Attachment E Historical Small Business Utilization.docx

DOCX document 43 KB Posted

Attached to
DESIGN-BID-BUILD, P1044, PIER 31 EXTENSION NAVAL SUBMARINE BASE NEW LONDON, GROTON, CONNECTICUT
Solicitation number
N4008524R2503
Issued by

About this file

This document is Attachment E - Historical Small Business Utilization for the DESIGN-BID-BUILD, P1044, PIER 31 EXTENSION NAVAL SUBMARINE BASE NEW LONDON, GROTON, CONNECTICUT (Solicitation Number N4008524R2503) federal contract opportunity.

Attachment E requires offerors, both large and small businesses, to provide information on their historical small business utilization and achievements for each project submitted under the Corporate Experience factor. Offerors must complete detailed tables providing the total project value, total self-performed value, total subcontracted value, and the actual and goal percentages for various small business categories (small business, small disadvantaged business, women-owned small business, HUBZone, veteran-owned, and service-disabled veteran-owned). Explanations are required for any unmet goals or lack of small business subcontracting. This information will be used to evaluate the offeror's small business utilization and participation as part of the evaluation criteria.

View the file

Other files

File Type Posted
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
2024 Dig Permit - (Purpose) Template.pdf PDF
Final Pier 32 Sediment Sampling Results Report January 2014.pdf PDF
MW Pier 31.pdf PDF
Amendment 0005.pdf PDF
S-533A STAIR FOR AIR COMP ACCESS (BID OPTION 5).pdf PDF
APPROVAL of SIUGP RegistrationCTSIU0026.pdf PDF
MW Pier 10.pdf PDF
Basewide LUC map.pdf PDF
REV CN102 RELOCATED FLOATING SECURITY BARRIER PLAN.pdf PDF
E-601 - UNIT SUBSTATION P31N SWITCHGEAR SCHEDULES.pdf PDF
Rev 3 - Attachment H- Price Proposal Form.pdf PDF
Amendment 0004.pdf PDF
Pier 31 - Crane Weight Test Area-E-108.pdf PDF
SUBASENLONINST 5090.25B Enclosure 3.pdf PDF
Amendment 0003.pdf PDF
Rev 2 - Attachment H- Price Proposal Form.docx DOCX document
Amendment 0002.pdf PDF
Revised Attachment H - Price Proposal Form.docx DOCX document
Amendment 0001.pdf PDF
Attachment J - Site Visit Log.pdf PDF
dwg p1044 final 100 pct plans sat date.pdf PDF
spc P1044 Final 100 pct rev1 Appendix G - Pier 31 Existing Substation Shop drawings.pdf PDF
spc P1044 Final 100 pct rev1 Appendix F - Stormwater Management Plan and Permit 2 of 2.pdf PDF
Solicitation N4008524R2503.pdf PDF
spc P1044 Final 100 pct rev1 Appendix D - HazMat Report.pdf PDF
Attachment I Base map.pdf PDF
spc P1044 Final 100 pct rev1 Appendix C - Environmental permits placeholder.pdf PDF
spc P1044 Final 100 pct rev1 Appendix F - Stormwater Management Plan and Permit 1 of 2.pdf PDF
spc P1044 Final rev1 Appendix H marina dwgs.pdf PDF
Attachment H Price Proposal Form.pdf PDF
spc P1044 Final 100 pct specification rev1.pdf PDF
spc P1044 Final 100 pct rev1 Appendix B - Temporary Environmental Controls.pdf PDF
spc P1044 Final 100 pct rev1 Appendix A - 1 of 2 Pier 31 Record Drawings.pdf PDF
Attachment A Pre Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment B PIEE Vendor Access Instructions.pdf PDF
Attachment C Construction Experience Project Data.docx DOCX document
spc P1044 Final 100 pct rev1 Appendix E - Sediment Sampling results.pdf PDF
Attachment D Past Performance Questionnaire.docx DOCX document
spc P1044 Final 100 pct rev1 Appendix A - 2 of 2 Pier 10 and 17 Stub Record Drawings.pdf PDF
Attachment F Small Business Participation Commitment.docx DOCX document
Pier 31 JA Electrical Equipment Redacted.pdf PDF
Attachment G Individual Small Business Subcontracting Plan.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN-BID-BUILD, P1044, PIER 31 EXTENSIONN40085-24-R-2503
NEW LONDON, CONNECTICUTAttachment E

ATTACHMENT E

HISTORICAL SMALL BUSINESS UTILIZATION

N4008524R2503

This form is to be completed by ALL offerors (both large AND small businesses) in order to provide supporting information for the evaluation of Factor 5, Small Business Utilization and Participation. Attachment E documents the offeror’s historical small business utilization and achievements for each project submitted under Factor 1, Corporate Experience. Round all percentages to the nearest tenth of a percent (i.e., include only 1 number after the decimal point).

Information provided in a different format and/or on a form created by the offeror will not be evaluated. Attachments or addendums to Attachment E will not be evaluated. Only complete Attachment E. Offerors are permitted to expand portions of the form, as needed, to provide sufficient response.

INSTRUCTIONS FOR COMPLETING ATTACHMENT E:

· Complete the “PROJECT DETAILS” section for each Project submitted under Factor 1, Corporate Experience.

· Include contract or task order number; project title; the offeror’s business size; whether the contract was performed as a prime, subcontractor, or JV member; and whether a subcontracting plan was required.

· Complete the “ACTUAL” column (required for all projects regardless of whether goals were established)

· Enter dollar values actually subcontracted for each of the categories listed.

· Provide actual percentages calculated as a percentage of total subcontract value, unless goals were calculated as a percentage of total contract value.

· Complete the “GOAL” column - Enter goals, if applicable.

· If the project was a task order and no goals were established at the task order level, only complete the “ACTUAL” column. Goals for the overarching IDIQ contract should not be included in the “GOAL” column for task orders.

· Goals shall be included for standalone contracts when established.

· Goals can be entered as a percentage of total subcontract value or total contract value based on how the goals were established in the contract award.

· If goals were not established for the project submitted, or if goals were not established for a specific socioeconomic category, check N/A where applicable. The N/A block does not apply to the “ACTUAL” column, as actual subcontracted values are required for ALL projects, regardless of whether goals were established.

· If a goal was unmet for a Project, complete the section below titled “TO BE COMPLETED AS REQUIRED” under item #1.

· Explanation is required for each unmet goal.

· Item #1 is to be completed for each Project with unmet goal(s).

· If a Project has no small business subcontracting achievement (i.e.: $0 subcontracting in (d)), complete the “TO BE COMPLETED AS REQUIRED” under item #2.

· Item #2 is to be addressed for each Project with no small business subcontracting achievement.

· Enter zeroes (0) where applicable.

DEFINITION OF TERMS IN ATTACHMENT E:

· Total Project Dollar Value: the total contract or task order value; this is the actual value of the contract or task order, rather than a “Not To Exceed” dollar value on an IDIQ type contract.

· Total Self-Performed Value: the contract or task order dollar amount performed by the prime contractor, subcontractor or JV.

· Total Subcontract Value: the dollar amount of the contract or task order performed by subcontractors.

PROJECT DETAILS: Project #1

Contract/Project Number/Task Order Number:

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_| JV Member |_|

Subcontracting Plan Required: |_| Yes |_| No

ACTUAL
GOAL

(if applicable)

1. Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

1. Total Self-Performed Value: $

1. Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

TO BE COMPLETED AS REQUIRED:

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

1. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #2

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_| JV Member |_|

Subcontracting Plan Required: |_| Yes |_| No

ACTUAL
GOAL

(if applicable)

1. Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

1. Total Self-Performed Value: $

1. Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

1. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #3

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_| JV Member |_|

Subcontracting Plan Required: |_| Yes |_| No

ACTUAL
GOAL

(if applicable)

1. Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

1. Total Self-Performed Value: $

1. Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

1. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #4

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_| JV Member |_|

Subcontracting Plan Required: |_| Yes |_| No

ACTUAL
GOAL

(if applicable)

1. Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

1. Total Self-Performed Value: $

1. Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

1. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #5

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_| JV Member |_|

Subcontracting Plan Required: |_| Yes |_| No

ACTUAL
GOAL

(if applicable)

1. Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

1. Total Self-Performed Value: $

1. Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

1. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

File details come from the government source that posted it. Updated .