YUM Unit Price Bid Sheet Blank FY26.xlsx
XLSX spreadsheet 78 KB Posted
- Solicitation number
- 20154783
About this file
This document is a detailed pricing template (Unit Price Bid Sheet) for a Customs and Border Protection (CBP) maintenance contract covering the Yuma and El Centro sectors in Arizona and California. The comprehensive pricing schedule includes labor, materials, and equipment rates across multiple Contract Line Item Numbers (CLINs) for various maintenance services such as fence and gate repairs, road and bridge maintenance, electrical work, vegetation control, drainage systems, and tunnel remediation.
The labor pricing is structured with three rate tiers for each service category: routine daytime work, urgent daytime work, and urgent after-hours work. The materials section lists extensive inventories of items like fence components, electrical fixtures, concrete, culvert pipes, and erosion control materials. Equipment rates are provided for a wide range of machinery including excavators, trucks, lifts, and specialized tools. The solicitation requires mandatory site visits on January 26th and 27th, 2026, with attendee lists due to the Contracting Officer by January 21, 2026. The contract appears focused on technical infrastructure maintenance for border security assets across the Yuma and El Centro geographical sectors.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mob-Demob
| Zone | Start | Reference | End | Reference | Geo Reference | Distance (linear miles) | Station | ||
| 1 | 32.705935 | -114.909975 | Mon 210 | 32.710936 | -114.834917 | Mon 209 | C1 Dunes | 4.50 | Yuma |
| Mobilization | |||||||||
| Demobilization | |||||||||
| 2 | 32.710936 | -114.834917 | Mon 209 | 32.716497 | 114.753989 | Cut off Rd (sidewinder) | C1 Dunes | 4.75 | Yuma |
| Mobilization | |||||||||
| Demobilization | |||||||||
| 3 | 32.716497 | 114.753989 | Cut off Rd | 32.718771 | -114.719592 | River | Andrade/Alamo | 2.50 | Yuma |
| Mobilization | |||||||||
| Demobilization | |||||||||
| 4 | 32.718771 | -114.719592 | River Trail | 32.683791 | -114.740535 | Co 10th | River Trail | 2.75 | Yuma |
| Mobilization | |||||||||
| Demobilization | |||||||||
| 5 | 32.683791 | -114.740535 | Co 10th | 32.625533 | -114.78168 | Co 14th | River Trail | 4.75 | Yuma |
| Mobilization | |||||||||
| Demobilization | |||||||||
| 6 | 32.625533 | -114.78168 | Co 14th | 32.570984 | -114.805058 | Co 18th | River Trail | 6.50 | Yuma |
| Mobilization | |||||||||
| Demobilization | |||||||||
| 7 | 32.570984 | -114.805058 | Co 18th | 32.523242 | -114.799511 | Co 21st | Gadsen/River Trail | 4.00 | Yuma |
| Mobilization | |||||||||
| Demobilization | |||||||||
| 8 | 32.523242 | -114.799511 | Co 21st | 32.48526 | -114.782626 | SLU POE | SLU West | 4.25 | Yuma |
| Mobilization | |||||||||
| Demobilization | |||||||||
| 9 | 32.484713 | -114.780567 | SLU POE | 32.47093 | -114.734902 | AVE G | SLU East | 3.00 | Yuma |
| Mobilization | |||||||||
| Demobilization | |||||||||
| 10 | 32.47093 | -114.734902 | AVE G | 32.401161 | -114.503846 | MON 199 | SLU East/BMGR | 14.50 | Yuma |
| Mobilization | |||||||||
| Demobilization | |||||||||
| 11 | 32.401161 | -114.503846 | MON 199 | 32.354461 | -114.350553 | MON 197 | BMGR | 9.50 | Yuma |
| Mobilization | |||||||||
| Demobilization | |||||||||
| 12 | 32.354461 | -114.350553 | MON 197 | 32.260445 | -114.044545 | MON 191 | BMGR | 20.00 | Wellton |
| Mobilization | |||||||||
| Demobilization | |||||||||
| 13 | 32.260445 | -114.044545 | MON191 | 32.1832 | -113.7954 | MON 186 | BMGR | 16.00 | Wellton |
| Mobilization | |||||||||
| Demobilization | |||||||||
| 14 | 32.18320 | -113.79540 | MON 186 | 32.05660 | -113.39070 | MON 179 | BMGR | 26.00 | Wellton |
| Mobilization | |||||||||
| Demobilization | |||||||||
| 15 | 32.05660 | -113.39070 | MON 179 | 32.03870 | -113.33410 | MON 178 | BMGR | 3.00 | Wellton |
| Mobilization | |||||||||
| Demobilization |
Labor
| Yuma Sector | ||||||
| Labor Itemized Pricing List | ||||||
| CLIN 1 Fences and Gates | Crew Composition | |||||
| Line Item | Description | UoM | Unit Rate | Trade | Qty |
| 1 | Routine Repair & Maintenance for | Daily work crew to perform routine maintenance and | Day | Welder | 1 |
| Yuma Sector | repairs per SOW | Welder Helper | 1 | ||
| (Routine work Performed during daylight hours, | |||||
| based on 8 hour workday Mon-Fri) |
| 2 | Urgent Repair & Maintenance for | Hourly work crew to perform urgent maintenance | Hour | Welder | 1 |
| Yuma Sector | and repairs per SOW | Welder Helper | 1 | ||
| (Urgent work performed during daylight hours, | |||||
| based on 8 hour workday Mon-Fri) |
| 3 | Urgent After-Hour Repair & | Hourly work crew to perform urgent maintenance | Hour | Welder | 1 |
| Maintenance for Yuma Sector | and repairs outside of the standard 8 hour M-F | Welder Helper | 1 | ||
| schedule, inclusive of nights, weekends and holidays |
| CLIN 2 Roads and Bridges | Crew Composition | |||||
| Line Item | Description | UoM | Unit Rate | Trade | Qty |
| 1 | Routine Repair & Maintenance for | Daily work crew to perform routine maintenance and | Day | Equipment Operator | 2 |
| Yuma Sector | repairs per SOW | Labor | 1 | ||
| (Routine work Performed during daylight hours, | |||||
| based on 8 hour workday Mon-Fri) |
| 2 | Urgent Repair & Maintenance for | Hourly work crew to perform urgent maintenance | Hour | Equipment Operator | 2 |
| Yuma Sector | and repairs per SOW | Labor | 1 | ||
| (Urgent work performed during daylight hours, | |||||
| based on 8 hour workday Mon-Fri) |
| 3 | Urgent After-Hour Repair & | Hourly work crew to perform urgent maintenance | Hour | Equipment Operator | 2 |
| Maintenance for Yuma Sector | and repairs outside of the standard 8 hour M-F | Labor | 1 | ||
| schedule, inclusive of nights, weekends and holidays |
| CLIN 3 Drainage and Grates | Crew Composition | |||||
| Line Item | Description | UoM | Unit Rate | Trade | Qty |
| 1 | Routine Repair & Maintenance for | Daily work crew to perform routine maintenance and | Day | Equipment Operator | 2 |
| Yuma Sector | repairs per SOW | Labor | 1 | ||
| (Routine work Performed during daylight hours, | |||||
| based on 8 hour workday Mon-Fri) |
| 2 | Urgent Repair & Maintenance for | Hourly work crew to perform urgent maintenance | Hour | Equipment Operator | 2 |
| Yuma Sector | and repairs per SOW | Labor | 1 | ||
| (Urgent work performed during daylight hours, | |||||
| based on 8 hour workday Mon-Fri) |
| 3 | Urgent After-Hour Repair & | Hourly work crew to perform urgent maintenance | Hour | Equipment Operator | 2 |
| Maintenance for Yuma Sector | and repairs outside of the standard 8 hour M-F | Labor | 1 | ||
| schedule, inclusive of nights, weekends and holidays |
| CLIN 4 Lighting and Electrical | Crew Composition | |||||
| Line Item | Description | UoM | Unit Rate | Trade | Qty |
| 1 | Routine Repair & Maintenance for | Daily work crew to perform routine maintenance and | Day | Electrican Med Volt | 2 |
| Yuma Sector | repairs per SOW | ||||
| (Routine work Performed during daylight hours, | |||||
| based on 8 hour workday Mon-Fri) |
| 2 | Urgent Repair & Maintenance for | Hourly work crew to perform urgent maintenance | Hour | Electrican Med Volt | 2 |
| Yuma Sector | and repairs per SOW | ||||
| (Urgent work performed during daylight hours, | |||||
| based on 8 hour workday Mon-Fri) |
| 3 | Urgent After-Hour Repair & | Hourly work crew to perform urgent maintenance | Hour | Electrican Med Volt | 2 |
| Maintenance for Yuma Sector | and repairs outside of the standard 8 hour M-F | ||||
| schedule, inclusive of nights, weekends and holidays |
| CLIN 5 Vegetation Control and Debris Removal | Crew Composition | |||||
| Line Item | Description | UoM | Unit Rate | Trade | Qty |
| 1 | Routine Repair & Maintenance for | Daily work crew to perform routine maintenance and | Day | Equipment Operator | 1 |
| Yuma Sector | repairs per SOW | Labor | 2 | ||
| (Routine work Performed during daylight hours, | |||||
| based on 8 hour workday Mon-Fri) |
| 2 | Urgent Repair & Maintenance for | Hourly work crew to perform urgent maintenance | Hour | Equipment Operator | 1 |
| Yuma Sector | and repairs per SOW | Labor | 2 | ||
| (Urgent work performed during daylight hours, | |||||
| based on 8 hour workday Mon-Fri) |
| 3 | Urgent After-Hour Repair & | Hourly work crew to perform urgent maintenance | Hour | Equipment Operator | 1 |
| Maintenance for Yuma Sector | and repairs outside of the standard 8 hour M-F | Labor | 2 | ||
| schedule, inclusive of nights, weekends and holidays |
| Additional Crew Members to Supplement Crew Composition | ||||||
| Line Item | Description | UoM | Unit Rate | UoM | Unit Rate | |
| 1 | Laborer - Arizona | Laborer rate in Arizona | Hour | Day | ||
| 2 | Operator - Arizona | Operator rate in Arizona | Hour | Day | ||
| 3 | Laborer - California | Laborer rate in California | Hour | Day | ||
| 4 | Operator - California | Operator rate in California | Hour | Day |
| Over Time and or Travel Rates if Authorized | ||||
| Line Item | Description | UoM | Unit Rate | |
| 1 | CLIN 1 - Work Crew Overtime for | Over Time Rate Crew CLIN 1 | Hour | |
| Routine Work Activities | ||||
| 2 | CLIN 2 - Work Crew Overtime for | Over Time Rate Crew CLIN 2 | Hour | |
| Routine Work Activities | ||||
| 3 | CLIN 3 - Work Crew Overtime for | Over Time Rate Crew CLIN 3 | Hour | |
| Routine Work Activities | ||||
| 4 | CLIN 4 - Work Crew Overtime for | Over Time Rate Crew CLIN 4 | Hour | |
| Routine Work Activities | ||||
| 5 | CLIN 5 - Work Crew Overtime for | Over Time Rate Crew CLIN 5 | Hour | |
| Routine Work Activities | ||||
| 6 | Operator - Arizona (Overtime) | Operator Over Time Rate in Arizona | Hour | |
| 7 | Operator - California (Overtime) | Operator Over Time Rate in California | Hour | |
| 8 | Laborer - Arizona (Overtime) | Labor Over Time Rate in Arizona | Hour | |
| 9 | Laborer - California (Overtime) | Labor Over Time Rate in California | Hour | |
| CLIN 5 Pest Control and Dead Animal Carcus Removal | ||||
| Line Item | Description | UoM | Unit Rate | |
| 1 | Routine Services Associated with the | Perform routine services associated with the | Hour | |
| Disposal of Dead Animals | disposal of dead animals per the SOW | |||
| (Routine work Performed during daylight hours, | ||||
| based on 8 hour workday Mon-Fri) |
| 2 | Routine Services Associated with the | Perform routine services associated with the | Day |
| Disposal of Dead Animals | disposal of dead animals per the SOW | ||
| (Routine work Performed during daylight hours, | |||
| based on 8 hour workday Mon-Fri) |
| 3 | Urgent Services Associated with the | Perform urgent services associated with the | Hour |
| Disposal of Dead Animals | disposal of dead animals per SOW | ||
| (Urgent work performed during daylight hours, | |||
| based on 8 hour workday Mon-Fri) |
| 4 | Urgent After-Hour Services | Perform urgent services associated with the | Hour |
| Associated with the Disposal of Dead | disposal of dead animals per SOW outside of the | ||
| Animals | standard 8 hour M-F schedule, inclusive of nights, | ||
| weekends and holidays |
| 5 | Routine Services Associated with the | Perform routine services associated with the | Hour |
| Removal of Active Bee Hives | removal of active bee hives per the SOW | ||
| (Routine work Performed during daylight hours, | |||
| based on 8 hour workday Mon-Fri) |
| 6 | Routine Services Associated with the | Perform routine services associated with the | Day |
| Removal of Active Bee Hives | removal of active bee hives per the SOW | ||
| (Routine work Performed during daylight hours, | |||
| based on 8 hour workday Mon-Fri) |
| 7 | Urgent Services Associated with the | Perform urgent services associated with the removal | Hour |
| Removal of Active Bee Hives | of active bee hives per SOW | ||
| (Urgent work performed during daylight hours, | |||
| based on 8 hour workday Mon-Fri) |
| 8 | Urgent After-Hour Services | Perform urgent services associated with the removal | Hour |
| Associated with the Removal of | of active bee hives per SOW outside of the standard | ||
| Active Bee Hives | 8 hour M-F schedule, inclusive of nights, weekends | ||
| and holidays |
| 9 | Routine Services Associated with the | Perform routine services associated with the repair | Hour |
| Repair of Animal Burrows | of animal burrows per the SOW | ||
| (Routine work Performed during daylight hours, | |||
| based on 8 hour workday Mon-Fri) |
| 10 | Routine Services Associated with the | Perform routine services associated with the repair | Day |
| Repair of Animal Burrows | of animal burrows per the SOW | ||
| (Routine work Performed during daylight hours, | |||
| based on 8 hour workday Mon-Fri) |
| 11 | Urgent Services Associated with the | Perform urgent services associated with the repair | Hour |
| Repair of Animal Burrows | of animal burrows per SOW | ||
| (Urgent work performed during daylight hours, | |||
| based on 8 hour workday Mon-Fri) |
| 12 | Urgent After-Hour Services | Perform urgent services associated with the repair | Hour |
| Associated with the Repair of Animal | of animal burrows per SOW outside of the standard | ||
| Burrows | 8 hour M-F schedule, inclusive of nights, weekends | ||
| and holidays |
Materials
| Yuma Sector | ||||||
| Materials Itemized Pricing List | ||||||
| ALL CLIN's - Materials | ||||||
| No: | Description | UoM | Use | Use Description | Unit Price | Comment |
| 2 | Jersey Barrier | EA | Barrier | Approx 12.5 Feet in Length | 12.5' Concrete K-Rail, Including Delivery | |
| 10 | Guardrail Terminal | EA | Barrier | Guard Rail | Tangent Type | |
| 11 | Sheet Pile Corrugated Stock (W 18"-48" L 15'-30') | Sq. FT | Barrier | Revetment | Sheet Pile Retaining Wall | |
| 12 | Sheet Pile Flat Stock (W 18"-48" L 15'-30') | Sq. FT | Barrier | Revetment | Sheet Pile Retaining Wall | |
| 13 | Pre Cast Concrete Lego Style Block (2' x 2' x 6') | EA | Barrier | |||
| 14 | Apron Endwalls for Corrugated Pipe Steel 12" Pipe | EA | Drainage | Culvert | ||
| 15 | Apron Endwalls for Corrugated Pipe Steel 15" Pipe | EA | Drainage | Culvert | ||
| 16 | Apron Endwalls for Corrugated Pipe Steel 18" Pipe | EA | Drainage | Culvert | ||
| 17 | Apron Endwalls for Corrugated Pipe Steel 21" Pipe | EA | Drainage | Culvert | ||
| 18 | Apron Endwalls for Corrugated Pipe Steel 24" Pipe | EA | Drainage | Culvert | ||
| 19 | Apron Endwalls for Corrugated Pipe Steel 30" Pipe | EA | Drainage | Culvert | ||
| 20 | Apron Endwalls for Corrugated Pipe Steel 36" Pipe | EA | Drainage | Culvert | ||
| 21 | Apron Endwalls for Corrugated Pipe Steel 42" Pipe | EA | Drainage | Culvert | ||
| 22 | Apron Endwalls for Corrugated Pipe Steel 48" Pipe | EA | Drainage | Culvert | ||
| 23 | Culvert Pipe Corrugated Steel 10" dia | LF | Drainage | Culvert | ||
| 24 | Culvert Pipe Corrugated Steel 12" dia | LF | Drainage | Culvert | ||
| 25 | Culvert Pipe Corrugated Steel 15" dia | LF | Drainage | Culvert | ||
| 26 | Culvert Pipe Corrugated Steel 18" dia | LF | Drainage | Culvert | ||
| 27 | Culvert Pipe Corrugated Steel 21" dia | LF | Drainage | Culvert | ||
| 28 | Culvert Pipe Corrugated Steel 24" dia | LF | Drainage | Culvert | ||
| 29 | Culvert Pipe Corrugated Steel 30" dia | LF | Drainage | Culvert | ||
| 30 | Culvert Pipe Corrugated Steel 36" dia | LF | Drainage | Culvert | ||
| 31 | Culvert Pipe Corrugated Steel 42" dia | LF | Drainage | Culvert | ||
| 32 | Culvert Pipe Corrugated Steel 48" dia | LF | Drainage | Culvert | ||
| 35 | .75" Copper Clad Steel Grounding Rod 10' L | EA | Electrical | Grounding | ||
| 36 | Copper Ground Wire 8 ga. | FT | Electrical | Grounding | ||
| 37 | Light Fixture GE PFlS07SOMHlDB | EA | Electrical | Fixture enclosure | ||
| 38 | Sport light Fixture Hubbell SL51000S-158 | EA | Electrical | Fixture enclosure | ||
| 39 | Bulb high pressure sodium lamps 1000-watt | EA | Electrical | Lamp | ||
| 40 | Bulb metal halide lamps 1000-watt | EA | Electrical | Lamp | ||
| 41 | luminary photo cell Intermatic K4321 | EA | Electrical | Photo Cell | ||
| 42 | Ballast 240 Volts | EA | Electrical | |||
| 43 | Transformer Primary 13,200 volts, Secondary 240 Volts | EA | Electrical | |||
| 44 | Transformer Primary 7,200 volts, Secondary 240 Volts | EA | Electrical | 25 Kva 7200/240 | ||
| 45 | Waterproof Fluorescent Light Fixtures | EA | Electrical | Fluorescent Fixtures | Tunnel Lighting Repair | |
| 46 | T-8 Fluorescent Bulbs | EA | Electrical | Bulb | Tunnel Lighting Repair | |
| 47 | 3/4" EMT Conduit | LF | Electrical | Tunnel Lighting Repair | ||
| 48 | 3/4" EMT Waterproof Couplings | EA | Electrical | Tunnel Lighting Repair | ||
| 49 | 3/4" EMT Waterproof Connectors | EA | Electrical | Tunnel Lighting Repair | ||
| 50 | 3/4" EMT Straps | EA | Electrical | Tunnel Lighting Repair | ||
| 51 | Wire Electrical 12 AWG various colors | LF | Electrical | Tunnel Lighting Repair | ||
| 52 | 3/4" EMT Waterproof Couplings | EA | Electrical | Tunnel Lighting Repair | ||
| 53 | Concrete Anchors 1/4" | EA | Electrical | Tunnel Lighting Repair | ||
| 54 | Lights Quarts 74 Watts | EA | Electrical | Tunnel Lighting Repair | ||
| 55 | 3 x 3 x 1/4 Angle | LF | Electrical | Tunnel Lighting Repair | ||
| 56 | Steel/Aluminum Power Pole 60FT | EA | Electrical | |||
| 57 | 1/0 Copper, 15kV THWN or XHHW | FT | Electrical | |||
| 58 | #6 Bare Solid Copper Wire Ground | FT | Electrical | |||
| 59 | 200 amp Load Break Elbow | EA | Electrical | |||
| 60 | 2" Rigid Radius Sweep | EA | Electrical | |||
| 61 | 2" Schedule 40 PVC Electrical | FT | Electrical | |||
| 62 | Electrical Burial Warning Tape | Rl | Electrical | |||
| 63 | Photocell Control Relay | EA | Electrical | Relay | ||
| 64 | High Pressure Sodium Ballast Kit, 1000W | EA | Electrical | |||
| 65 | Fuse, 600 Volt | EA | Electrical | |||
| 66 | Capacitor, 480 Volt | EA | Electrical | |||
| 67 | T-5 Fluorescent Light Bulb | EA | Electrical | |||
| 68 | Label, Warning Arc Flash, NFPA 70 E | EA | Electrical | |||
| 69 | Hubbell CS6365C CA STD Plug, 50 Amp | EA | Electrical | |||
| 70 | Hubbell CS6369 #2 Large Receptacle | EA | Electrical | |||
| 71 | Electrical Box, 2G Deep, DD5100XS | EA | Electrical | |||
| 72 | Electrical Box Cover, 2G | EA | Electrical | |||
| 73 | Electrical Cord 6/4, SEOW 600V | FT | Electrical | |||
| 74 | LED Failsafe Light | EA | Electrical | |||
| 75 | 3P 200amp 600V Circuit Breaker | EA | Electrical | |||
| 76 | Switch, 2P 20A 120/277 Comm. Ground | EA | Electrical | Yuma | ||
| 77 | Electrical Box Cover, MX1050S Flat/Waterproof | EA | Electrical | Yuma | ||
| 78 | Bulb, 36881 HPS Lamp | EA | Electrical | High Pressure Sodium Bulb | Yuma | |
| 79 | Fixture-Galleon 6-Bar LED SL2 Optics,45d Ambient | EA | Electrical | LED Fixture | Yuma PDR58466-GAN-AE-06-LED-8-SL2-AP-MA-3-HA45C | |
| 80 | Fixture-Galleon 6-Bar LED T2 Optics,45d Ambient | EA | Electrical | LED Fixture | Yuma PDR58467-GAN-AE-06-LED-8-T2-AP-MA-3-HA45C | |
| 81 | Fixture-Galleon 10-Bar LED 5WQ Optics,45d Ambient | EA | Electrical | LED Fixture | Yuma PDR58468-GAN-AE-10-LED-8-5WQ-AP-MA-3-HA45C | |
| 82 | Fixture-Galleon 10-Bar LED T4W Optics,45d Ambient | EA | Electrical | LED Fixture | Yuma PDR58469-GAN-AE-10-LED-8-T4W-AP-MA-3-HA45C | |
| 83 | Fixture-Galleon 10-Bar LED T4W Optics,90d Ambient Rotated Right | EA | Electrical | LED Fixture | Yuma PDR58470-GAN-AE-10-LED-8-T4W-AP-MA-3-HA45C-R90 | |
| 84 | Fixture-Galleon 10-Bar LED T4W Optics,90d Ambient Rotated Left | EA | Electrical | LED Fixture | Yuma PDR58471-GAN-AE-10-LED-8-T4W-AP-MA-3-HA45C-L90 | |
| 85 | Fixture-Galleon 8-Bar LED T2 Optics,45d Ambient | EA | Electrical | LED Fixture | Yuma PDR58472-GAN-AE-08-LED-8-T2-AP-MA-3-HA45C | |
| 86 | Fixture-Galleon 8-Bar LED T2 Optics,90d Ambient Rotated Right | EA | Electrical | LED Fixture | Yuma PDR58473-GAN-AE-08-LED-8-T4FT-AP-MA-3-HA45C-R90 | |
| 87 | Fixture-Galleon 8-Bar LED T2 Optics,90d Ambient Rotated Left | EA | Electrical | LED Fixture | Yuma PDR58474-GAN-AE-08-LED-8-T4FT-AP-MA-3-HA45C-L90 | |
| 88 | Bridge Light Fixture Line 2.0, Symmetric, 72” V2 High Output,3000K | EA | Electrical | Yuma Eaton 0.05. V2.E.3K.60.1.72 | ||
| 89 | 100W Driver for Line 2.0 Symmetric (special 480V) | EA | Electrical | LED Driver | Yuma LEDINTA0024V41DLO | |
| 90 | Filter | EA | Electrical | Yuma | ||
| 91 | Thermostat | EA | Electrical | Yuma | ||
| 92 | Fan | EA | Electrical | Yuma | ||
| 93 | Fuse, Cutout Type XS w/ hardware | EA | Electrical | Medium Voltage In Line Fuse Holder | ||
| 94 | Straw Waddle Fiber Roll 8" x 25' | EA | Erosion | |||
| 95 | Filter Fabric Synthetic | Sq. YD | Erosion | |||
| 96 | 2" Diamond Chain Link Fence Fabric 9 ga. 10' H, (50' roll) Galvanized, Zinc or Alum coating? | FT | Fence | Mesh Fabric | ||
| 97 | 2" Diamond Chain Link Fence Fabric 9 ga. 8' H, (50' roll) Galvanized, Zinc or Alum coating? | FT | Fence | Mesh Fabric | ||
| 98 | 2" Diamond Chain Link Fence Fabric 9 ga. 6' H, (50' roll) Galvanized, Zinc or Alum coating? | FT | Fence | Mesh Fabric | ||
| 99 | 1.375" Dia Galvanized Top/Bottom Rail Tubing Schedule 80, | EA | Fence | Rail | ||
| 100 | 2.875" Dia Galvanized Brace Rail Tubing Schedule 80, | EA | Fence | Brace Rail | ||
| 101 | 2.875" Dia Galvanized Line Post Tubing Schedule 80, for 6' Mesh Fence | EA | Fence | Post | ||
| 102 | 2.875" Dia Galvanized Line Post Tubing Schedule 80, for 8' Mesh Fence | EA | Fence | Post | ||
| 103 | 2.875" Dia Galvanized Line Post Tubing Schedule 80, for 10' Mesh Fence | EA | Fence | Post | ||
| 104 | 4.0" Dia Galvanized Line Post/ Corner/ End/ Pull Tubing Schedule 80, | EA | Fence | for 8' Mesh Fence | ||
| 105 | 4.0" Dia Galvanized Line Post/ Corner/ End/ Pull Tubing Schedule 80, | EA | Fence | for 10' Mesh Fence | ||
| 106 | .375" Dia Galvanized Truss Rod | EA | Fence | Brace | ||
| 107 | Truss Rod Tightner Hardware | EA | Fence | Brace Hardware | ||
| 108 | Tension Bar Galvanized .187" x .75" x 10' | EA | Fence | Mesh Tension Bar | ||
| 109 | Tension Wire 12 ga. | FT | Fence | Tension Wire | ||
| 110 | Steel Wire Tie 9 ga. | EA | Fence | Tmesh Ties | ||
| 111 | 1.375" Dia Aluminum Rail End | EA | Fence | Hardware | ||
| 112 | 1.375" Dia Dome Caps | EA | Fence | Hardware | ||
| 113 | 1.375" Dia Galvanized Single Brace Bands | EA | Fence | Hardware | ||
| 114 | 1.375" Dia Galvanized Tension Bands | EA | Fence | Hardware | ||
| 115 | 2.875" Dia Dome Caps | EA | Fence | Hardware | ||
| 116 | 2.875" Dia Galvanized Single Brace Bands | EA | Fence | Hardware | ||
| 117 | 2.875" Dia Galvanized Tension Bands | EA | Fence | Hardware | ||
| 118 | 4.0" Dia Dome Caps | EA | Fence | Hardware | ||
| 119 | 4.0" Dia Galvanized Single Brace Bands | EA | Fence | Hardware | ||
| 120 | 4.0" Dia Galvanized Tension Bands | EA | Fence | Hardware | ||
| 121 | Barbed Wire Arms Three Stand 45 Deg Galvanized | EA | Fence | Barbed Wire Arms | ||
| 122 | Barbed Wire Arms V Shaped Six Stand 45 Deg Galvanized | EA | Fence | Barbed Wire Arms | ||
| 123 | Barbed Wire | FT | Fence | Barbed Wire | ||
| 124 | #6 Reinforcing Bar, ASTM A615 Grade 60 | FT | Fence | Bollard Reinforcement | ||
| 125 | Angle Iron 4" x 4" x .25" thickness, equal legs, ASTM A36 | FT | Fence | Rail | ||
| 126 | Plate Steel 4" x .5" thickness, ASTM A36 | FT | Fence | Rail Sheathing | ||
| 127 | Steel Sheathing 5' x 8' , 11 ga | EA | Fence | Sheathing Anti climb | ||
| 128 | Stamped Bollard Cap, 11 Ga Steel | EA | Fence | Bollard Cap | ||
| 129 | Plate Steel 6" x 8.5" Bollard Cap 45 Deg, 11 ga | EA | Fence | Bollard Cap | ||
| 130 | Plate Steel 8.5" x 1' Bollard Cap 45 Deg, w/ bollard rotated 45 Deg, 11 ga | EA | Fence | Bollard Cap | ||
| 131 | Grout, f'c = 3,000 psi | Cu. FT | Fence | Bollard Fill | ||
| 132 | #4 Reinforcing Bar, ASTM A615 Grade 60 | FT | Fence | Grade Beam | ||
| 133 | #5 Reinforcing Bar, ASTM A615 Grade 60 | FT | Fence | Grade Beam | ||
| 134 | #6 Reinforcing Bar, ASTM A615 Grade 60 | FT | Fence | Bollard Reinforcement | ||
| 135 | Bar Steel 1"x1" Solid, Steel Picket | FT | Fence | Picket | ||
| 136 | HSS 4" x 4" x .187" Steel Bollard, ASTM A500, Grade B | FT | Fence | Embedment for Animal Tube Square | ||
| 137 | HSS 2" x 4" x .187" Steel, A500, Grade B | FT | Fence | Rail Tube Rectangular | ||
| 138 | Bar Steel 1.5" x 3" Solid, ASTM A36 | FT | Fence | Inside Rail Expansion Joint | ||
| 139 | Plate Steel 6"x8.5", 11 Gage Steel | EA | Fence | Mitered Bollard Cap | ||
| 140 | Stamped Bollard Cap, 11 Gage Steel | EA | Fence | Bollard Cap | ||
| 141 | Mesh Welded Wire 3" x .5", 6 ga | Sq. FT | Fence | Fence Fabric Beta Fence 5000 | ||
| 142 | Mesh Welded Wire 2" x 2", 6 ga | Sq. FT | Fence | Fence Fabric | ||
| 143 | W 6 x 15 Wide Flange Beam ASTM A36 | FT | Fence | Columns Structural Steel | ||
| 144 | Welding Rod, 7018 MR, 5/32", 14" L - 10 lbs. | BX | Fence | Consumable | ||
| 145 | #5 Reinforcing Bar, ASTM A615 Grade 60 | FT | Fence | Grade Beam | ||
| 146 | HSS 12" x 12"x .25", ASTM A500, Grade B | FT | Fence | Gate Post Tube Square | ||
| 147 | HSS 7" x 7" x .25" Steel Rail Sleeve, ASTM A500, Grade B | FT | Fence | Rail Sleeve Tube Square | ||
| 148 | HSS Steel Bar .5" x 4", ASTM A36 | EA | Fence | Rail for Sheathing | ||
| 149 | 11 Gage Top of Bollard Cap Plates | EA | Fence | Bollard Cap Plates | ||
| 150 | 11 Gage Top of Gate Post Cap Plates | EA | Fence | Gate Post Cap Plates | ||
| 151 | Plate Steel 5' x 6'-4" 11 Gage Steel Sheathing | EA | Fence | Anti climb sheathing | ||
| 152 | 3" Diam Sched 40 Steel Pipe, L= 2.25", w/ .5" Wide Slot | EA | Fence | Puck lock housing | ||
| 153 | Steel Bar Solid 1" Dia x 7-5/16", ASTM A36 | EA | Fence | Pins | ||
| 154 | King Kong Barrel Hinges | EA | Fence | Hinges | ||
| 155 | HP 12 x 53, ASTM572 Grade 50 | FT | Fence | Gate Post Structural Steel Shape HP 12 x 53 | ||
| 156 | HSS 6" x 6" x .187" Steel Bollard, ASTM A500, Grade B | FT | Fence | Bollard Tube Square | ||
| 157 | HSS 9" x 3" x .187" Member Framing, ASTM A500 | FT | Fence | Gate Framing Member Tube Rectangular | ||
| 158 | HSS 1" x 1" Square Bar Solid, ASTM A36 | FT | Fence | Hoist Guide | ||
| 159 | HSS 1.5" Round Bar Solid, ASTM A36 | FT | Fence | Gate Locking Bolt | ||
| 160 | HSS .25" Round Bar Solid, ASTM A36 | FT | Fence | Gate Lock Box | ||
| 161 | Angle Iron 4.5" x 6" x .25" thickness, unequal legs, ASTM A36 | FT | Fence | Rail | ||
| 162 | Plate Steel .5" thickness x 4" wide , ASTM A36 | FT | Fence | Rail for Sheathing | ||
| 163 | Plate Steel .5" thickness x 6" wide , ASTM A36 | FT | Fence | Mount for Gap Filler Bollard | ||
| 164 | Steel Sheathing 5' x 8' , 11 ga | EA | Fence | Sheathing | ||
| 165 | Plate Steel 6" x 8.5" Bollard Cap 45 Deg, 11 ga | EA | Fence | Bollard Cap | ||
| 166 | Plate Steel 8.5" x 1' Bollard Cap 45 Deg, w/ bollard rotated 45 Deg, 11 ga | EA | Fence | Bollard Cap | ||
| 167 | Plate Steel 11.75" x 16.5" Bollard Cap 45 Deg, 11 ga | EA | Fence | Bollard Cap for 12" x 12" Post (HP 12 x 53) | ||
| 168 | Plate Steel 10" x 12" x 1" thickness, ASTM A36 | EA | Fence | Support for Framing cutoff Bollard Section | ||
| 169 | Plate Steel 9" x 3" x .187" thickness, ASTM A36 | EA | Fence | Cap for 9" x 3" Rectangular Tube | ||
| 170 | Plate Steel 6" x 3" x .187" thickness, ASTM A36 | EA | Fence | Cap for 6" x 3" Rectangular Tube | ||
| 171 | Plate Steel 4" x 4" x .187" thickness, ASTM A36 | EA | Fence | Cap for 4" x 4" Rectangular Tube | ||
| 172 | Plate Steel 6" x 6" x .187" thickness, ASTM A36 | EA | Fence | Cap for 6" x 6" Rectangular Tube | ||
| 173 | Plate Steel 8" x 9" x .187" thickness, ASTM A36 | EA | Fence | Mounting Plate Hoist Beam | ||
| 174 | Plate Steel .187" thickness, ASTM A36 | Sq. FT | Fence | Various Fabrications including Lock Box | ||
| 178 | HSS 6" x 6" x .25" Steel Bollard, ASTM A500, Grade B | FT | Fence | Rail Tube Square | ||
| 179 | HSS 7" x 7" x .25" Steel Bollard, ASTM A500, Grade B | FT | Fence | Rail Sleeve Tube Square | ||
| 180 | HSS 2" x 2" x .187" Steel Bollard, ASTM A500, Grade B | FT | Fence | Rail Tube Square | ||
| 181 | W 6 x 25 Wide Flange Beam ASTM A36 | FT | Fence | Cross Beam Structural Steel | ||
| 182 | Cast in Place Concrete, f'c = 3000 psi | Cu. YD | Fence | Grade Beam | ||
| 183 | Grout, f'c = 3000 psi | Cu. FT | Fence | Post Fill | ||
| 184 | #4 Reinforcing Bar, ASTM A615 Grade 60 | FT | Fence | Shaft Footing Reinforcement | ||
| 185 | W 6 x 9 Wide Flange Beam ASTM A36 | FT | Fence | Rail Structural Steel | ||
| 186 | Bolt 1/4 x 2 1/2 | EA | Fence | Wire Mesh Repair | ||
| 187 | Nut 1/4 in | EA | Fence | Wire Mesh Repair | ||
| 188 | Washer 3/4 in Dia x 1/4 center | EA | Fence | Wire Mesh Repair | ||
| 189 | HSS 6x6x1/2” Steel Bollard, ASTM A500, Grade B | FT | Fence | |||
| 190 | 7 1/2 in Stainless Steel Hasp | EA | Fence | Model#S808-725/CD941 Tunnel Lock Box | ||
| 191 | 3" Schedule 40 Stainless Steel Pipe, L=2.25", w/ 0.5" Wide Slot | EA | Fence | Tunnel | ||
| 192 | Plate Steel, 0.5" Thick x 1.5" Wide, Stainless Steel | FT | Fence | Tunnel | ||
| 193 | Angle Iron, 1"x1"x0.125", Equal Legs | FT | Fence | Tunnel | ||
| 194 | Puck Lock | EA | Fence | Re-Key not included, performed by GOV | Secure Fence Gates | |
| 195 | Hardened Chain | FT | Fence | Secure Tower Gate and Train Gate | ||
| 196 | Razor Wire, Galvanized | RL | Fence | Used on Temporary Train Gate Fence | ||
| 197 | Chain link custom swing gate, 16’Hx21’W | EA | Fence | Temporary Train Gate | ||
| 198 | Plate Steel, 4'x8'x1/4" | EA | Fence | Used on Train Gate Temp Fence | ||
| 199 | Rectangular Laminated Rubber Dock Bumper (6"H x 38"W x 4.5"D) | EA | Fence | Bumper used at the Train Gate | ||
| 200 | 6' Steel T Post | EA | Fence | Barb wire fencing | ||
| 201 | Concrete Form 18” Diameter | FT | Form | Sono Tube Wash Post and Rail Foundation | ||
| 202 | Geocell Cellular Confinement (15'x35') | EA | Form | Retains soil used for supporting traffic weight | ||
| 203 | Anchor Plate Assembly (12x12x12) wrong dimensions in plans one dim should be 1/2" | EA | Hardware | Tunnel Ratching Hoist | ||
| 204 | HY200-R Epoxy | EA | Hardware | Tunnel Ratching Hoist | ||
| 205 | HY200 Dispenser | EA | Hardware | Tunnel Ratching Hoist | ||
| 206 | HAS-R ½” x 6 ½” SS 316 Anchor Bolts | EA | Hardware | Tunnel Ratching Hoist | ||
| 207 | Shackle 2 Ton | EA | Hardware | Tunnel Ratching Hoist | ||
| 208 | Columbus McKinnon Level Hoist 3 Ton | EA | Hardware | Tunnel Ratching Hoist | ||
| 209 | Chain ½” Stainless Steel 3 Ton | EA | Hardware | Tunnel Ratching Hoist | ||
| 210 | U-Bolt, ¼” | EA | Hardware | |||
| 211 | U-Bolt, ½” | EA | Hardware | |||
| 212 | Spray Paint, 12 oz. can | EA | Marking | Light Pole Stenciling | ||
| 213 | Stencil Set, Metal 6" | EA | Marking | Light Pole Stenciling | ||
| 214 | Cast-In-Place Concrete, f'c = 3000 psi | Cu. FT | Materials | Grade Beam | ||
| 215 | Cast-In-Place Concrete, f'c = 3000 psi | Cu. YD | Materials | Post Shaft Footing | ||
| 216 | Class II Road Base | Ton | Materials | Aggregate | ||
| 217 | Gravel Crushed 3/4" | Ton | Materials | Aggregate | ||
| 218 | Gravel Pea 3/8" | Ton | Materials | Aggregate | ||
| 219 | Lignin Sulfonate | Ton | Materials | Soil Stabilizer | ||
| 220 | Soil Tac | Ton | Materials | Soil Stabilizer | ||
| 221 | Cement 90 lbs. | Bag | Materials | Concrete | ||
| 222 | Crusher Fines | Ton | Materials | Aggregate | May Not be available | |
| 223 | 2 sack Concrete Slurry | Cu. YD | Materials | Concrete | ||
| 224 | Riprap 4"- 12" average 6" | Ton | Materials | |||
| 225 | Riprap 6"- 18" average 12" | Ton | Materials | |||
| 226 | Riprap 12"- 24" average 18" | Ton | Materials | |||
| 227 | Riprap 18"- 30" average 24" | Ton | Materials | |||
| 228 | Water | Gal | Materials | |||
| 229 | Quickrete concrete mix | Bag | Materials | Concrete | ||
| 230 | Class II Base (Weed Free) | Ton | Materials | Aggregate | ||
| 231 | Certified weed free base rock | Ton | Materials | Aggregate | ||
| 234 | 3" Ball Valve | EA | Plumbing | Well Repair BANWR | ||
| 235 | 3" Close Nipple | EA | Plumbing | Well Repair BANWR | ||
| 236 | 3" Black Pipe, Threaded | FT | Plumbing | Well Repair BANWR | ||
| 237 | 8" Gate Valve, Flanged | EA | Plumbing | Well Repair BANWR | ||
| 238 | 8" Flange Kit | EA | Plumbing | Well Repair BANWR | ||
| 239 | Glyphosate Weed Preventer (2.5 Gallon) | EA | Vegetation | Weed Killer | ||
| 240 | Hy Security Gate Opener 8" Drive Wheels | EA | Hardware | Model Slide Driver 200 | Enforcement Zone Gates | |
| 241 | HY Security Gate Opener Limit Switches | EA | Hardware | Model Slide Driver 200 | Enforcement Zone Gates | |
| 242 | HY Security Gate Opener Recievers | EA | Hardware | Model Slide Driver 200 | Enforcement Zone Gates | |
| 243 | HY Security Gate Opener Power Supply | EA | Hardware | Model Slide Driver 200 | Enforcement Zone Gates | |
| 244 | HY Security Gate Opener Battery Charger | EA | Hardware | Model Slide Driver 200 | Enforcement Zone Gates | |
| 245 | Hy Security Gate Opener Batteries | EA | Hardware | Model Slide Driver 200 | Enforcement Zone Gates | |
| 246 | Hy Security Gate Opener Guide Wheels | EA | Hardware | Model Slide Driver 200 | Enforcement Zone Gates | |
| 247 | Hy Security Operator- Model Slide Driver 200 UPS | EA | Gate Oper. | Model Slide Driver 200 | Evforcement Zone Gates | |
| 248 | 1.5 Ton Chan Hoist | EA | Gate Opener | Sanchez Canal Gates | ||
| 249 | Combination Pad Lock | EA | Hardware | Multi Use | ||
| 250 | Bollard Sleeve Temporary Repair (Yellow) | EA | Hardware | Sleeve | Enforcement Zone | |
| 251 | Bollard Sleeve Temporary Repair Storage Box | EA | Hardware | Storage Box | Enforcement Zone | |
| 252 | 3/8" Drive, Ratchet | EA | Tool | Ratchet | Enforcement Zone | |
| 253 | 3/8" Drive Torx Socket | EA | Tool | Socket | Enforcement Zone | |
| 247 | Gate Remote Clickers (Multi Code made by Linear) | EA | Hardware | Gate Clicker | Enforcement Zone Gates |
&P
Equipment
| Yuma Sector | ||||||
| Equipment Itemized Pricing List | ||||||
| ALL CLIN's - Equipment | ||||||
| No: | Description | Use | Rate Per Hour | Rate Per Day | Rate Per Month | Comments |
| 1 | Vacuum Trailer with Pump | Debris Removal | Vermeer VX30-500LT | |||
| 2 | Bucket Truck | Electrical | ||||
| 3 | Welding Rig | Fence | ||||
| 4 | Hoist Truck | Fence | ||||
| 5 | Man Lift | Fence | ||||
| 6 | Snorkel Lift | Fence | ||||
| 7 | Horizontal/Vertical Band Saw | Fence | ||||
| 8 | Portable Magnetic Drill | Fence | Horizontial Boring Machine | |||
| 9 | Trench Compactor walk behind | Fence Foundation | King Louie Complete rebuild compact trench after demo | |||
| 10 | Excavator | Muiltable | ||||
| 11 | Dozer | Muiltable | ||||
| 12 | Loader | Muiltable | ||||
| 13 | Grader | Muiltable | ||||
| 14 | Backhoe | Muiltable | ||||
| 15 | Water Truck | Muiltable | ||||
| 16 | Compactor | Muiltable | ||||
| 17 | Dump Truck (5 yd capacity) | Muiltable | ||||
| 18 | Service Truck | Muiltable | ||||
| 19 | Mini excavator | Muiltable | ||||
| 20 | Cleaning of equipment | Muiltable | ||||
| 21 | Portable Cement Mixer | Muiltable | ||||
| 22 | Concrete Saw | Muiltable | ||||
| 23 | Generator portable 5-10Kw | Muiltable | ||||
| 24 | Dozer D6 | Muiltable | ||||
| 25 | Compactor Rammer Jumping Jack | Muiltable | ||||
| 26 | Heavy Haul Transport Trailer | Muiltable | Tandem Axle | |||
| 27 | 30' Travel Trailer | Muiltable | ||||
| 28 | Water Buffalo 500 Gal | Muiltable | ||||
| 29 | 20' Storage Container | Muiltable | ||||
| 30 | Heavy Haul Transport Truck/Trailer/Operator | Muiltable | ||||
| 31 | Mini Skid Steer | Muiltable | Max 3ft width with bucket | |||
| 32 | Forklift | Muiltable | 10,000 lb capacity | |||
| 33 | Excavator Long Reach | Muiltable | ||||
| 34 | Dump Truck (14 yd capacity) | Muiltable | ||||
| 35 | Dump Truck Belly End Dump | Muiltable | ||||
| 36 | Water Tank, 21,000 Gallon | Muiltable | ||||
| 37 | Dozer D8 | Muiltable | Caterpillar D8T or equivalent | |||
| 38 | Stand with Water Tank | Muiltable | Klein, 10,000 gallon | |||
| 39 | Scraper 17CY | Muiltable | Caterpillar 613C or equivalent | |||
| 40 | Water Truck | Muiltable | Articulating Water Pull 6,000-8,000 gallon capacity | |||
| 41 | Concrete Pump Truck | Muiltable | with operator | |||
| 42 | Portable Trailer Mounted Port-a-John | Muiltable | ||||
| 43 | Pile Driving Machine | Muiltable | ||||
| 44 | 40 Ton Articulated Dump Truck | Muiltable | ||||
| 45 | Professional Paint Sprayer, Ultramax II 490 | Tunnel Painting | ||||
| 46 | Weed Eaters | Veg Debris | ||||
| 47 | Mowers | Veg Debris | ||||
| 48 | Chipper Grinder | Veg Debris | ||||
| 49 | Chainsaw | Veg Debris | 24", Gas Stihl/MS440 or 460 | |||
| 50 | 8" Pull Behind Wood Chipper | Veg Debris |
&P
Work Activity Report Form
| Work Activity (WA) Number: | Date(s): | REV: | 0 | |
| WORK DESCRIPTION | ||||
| TI Asset Description: | Work Category: |
Work Category Sub Type:
| Asset Objective(s): | Damage Extent: | ||||||
| Work Category: | Location: | ||||||
| Work Classification: | Sector: | ||||||
| Work Subdivisions: | GPS: | BEG | N: | ||||
| W: | END | N: |
W:
| Prime Lead Contact: | Name: | Ph: | Email: | |
| SUB Lead Contact: | Name: | Ph: | Email: | |
| GOV Lead Contact: | Name: | Ph: | Email: | |
| WORK PERFORMANCE | ||||
| Inspection: | Frequency: | |||
| Scope of Work: |
Work Standards/ QC Metrics:
| Work Duration: | Days: ## | WAR STATUS: | Initial | |
| ACCESS | ||||
| Access Issues (including any expiration dates): | Access Stakeholder(s): |
| Stakeholder Type: | ||||||
| ENVIRONMENTAL | ||||||
| Applicable | ||||||
| Environmental Regulations and Sources (_): | Applicable Environmental BMPs: | BMP’s reviewed and implemented? | Yes | |||
| Survey by Biologist if required? | No |
| COST | ||
| Est. Labor Costs: | Act. Labor Costs: | Other Notes/Photos |
| Est. Travel Costs: | Act. Travel Costs: | Other Notes/Photos |
Nearest CBP facility: xxx Avg. travel time to TI asset: #.# HRS Work Classification: [routine/urgent]
POC:
| Est. Equip Costs | Act. Equip Costs |
| Est. Material Costs: | Act. Material Costs: |
| Est. Mobilization: | Act. Mobilization: |
| Est. Other Costs: | Act. Other Costs: |
| Est. Total Costs: | Act. Total Costs: |
| Prime Representative: | Date: | ||
| Name, Signature | DD/MM/YYYY | ||
| Subcontractor: | Date: | ||
| Name, Signature | DD/MM/YYYY |
| Photographs: |
| Before: |
W
After:
&"Times New Roman,Bold"&24Work Activity Report
&"Times New Roman,Regular"&10 Contract # xxxxx &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 04/04/2019
Work Order Form
&"Times New Roman,Bold"&22Work Order Form
&"Times New Roman,Regular"&10Contract # xxxxxxxx &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 04/04/2019
File details come from the government source that posted it. Updated .