Scheduled Work Bid Form YUM FY26 2-18-26.xlsx

XLSX spreadsheet 64 KB Posted

Attached to
Yuma, Arizona and El Centro, California Sectors-TI Maintenance Solicitation
Solicitation number
20154783
Issued by

About this file

This is a Scheduled Work Bid Form for the Yuma (YUM) sector maintenance contract under the CBP's Technical Infrastructure (TI) Maintenance Solicitation (20154783). The form requires offerors to complete pricing for a base period (04/01/26 - 03/31/27) and four option periods through 03/31/31. Offerors must populate yellow-highlighted cells with proposed costs for unscheduled maintenance, which currently show government estimates of $4,096,666.93 for the base period, escalating annually to $4,610,834.72 in Option Period 4, with a five-year total of $21,749,761.10. The form also requires offerors to propose a coefficient percentage for scheduled maintenance, unscheduled maintenance, and program management costs; however, all scheduled maintenance line items currently show $0 pricing. Scheduled maintenance covers routine maintenance of 25 motorized sliding gates, 4 motorized swing gates, 10 manual lift gates, 18 salinity canal gates, 1 bridge inspection/certification, and 253 border lighting circuit panels, each with specified quantities and event frequencies. The form automatically transfers scheduled amounts to a summary sheet to calculate total evaluated price.

View the file

Other files

File Type Posted
Amendment_07_-_ 70B01R26R00000018_-_SF_30 3-2-2026.pdf PDF
QA Phase 2.pdf PDF
Amendment_06_-_ 70B01R26R00000018_-_SF_30.pdf PDF
Amendment_05_-_ 70B01R26R00000018_-_SF_30.pdf PDF
TAB 1.1.3 SOW YUM ELC TI Maint FY26 2-18-26.pdf PDF
CUS1449 RFP - UPDATED 70B01C26R00000018 2-18-26.pdf PDF
YUM Unit Price Bid Sheet Blank FY26 2-18-26.xlsx XLSX spreadsheet
Scheduled Work Bid Form ELC FY26 2-18-26.xlsx XLSX spreadsheet
ELC Unit Price Bid Sheets Blank FY26 2-18-26.xlsx XLSX spreadsheet
Contractor Notional Work Plan YUM ELC TIM Maint FY26 2-18-26.xlsx XLSX spreadsheet
Amendment_04_-_ 70B01R26R00000018_-_SF_30.pdf PDF
Amendment_03_-_70B01C24Q00000004_-_SF_30.pdf PDF
Contractor Notional Work Plan YUM ELC TIM Maint 1-30-26.xlsx XLSX spreadsheet
QA- TI Maintenance Yuma ELC 1-30-26.xlsx XLSX spreadsheet
Corporate Questions YUM ELC TI Maint FY26.docx DOCX document
Amendment_02_-_70B01C24Q00000004_-_SF_30.pdf PDF
Scheduled Work Bid Form YUM FY26 1-28-26.xlsx XLSX spreadsheet
CUS1449 RFP - UPDATED 70B01C26R00000018 1-28-26.pdf PDF
Yum-ELC Notional Work Plan_01.28.26.xlsx XLSX spreadsheet
Exhibit C TI Design Standards v6 YUM ELC TI Maint FY26.pdf PDF
TAB 1.1.3 SOW YUM ELC TI Maint 1-28-26.pdf PDF
Amendment_01_-_70B01C24Q00000004_-_SF_30.pdf PDF
Scheduled Work Bid Form ELC FY26 1-28-26.xlsx XLSX spreadsheet
Scheduled Work Bid Form YUM FY26 v3.xlsx XLSX spreadsheet
SCA WAGES EL CENTRO.pdf PDF
SCA WAGES YUMA.pdf PDF
DBA WAGES YUMA.pdf PDF
CUS1449 RFP - Commercial Items (SF1449) 1-16-26.pdf PDF
YUM Unit Price Bid Sheet Blank FY26.xlsx XLSX spreadsheet
Notional Work Plan YUM ELC TIM Maint FY26 rev1.xlsx XLSX spreadsheet
DBA WAGES EL CENTROpdf.pdf PDF
Scheduled Work Bid Form ELC FY26 v3.xlsx XLSX spreadsheet
ELC Unit Price Bid Sheets Blank FY26 v1.xlsx XLSX spreadsheet
SOW YUM ELC TI Maint FY26 1-16-26.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions YUM

PMO Scheduled Work Bid Form
The Offeror shall complete the sheets for the Base Period, Option Period 1, Option Period 2, Option Period 3, and Option Period 4 for YUM by filling the cells highlighted in YELLOW. In addition, the offeror shall propose the co-efficient price by completing Row 11-17, and propose its coefficient % on the Summary sheet. For the Base, OY1, OY2, & OY3 the Scheduled amounts will transfer automatically to the summary sheet to give the total evaluated price.

Summary

Yuma Sector (YUM)
RequirementBase Period:
04/01/26 - 03/31/27Option 1:
04/01/27 - 03/31/28Option 2:
04/01/28 - 03/31/2029Option 3:
04/01/29 - 03/31/2030Option 4:
04/01/30 - 03/31/2031Total
Scheduled Maintenance (YUM)- FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unscheduled Maintenance (YUM)$ 4,096,666.93$ 4,219,566.94$ 4,346,153.95$ 4,476,538.56$ 4,610,834.72`
Subtotal:$ 4,096,666.93$ 4,219,566.94$ 4,346,153.95$ 4,476,538.56$ 4,610,834.72$ 21,749,761.10
Scheduled Maintenance Co-Efficient ($)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unscheduled Maintenance Co-Efficient ($)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Management Costs - Co-Efficient Subtotal:$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Estimated Cost:$ 4,096,666.93$ 4,219,566.94$ 4,346,153.95$ 4,476,538.56$ 4,610,834.72$ 21,749,761.10
Co-Efficient Factor (YUM) - Percentage %
Summary of Co-Efficient Value:
Overhead
G&A
Bond Rate
Fee
Use Tax
Scheduled Maintenance referenced in SOW C.4.1, C.5.1
Coefficient referenced in SOW C.5.4

BASE Period (YUM)

CategoryBASE PERIOD: YUM SCHEDULED MAINT [FFP]Description of ServiceQty of AssetCount of EventsDurationTotal CostCost/EventLabor ($)*Equipment ($)*Material ($)ODC ($)
F&GSLU/ BMGR Maintenance Motorized Sliding GatesRoutine: Excercise, Clean (pests and debris), Lubricate and Inspect25 ea12$0$0.00
F&GSLU Maintenance Motorized Swing GatesRoutine: Exercise , Clean (pests and debris), Lubricate and Inspect4 ea12$0$0.00
F&GSLU Sanchez Canal Channel Manual Lift GatesRoutine: Open /Close gates to inspect for damage/ operation and remove any debris caught in bollards.10 ea26$0$0.00
F&GSLU Maintenance Salinity Canal GatesRoutine: Exercise, Inspect and Lubricate18 ea6$0$0.00
R&BSanchez Canal Bridge Inspection/ CertificationRoutine: Inspect and Certify 125 foot Steel Bridge1 ea1$0$0.00
L&EMaintenance SLU Border Lighting Circuit PanelsRoutine: Inspect, clean and check for failed components , ie fuses, breakers and photocells253 ea6$0$0.00
Scheduled Totals:$ - 0

OPT Period 1 (YUM)

CategoryOpt PERIOD 1: YUM SCHEDULED MAINT [FFP]Description of ServiceQty of AssetCount of EventsDurationTotal CostCost/EventLabor ($)*Equipment ($)*Material ($)ODC ($)
F&GSLU/ BMGR Maintenance Motorized Sliding GatesRoutine: Excercise, Clean (pests and debris), Lubricate and Inspect25 ea12$0$0.00
F&GSLU Maintenance Motorized Swing GatesRoutine: Exercise , Clean (pests and debris), Lubricate and Inspect4 ea12$0$0.00
F&GSLU Sanchez Canal Channel Manual Lift GatesRoutine: Open /Close gates to inspect for damage/ operation and remove any debris caught in bollards.10 ea26$0$0.00
F&GSLU Maintenance Salinity Canal GatesRoutine: Exercise, Inspect and Lubricate18 ea6$0$0.00
R&BSanchez Canal Bridge Inspection/ CertificationRoutine: Inspect and Certify 125 foot Steel Bridge1 ea1$0$0.00
L&EMaintenance SLU Boarder Lighting Circuit PanelsRoutine: Inspect, clean and check for failed components , ie fuses, breakers and photocells253 ea6$0$0.00
Scheduled Totals:$0.00

OPT Period 2 (YUM)

CategoryOpt PERIOD 2: YUM SCHEDULED MAINT [FFP]Description of ServiceQty of AssetCount of EventsDurationTotal CostCost/EventLabor ($)*Equipment ($)*Material ($)ODC ($)
F&GSLU/ BMGR Maintenance Motorized Sliding GatesRoutine: Excercise, Clean (pests and debris), Lubricate and Inspect25 ea12$0$0.00
F&GSLU Maintenance Motorized Swing GatesRoutine: Exercise , Clean (pests and debris), Lubricate and Inspect4 ea12$0$0.00
F&GSLU Sanchez Canal Channel Manual Lift GatesRoutine: Open /Close gates to inspect for damage/ operation and remove any debris caught in bollards.10 ea26$0$0.00
F&GSLU Maintenance Salinity Canal GatesRoutine: Exercise, Inspect and Lubricate18 ea6$0$0.00
R&BSanchez Canal Bridge Inspection/ CertificationRoutine: Inspect and Certify 125 foot Steel Bridge1 ea1$0$0.00
L&EMaintenance SLU Boarder Lighting Circuit PanelsRoutine: Inspect, clean and check for failed components , ie fuses, breakers and photocells253 ea6$0$0.00
Scheduled Totals:$0.00

OPT Period 3 (YUM)

CategoryOpt PERIOD 3: YUM SCHEDULED MAINT [FFP]Description of ServiceQty of AssetCount of EventsDurationTotal CostCost/EventLabor ($)*Equipment ($)*Material ($)ODC ($)
F&GSLU/ BMGR Maintenance Motorized Sliding GatesRoutine: Excercise, Clean (pests and debris), Lubricate and Inspect25 ea12$0$0.00
F&GSLU Maintenance Motorized Swing GatesRoutine: Exercise , Clean (pests and debris), Lubricate and Inspect4 ea12$0$0.00
F&GSLU Sanchez Canal Channel Manual Lift GatesRoutine: Open /Close gates to inspect for damage/ operation and remove any debris caught in bollards.10 ea26$0$0.00
F&GSLU Maintenance Salinity Canal GatesRoutine: Exercise, Inspect and Lubricate18 ea6$0$0.00
R&BSanchez Canal Bridge Inspection/ CertificationRoutine: Inspect and Certify 125 foot Steel Bridge1 ea1$0$0.00
L&EMaintenance SLU Boarder Lighting Circuit PanelsRoutine: Inspect, clean and check for failed components , ie fuses, breakers and photocells253 ea6$0$0.00
Scheduled Totals:$0.00

OPT Period 4 (YUM)

CategoryOpt PERIOD 3: YUM SCHEDULED MAINT [FFP]Description of ServiceQty of AssetCount of EventsDurationTotal CostCost/EventLabor ($)*Equipment ($)*Material ($)ODC ($)
F&GSLU/ BMGR Maintenance Motorized Sliding GatesRoutine: Excercise, Clean (pests and debris), Lubricate and Inspect25 ea12$0$0.00
F&GSLU Maintenance Motorized Swing GatesRoutine: Exercise , Clean (pests and debris), Lubricate and Inspect4 ea12$0$0.00
F&GSLU Sanchez Canal Channel Manual Lift GatesRoutine: Open /Close gates to inspect for damage/ operation and remove any debris caught in bollards.10 ea26$0$0.00
F&GSLU Maintenance Salinity Canal GatesRoutine: Exercise, Inspect and Lubricate18 ea6$0$0.00
R&BSanchez Canal Bridge Inspection/ CertificationRoutine: Inspect and Certify 125 foot Steel Bridge1 ea1$0$0.00
L&EMaintenance SLU Boarder Lighting Circuit PanelsRoutine: Inspect, clean and check for failed components , ie fuses, breakers and photocells253 ea6$0$0.00
Scheduled Totals:$0.00

File details come from the government source that posted it. Updated .