Rev 2 - Attachment H- Price Proposal Form.docx

DOCX document 38 KB Posted

Attached to
DESIGN-BID-BUILD, P1044, PIER 31 EXTENSION NAVAL SUBMARINE BASE NEW LONDON, GROTON, CONNECTICUT
Solicitation number
N4008524R2503
Issued by

About this file

This document is a Price Proposal Form for a federal contract opportunity to design and build the Submarine Pier 31 Extension project at the Naval Submarine Base New London in Groton, Connecticut.

The Price Proposal Form includes the base line item for the overall project as well as several options for additional work, including demolition and reconstruction of Pier 10 and Pier 17, dredging at Pier 10, demolition and reconstruction of a quaywall structure north of Pier 33, and installation of a low-pressure compressed air system at Pier 31. Offerors are required to provide firm fixed prices for the base line item and each option. The Government reserves the right to award the options within 365 days after contract award. The contract completion date will not change if any or all options are awarded. The Government will evaluate offers by adding the option prices to the base line item price. The quantity of certain unit-priced items may be subject to equitable price adjustments if the actual quantity varies significantly from the estimated quantity.

View the file

Other files

File Type Posted
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
2024 Dig Permit - (Purpose) Template.pdf PDF
Final Pier 32 Sediment Sampling Results Report January 2014.pdf PDF
MW Pier 31.pdf PDF
Amendment 0005.pdf PDF
S-533A STAIR FOR AIR COMP ACCESS (BID OPTION 5).pdf PDF
APPROVAL of SIUGP RegistrationCTSIU0026.pdf PDF
MW Pier 10.pdf PDF
Basewide LUC map.pdf PDF
REV CN102 RELOCATED FLOATING SECURITY BARRIER PLAN.pdf PDF
E-601 - UNIT SUBSTATION P31N SWITCHGEAR SCHEDULES.pdf PDF
Rev 3 - Attachment H- Price Proposal Form.pdf PDF
Amendment 0004.pdf PDF
Pier 31 - Crane Weight Test Area-E-108.pdf PDF
SUBASENLONINST 5090.25B Enclosure 3.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Revised Attachment H - Price Proposal Form.docx DOCX document
Amendment 0001.pdf PDF
Attachment J - Site Visit Log.pdf PDF
dwg p1044 final 100 pct plans sat date.pdf PDF
spc P1044 Final 100 pct rev1 Appendix G - Pier 31 Existing Substation Shop drawings.pdf PDF
spc P1044 Final 100 pct rev1 Appendix F - Stormwater Management Plan and Permit 2 of 2.pdf PDF
Attachment E Historical Small Business Utilization.docx DOCX document
Solicitation N4008524R2503.pdf PDF
spc P1044 Final 100 pct rev1 Appendix D - HazMat Report.pdf PDF
Attachment I Base map.pdf PDF
spc P1044 Final 100 pct rev1 Appendix C - Environmental permits placeholder.pdf PDF
spc P1044 Final 100 pct rev1 Appendix F - Stormwater Management Plan and Permit 1 of 2.pdf PDF
spc P1044 Final rev1 Appendix H marina dwgs.pdf PDF
Attachment H Price Proposal Form.pdf PDF
spc P1044 Final 100 pct specification rev1.pdf PDF
spc P1044 Final 100 pct rev1 Appendix B - Temporary Environmental Controls.pdf PDF
spc P1044 Final 100 pct rev1 Appendix A - 1 of 2 Pier 31 Record Drawings.pdf PDF
Attachment A Pre Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment B PIEE Vendor Access Instructions.pdf PDF
Attachment C Construction Experience Project Data.docx DOCX document
spc P1044 Final 100 pct rev1 Appendix E - Sediment Sampling results.pdf PDF
Attachment D Past Performance Questionnaire.docx DOCX document
spc P1044 Final 100 pct rev1 Appendix A - 2 of 2 Pier 10 and 17 Stub Record Drawings.pdf PDF
Attachment F Small Business Participation Commitment.docx DOCX document
Pier 31 JA Electrical Equipment Redacted.pdf PDF
Attachment G Individual Small Business Subcontracting Plan.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MCON P-1044 – Submarine Pier 31 ExtensioneProject No. 1683671
Naval Submarine Base New London – Groton, CTRev 2 Attachment H- Price Proposal FormFY21 MCON P-898 – Replace SSN Berthing Pier 32eProject No. 1565917

Naval Submarine Base New London – Groton, CT

DOCUMENT 00 22 13.00 20

SUPPLEMENTARY INSTRUCTIONS TO OFFERORS

07/18/2024 REV 2

PART 1 GENERAL

1.1 CONTRACT LINE ITEMS

The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.

Provide the Line Item prices, where indicated by blank underlines, for the following items:

Line Item 0001 ‐ BASE PRICE. Price includes the following:

Line Item 0001A. Price for the entire work for Submarine Pier 31 Extension at NAVSUBASE New London, CT, in accordance with the drawings and specifications, but excluding work described in Line Item 0001B, 0001C, 0001D, 0001E, 0001F, 0001G, 0001H, 0001I, 0001J, 0001K, 0001L, 0001M, 0001N, 0002, 0003, 0004, 0005, and 0006.

Line Item
Description
Unit
Unit Price
No. Units
Total Price for Line Item

(Unit Price X No. Units)

0001A MILCON P-1044, complete, in accordance with the drawings and specifications, but excluding work described in Line Item 0001B, 0001C, 0001D, 0001E, 0001F, 0001G, 0001H, 0001I, 0001J, 0001K, 0001L, 0001M, 0001N, 0002, 0003, 0004, 0005, 0006

Lump Sum

0001B

All 36” diameter steel pipe piles
LF
$________
4377
$____________

0001C

All polymeric fender piles including steel H-pile extension

LF

0001D

Dynamic pile load PDA test for 36" diameter steel pipe piles (includes re-strike)

EA

0001E Dynamic pile load test for polymeric fender piles with steel H-pile extension

EA

The quantities in Line Items 0001G thru Line Items 0001N are for estimated work above beyond those indicated in the contract drawings for Line Items 0001A-0001F. These items will only be performed at the direction of the Contracting Officer. The contractor will only receive payment for quantities actually performed and a deductive modification will be executed for quantities not performed.

Line Item 0001F. Price includes all work, complete, for dredging and for disposal and capping of the dredged material at the designated CAD cell area for Pier 31, and the turning basin.

The quantity of material removed shall be determined based on pre- and post-dredge surveys and the quantity will be approved by the Contracting Officer. Prior to performing the work the contractor shall perform the pre-dredge survey and calculate the volume to be dredged and notify the Contracting Officer of any discrepancies. Work shall be performed in accordance with drawings and specifications and in accordance with the following schedule:

Line Item
Description
Unit
Unit Price
No. Units
Total Price for Line Item

0001F Pier 31 Dredging and Disposal/Capping of Material. (Includes allowable over dredge)

Cubic Yards

43,652

Line Item 0001G. Price includes all work, complete, for mitigating obstructions encountered during Contractor installation of driven steel pipe piles/casing pipe utilizing any and/or all of the options indicated in the drawings (including, but not limited to those shown on Drawing S-003). Work shall be performed in accordance with drawings and specifications and in accordance with the following schedule:

Line Item
Description
Unit
Unit Price
No. Units
Total Price for Line Item

0001G Steel Pipe Pile/Casing Pipe Installation Obstruction Mitigation

EA

Line Item 0001H. Price for provision of imported, off-site, Backfill and Fill Material as directed by the Contracting Officer for replacement of material disposed of under Line Item 0001M, 0001N, 0001O and 0001P, complete in place. Unsatisfactory Material is defined as material that does not conform to the Satisfactory Material requirements in Section 31 23 00.00 20, Paragraph 2.1.1. Imported Backfill and Fill material shall meet the requirements of Section 31 23 00.00 20, Paragraph 2.1.5 and Paragraph 1.6, Requirements for Off Site Soil.

The quantity of material to be provided shall be determined based on certified truck scale measurements and the quantity will be approved by the Contracting Officer. Work shall be performed in accordance with drawings and specifications and in accordance with the following schedule:

Line Item
Description
Unit
Unit Price
No. Units
Total Price for Line Item

0001H

Provision of imported, off site, Backfill and Fill Material.
Tons (Truck Scale Measure)

Line Item 0001I. Price for disposal of unsatisfactory soil that is classified as non-hazardous, but is contaminated with Total Petroleum Hydrocarbons (TPH) up to 500 mg/kg that is encountered within planned excavations (i.e. utilities, foundations) necessary to complete the work. Unsatisfactory Material is defined as material that does not conform to the Satisfactory Material requirements in Section 31 23 00.00 20, Paragraph 2.1.1. Material may contain constituents at concentrations up to the RDEC and GA PMC as defined in the Connecticut Remediation Standard Regulations (CT RSRs). Unsatisfactory Material disposal determinations shall be approved by the Contracting Officer. Excavated materials may be re-used on site or disposed of at a licensed, permitted facility.

The unit price shall include all work, complete, for handling, stockpiling, amendment and solidification, sampling, testing and reporting, transportation, disposal, all fees, clean-up, labor, management, supervision and incidentals. The quantity of material removed shall be determined based on certified truck scale measurements and the quantity will be approved by the Contracting Officer. Work shall be performed in accordance with drawings and specifications and in accordance with the following schedule:

Line Item
Description
Unit
Unit Price
No. Units
Total Price for Line Item

0001I

Disposal of unsatisfactory, non-hazardous, petroleum contaminated soils with Total Petroleum Hydrocarbons up to 500 mg/kg and meets CT RDEC and GAPMC as defined in the CT RSRs that is encountered within planned excavations (i.e. utilities, foundations).
Tons (Truck Scale Measure)

Line Item 0001J. Price for disposal of unsatisfactory soil that is classified as non-hazardous waste that is encountered within planned excavations (i.e. utilities, foundations), containing concentrations of total petroleum hydrocarbons greater than 500 ppm, contains no PCBs, and non-hazardous concentrations of heavy metals that is necessary to complete the work. Unsatisfactory Material is defined as material that does not conform to the Satisfactory Material requirements in Section 31 23 00.00 20, Paragraph 2.1.1. Unsatisfactory Material disposal determinations shall be approved by the Contracting Officer. Material may be sent for disposal or treatment for reuse at a licensed, permitted facility. The unit price shall include all work, complete, for handling, stockpiling, amendment and solidification, sampling, testing and reporting, transportation, disposal, all fees, clean-up, decontamination, labor, management, supervision and incidentals. The quantity of material removed shall be determined based on certified truck scale measurements and the quantity will be approved by the Contracting Officer. Work shall be performed in accordance with drawings and specifications and in accordance with the following schedule:

Line Item
Description
Unit
Unit Price
No. Units
Total Price for Line Item

0001J

Disposal of non-hazardous, unsatisfactory soils exceeding CT RSRs, with no PCBs or heavy metals encountered within planned excavations (i.e. utilities, foundations).
Tons (Truck Scale Measure)

Line Item 0001K. Price for disposal of unsatisfactory soil that is classified as non-hazardous waste that is encountered within planned excavations (i.e. utilities, foundations), containing concentrations of total petroleum hydrocarbons greater than 500ppm, may contain PCBs and heavy metals at concentrations less than TSCA and RCRA concentrations of heavy metals and PCBs, that is necessary to complete the work. Unsatisfactory Material is defined as material that does not conform to the Satisfactory Material requirements in Section 31 23 00.00 20, Paragraph 2.1.1. Unsatisfactory Material disposal determinations shall be approved by the Contracting Officer. Material must be sent for disposal at a licensed and permitted landfill.

The unit price shall include all work, complete, for handling, stockpiling, amendment and solidification, sampling, testing, and reporting, transportation, disposal, all fees, clean-up, decontamination, labor, management, supervision, and incidentals. The quantity of material removed shall be determined based on certified truck scale measurements and the quantity will be approved by the Contracting Officer. Work shall be performed in accordance with drawings and specifications and in accordance with the following schedule:

Line Item
Description
Unit
Unit Price
No. Units
Total Price for Line Item

0001K

Disposal of non-hazardous, unsatisfactory soils exceeding CT RSRs, containing PCBs and / or heavy metals (non-TSCA, non-RCRA) encountered within planned excavations (i.e. utilities, foundations).
Tons (Truck Scale Measure)

Line Item 0001L. Price for CT DEEP Permitting, Soil and Groundwater Characterization and Dewatering Design for dewatering, and handling and treatment of groundwater and stormwater removed from excavations and discharged in compliance with the Contractor obtained General Permit for Discharge of Groundwater Remediation Wastewater Registration approval by CT DEEP. Price shall be inclusive of all; permitting, soil and groundwater characterization, dewatering design of pumping and pipe systems, flow monitoring, treatment systems, borings and test pits for soil and groundwater characterization sampling, collection of soil and water characterization samples, analysis, reporting, all labor, design, supervision, fees and incidentals.

The quantity for CT DEEP Permitting, Soil and Groundwater Characterization and Dewatering Design for dewatering, and handling and treatment of groundwater and stormwater removed from excavations and discharged in compliance with the Contractor obtained General Permit for Discharge of Groundwater Remediation Wastewater Registration approval by CT DEEP will be measured as one Lump Sum. Work shall be performed in accordance with drawings and specifications and in accordance with the following schedule:

Line Item
Description
Unit
Unit Price
No. Units
Total Price for Line Item

0001L CT DEEP Permitting, Soil and Groundwater Characterization, and Dewatering Design for dewatering, and handling, treatment of groundwater and stormwater removed from excavations and discharged in compliance with the Contractor obtained General Permit for Discharge of Groundwater Remediation Wastewater Registration approval by CT DEEP.

Lump Sum

Line Item 0001M. Price for Dewatering, Handling and Treatment of Groundwater and Stormwater removed from excavations and discharged in compliance with the Contractor obtained General Permit for Discharge of Groundwater Remediation Wastewater Registration approval by CT DEEP. Price shall be inclusive of all; mobilization, provision and operation of all equipment, pumping systems, piping, hoses, flow monitoring, treatment systems, maintenance, temporary storage facilities, surface water control, equalization, reporting, all labor, supervision and demobilization and cleanup, decontamination, disposal of expendable materials, consumables and incidentals.

The quantity for Dewatering, Handling and Treatment of Groundwater and Stormwater removed from excavations and discharged in compliance with the Contractor obtained General Permit for Discharge of Groundwater Remediation Wastewater Registration approval by CT DEEP will be measured as one Lump Sum. Work shall be performed in accordance with drawings and specifications and in accordance with the following schedule:

Line Item
Description
Unit
Unit Price
No. Units
Total Price for Line Item

0001M Dewatering, Handling and Treatment of Groundwater and Stormwater removed from excavations and discharged in compliance with the Contractor obtained General Permit for Discharge of Groundwater Remediation Wastewater Registration approval by CT DEEP.

Lump Sum

Line Item 0001N. Price for Demobilization and remobilization of waterborne vessels from the North side of Pier 31 required to provide access to the south side of Pier 32 for certain Pier 32 activities.

Line Item
Description
Unit
Unit Price
No. Units
Total Price for Line Item

0001N Demobilization and remobilization of waterborne vessels from the North side of Pier 31 for Pier 32 activities

EA

TOTAL PRICE FOR LINE ITEM 0001 (0001A, 0001B, 0001C, 0001D, 0001E, 0001F, 0001G, 0001H, 0001I, 0001J, 0001K, 0001L, 0001M, and 0001N)

Line Item 0002 (BID OPTION 1) - Price includes the following:

Line Item 0002A. Price for all work, complete, in accordance with the drawings and specifications for demolition and disposal of Pier 10, including utilities, and construction of the adjacent quaywall fender system.

Line Item
Description
Total Price for Line Item 0002A Bid Option 1
0002A
Bid Option 1: Pier 10 Demolition and new Fender System Construction
$ __________

Line Item 0002B. Price for removal and disposal of residual diesel oil from the diesel oil piping system to be demolished as part of option 1. Line Item 0002B will only be exercised if Line Item 0002A is awarded.

Line Item
Description
Unit
Unit Price
No. Units
Total Price for Line Item 0002B Bid Option 1

(Unit Price X No. Units)

0002B
Bid Option 1: Pier 10 collection and removal of residual diesel oil.
gallons

TOTAL PRICE FOR LINE ITEM 0002 BID OPTION 1 (0002A and 0002B)

Line Item 0003 (BID OPTION 2) - Price includes the following:

Price for all work, complete, in accordance with the drawings and specifications for demolition and disposal of Pier 17 Stub, including utilities, and construction of the adjacent quaywall fender system.

Line Item
Description
Total Price for Line Item 0003 Bid Option 2
0003
Bid Option 2: Pier 17 Stub Demolition and new Fender System Construction
$___________

Line Item 0004 (BID OPTION 3) - Price includes the following:

Price includes all work, complete, for dredging at Pier 10 following demolition of the structure and for disposal and capping of the dredged material at the designated CAD cell area. This Bid Option will not be awarded unless Bid Option 1 is awarded.

The quantity of material removed shall be determined based on pre- and post-dredge surveys and the quantity will be approved by the Contracting Officer. Work shall be performed in accordance with drawings and specifications and in accordance with the following schedule:

Line Item
Description
Unit
Unit Price
No. Units
Total Price for Line Item 0004 Bid Option 3

(Unit Price X No. Units)

0004
Bid Option 3: Pier 10 Dredging and Disposal/Capping of Material (including allowable overdepth)
Cubic Yards

4,500

Line Item 0005 (BID OPTION 4) - Price includes the following:

Price for all work, complete, in accordance with the drawings and specifications for demolition, disposal, and reconstruction of the existing pile supported quaywall structure north of Pier 33 to accommodate the relocation of crane test weights. The work also includes construction of the quaywall fender system in this area.

Line Item
Description
Total Price for Line Item 0005 Bid Option 4
0005
Bid Option 4: Crane Weight Test Area Quaywall Demolition/Construction and Fender System Construction

Line Item 0006 (BID OPTION 5) - Price includes the following:

Price for all work, complete, in accordance with the drawings and specifications for fabrication, construction, and installation of the low-pressure compressed air system at Pier 31.

Line Item
Description
Total Price for Line Item 0006 Bid Option 5
0006
Bid Option 5: Pier 31 Low-Pressure Compressed Air System
$____________

TOTAL PRICE FOR LINE ITEMS 0002, 0003, 0004, 0005, AND 0006

TOTAL PRICE FOR LINE ITEM 0001 THROUGH LINE ITEM 0006

1.2 GENERAL BID NOTES

a. Award will be made on the price proposed for Base Work and all Options. For bid items where unit prices are indicated as required, bidders shall enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

b. The Government reserves the unilateral right to award Line Item 0002, 0003, 0004, 0005, and 0006 to the Contractor at the proposed price within 365 calendar days after the contract award, and in accordance with all bid notes. A firm fixed proposed price is required for Line Item 0001, 0002, 0003, 0004, 0005, and 0006. No provision is made for economic price adjustment. The Contract Completion Date (CCD) does not change if any or all the bid options are awarded.

c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for Line Item 0001. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the Option(s).

d. In accordance with FAR 52.217-7; Option for Increased Quantity-Separately Priced Line Item (Mar 1989), the Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

e. In accordance with FAR 52.211-18; If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.

f. Refer to the Index of Drawings for a listing of sheets which include Bid Option work.

g. Bid Option 3 will not be awarded unless Bid Option 1 is awarded.

h. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic and option requirements. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

i. Failure to enter a price for any Line Item will be result in a proposal being rejected as unacceptable.

j. If Line Items 0002, 0003, 0004, 0005, and/or 0006 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Document --