substances shall be identified by their generic chemical names and Chemical Abstract System (CAS) number (all substances are listed in Appendix E of this general permit).
(L) A description of any best management practices, such as conservation and reuse of water, minimization, substitution and reuse of chemicals, and other pollution prevention measures, implemented or to be implemented by the registrant to minimize any adverse environmental effects of the subject discharge.
(M) A description of any wastewater treatment processes, such as neutralization, oil/water separation, silver recovery, or precipitation of solids or metals, etc. which the registrant utilizes or will utilize to achieve compliance with any of the effluent limits specified in Section 5(a) of this
(N) A written approval from the applicable POTW Authority for the discharge.
(O) For any discharge with a total maximum daily flow greater than 5000 gpd, excluding noncontact cooling water, hydrostatic pressure testing wastewater, commercial laundry, and food processing wastewater discharges, the signed NetDMR Subscriber Agreement.
(P) For existing discharges only, one screening analysis from the testing of a sample taken within 90 days of registration or the most recent sampling event for pollutants specified by Section 5(b)(1) of this general permit shall be submitted with the registration form.
(Q) If the discharge requires treatment to meet the effluent limits and conditions of Section 5(a) of this general permit (or a variance) and the total maximum daily flow is less than 25,000 gallons per day, a certification by a Professional Engineer or Certified Hazardous Materials Manager that complies with Section 3(b)(8) of this general permit.
(Certified Hazardous Materials Managers may only certify treatment systems that consist solely of pre-engineered silver recovery systems for treating printing and photoprocessing wastewater or pre-engineered oil/water separators for treating air compressor condensate and blowdown, cutting and grinding wastewater, or food processing wastewater.)
(R) If the total maximum daily flow of the registrant’s discharge is greater than 25,000 gallons per day (excluding non-contact cooling water and
DEEP-WPED-GP-012 Page 16 of 66 Rev. 05/03/18 reverse osmosis reject water), a certification by a Qualified Professional Engineer or Qualified Certified Hazardous Materials Manager that complies with Section 3(b)(8) of this general permit. (Qualified Certified Hazardous Materials Managers may only certify discharges greater than 25,000 gallons per day if no treatment is required or if treatment as referenced in Section 4(c)(2)(Q) of this general permit is used.)
(S) A written certification, signed by the registrant and any other individual or individuals responsible for preparing the registration, which complies with the requirements of Section 3(b)(9) of this general permit.
(T) Water treatment facilities that discharge clarifier tank blowdown, filter media backwash, sludge dewatering wastewater or other residuals handling wastewaters with Total Suspended Solids (TSS) levels in excess of 600 mg/l directly to a sanitary sewer line or transport residuals by truck to a POTW shall submit a plan for the management of water treatment wastewaters and residuals. Such plan shall, at a minimum, include the following information:
(i) the sources of such wastewaters
(ii) the expected average and maximum daily flows in gallons per day of wastewaters
(iii) the source of the suspended solid (including the identification of any coagulant)
(iv) the frequency of discharge
(v) for residuals, the percent dry solids and quantity per shipment and per year
(vi) the name of the POTW receiving the wastewater or residual
(vii) which treatment unit of the POTW the wastewaters will be discharged to (e.g. headworks, solids handling, etc)
(viii) standard operating procedures for residuals management at the facility which shall include:
a. a site map
b. a summary of the operation and maintenance plans for any lagoons or clarifiers
c. a description of where any solid residuals removed may be placed, stored or disposed of, and
d. the techniques used to prevent the removed solids from re-entering the surface waters from any on-site storage.
(ix) From a representative sample of residuals being removed during the treatment process, a chemical analysis of its content (percent solids and total metals in mg/kg). the following metal concentrations will be determined:
Arsenic (As), Barium (Ba), Cadmium (Cd), Chromium (Cr), Copper (Cu), Lead (Pb), DEEP-WPED-GP-012 Page 17 of 66 Rev. 05/03/18
Mercury (Hg), Selenium (Se) Silver (Ag).
(x) For residuals, provide a feasibility analysis of treatment and disposal options for residuals other than discharge to a POTW. Such analysis shall include:
a. a discussion of the alternatives and
b. approximate cost and time frame necessary for implementation of such alternatives at that facility
(d) Scope of Registration
A registrant shall submit one registration form for all activities taking place at a single site for which the registrant seeks authorization under this general permit. Activities taking place at more than one site may not be consolidated on one registration form.
(e) Contents of a Modified Registration
(1) A modified registration shall be submitted:
(A) To correct inaccurate or misleading information previously submitted to the Department, in accordance with Section 6(g) of this general permit;
(B) Prior to any significant facility modifications, as described in Section 5(e)(3)(A) of this general permit.
(2) Modified Registration Form:
(A) A modified registration shall be filed on forms described in Section 4(c) of this general permit and include any additional information required by Section 5(e)(3)(A) for a facility modification. For all registration section(s) remaining unchanged from the initial registration, a registrant may indicate “Information Unchanged” in the appropriate section(s) of the registration.
(B) No fee is required to be submitted with a modified registration.
(f) Where to File a Registration or Modified Registration
(1) A registration or modified registration shall be filed with the commissioner at the following address:
Central Permit Processing Unit Connecticut Department of Energy and Environmental Protection 79 Elm Street Hartford, CT 06106-5127
(2) A copy of the registration or modified registration shall also be sent to the
POTW authority which will receive the discharge.
DEEP-WPED-GP-012 Page 18 of 66 Rev. 05/03/18
(g) Additional Information
The commissioner may require a registrant to submit additional information, which the commissioner reasonably deems necessary to evaluate the consistency of the subject activity with the requirements for authorization under this general permit.
(h) Action by Commissioner
(1) The commissioner may reject without prejudice a registration or modified registration if it is determined that it does not satisfy the requirements of Section 4(c) or 4(d) of this general permit and more than thirty days (30) have elapsed since the commissioner requested that the registrant submit additional information. Any registration refiled after such a rejection shall be accompanied by the fee specified in Section 4(a) of this general permit.
(2) The commissioner shall disapprove a registration or modified registration if it is found that the subject activity is:
(A) Inconsistent with the requirements for authorization under Section 3 of this general permit; OR
(B) Unable to comply with the effluent limits in Section 5(a) of this general permit; OR
(C) The imposition of conditions in this general permit cannot ensure that the discharge, either singly or in combination with other discharges, would not cause or contribute to pollution, would not endanger human health or the environment or would not be consistent with the Connecticut Water Quality Standards; OR
(D) For any other reason provided by law.
(3) Disapproval of a registration or modified registration under this subsection shall constitute notice to the registrant that the subject activity may not lawfully be conducted or maintained without the issuance of an individual permit.
(4) The commissioner may approve a registration or modified registration with reasonable conditions. If the commissioner approves a registration with conditions, the permittee shall be bound by such conditions as if they were a part of this general permit.
(5) Rejection, disapproval, or approval of a registration or modified registration shall be in writing.
DEEP-WPED-GP-012 Page 19 of 66 Rev. 05/03/18
Section 5. Conditions of This General Permit
The permittee must meet the requirements for authorization set forth in Section 3 of this general permit and assure that the discharge authorized by this general permit is conducted in accordance with the following conditions:
(a) Effluent Limits and Conditions
(1) Effluent Limits
(A) Effluent Limits—Wastewater discharged under the authority of this general permit shall not contain any pollutant identified in Table 5-1 of this section except in a concentration at or below the maximum concentration specified therein.
Table 5-1 Effluent Limits1
Pollutant Maximum Instantaneous Concentration
Pollutant Maximum Instantaneous Concentration
Conventional Pollutants mg/l
Metals mg/l
Biochemical Oxygen Demand (BOD5)
600.02
Lead, Total
0.5
Total Suspended Solids (TSS)
600.02
Nickel, Total
2.0
Ammonia-Nitrogen
50.03
Silver, Total
0.55
Nitrate-Nitrogen
50.03
Tin, Total
4.0
Total Fats, Oils and Grease4 100.0
Zinc, Total
Organic Pollutants
Total Volatile Organics
5.0
Antimony, Total
Formaldehyde
10.03
Arsenic
0.10
Methylene Chloride
1.0
Beryllium, Total
Phenols, Total
10.0 Cobalt, Total
Phthalate Esters
Mercury, Total
0.0002
Polynuclear Aromatic Hydrocarbons
Molybdenum, Total
Ethylene Glycol
300.03
Selenium, Total
Propylene Glycol
300.03
Strontium, Total
Metals
Thallium, Total
Cadmium, Total
Titanium, Total
Chromium, Total
Vanadium, Total
Copper, Total
Zirconium, Total
DEEP-WPED-GP-012 Page 20 of 66 Rev. 05/03/18
1These effluent limits do not apply to residuals generated by water treatment facilities that are transported to the solids handling portion of a POTW.
2This pollutant concentration may be exceeded provided that the total mass loading (flow x concentration) of such pollutant discharged to the receiving POTW does not exceed 100.0 lbs/day or 2% of the POTW’s design loading, whichever is less. This limit does not apply to discharges of Food Processing Wastewater or Water Treatment Wastewater
3For ammonia-nitrogen, nitrate-nitrogen, formaldehyde, ethylene glycol, or propylene glycol, the pollutant concentration may be exceeded provided that the total mass loading (flow x concentration) of each pollutant discharged to the receiving POTW does not exceed 10.0 lbs/day.
4For Food Processing wastewaters only, use EPA Method 1664, Rev. A reporting as Total Oil & Grease.
For all other wastewaters use EPA Method 1664, Rev. A reporting as Total Petroleum Hydrocarbons.
5 For photographic processing wastewaters only, if maximum daily flow is less than 100 gallons per day, the silver effluent limit is 5.0 mg/l. For flows greater than 100 gpd, the silver limit is 2.0 mg/l.
(B) POTW Specific Effluent Limits—If the facility process discharge is directed to a POTW listed in Appendix D of this general permit and has a total maximum daily flow greater than 5000 gpd (excluding noncontact cooling water), effluent limits listed in Appendix D of this general permit specific to that POTW supersede limits in Table 5-1.
(C) Wastewater discharged under the authority of this general permit shall not contain any chemical additive containing any substance listed in Appendix B, Table II, III, or V or Appendix D of Section 22a-430-4 of the Regulations of Connecticut State Agencies (all substances are listed in Appendix E of this general permit), other than a substance for which an effluent limit is specified in Table 5-1 of this section or as otherwise approved by the commissioner in accordance with Section 7(a) of this general permit.
(2) Effluent Conditions
(A) Wastewater discharged under the authority of this general permit shall not contain pollutants which create a fire or explosion hazard in the receiving POTW, including but not limited to, wastewaters with a closed cup flashpoint of less than 140oF (60oC) using the test methods specified in 40 CFR 261.21.
(B) Wastewater discharged under the authority of this general permit shall not cause corrosive structural damage to the receiving POTW and shall not have a pH of less than 5.0 or more than 12.0 Standard Units.
(C) Wastewater discharged under the authority of this general permit shall not contain solid or viscous pollutants in amounts which will cause obstruction of flow in the sanitary sewer system or receiving POTW.
(D) Wastewater discharged under the authority of this general permit shall not contain heat in amounts which will inhibit biological activity in the POTW, but in no case heat in such quantities that the influent temperature at the POTW exceeds 104oF (40oC).
(E) Wastewater discharged under the authority of this general permit shall not contain pollutants which result in the presence of toxic gases, vapors or fumes within the
DEEP-WPED-GP-012 Page 21 of 66 Rev. 05/03/18
POTW in a quantity that may cause acute worker health or safety problems.
(F) Wastewater discharged under the authority of this general permit shall not contain pollutants in a quantity or concentration which may cause foaming at the POTW or within the POTW’s effluent.
(G) Wastewater discharged under the authority of this general permit shall not contain either singly or in combination with other discharges any pollutant in sufficient amounts to cause acute worker health and safety problems, problems in the collection system or pass through or interference with the receiving POTW.
(H) Wastewater discharged under the authority of this general permit shall not contain either singly or in combination with other discharges flow in excess of the hydraulic capacity of the receiving POTW or its conveyance system.
(I) The use or addition of water to dilute a discharge of wastewater in order to meet any effluent limit or condition of this general permit is prohibited.
(J) The permittee shall maintain in full effect all best management practices (BMPs) needed to comply with any of the terms and conditions of this general permit.
Such BMPs shall be developed and implemented consistent with sound and recognized engineering principles and include but not be limited to water conservation, chemical substitution/reuse and all other pollution prevention measures.
(K) The permittee shall ensure that all discharges authorized by this general permit are in conformance with the sewer use ordinance of the municipality receiving the discharge, and that all required local permits and approvals have been obtained for the discharges authorized by this general permit.
(L) The discharge shall be totally enclosed in piping from the source to a municipal sanitary sewer line unless operating conditions require otherwise. Best management practices shall be used for chemical and fuel storage to prevent spillage that could be received by floor drains, trenches, etc.
(M) Any spill or release or leakage of any chemical liquid shall be immediately cleaned up and disposed of in accordance with all applicable state and federal law. In no case shall such a chemical liquid be disposed of in any floor drain, toilet, sink, sanitary sewer, storm drain, surface water body or on the ground.
(b) Monitoring Requirements
(1) Parameter Monitoring
(A) Each permittee must monitor the wastewater for the parameters specified in Tables 5-2a or 5-2b of this section per category of wastewater (e.g.
boiler blowdown or noncontact cooling water) at the frequency specified in Table 5-3 of this section in accordance with the methods specified in 40 CFR Part 136 to determine whether such discharge complies with the effluent limits and other conditions of this general permit.
DEEP-WPED-GP-012 Page 22 of 66 Rev. 05/03/18
(B) In addition, each permittee must monitor the wastewater at the frequency shown in Table 5-3 for any parameters specified in Table 5-1 of this section that are known or suspected to be present in the discharge.
(2) Discharges of the following wastewaters are exempt from all monitoring requirements provided that the discharge is in compliance with the effluent limits of Table 5-1:
(A) building maintenance wastewaters,
(B) fire suppression testing wastewaters,
(C) swimming pool wastewaters,
(D) discharges comprised of sources of groundwater and stormwater which enter private or public utility equipment manholes and/or vaults which are conveyed to a POTW by combined storm and sanitary sewers, and
(E) discharges generated by the testing and maintenance of potable water distribution systems and/or used for insuring public health and safety which are conveyed to a POTW by combined storm and sanitary sewers.
Table 5-2a. Group I Monitoring Requirements—“X” indicates required monitoring.
Discharge Group I
Air Compressor
Condensate & Blowdown
Boiler Blowdown
Contact Cooling &
Heating Water
Cutting & Grinding
Non-Destruct Testing
Rinsewater
Printing (Photo-
Processing1)
Tumbling
Cleaning
Water Treatment Other
Temperature X pH X X X X X X X X X Total Suspended Solids X
X X X X X X
Ammonia- Nitrogen
Oil & grease, TPH X
X X X X X
Volatile Organic Compounds, total
Aluminum X2 Arsenic X2 Cadmium, total X Chromium, total X X Copper, total X X X X X X X X X Iron, total Lead, total X X X X X X X X X Nickel, total X X X Silver, total X Zinc, total X X X X X X X X
1 Required monitoring for a photoprocessing discharge is silver and pH only. Refer to specific instructions at Section 5(b)(5)(B).
2Aluminum and arsenic monitoring shall be required only for wastewater associated with alum treatment.
DEEP-WPED-GP-012 Page 23 of 66 Rev. 05/03/18
Table 5-2b. Group II Monitoring Requirements—“X” indicates required monitoring.
Group II
Commercial Laundry
Food Processing
Hydrostatic Pressure Testing
Non-Contact Cooling Water, Reverse Osmosis Reject Water
Temperature X pH X X X X
BOD5 X X
Total Suspended Solids X X X Oil & grease, TPH X X Oil & grease, total X Iron, total X
(3) Flow Monitoring
(A) The permittee shall monitor the total daily flow on the day of pollutant sampling for each discharge of MISC wastewater in accordance with the frequencies in Table 5-3 below.
(B) The permittee shall monitor each discharge pipe having a maximum daily flow of greater than 5,000 gpd (before mixing with noncontact cooling water or domestic sewage and except for batch treatment systems with a known discharge volume and discharges which occur less than once per week) by means of a flow meter capable of measuring, visually indicating and recording instantaneous and total daily flow (unless alternate flow monitoring plan is approved by commissioner).
(C) Estimates of flow may be used to satisfy this requirement for discharges of less than 5,000 gpd, provided they are based on information from a dedicated incoming water meter, a batch treatment tank volume, the accurately timed filling of a container of known volume, a rated pump capacity or other generally acceptable engineering practice.
(4) pH Monitoring
(A) The permittee shall accurately determine the pH of wastewater discharged in accordance with the requirements of this general permit. All instrumentation for pH monitoring must be installed and maintained in accordance with manufacturers’ specifications, calibrated (electronic calibration) by a qualified source at least once per year to ensure accuracy and calibrated using a standard buffer solution at least monthly.
(B…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .