About this file

This document is an amendment to a solicitation for a design-bid-build contract for the Pier 31 extension project at the Naval Submarine Base New London in Groton, Connecticut.

The key changes made in this amendment include:

  • Extending the proposal due date from August 22, 2024 to September 5, 2024
  • Providing additional drawings and documents, including a continuation sheet for contract drawings, updated provisions and clauses, responses to pre-proposal inquiries, and revised pricing forms
  • Clarifying requirements related to the reuse of existing piping, silt fence and inlet protection locations, and loading criteria for existing piers
  • Providing updated federal representation and certification requirements

Overall, this amendment provides additional details and clarifications to the solicitation in preparation for the upcoming proposal submission.

View the file

Other files

File Type Posted
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
2024 Dig Permit - (Purpose) Template.pdf PDF
Final Pier 32 Sediment Sampling Results Report January 2014.pdf PDF
MW Pier 31.pdf PDF
Amendment 0005.pdf PDF
S-533A STAIR FOR AIR COMP ACCESS (BID OPTION 5).pdf PDF
APPROVAL of SIUGP RegistrationCTSIU0026.pdf PDF
MW Pier 10.pdf PDF
Basewide LUC map.pdf PDF
REV CN102 RELOCATED FLOATING SECURITY BARRIER PLAN.pdf PDF
E-601 - UNIT SUBSTATION P31N SWITCHGEAR SCHEDULES.pdf PDF
Rev 3 - Attachment H- Price Proposal Form.pdf PDF
Pier 31 - Crane Weight Test Area-E-108.pdf PDF
SUBASENLONINST 5090.25B Enclosure 3.pdf PDF
Amendment 0003.pdf PDF
Rev 2 - Attachment H- Price Proposal Form.docx DOCX document
Amendment 0002.pdf PDF
Revised Attachment H - Price Proposal Form.docx DOCX document
Amendment 0001.pdf PDF
Attachment J - Site Visit Log.pdf PDF
dwg p1044 final 100 pct plans sat date.pdf PDF
spc P1044 Final 100 pct rev1 Appendix G - Pier 31 Existing Substation Shop drawings.pdf PDF
spc P1044 Final 100 pct rev1 Appendix F - Stormwater Management Plan and Permit 2 of 2.pdf PDF
Attachment E Historical Small Business Utilization.docx DOCX document
Solicitation N4008524R2503.pdf PDF
spc P1044 Final 100 pct rev1 Appendix D - HazMat Report.pdf PDF
Attachment I Base map.pdf PDF
spc P1044 Final 100 pct rev1 Appendix C - Environmental permits placeholder.pdf PDF
spc P1044 Final 100 pct rev1 Appendix F - Stormwater Management Plan and Permit 1 of 2.pdf PDF
spc P1044 Final rev1 Appendix H marina dwgs.pdf PDF
Attachment H Price Proposal Form.pdf PDF
spc P1044 Final 100 pct specification rev1.pdf PDF
spc P1044 Final 100 pct rev1 Appendix B - Temporary Environmental Controls.pdf PDF
spc P1044 Final 100 pct rev1 Appendix A - 1 of 2 Pier 31 Record Drawings.pdf PDF
Attachment A Pre Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment B PIEE Vendor Access Instructions.pdf PDF
Attachment C Construction Experience Project Data.docx DOCX document
spc P1044 Final 100 pct rev1 Appendix E - Sediment Sampling results.pdf PDF
Attachment D Past Performance Questionnaire.docx DOCX document
spc P1044 Final 100 pct rev1 Appendix A - 2 of 2 Pier 10 and 17 Stub Record Drawings.pdf PDF
Attachment F Small Business Participation Commitment.docx DOCX document
Pier 31 JA Electrical Equipment Redacted.pdf PDF
Attachment G Individual Small Business Subcontracting Plan.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N4008524R2503 DESIGN-BID-BUILD, P1044, PIER 31 EXTENSION NAVAL SUBMARINE BASE NEW LONDON, GROTON, CONNECTICUT

POC: Kristy Gerrek, kristy.l.gerrek.civ@us.navy.mil

Please see continuation pages.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 17

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Aug-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008524R2503

X 9B. DATED (SEE ITEM 11)

06-Jun-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Aug-2024

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008524R2503

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0004

This amendment is issued to incorporate the following:

1. The proposal due date is extended from 22 AUGUST 2024 to 05 SEPTEMBER 2024

2. Provide Continuation Sheet for Contract Drawings

3. Incorporate and update applicable provisions and clauses (see below)

4. Provide responses to Pre-proposal Inquiries

5. Provide Rev 3 - Attachment H- Price Proposal Form (attached separately)

6. Provide Attachment E-601 - UNIT SUBSTATION P31N SWITCHGEAR SCHEDULES (attached separately)

7. Provide Attachment Pier 31 - Crane Weight Test Area-E-108 (attached separately)

8. Provide Attachment SUBASENLONINST 5090.25B Enclosure 3 (attached separately)

1. The proposal due date is extended from 22 AUGUST 2024 to 05 SEPTEMBER 2024

***PLEASE NOTE: NO ADDITIONAL PPI’S WILL BE ACCEPTED***

2. Continuation Sheet

1.2 CONTRACT DRAWINGS

Add drawing E-108 Electrical Plan – Crane Weight Handling Area to the contract documents.

Drawing E-601 Unit Substation P31N Switchgear Schedules

Added Detail C2 Crane Weight Handling One Line Diagram Added – Detail A3 – Pad Mounted Transformer

3. Incorporate and update applicable provisions and clauses

(see below)

4. Pre- proposal Inquiries

PPI # Page Section Paragraph Question Responses

17 18 & 19 33 11 00 3.2.2

Specification Section 33 11 00 requires Hydrostatic Testing, Leakage Testing and Special Testing requirements including hydrostatic pressure of not less than 200 psi for no less than 2 hours. The Mechanical drawings indicate that the 6" Fresh Water line is to be removed and stored for re-installation (i.e. reuse). Without knowing the condition of the existing Fresh water line or the last time it was tested, please advise on potential remedies for the reinstalled water line test failures should they occur.

Per Specification Section 33 11 00

“FRESH WATER UTILITY

DISTRIBUTION PIPING” the piping material is ductile piping, and per

SECTION 02 41 00 DEMOLITION

AND DECONSTRUCTION,

Paragraph 3.6 REUSE OF SALVAGED ITEMS Recondition salvaged materials and equipment designated for reuse before installation. Replace items damaged during removal and salvage operations or restore them as necessary to usable condition.

Contractor shall recondition the ductile pipe (i.e. replace all joined gasket/rubber ring/etc.), replace any damaged items during removal & storage, etc., before commencing reinstallation of the 6” Fresh water.

C-503

Drawing C-503 shows inlet protection and silt fence details, but there are no drawings that show the locations for installation. Please provide overall drawings for silt fence and inlet protection locations.

Fence locations and sediment control shall be determined by the contractor based on the limits of site disturbance, soil stockpiles, etc. See specification section 01 57 19.

What is the loading criteria of the existing pier 31/ bents? What equipment loading can be utilized for construction activities?

The existing Pier 31 bents were designed based on various load combinations included on the reference drawings and assuming composite action of the cap / deck. The contractor shall provide calculations for loading of the piers depending on the state of demolition or construction and the pier bent section that is present at the time to ensure the pier bents are not overstressed for the intended contractor's loading.

What is the loading criteria for Pier 10? What equipment loading can be utilized for construction activities?

The loads are indicated on the Pier 10 record dwgs in appendix A1.

However, they are largely unreadable.

Based on the readable information, the design live loads are 600 psf, AASHTO H20 truck load, and crane outrigger loads of various magnitudes based on pick radius. The contractor shall determine equipment based on the 600 psf live load and H20 truck loads.

What is the loading criteria for Pier 17? What equipment loading can be utilized for construction activities?

The pier 17 design loads are indicated in the appendix A1 on the Pier 17 record dwgs. The contractor shall determine equipment based on its' loading.

CN107 /

CN301

In regards to the phasing of the alternates for the Pier 10 demo and dredging, how does this dredging coincide with the contract dredging of Pier 31 and turning basin?

Does all material under/adjacent to Pier 10 need to be place in CAD cell prior to balance of dredge from in all 3 areas (P31, basin, and P10)? (Sheet CN107/Sheet CN301- Note 2).

Assuming Pier 10 option is awarded the dredge material shall be placed as indicated in note 2. "Dredge areas adjacent / underneath piers"

CN301

If initial 2' of dredge material is required to be removed first is there sufficient capacity within the CAD cell for pier 10 and Pier 31 locations be placed below EL-57 in the center CAD cell? (CAD CELL Long typ Section; sheet CN301)

There is no significance to EL -57.

CAD Cell sections on CN301 are included for diagrammatic purposes and to further inform the handling of dredged material disposal within the CAD cells.

1.4.1.C

No photos are allowed per Specification Section 1.4.1.C. Are phones and laptops with cameras allowed to be operated on the base?

No.

S-106, S-303

Existing record drawing G-003 (sheet 3 of 135 dated April 2, 2013) show Pier 31 having 23 support bents. The P-1044 Pier 31 Extension Plans show bent #24 is an existing pile bent to remain in place (S-106). Sheet S-303, section A2 includes bent 24 within the pier extension. Please indicate what set of documents is correct.

Record dwg G-003 is incorrect. Pier 31 has 24 bents (Record dwg S101).

Existing bent 24 will be modified as part of the extension and remain in place for pier extension.

1.33.00 1.10.d

Section 01.33.00-1.10.d- To properly schedule the work the duration noted for review by the contracting officer is blank. How many days for submittals when the contracting officer is reviewing and approving?

21 days.

Justification and Approval

Description of the Action

Being Approved:

Per the J&A document provided in the solicition, Kinney Electric is the single switchgear manufacturer to be used on the project. Can you please provide contact information for Kinney Electric.

The Navy does not have a current contact for Kinney Electric.

Drawings

ED102, E-102

& E-505

In regards to the Voice/Data outlet stations, Drawing ED102, Note 2 states "All equipment is existing to remain unless otherwise noted", Drawing E-102 indicates "Existing" stations on the pier, yet Drawing E- 505 would indicate new Voice/Data Outlet stations. Please confirm the existing voice/data outlet stations are to remain in place and new units are not to be furnished or installed on pier 31?

Confirmed. Existing Voice/Data Outlet Stations to remain in place.

Drawings

SD105,

SD109,

ED104, E-101,

E-105

In regards to the High Mast Lights, Drawing SD105, Note 5 & SD109, Note 4 states "Demolish Exist High Mast Light" adjacent to Bent 23 (LC1 Pole Location). Drawing ED104 states; "Disconnect, Remove and Store for reuse of Existing 100' High-Mast Lighting Pole. Return heads and Ring to the Government.."

Drawings E-101 & E-105 would indicate re-use of the existing LC1 & LC2 light poles . Please confirm that we are to reuse the existing LC1 Pole and provide new ring and head only and that the intent is not to completely demolish the existing LC1 High mast pole & furnish / install a new Pole as well as ring and head at the revised LC1 High Mast Pole location.

Confirmed. Reuse existing light poles LC1 and LC2 and provide electrical rings and heads for a complete and usable lighting system.

Drawings

ED104

The hatch marks on drawing ED104, would indicate demolition of existing Manhole P31L-N4 between Bents 21 & 22 yet Drawing E-104 would indicate continued use of existing Manhole P31L-N4 at this location. Please confirm the existing manhole is to remain in place for reuse.

Confirmed. Existing manhole P31L- N4 is to remain.

Revised

Appendix H

CLIN 0001G a dollar value was added for $593,863.45. Is this item now intended to be an allowance item? Please confirm.

No. Contractor to provide own value.

Revised Appendix H

The Total Price for CLIN 0001 field on page 9 of the document appears to have been filled in. Please confirm we are to delete this value and replace with our actual bid price.

Confirmed.

Amendment #2, Question

#23 & CLIN

0001C

Following up from this previously asked question, we understand the H-pile stinger is included in this pay item, however does the quantity listed of 3,587 LF include the length

The quantity does not include the stinger pile however the stinger shall be included in the unit price.

of the Polymeric Pile plus stinger or is the measurement for payment only based on the polymeric pile. Our takeoff quantity for the polymeric pile length alone match the quantity on the bid form but when adding the H-pile stinger length we are over double the quantity on the bid form.

Amendment #2, Drawing

S-535

The Call out on the Crane Weight Test Area Quaywall Deck Plan (Bid Option 4) was modified to state "Allowable Loading Sign, See A4 on S-535" but no additional detail A4 is on S-535. Please confirm that the sign detail call out should be detail A4 on S-538 and also confirm that the original call out (C5 on S-

538) referencing the allowable loading sign foundation is still applicable to this callout on drawing S-535?

Reference should be A4 on S-538.

Sign foundation C5 on S-538 is correct.

Amendment #2

Drawing S-

Notes 1.A and 1.B on Drawing S- 538 provided with Amendment #2 are clouded but do not appear to contain any modifications from the original notes on S-538. Please confirm no changes to these notes are required

No changes are required.

Drawing

CN101 &

CN102

Is the Detail for the Buoy at the Crane Weight Test Area similar to the details for Buoy Anchors on Drawing CN-101? And is the Boom Anchor Block on the CWTA platform in addition to all the Sinkers and Anchors in the water under the Buoy at the CWTA? Or is the Boom Anchor Block on the CWTA platform in lieu of all in-water sinkers and anchors? Please clarify.

Yes, the detail for the buoy anchor is the same. Relocation of the boom anchor block is in addition to the relocation of the buoy anchors.

Amendment #2, Question

#18 & Drawing M-

Note 5 on Drawing M-101 provided with Amendment #2 is clouded but does not appear to contain any modifications from the original note on M-101. However, the contract drawing change summary indicates that Note 7 was updated which also does not appear to be accurate.

Please confirm no changes to these notes are required based on the response to question #18 in Addendum #2

No Changes. Please disregard this cloud.

Amendment #2, Drawing M-

The callout in detail A2 on Drawing M-401 provided with Amendment #2 is clouded but does not appear to contain any modifications from the original note on M-401. Please confirm no changes to this callout are required.

No Changes. Please disregard this cloud.

N/A Attachment A of Specifications

Enclosure 3

Please provide a readable copy of Enclosure 3 to Attachment A (pertinent to soil management).

Please see attachment

SUBASENLONINST 5090.25B

Enclosure 3 provided with Amendment 0004.

Drawings M-101 & E-

The details on Drawings M-101 and E-101 depict both Mechanical and Electrical utility lines running below grade to the proposed elevated compressed air enclosure more than 10' above. Please provide details on the transition from the below grade utilities to the elevated compressed air enclosure including attachment to the steel dunnage, penetrations through the new enclosure floor and thrust blocks if required.

Provide three equally spaced stainless steel strut supports for pipe and conduit. Anchor to structural column with stainless steel U-bolt. Provide riser clamp and seal if entering through the floor of the compressor house.

Drawing S-

Spec Section 22 15 14.00

Paragraph 2.2.2.1

Please provide connection details for how the proposed elevated compressed air enclosure is attached to the steel dunnage. The current drawing set does not detail if the new enclosure is to be welded or bolted to the steel dunnage while meeting the required 110 MPH equivalent wind load that is indicated in specification section 22 15 14.00 40

The compressor enclosure may be bolted or welded depending on the configuration of the compressor base framing provided by the manufacturer.

Coordinate base framing connection requirement with the manufacturer and the design wind load.

Drawing C-

The callout on drawing C-103 states "Provide Concrete Encased Conduit" that appears to run below the surface to what appear to be two new Crane Shore Power Terminals (Terminal 1 and 2) in the existing parking spaces.

There are also two light poles that are to be relocated along the bulkhead curb line. Note 4 on drawing C-103 states "See Electrical Drawings for Underground duct bank layout and details." but there are no details provided in the Electrical Drawings. Please provide details for these conduit / duct bank runs, including installation depth below the existing surface as well as details on the new crane shore power terminals. Please also advise if the conduits are to run underneath the existing parking spaces in existing

Please refer to new sheet E-108 which includes the electrical design for the Crane Weight Handling Area. This sheet also contains the detail for a typical underground duct bank. Please also refer to revised drawing E-601 which includes the one-line diagram and pad mounted transformer detail for the crane weight handling area. Please see Attachment Pier 31 - Crane Weight Test Area - E-108, Attachment E- 601

- UNIT SUBSTATION P31N

SWITCHGEAR SCHEDULES, and the Continuation Page (within Amendment) provided with Amendment 0004.

spare conduits or if the contractor is to install new conduit runs below the concrete deck through the quay wall substructure elements to feed the light poles and crane shore power terminals.

Amendment #3, Page 2 of

Paragraph 1.2

Amendment #3 states that Demolition of Pier 10 and Crate Test Area are to be included as Bid Option 0001, however the revised Attachment H - Price Proposal form has only Pier 10 as Bid Option 1 while the Crane Test Weight Area Demolition remains in Bid Option 4.

Please clarify.

Please utilize Rev 3 - Attachment H- Price Proposal Form provided with Amendment 0004.

Amendment #3, Page 2 of

Paragraph 1.2

Amendment #3 states that the Demolition of Pier 10 Option and Crane Weight Test Area Option may be exercised within 365 days after contract award. If it were exercised exactly 365 days after award it would likely push off Pier 10 dredging if also exercised to beyond October 1, 2026 dredging window.

Should the bid time assumption be that this option would not be awarded until 365 days after award?

Clarifications will be provided at the time of executing the Bid Options.

SF1442 13A.

Will a revised SF 1442 form be provided with the updated bid due date?

No. The updated bid date was provided with Amendment 0001 and Amendment 0004. Please reference Amendments for updated Bid Dates.

Attachment G

Subcontracting

Plan

The last page of the Attachment G - Small Business Subcontracting plan only contains four (4) options. Will you be providing an updated form showing five (5) options?

Please only utilize Base Period. Option Periods are not applicable.

Attachment H

- Price

Proposal Form

Amendment 2 revised Price proposal form added CLIN 0001H and 0001I

- 100% work shutdown and CLIN 0001N - Removal of debris.

Amendment 3 Revised Price Proposal Form does not include these items. Is it the intent of Amendment #3 to remove these items that were added in Amendment #2?

Those line items were mistakenly added with Amendment 0002. Please utilize Rev 3 - Attachment H- Price Proposal Form provided with Amendment 0004.

Drawing G- 104 Note 1

Drawing references removing existing timber pier anchors at the marina. Appendix H drawings appear to describe these anchors as Helical Pile anchors. There are no other drawings or references describing how large these Helical Piles are. Please confirm 1) the timber pier anchors are in-fact

All available information for the existing marina and the anchors has been provided. Anchors must be removed their entirety.

helical piles that require removal.

2)Please provide further information as to how large (diameter) and deep these helical anchors are installed.

3)If there is a concrete cap on top of the helical pile please provide concrete cap details 4)Must these anchors be removed in their entirety or may be but cut 2ft below dredge prism?

Spec 02 61 13

Enclosure 3 of Attachment A in Spec 02 61 13 is un-readable. Please provide a legible copy.

Please see attachment

SUBASENLONINST 5090.25B

Enclosure 3 provided with Amendment 0004.

Drawing S-

Detail A3 on Drawing S-509 show the deck edge dropping down below top of Cap/Stringer between caps.

There is no detail of this similar arrangement over an existing Stringer. It would appear if this is a similar detail, doweling into the existing stringer on the edges would be required, however there is no detail showing this. Please clarify if additional doweling is required on the edges of deck where poured over existing stringers and if so please specify the depth.

Yes, dowels #5 @12 with 18" embedment into existing edge stringer are required. Other details similar to A3/S-509 are required for all existing edge stringers impacted by demolition.

Attachment H

- Price

Proposal Form

Amendment 3 Price proposal form CLIN 0001N has a quantity of 20 EA. Is this based on 20 individual marine vessels that require moving or 20 events where vessel(s) may be moved? 20 Events.

Drawing

SD606 &

SD303,

SD104

Photograph in SD606, Detail A1 & A3 and Drawing SD104 show the CWTA Demo of Fender system as a timber fender system mounted to the concrete fascia. Drawing SD303 appears to show the fender system differently from the photo on SD606 as a fiberglass Pile with Arch Fender. Please clarify which is correct.

Both dwgs SD 104 and SD606 are correct. The existing fender system is timber facing mounted to steel H piles.

There is an arch fender connecting the H pile to the concrete fascia. See also A4/SD606 for additional information.

Drawing E- 106 & E-403

Regarding the Grounding and attachment to the piles as shown on Detail A2 and A4 on Drawing E- 403, it is not clear to which piles and how many piles we are to ground to.

Based on Drawing E-106 it appears the existing pier section between Bents 1 through 24 already has an embedded grounding wire that is already connected to the existing piles. Are we only to connect new

Bond to the two seel piles in the locations shown on E-106 and the six locations shown on E-403 grounding wire to the new piles in Pile Rows A and E only at bents 25 through 28 (in other words 8 piles)?

Drawings:

C-103 & C-

Drawing C-103 contains a double dashed line on the landside of the new curb extension with no callout indicating what this pertains to but appears to indicate the guardrail that is called out on drawing C-506.

Please confirm the following: 1.)

The Double dashed line is for the new Guardrail, 2.) There are no guardrail transitions back to the existing curb or fence line and blunt ends in the guardrail are intended, 3.) the guardrail should be continous along the entire curb extension for about 285 feet and is intended to block the access to the new 40' and 15' manual sliding gates to be incorporated into the fence line.

1. The double dashed line on C103 is the new guardrail. 2. The returns on the guard rails should be standard galvanized steel "bull nose" terminal ends. 3. The guard rails shall be open to match the width of the sliding gate openings

Pages 5 & 6 22 15 14.00 2.2.2.1

Specification 22 15 14.00, section

2.2.2.1 lists out some very specific requirements for the Option 5 Compressor House including design elements and details of the various interior and exterior component requirements, appearing to be from specific manufacturers that may have been contacted during design development. If these are intended to be fully assembled skid mounted compressor house units, please provide a list of manufacturers that the Navy has utilized to manufacture similar units in the past or who may have been contacted during design development to provide accurate pricing for this compressor house unit as this is not a typical item for standard compressor vendors to provide.

The design was based on the below manufacturers:

Kaeser: Sequeira, John (860) 212-6455 john.sequeira@kaeser.com Atlas Copco: Ryan Dempsey +1 (518) 616-3236 ryan.dempsey@atlascopco.com

Drawing S-513

Detail A1 on drawing S-513 states:

"Government Furnished Contractor Installed Guard Booth". Please confirm that we are not to include the purchase price of the Guard Booth in our price Proposal

The inboard guard booth is no longer in the project per PPI response 28.

The outboard guard booth shall be provided and installed by the Contractor.

Attachment H 0001C

Please confirm the quantity for item 0001C - Polymeric Fender Piles including steel H-Pile Extension. It appears the provided quantity is significantly less than calculated. The correct length is 7174 LF.

Solicitation 9 00 21 00 3.(i).4 & 5

For the SAM Registration and FAPIIS confirmations, please confirm if there is a document requirement to satisfy the items or if a statement can be written in the proposal. If there is a specific document, please provide a means of obtaining (i.e. section within Sam.gov, direct phone number, etc.)

Please ensure your SAM.gov Entity Registration is current and active, along with your full Representation and Certifications as required by Section 00 45 00. Both verification printouts can be downloaded and included with your proposal submission. Both verifications are located within SAM.gov.

Solicitation 9 00 21 00 3.(i).5

Please confirm that by having a current registration in SAM that a contractor also satisfies the requirement of the FAPIIS as it appears to be the case.

Offeror shall ensure Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete, as required by FAR 52.209-7, Information Regarding Responsibility Matters. FAPIIS is located under Responsibility / Qualification under your Entity Registration.

5. Provide Rev 3 - Attachment H- Price Proposal Form (attached separately)

6. Provide Attachment E-601 - UNIT SUBSTATION P31N SWITCHGEAR SCHEDULES (attached separately)

7. Provide Attachment Pier 31 - Crane Weight Test Area-E-108 (attached separately)

8. Provide Attachment SUBASENLONINST 5090.25B Enclosure 3 (attached separately)

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 22-Aug-2024 02:00 PM to 05-Sep-2024 02:00 PM.

Global Changes

CLIN 0001 -- CLIN 0006

The unit of issue has changed from Each to Project.

SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS

The following have been modified:

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237990.

(2) The small business size standard is 45,000,000.

(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition--

(i) Is set aside for small business and has a value above the simplified acquisition threshold;

(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or

(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

[ ] Paragraph (d) applies.

[ ] Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.204-26, Covered Telecommunications Equipment or Services--Representation. This provision applies to all solicitations.

(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations--Representation.

(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(x) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.

(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).

(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xvi) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial products or commercial services.

(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of biobased products in USDA-designated product categories; or include the clause at 52.223-2, Reporting of Biobased Products Under Service and Construction Contracts.

(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.

(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.

(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xxi) 52.225-4, Buy American-Free Trade Agreements-Israeli Trade Act Certificate. (Basic, Alternates II and III.)

This provision applies to solicitations containing the clause at 52.225-3.

(A) If the acquisition value is less than $50,000, the basic provision applies.

(B) If the acquisition value is $50,000 or more but is less than $100,000, the provision with its Alternate II applies.

(C) If the acquisition value is $100,000 or more but is less than $102,280, the provision with its Alternate III applies.

(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.

(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.

(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

(i) 52.204-17, Ownership or Control of Offeror.

(ii) 52.204-20, Predecessor of Offeror.

(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

(iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.

(v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.

(vi) 52.227-6, Royalty Information.

(A) Basic.

(B) Alternate I.

(vii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The Offeror has completed the annual representations and certifications electronically in SAM accessed through https://www.sam.gov. After reviewing the SAM information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [ offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.

(End of provision)

The following included by reference have been revised:

52.223-1 Biobased Product Certification MAY 2024

The following included by full text have been revised:

252.204-7007 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)

Substitute the following paragraphs (b), (d) and (e) for paragraphs (b) and (d) of the provision at FAR 52.204-8:

(b)(1) If the provision at FAR 52.204-7, System for Award Management, is included in this solicitation, paragraph

(e) of this provision applies.

(2) If the provision at FAR 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (e) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

__ (i) Paragraph (e) applies.

__ (ii) Paragraph (e) does not apply and the Offeror has completed the individual representations and certifications in the solicitation.

(d)(1) The following representations or certifications in the SAM database are applicable to this solicitation as indicated:

(i) 252.204-7016, Covered Defense Telecommunications Equipment or Services--Representation. Applies to all solicitations.

(ii) 252.216-7008, Economic Price Adjustment--Wage Rates or Material Prices Controlled by a Foreign Government. Applies to solicitations for fixed-price supply and service contracts when the contract is to be performed wholly or in part in a foreign country, and a foreign government controls wage rates or material prices and may during contract performance impose a mandatory change in wages or prices of materials.

(iii) 252.225-7042, Authorization to Perform. Applies to all solicitations when performance will be wholly or in part in a foreign country.

(iv) 252.225-7049, Prohibition on Acquisition of Certain Foreign Commercial Satellite Services--Representations.

Applies to solicitations for the acquisition of commercial satellite services.

(v) 252.225-7050, Disclosure of Ownership or Control by the Government of a Country that is a State Sponsor of Terrorism. Applies to all solicitations expected to result in contracts of $150,000 or more.

(vi) 252.229-7012, Tax Exemptions (Italy)--Representation. Applies to solicitations when contract performance will be in Italy.

(vii) 252.229-7013, Tax Exemptions (Spain)--Representation. Applies to solicitations when contract performance will be in Spain.

(viii) 252.247-7022, Representation of Extent of Transportation by Sea. Applies to all solicitations except those for direct purchase of ocean transportation services or those with an anticipated value at or below the simplified acquisition threshold.

(2) The following representations or certifications in SAM are applicable to this solicitation as indicated by the Contracting Officer: [Contracting Officer check as appropriate.]

____ (i) 252.209-7002, Disclosure of Ownership or Control by a Foreign Government.

____ (ii) 252.225-7000, Buy American--Balance of Payments Program Certificate.

____ (iii) 252.225-7020, Trade Agreements Certificate.

____ Use with Alternate I.

____ (iv) 252.225-7031, Secondary Arab Boycott of Israel.

____ (v) 252.225-7035, Buy American--Free Trade Agreements--Balance of Payments Program Certificate.

____ Use with Alternate I.

____ Use with Alternate II.

____ Use with Alternate III.

____ Use with Alternate IV.

____ Use with Alternate V.

____ (vi) 252.226-7002, Representation for Demonstration Project for Contractors Employing Persons with Disabilities.

____ (vii) 252.232-7015, Performance-Based Payments--Representation.

(e) The Offeror has completed the annual representations and certifications electronically via the SAM website at https://www.sam.gov. After reviewing the SAM database information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in FAR 52.204-8(c) and paragraph (d) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer, and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [Offeror to insert changes, identifying change by provision number, title, date____]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR/DFARS provision No.

Title Date Change

Any changes provided by the Offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications located in the SAM database.

(End of provision)

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been added by reference:

52.219-4 Notice of Price Evaluation Preference for HUBZone Small

Business Concerns

OCT 2022

The following included by reference have been revised:

52.223-2 Reporting of Biobased Products Under Service and

Construction Contracts.

MAY 2024

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2024 52.223-6 Drug-Free Workplace MAY 2024 52.223-11 Ozone-Depleting Substances and High Global Warming

Potential Hydrofluorocarbons.

MAY 2024

52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners.

MAY 2024

52.223-20 Aerosols MAY 2024 52.223-21 Foams MAY 2024

(End of Summary of Changes)