This document is the Small Business Participation Commitment Document (SBPCD) for the Design-Bid-Build, P1044, Pier 31 Extension solicitation (N4008524R2503) for the Naval Submarine Base in New London, Connecticut. The SBPCD outlines the minimum level of commitment to subcontract with small businesses, which is a required evaluation factor.

The key details include: the total contract value, the prime contractor's self-performed work value, the percentage and dollar value of overall small business participation, and the participation levels for specific socioeconomic small business categories (SDB, WOSB, HUBZone, VOSB, SDVOSB). A table is provided to list any small business subcontractors with firm commitments. If the 20% minimum small business participation requirement is not met, a detailed explanation is required. The document also contains instructions for completing the form and notes that attachments or addendums will not be evaluated.

View the file

Other files

File Type Posted
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
2024 Dig Permit - (Purpose) Template.pdf PDF
Final Pier 32 Sediment Sampling Results Report January 2014.pdf PDF
MW Pier 31.pdf PDF
Amendment 0005.pdf PDF
S-533A STAIR FOR AIR COMP ACCESS (BID OPTION 5).pdf PDF
APPROVAL of SIUGP RegistrationCTSIU0026.pdf PDF
MW Pier 10.pdf PDF
Basewide LUC map.pdf PDF
REV CN102 RELOCATED FLOATING SECURITY BARRIER PLAN.pdf PDF
E-601 - UNIT SUBSTATION P31N SWITCHGEAR SCHEDULES.pdf PDF
Rev 3 - Attachment H- Price Proposal Form.pdf PDF
Amendment 0004.pdf PDF
Pier 31 - Crane Weight Test Area-E-108.pdf PDF
SUBASENLONINST 5090.25B Enclosure 3.pdf PDF
Amendment 0003.pdf PDF
Rev 2 - Attachment H- Price Proposal Form.docx DOCX document
Amendment 0002.pdf PDF
Revised Attachment H - Price Proposal Form.docx DOCX document
Amendment 0001.pdf PDF
Attachment J - Site Visit Log.pdf PDF
dwg p1044 final 100 pct plans sat date.pdf PDF
spc P1044 Final 100 pct rev1 Appendix G - Pier 31 Existing Substation Shop drawings.pdf PDF
spc P1044 Final 100 pct rev1 Appendix F - Stormwater Management Plan and Permit 2 of 2.pdf PDF
Attachment E Historical Small Business Utilization.docx DOCX document
Solicitation N4008524R2503.pdf PDF
spc P1044 Final 100 pct rev1 Appendix D - HazMat Report.pdf PDF
Attachment I Base map.pdf PDF
spc P1044 Final 100 pct rev1 Appendix C - Environmental permits placeholder.pdf PDF
spc P1044 Final 100 pct rev1 Appendix F - Stormwater Management Plan and Permit 1 of 2.pdf PDF
spc P1044 Final rev1 Appendix H marina dwgs.pdf PDF
Attachment H Price Proposal Form.pdf PDF
spc P1044 Final 100 pct specification rev1.pdf PDF
spc P1044 Final 100 pct rev1 Appendix B - Temporary Environmental Controls.pdf PDF
spc P1044 Final 100 pct rev1 Appendix A - 1 of 2 Pier 31 Record Drawings.pdf PDF
Attachment A Pre Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment B PIEE Vendor Access Instructions.pdf PDF
Attachment C Construction Experience Project Data.docx DOCX document
spc P1044 Final 100 pct rev1 Appendix E - Sediment Sampling results.pdf PDF
Attachment D Past Performance Questionnaire.docx DOCX document
spc P1044 Final 100 pct rev1 Appendix A - 2 of 2 Pier 10 and 17 Stub Record Drawings.pdf PDF
Pier 31 JA Electrical Equipment Redacted.pdf PDF
Attachment G Individual Small Business Subcontracting Plan.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN-BID-BUILD, P1044, PIER 31 EXTENSIONN40085-24-R-2503
NEW LONDON, CONNECTICUTAttachment F

ATTACHMENT F

SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT (SBPCD)

OFFEROR’S NAME

ADDRESS

N40085-24-R-2503 Design-Bid-Build, P1044, Pier 31 Extension New London, Connecticut

Date Prepared

1. Instructions. The SBPCD includes the minimum level of commitment to subcontract with the SBs identified herein. This form is to be completed by ALL offerors (both large AND small businesses) in order to provide supporting information for evaluation of Factor 5, Small Business Utilization and Participation. This is the only form that will be evaluated to determine the offeror’s small business participation commitment. Information provided in a different format and/or on a form created by the offeror will not be evaluated. Attachments or addendums to this form will not be evaluated. Round dollars to nearest whole dollar and percentages to the nearest tenth of a percent.

1. Offeror Information. Prime contractor size based on the NAICS Code identified in the solicitation (check one):

☐ Large Business (LB) ☐ Small Business (SB)

For offerors that identify as a SB, check all applicable socioeconomic categories that apply or check “None” if the offeror does not qualify under any of the socioeconomic categories:

☐ Historically Underutilized Business Zone Small Business (HUBZone SB) ☐ Woman-Owned Small Business (WOSB) ☐ Economically Disadvantaged Woman-Owned Small Business (EDWOSB) ☐ Small Disadvantaged Business (SDB) ☐ Veteran-Owned Small Business (VOSB) ☐ Service-Disabled Veteran-Owned Small Business (SDVOSB) ☐ None

1. Subcontracting Breakdown.

1. Total contract value (TCV)(including options)$
1. Total value of the work to be self-performed by the prime offeror$

1. Small Business Participation.

1.

Small Business Participation (Including Small Business prime offeror’s participation)

Business Category
Dollar Value
% of TCV

Total Small Business (SB) (including all SB socio-economic categories and work self-performed as a SB) The minimum total small business subcontracting requirement for this contract is 20%. If this minimum small business participation requirement is not met, a detailed explanation is required below.

$
%
Small Disadvantaged Business (SDB)
$
%
Woman-Owned Small Business (WOSB)
$
%
Historically Underutilized Business Zone Small Business (HUBZone)
$
%
Veteran-Owned Small Business (VOSB)
$
%
Service-Disabled Veteran-Owned Small Business (SDVOSB)
$
%

If the offeror has not proposed a minimum of 20% for small business participation, provide a detailed explanation:

1. To the greatest extent possible, the table below should identify SBs where firm commitments are in place, to support the minimum small business participation requirement identified in paragraph 4.a (above). Only add subcontractors with firm commitments to the table below, do NOT add subcontractor without firm commitments established. A SB commitment is a written agreement between a prime and small business to work together on this contract. This commitment in writing is considered the nature of commitment, which can include written teaming agreement, joint venture agreement, mentor-protégé agreement, written/signed letter of commitment from the small business, etc. This table can be expanded as needed.

Company Name
Small Business Category(ies)*
Products/Services, including type & variety of work
Nature of Commitment

*SB, WOSB, EDWOSB, SDB, HUBZone SB, VOSB, SDVOSB

1. Explanation/Rationale. If no subcontractors are identified in paragraph 4.b. above, provide detailed explanation for why subcontractors are not identified with firm commitments AND how your firm will be able to achieve the proposed small business participation. ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

1. If the offeror does not intend to subcontract, provide a detailed explanation why subcontracting would not result in efficient contract performance. SBs intending to 100% self-perform are not required to provide an explanation.

File details come from the government source that posted it. Updated .