This is a Solicitation/Contract/Order for Commercial Products and Commercial Services issued by U.S. Customs and Border Protection (CBP) for Tactical Infrastructure (TI) Maintenance services in the Yuma and El Centro Sectors. The contract is a firm-fixed price/fixed unit price hybrid with a base year and three one-year option periods, totaling four years. The solicitation is set aside for small business and specifically targets maintenance services across six work area categories: 1) fence and gates, 2) roads and bridges, 3) drainage and grate systems, 4) lighting and electrical systems, 5) vegetation control and debris removal, and 6) TI attributes like structures and generators.

The procurement will be conducted through a two-phase evaluation process. Phase 1 involves a corporate interview and evaluation of the contractor's experience, with an advisory down-select to identify the most qualified offerors. Phase 2 requires written submissions addressing management approach, technical capabilities, and pricing. Evaluation factors are weighted with management approach being most important, followed by technical capabilities and experience, with all non-price factors significantly more important than price. Key requirements include having an office within each sector's Area of Responsibility, demonstrating knowledge of Statement of Work requirements and Tactical Infrastructure Design Standards, and the ability to support routine and urgent maintenance work across the designated sectors.

View the file

Other files

File Type Posted
Amendment_07_-_ 70B01R26R00000018_-_SF_30 3-2-2026.pdf PDF
Amendment_06_-_ 70B01R26R00000018_-_SF_30.pdf PDF
QA Phase 2.pdf PDF
Amendment_05_-_ 70B01R26R00000018_-_SF_30.pdf PDF
TAB 1.1.3 SOW YUM ELC TI Maint FY26 2-18-26.pdf PDF
Contractor Notional Work Plan YUM ELC TIM Maint FY26 2-18-26.xlsx XLSX spreadsheet
Scheduled Work Bid Form ELC FY26 2-18-26.xlsx XLSX spreadsheet
ELC Unit Price Bid Sheets Blank FY26 2-18-26.xlsx XLSX spreadsheet
YUM Unit Price Bid Sheet Blank FY26 2-18-26.xlsx XLSX spreadsheet
CUS1449 RFP - UPDATED 70B01C26R00000018 2-18-26.pdf PDF
Scheduled Work Bid Form YUM FY26 2-18-26.xlsx XLSX spreadsheet
Amendment_04_-_ 70B01R26R00000018_-_SF_30.pdf PDF
Amendment_03_-_70B01C24Q00000004_-_SF_30.pdf PDF
QA- TI Maintenance Yuma ELC 1-30-26.xlsx XLSX spreadsheet
Corporate Questions YUM ELC TI Maint FY26.docx DOCX document
Contractor Notional Work Plan YUM ELC TIM Maint 1-30-26.xlsx XLSX spreadsheet
Amendment_02_-_70B01C24Q00000004_-_SF_30.pdf PDF
Scheduled Work Bid Form YUM FY26 1-28-26.xlsx XLSX spreadsheet
Exhibit C TI Design Standards v6 YUM ELC TI Maint FY26.pdf PDF
Yum-ELC Notional Work Plan_01.28.26.xlsx XLSX spreadsheet
CUS1449 RFP - UPDATED 70B01C26R00000018 1-28-26.pdf PDF
TAB 1.1.3 SOW YUM ELC TI Maint 1-28-26.pdf PDF
Scheduled Work Bid Form ELC FY26 1-28-26.xlsx XLSX spreadsheet
Amendment_01_-_70B01C24Q00000004_-_SF_30.pdf PDF
SCA WAGES YUMA.pdf PDF
YUM Unit Price Bid Sheet Blank FY26.xlsx XLSX spreadsheet
SCA WAGES EL CENTRO.pdf PDF
DBA WAGES YUMA.pdf PDF
Scheduled Work Bid Form ELC FY26 v3.xlsx XLSX spreadsheet
ELC Unit Price Bid Sheets Blank FY26 v1.xlsx XLSX spreadsheet
Notional Work Plan YUM ELC TIM Maint FY26 rev1.xlsx XLSX spreadsheet
DBA WAGES EL CENTROpdf.pdf PDF
SOW YUM ELC TI Maint FY26 1-16-26.pdf PDF
Scheduled Work Bid Form YUM FY26 v3.xlsx XLSX spreadsheet
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12. DISCOUNT TERMS

8. OFFER DUE DATE/

9. ISSUED BY CODE 10. THIS ACQUISITION IS

6. SOLICITATION

ISSUE DATE

3. AWARD/EFFECTIVE DATE 5. SOLICITATION NUMBER2. CONTRACT NUMBER 4. ORDER NUMBER

a. NAME b. TELEPHONE NUMBER (No collect calls)7. FOR SOLICITATION

INFORMATION CALL:

SET ASIDE : % FOR:

SMALL BUSINESS

NAICS:

SIZE STANDARD:

HUBZONE SMALL

BUSINESS

11. DELIVERY FOR FOB

DESTINATION UNLESS

BLOCK IS MARKED

SEE SCHEDULE

13b. RATING

14. METHOD OF SOLICITATION

IFB RFPRFQ

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY17a. CONTRACTOR/ CODE

OFFEROR

FACILITY

CODE

TELEPHONE NO.

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS

BLOCK BELOW IS CHECKED.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS

IN OFFER.

8(A)

TBD 70B01C26R00000018

Kevin Sarff

LOCAL TIME

2/07/2026

DHS - Customs & Border Protection

Administration Facilities Training Contracting Division

1300 Pennsylvania Ave, NW

Washington DC 20229

237990

See Attached Delivery Schedule DHS - Customs & Border Protection Administration Facilities Training Contracting Division 1300 Pennsylvania Ave, NW

Washington DC 20229

US Customs and Border Protection

FAD Mail Stop 203-V

8899 E. 56th Street

Indianapolis IN 46249

PAGE OF PAGES1. REQUISITION NUMBERSolicitation/Contract/Order for Commercial Products and Commercial Services

Offeror to Complete Blocks 12,17,23,24, & 30 0020154781 1 2

ORDER UNDER DPAS (15 CFR 700)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

UNRESTRICTED OR

13a. THIS CONTRACT IS A RATED

01/16/2026

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

24.

AMOUNT

22.

UNIT

23.

UNIT PRICE

SEE ADDENDUM

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

ECONOMICALLY DISADVANTAGED WOMEN-

OWNED SMALL BUSINESS (EDWOSB)

CODE

CODE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

31c. DATE SIGNED

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED.

ADDENDA

ADDENDA

ARE ARE NOT ATTACHED.

ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND

RETURN

AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR

OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS

SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

29. AWARD OF CONTRACT: REFERENCE

YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING

ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO

ITEMS:

OFFER DATED

30A. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE

SIGNED

31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT)

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

$0.00

Kevin Sarff

COPIES TO ISSUING OFFICE. CONTRACTOR

10 1.000 EA

1.000 EA

1.000 EA

YUM Maintenance Base - PM

YUM Maintenance Base - Scheduled

YUM Maintenance Base - Unscheduled

ELC Maintenance Base - PM

ELC Maintenance Base - Scheduled

ELC Maintenance Base - Unscheduled

1.000 EA

X 100

X

1 pm EST

As modified/revised pursuant to Revolutionary FAR Overhaul

X

1.000 1.000

EA

EA

2 2

CONTRACT NUMBER REQUISITION NUMBER AWARD/EFFECTIVE DATE

PAGE OF PAGES

ADDITIONAL INFORMATION:

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

32a. QUANTITY IN COLUMN 21 HAS BEEN

ACCEPTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

FINALPARTIAL

36. PAYMENT 37. CHECK NUMBER

COMPLETE PARTIAL FINAL

39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)

41c. DATE 42b. RECEIVED AT (Location)

STANDARD FORM 1449 (REV. 11/2021) BACK

42d. TOTAL CONTAINERS42c. DATE RECEIVED (MM/DD/YYYY)

0020154781 00/00/0000

All work shall be done in accordance with the statement of work and terms and conditions.

The scheduled maintenance work is firm fixed priced

The unscheduled maintenance work is fixed unit priced. The contractor shall inform CBP when they meet 75% of the NTE.

The COR will be Joseph Lawson - Joseph.A.Lawson@cbp.dhs.gov

The contracting officer will be Kevin Sarff - Kevin.P.Sarff@cbp.dhs.gov

* Any applicable updates to the Federal Acquisition Regulation (FAR) made pursuant to the Revolutionary FAR Overhaul (RFP), and subsequently adopted by the Department of Homeland Security via Class Deviation, shall be deemed adopted and included in this contract without adjustment to price. Any clauses contained in this contract that have already been, or are later, updated in the RFP and adopted by DHS shall be considered to be amended to mirror the most up to date FAR RFP language without a change in the price.

70B01C26R00000018

TABLE OF CONTENTS

SECTION I SCHEDULES

I.2 SCHEDULE OF SUPPLIES/SERVICES

I.3 DELIVERY SCHEDULE

SECTION II CONTRACT CLAUSES

II.1 52.204-18 [Reserved (AUG 2025) (DEVIATION 25-19) (effective November 28, 2025)

II.2 52.240-93, Basic Safeguarding of Covered Contractor Information Systems (AUG 2025) (DEVIATION 25-23)

(EFFECTIVE NOVEMBER 3, 2025)

II.3 52.202-1 DEFINITIONS (JUN 2020)

II.4 52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APRIL 1985)

II.5 52.203-3 GRATUITIES (APR 1984)

II.6 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

II.7 52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)

II.8 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER

ACTIVITY (MAY 2014)

II.9 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

II.10 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (JUN 2020)

II.11 52.204-13 System for Award Management Maintenance. (AUG 2025) (DEVIATION 25-19) (effective November 3, 2025) 11

II.12 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) 11

II.13 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2025)

(DEVIATION 25-27)

II.14 52.209-13 VIOLATIONS OF ARMS CONTROL TREATIES OR AGREEMENTS – CERTIFICATION (NOV 2021) 11

II.15 52.212-4 CONTRACT TERMS AND CONDITIONS AND CONDITIONS – COMMERCIAL ITEMS (AUG 2025)

(DEVIATION 25-21) (EFFECTIVE NOVEMBER 28, 2025)

II.16 52.215-2 AUDIT AND RECORDS-NEGOTIATION (OCT 2025) (DEVIATION 26-08) (EFFECTIVE NOVEMBER 3, 2025) 11

II.17 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS – OVERTIME COMPENSATION (OCT 2025) (DEVIATION 26-10) (effective November 3, 2025)

II.18 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (OCT 2025) (DEVIATION 26-10) (effective November 3, 2025)

II.19 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)

II.20 52.222-8 PAYROLLS AND BASIC RECORDS (JUL 2021)

II.21 52.222-9 APPRENTICES AND TRAINEES (JUL 2005)

II.22 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)

II.23 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (OCT 2025) (DEVIATION 26-10) (effective November 3, 2025) 11

II.24 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014)

II.25 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED

REGULATIONS (MAY 2014)

II.26 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)

II.27 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014)

II.28 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2025) (DEVIATION 26-10) (effective November 3, 2025) 12

II.29 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (OCT 2025) (OCT 2025) (DEVIATION 26-10) (effective November 3, 2025)

II.30 52.222-37 EMPLOYMENT REPORTS ON VETERANS (OCT 2025) (OCT 2025) (DEVIATION 26-10) (effective November 3, 2025)

II.31 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT

(DEC 2010)

II.32 52.222-50 COMBATING TRAFFICKING IN PERSONS (NOV 2021)

II.33 52.222–55 MINIMUM WAGES UNDER EXECUTIVE ORDER 14026 (JAN 2022)

II.34 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2025) OCT 2025) (DEVIATION 26-10) (effective November 3, 2025)

II.35 52.222–62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2022)

II.36 52.227-1 AUTHORIZATION AND CONSENT (JUN 2020)

II.37 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (JUN 2020) 12

II.38 52.227-4 PATENT INEMNITY – CONSTRUCTION CONTRACTS (DEC 2007)

II.39 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997) Clause will be incorporated as needed at the Task Order level

II.40 FAR 52.228-5 INSURANCE-WORK OF A GOVERNMENT INSTALLATION (JAN 1997)

II.41 52.228-11 PLEDGES OF ASSETS (FEB 2021) (DEVIATION May 2023)

II.42 52.228-12 PROSPECTIVE SUBCONTRACTORS REQUEST FOR BONDS (DEC 2022)

II.43 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JUL 2000)

II.44 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)

II.45 52.228-15 PERFORMANCE AND PAYMENT BONDS - CONSTRUCTION (JUN 2020) (DEVIATION May 2023) 12

II.46 52.229-4 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

II.47 52.232-17 INTEREST (MAY 2014)

II.48 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

II.49 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)

II.50 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)

II.51 52.233-1 DISPUTES (AUG 2025), ALT 1 (DEVIATION 25-25) (effective November 3, 2025)

II.52 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (AUG 2025) (DEVIATION 25-25)

II.58 52.236-5 MATERIAL AND WORKMANSHIP (AUG 2025) (DEVIATION 25-15)

II.69 52.242-13 BANKRUPTCY (JUL 1995)

II.70 52.242-14 SUSPENSION OF WORK (APR 1984)

II.77 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

II.78 52.225-9 BUY AMERICAN--CONSTRUCTION MATERIALS (OCT 2025) (DEVIATION 26-09) (effective November 28, 2025)

(a) Definitions. As used in this clause— Commercially available off-the-shelf (COTS) item— (1) Means any item of supply (including construction material) that is– (i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101); (ii) Sold in substantial quantities in the commercial marketplace; and (iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and (2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products. “Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.

However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material. Cost of components means— (1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or (2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit.

Cost of components does not include any costs associated with the manufacture of the construction material. Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105. Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105. Domestic construction material means— (1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both- (i) An unmanufactured construction material mined or produced in the United States; or (ii) A construction material manufactured in the United States, if– (A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or (B) The construction material is a COTS item; or (2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of “cost of components”. Fastener means a hardware device that mechanically joins or affixes two or more objects together.

Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws. Foreign construction material means a construction material other than a domestic construction material. Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign. Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners. Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements. "United States" means the 50 States, the District of Columbia, and outlying areas. (b) Domestic preference. (1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR (a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause. (2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:

________________________________________________[Contracting Officer to list applicable excepted materials or indicate “none”] (3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that- (i) The cost of domestic construction material would be unreasonable.

(A) For domestic construction material that is not a critical item or does not contain critical components. (1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent; (2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause. (3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030. (B) For domestic construction material that is a critical item or contains critical components.(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR

25.105. (2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B)(1) of this clause. (3) The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January 1, 2030. (ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or (iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality. (c) Request for determination of inapplicability of the Buy American statute. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials; (B) Unit of measure; (C) Quantity; (D) Price; (E) Time of delivery or availability; (F) Location of the construction project; (G) Name and address of the proposed supplier;

and (H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause. (ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause. (iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued). (iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination. (2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause. (3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison _Construction Material Description _Unit of Measure _Quantity _Price (dollars)* Item1: Foreign construction material _______ _______ _______ Domestic construction material _______ _______ _______ Item 2: Foreign construction material _______ _______ _______ Domestic construction material _______ _______ _______ [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)]. [List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] Alternate I (Oct 2022). As prescribed in 25.602(a)(3) substitute the following sentence for the first sentence in paragraph (1)(ii)(A) of the definition of “domestic construction material” in paragraph (a): (A) The cost of its components mined, produced, or manufactured in the United States exceeds __ percent of the cost of all its components.

[Contracting officer to insert the percentage

II.83 3052.212-70 CONTRACT TERMS AND CONDITIONS APPLICABLE TO DHS ACQUISITION OF COMMERCIAL

ITEMS (JUL 2023)

In accordance with 19.811-3(d)(3), substitute the following for the paragraph (c) in FAR 52.219

18:

(c) Any award resulting from this solicitation will be made directly by the Contracting Officer to the successful 8(a) offeror selected through the evaluation criteria set forth in this solicitation

(End of Clause)

II.85 CONTRACT TYPE (OCT 2008)

II.86 CONTRACTING OFFICER'S AUTHORITY (MAR 2003)

II.87 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS - INVOICE PROCESSING PLATFORM (IPP)

(AUG -24)

II.88 GOVERNMENT CONSENT OF PUBLICATION/ENDORSEMENT (MAR 2003)

CBP Suitability Requirements

1. All Contractor Employees requiring access to CBP facilities and its information technology networks and systems must undergo an investigation to determine suitability for employment. Based on the position sensitivity designation, OPR/Personnel Security Division initiates either a T4 or T5 Background Investigation in accordance with CBP Personnel Security Handbook, HB 1400-07A

2. Contractor Employees who require access to DHS IT systems or development, management, or maintenance of those systems must be U.S. citizens in accordance with DHS Instruction 121-01-007-01, Revision 1, Chapter 2, Personnel Security Program Standards, § 13, and Citizenship Requirements, § 13F. (Lawful Permanent Resident status is not acceptable in this case). A waiver may be granted, as outlined in Chapter 2, § 14 of DHS Instruction Handbook 121-01-007-01, Revision 01

3. Provided the requirements of DHS Instruction Handbook 121-01-007-01 are met as outlined in paragraph I.B.1, below, Contractor Employees requiring access to CBP facilities, sensitive information or information technology resources are required to have a favorably adjudicated Tier 4 (T4) or Tier 5 (T5) background investigation (U.S.

Office of Personnel Management (OPM), Suitability Executive Agent and the Director of National Intelligence (DNI), Security Executive Agent, Federal Investigative Standards, December 2012, or its successor), prior to commencing work on this contract, as outlined in the applicable requirements document, such as a Statement of Work (SOW) or Performance Work Statement (PWS). Exceptions shall be approved on a case-by-case basis with the Contractor Employee’s access to facilities, systems, and information limited until the Contractor Employee receives a favorably adjudicated T4 or T5. A favorably adjudicated T4 or T5 shall include various aspects of a Contractor Employee’s life, including employment, education, residences, police, and court inquires, credit history, and national agency checks.

4. For contracts requiring Contractor Employees to possess a CBP suitability upon contract inception, the following is applicable: The Contractor shall submit, within ten (10) working days after award of the contract, a list containing the full legal name, social security number, place of birth (city and state), and date of birth of employee candidates who possess favorably adjudicated T4 or T5 background investigations that meet federal investigation standards (as mandated in the SOW/PWS). These individuals will be considered for “reciprocity” as applicable (reference CBP Form 78 – BIRD). For contracts not requiring Contractor Employees to possess a CBP suitability upon contract inception, the following is applicable: The Contractor shall require Contractor Employee candidates, needing a T4 or T5 background investigation for the contract, to submit information and documentation requested by CBP to initiate the background investigation process immediately upon request by CBP

5. Background Investigation information and documentation are submitted by proper completion of standard federal and agency forms provided by the COR, such as Electronic Questionnaires for Investigations Processing (e- QIP), Electronic Fingerprint Submission, CBP Form 78-Background Investigation Requirements Determination (BIRD) Form, Fair Credit Reporting Act (FCRA), Non-Disclosure Agreement (NDA), a Contractor Employee initial Background Investigation Form (CBP Form 77) (Sections A and B), and relevant “clearance” documents (if applicable), etc. The Contractor is responsible for ensuring all Contract Employee candidates complete the Electronic Questionnaire for Investigations Processing (e-QIP) and Electronic Fingerprints using their full legal name, correct SSN and ensuring these actions are completed in a timely manner, within 30 days of e-QIP initiation. The Contractor is also responsible for ensuring all Contract Employee candidates respond to phone calls and check their emails regularly for communications from the CBP Security Office and/or the field investigator for any necessary actions.

The appropriate forms, to include “clearance” documents if applicable, must be submitted to the COR assigned to the contract, and the COR shall forward the completed forms to the CBP security official that will review the information for completeness and begin the adjudication and “clearance” (if applicable) process. Any Contract Employee candidate who fails to comply after multiple requests and attempts to reach them will be discontinued from the Background Investigation process. The Contractor shall then propose a qualified replacement employee candidate to the CO and COR within 30 days after being notified of the discontinued Contract Employee candidate

6. CBP cannot provide a standard completion time for a T4 or T5 background investigation as many scenarios affect CBP’s ability to process an individual. During the term of this contract, the Contractor is required to provide the names of its employees who successfully complete the CBP T4 or T5 process to the CO and COR. Failure of any Contractor Employee to obtain and maintain a favorably adjudicated T4 or T5 shall be cause for dismissal. For key personnel, the Contractor shall propose a qualified replacement employee candidate to the CO and COR within 30 days after being notified of an unsuccessful candidate or vacancy. For all non-key personnel Contractor Employees, the Contractor shall propose a qualified replacement employee candidate to the COR within 30 days after being notified of an unsuccessful candidate or vacancy. The CO/COR shall approve or disapprove replacement employees. For contracts requiring Contractor Employees to possess a CBP suitability per SOW/PWS requirements, continuous failure to provide Contractor Employees who meet CBP T4 or T5 requirements may be cause for termination of the contract (refer #4)

Security Clearance Requirements

1. Contractor Employees who require access to classified information must be U.S. citizens or have Lawful Permanent Resident (LPR) status in accordance with DHS Instruction Handbook 121-01-007-01, Rev. 01, the Department of Homeland Security Personnel Security, Suitability and Fitness Program, Chapter 2, Personnel Security Program Standards, § 13, Citizenship Requirements. A waiver may be granted, as outlined in Chapter 2, § 14 of DHS Instruction Handbook 121-01-007-01

2. For contracts requiring Contractor Employees to possess a security clearance upon contract inception, the following is applicable: The Contractor shall submit, within ten (10) working days after award of the contract, a list containing the full legal name, social security number, place of birth (city and state), and date of birth of employee candidates who possess favorably adjudicated T5 background investigations that meet federal investigation standards (as mandated in the SOW/PWS). These individuals will be considered for “reciprocity” as applicable (refer to CBP Form 78 – BIRD). For contracts not requiring Contractor Employees to possess a security clearance upon contract inception, the following is applicable: The Contractor shall require Contractor Employee candidates, needing a T4 or T5 background investigation for the contract, to submit information and documentation requested by CBP to initiate the background investigation process immediately upon request by CBP

3. Background Investigation information and documentation are submitted by proper completion of standard federal and agency forms provided by the COR, such as Electronic Questionnaires for Investigations Processing (e- QIP), Electronic Fingerprint Submission, CBP Form 78-Background Investigation Requirements Determination (BIRD) Form, Fair Credit Reporting Act (FCRA), Non-Disclosure Agreement (NDA), a Contractor Employee Initial Background Investigation Form (CBP Form 77) (Sections A and B), and relevant “clearance” documents (if applicable), etc. The Contractor is responsible for ensuring all Contract Employee candidates complete the Electronic Questionnaire for Investigations Processing (e-QIP) and Electronic Fingerprints using their full legal name, correct SSN and ensuring these actions are completed in a timely manner, within 30 days of e-QIP initiation. The Contractor is also responsible for ensuring all Contract Employee candidates respond to phone calls and check their emails regularly for communications from the CBP Security Office and/or the field investigator for any necessary actions.

The appropriate forms, to include “clearance” documents if applicable, must be submitted to the COR assigned to the contract, and the COR shall forward the completed forms to the CBP security official that will review the information for completeness and begin the adjudication and “clearance” (if applicable) process. Any Contract Employee candidate who fails to comply after multiple requests and attempts to reach them will be discontinued from the Background Investigation process. The Contractor shall then propose a qualified replacement employee candidate to the CO and COR within 30 days after being notified of the discontinued Contract Employee candidate

4. CBP cannot provide a standard completion time for a T4 or T5 background investigation as many scenarios affect CBP’s ability to process an individual. During the term of this contract, the Contractor is required to provide the names of its employees who successfully complete the CBP T4 or T5 process to the CO and COR. Failure of any Contractor Employee to obtain and maintain a favorably adjudicated T4 or T5 shall be cause for dismissal. For key personnel, the Contractor shall propose a qualified replacement employee candidate to the CO and COR within 30 days after being notified of an unsuccessful candidate or vacancy. For all non-key personnel Contractor Employees, the Contractor shall propose a qualified replacement employee candidate to the COR within 30 days after being notified of an unsuccessful candidate or vacancy. The CO/COR shall approve or disapprove replacement employees. Continuous failure to provide Contractor Employees who meet CBP T4 or T5 requirements may be cause for termination of the contract

Contractor Tracking System

1. All Contractor Employees must be entered into the current agency Contractor Tracking System (CTS) database by the COR or Alternate COR. Additionally, the COR/ACOR shall maintain current, accurate and complete data for Contractor Employees during their performance on the contract. The Contractor Project Manager (CPM) shall provide timely start information to the CO/COR or designated government personnel to initiate the CTS entry. Other relevant information will also be needed for Contractor Employee record submission in the CTS database such as, but not limited to, the Contractor Employee’s legal name, brief job description, labor rate, Hash ID, schedule, and location. The CO/COR or designated government personnel shall provide the CPM with instructions for providing required information

2. The CO/COR may designate responsibility for out-processing to the CPM. The CPM must have an active CBP Background Investigation (BI) and an Active Directory (AD) account (i.e., email, etc.) within the agency. CPM shall provide Contactor Employee departure/separation date and reason for leaving to the CO/COR in accordance with CBP Directive 1210-007B, Tracking of Contractor Employees. Failure by the CPM to provide timely notification of Contractor Employee departure/separation in accordance with the contract requirements shall be documented and considered when government personnel complete a Contractor Performance Report (under Business Relations) or other performance related measures

Controls

Access Controls

1. The Contractor Employee shall comply with the U.S. Customs and Border Protection’s (CBP) administrative, physical, and technical security controls to ensure that the Government’s security requirements are met

2. All Contractor Employees under this contract must wear identification access badges when working in CBP facilities. Prior to Contractor Employees’ departure/separation, all badges, valid HSPD-12 compliant Personal

Identity Verification (PIV) card, building passes, parking permits, keys, and pass cards must be returned to the Contracting Officer’s Representative (COR). The COR shall immediately notify the cognizant Physical Security official to ensure that access to all buildings, and facilities, and network are revoked. NOTE: For contracts within the National Capitol Region (NCR), the Office of Professional Responsibility, Security Management Division (OPR/SMD) shall be notified immediately, if building access is revoked

3. Contractor Employees in possession of a valid HSPD-12 compliant PIV card are authorized to access Department Headquarters and DHS Component Headquarters while on official business, in accordance with DHS Instruction Manual # 121-01-011-01, Revision # 00

4. Contractor Employees may be subject to random security screening upon entering certain CBP facilities

5. Contractor Employees who do not have their PIV cards must sign-in at lobby guard desk, and show a federal, state, or local government-issued photo identification (e.g., driver’s license that meets the requirements of the REAL ID Act of 2005, US passport, US military ID card, Tribal ID, or Permanent Residence card)

Visitor Security Management

1. Visitors accessing any DHS Headquarters or DHS Component Headquarters facilities are subject to a criminal history check utilizing the National Crime Information Center (NCIC) system, except as stipulated elsewhere in DHS Instruction Manual # 121-01-011-01, Revision # 00

2. All visitors requesting access to CBP facilities are required to sign-in at designated visitor location, depending on the facility’s resources. Visitors are required to show a federal, state, or local government-issued photo identification (e.g., driver’s license that meets the requirements of the REAL ID Act of 2005, US passport, US military ID card, Tribal ID, or Permanent Residence card), unless otherwise directed by the Facility Security Manager (FSM) or CBP Assistant Technical Representative (ATR)

3. Visitors must be escorted to their intended CBP destination by CBP employees or CBP contractors with a valid CBP-issued PIV card capable of operating the turnstiles. Supplemental access cards cannot be used for escorting purposes without a valid CBP-issued PIV card

4. Visitor passes will be issued only at designated locations and/or entrances. All visitors are required to pass through screening at the designated entrances. All visitors must be escorted back to the security desk by a CBP employee or CBP contractor

Information Security Requirements

Managing Sensitive Security Information

1. Work under this contract may require access to sensitive information as defined under Homeland Security Acquisition Regulation (HSAR) Clause 3052.204-71, Contractor Employee Access, included in the solicitation/contract. The Contractor Employee shall not disclose, orally or in writing, any sensitive information to any person unless authorized in writing by the CO

2. The Department of Homeland Security (DHS) requires that Contractor employees take an annual Information Technology Security Awareness Training course before accessing sensitive information under the contract. Unless otherwise specified, the training shall be completed within thirty (30) days of contract award and be completed on an annual basis thereafter not later than October 31st of each year. Any new Contractor employees assigned to the contract shall complete the training before accessing sensitive information under the contract

3. All services provided under this contract must be compliant with the Department of Homeland Security (DHS) information security policy identified in DHS Sensitive Systems Policy Directive 4300A, v.13.1, DHS Sensitive Systems Handbook 4300A, v.12.0, or latest available version, and CBP Information Security Handbook (HB 1400- 04A). 24

4. Sensitive Information, as used in this clause, means any information, which if lost, misused, disclosed, or, without authorization is accessed, or modified, could adversely affect the national or homeland security interest, the conduct of Federal programs, or the privacy to which individuals are entitled under section 552a of title 5, United States Code (the Privacy Act), but which has not been specifically authorized under criteria established by an Executive Order or an Act of Congress to be kept secret in the interest of national defense, homeland security or foreign policy. This definition includes the following categories of information:

Managing Classified Information

1. Contracts requiring contractor employees to access Classified National Security Information, completion of the DD Form 254 (Contract Security Classification Specification) is necessary for the Contractor (the company) to establish and have on record. Additionally, FAR Clause 52.204-2, Security Requirements, must be included in the solicitation and contract. If desired, a Solicitation DD Form 254 can be added to the solicitation package. Contact the Security Management Division (SMD) for assistance at: cbpsecurity@cbp.dhs.gov

2. For additional information about the National Industrial Security Program (NISP) please visit the Defense Counterintelligence and Security Agency website and search for The NISPOM Rule

General Security Responsibilities

1. The Contractor shall ensure that its employees follow the general procedures governing physical, environmental, and information security described in the various DHS CBP regulations identified in this clause. The contractor shall ensure that its employees apply proper business practices in accordance with the specifications, directives, and manuals required for conducting work under this contract. Applicable Contractor Employees shall be responsible for physical security of work areas and CBP furnished equipment issued under this contract

2. The CO/COR may require the Contractor to prohibit its employees from working on this contract if continued employment becomes detrimental to the public’s interest for any reason including, but not limited to carelessness, insubordination, incompetence, or security concerns

3. Upon completion of this contract, the Contractor Employee shall return all sensitive information used in the performance of the contract to the CO/COR. The Contractor shall certify, in writing, that all sensitive and non-public information have been purged from any Contractor-owned system

4. All Government furnished information must be protected to the degree and extent required by local rules, regulations, and procedures. The Contractor Employee shall comply with all security policies contained in CBP Handbook 1400-05D, v.7.0, Information Systems Security Policies and Procedures Handbook, or latest available version

Notification of Contractor Employee Changes

1. The Contractor or CPM shall notify the CO/COR via phone or electronic transmission, immediately after a personnel change becomes known or no later than five (5) business days prior to departure of the Contractor Employee. Telephone notifications must be immediately followed up in writing. CPM’s notification shall include, but is not limited to name changes, resignations, terminations, and reassignments to another contract

2. The CPM shall notify the CO/COR and program office (if applicable) in writing of any proposed change in access requirements for its employees at least fifteen (15) days, or thirty (30) days if a security clearance is to be obtained, in advance of the proposed change

Non-Disclosure Agreements

As part of the background investigation package, Contractor Employees are required to execute and submit a Non- Disclosure Agreement (DHS Form 11000-6) as a condition to perform on any CBP contract

A. Contractor Performance Evaluations

C. Electronic Access to Contractor Performance Evaluations

II.92 HOLIDAYS AND ADMINISTRATIVE LEAVE (OCT 2021)

II.93 ADDITIONAL CONTRACTOR PERSONNEL REQUIREMENTS (AUG 2022)

SECTION III SOLICITATION PROVISIONS

III.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

III.2 52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL

CONFIDENTIALITY AGREEMENTS OR STATEMENTS – REPRESENTATION (JAN 2017)

III.3 52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS--

REPRESENTATION (NOV 2015)

III.4 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (NOV 2025) (Deviation 25-27)

III.5 52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A

FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)

III.6 52.216-1 TYPE OF CONTRACT (OCT 2025) (DEVIATION 26-04) (effective November 28, 2025)

III.7 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

III.8 52.204-7, SYSTEM FOR AWARD MANAGEMENT (AUG 2025) (DEVIATION 25-19) (effective November 28, 2025) 43

III.9 52.212-1 INSTRUCTIONS to OFFERORS–COMMERCIAL PRODUCTS and COMMERCIAL SERVICES (AUG

2025) (DEVIATION 25-21)

III.10 52.212-2 EVALUATION – COMMERCIAL PRODUCTS and COMMERCIAL SERVICES (AUG 2025)

(DEVIATION 25-21)

III.11 52.233-2 SERVICE OF PROTEST (AUG 2025) (DEVIATION 25-25) (effective Nov. 3, 2025)

III.12 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS

(AUG 2025) (DEVIATION 25-23)

III.13 AGENCY LEVEL PROTEST NOTICE (APR 2003)

SECTION I SCHEDULES

I.1 DESCRIPTION: The anticipated contract is a single award firm fixed unit priced hybrid contract for scheduled and unscheduled repairs at all locations throughout the Yuma and El Centro Sectors described in the statement of work.

I.2 SCHEDULE OF SUPPLIES/SERVICES

ITEM # DESCRIPTION QTY UNIT UNIT PRICE EXT. PRICE

10 YUM Maintenance Base - PM 1.000 EA

20 YUM Maintenance Base - Scheduled 1.000 EA

30 YUM Maintenance Base - Unscheduled 1.000 EA

40 ELC Maintenance Base - PM 1.000 EA

50 ELC Maintenance Base - Scheduled 1.000 EA

60 ELC Maintenance Base - Unscheduled 1.000 EA

Total Funded Value of Award:

I.3 DELIVERY SCHEDULE

DELIVER TO: ITEM # QTY DELIVERY DATE

Customs and Border Protection 1300 Pennsylvania Avenue N W Washington, DC 20229

10 1.000 TBD

20 1.000 TBD

30 1.000 TBD

40 1.000 TBD

SECTION II CONTRACT CLAUSES

*CBP Reserves the right to unilaterally modify this contract to incorporate additional DEVIATIONS arising from the Revolutionary FAR Overhaul (RFO). See FAR Overhaul - FAR Part DEVIATION Guidance | Acquisition.GOV.

* Clauses applicable to construction will apply to construction work performed under this Contract.

II.1 52.204-18 [Reserved (AUG 2025) (DEVIATION 25-19) (effective November 28, 2025)

II.2 52.240-93, Basic Safeguarding of Covered Contractor Information Systems (AUG 2025) (DEVIATION 25-23)

(EFFECTIVE NOVEMBER 3, 2025)

II.3 52.202-1 DEFINITIONS (JUN 2020)

II.4 52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APRIL 1985)

II.5 52.203-3 GRATUITIES (APR 1984)

II.6 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

II.7 52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)

II.8 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER

ACTIVITY (MAY 2014)

II.9 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

II.10 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (JUN 2020)

II.11 52.204-13 System for Award Management Maintenance. (AUG 2025) (DEVIATION 25-19) (effective November

3, 2025)

II.12 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)

II.13 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2025)

(DEVIATION 25-27)

II.14 52.209-13 VIOLATIONS OF ARMS CONTROL TREATIES OR AGREEMENTS – CERTIFICATION (NOV 2021)

II.15 52.212-4 CONTRACT TERMS AND CONDITIONS AND CONDITIONS – COMMERCIAL ITEMS (AUG 2025)

(DEVIATION 25-21) (EFFECTIVE NOVEMBER 28, 2025)

II.16 52.215-2 AUDIT AND RECORDS-NEGOTIATION (OCT 2025) (DEVIATION 26-08) (EFFECTIVE NOVEMBER 3, 2025)

II.17 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS – OVERTIME COMPENSATION (OCT 2025) (DEVIATION 26-10) (effective November 3, 2025)

II.18 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (OCT 2025) (DEVIATION 26-10) (effective November 3, 2025)

II.19 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)

II.20 52.222-8 PAYROLLS AND BASIC RECORDS (JUL 2021)

II.21 52.222-9 APPRENTICES AND TRAINEES (JUL 2005)

II.22 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)

II.23 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (OCT 2025) (DEVIATION 26-10) (effective November 3, II.24 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014)

II.25 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED

REGULATIONS (MAY 2014)

II.26 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)

II.27 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014)

II.28 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2025) (DEVIATION 26-10) (effective November 3, II.29 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (OCT 2025) (OCT 2025) (DEVIATION 26-10) (effective November 3, 2025)

II.30 52.222-37 EMPLOYMENT REPORTS ON VETERANS (OCT 2025) (OCT 2025) (DEVIATION 26-10) (effective November 3, 2025)

II.31 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)

II.32 52.222-50 COMBATING TRAFFICKING IN PERSONS (NOV 2021)

II.33 52.222–55 MINIMUM WAGES UNDER EXECUTIVE ORDER 14026 (JAN 2022)

II.34 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2025) OCT 2025) (DEVIATION 26-10) (effective

November 3, 2025)

II.35 52.222–62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2022)

II.36 52.227-1 AUTHORIZATION AND CONSENT (JUN 2020)

II.37 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (JUN 2020)

II.38 52.227-4 PATENT INEMNITY – CONSTRUCTION CONTRACTS (DEC 2007)

II.39 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997) Clause will be incorporated as needed at the Task Order level.

II.40 FAR 52.228-5 INSURANCE-WORK OF A GOVERNMENT INSTALLATION (JAN 1997)

II.41 52.228-11 PLEDGES OF ASSETS (FEB 2021) (DEVIATION May 2023)

II.42 52.228-12 PROSPECTIVE SUBCONTRACTORS REQUEST FOR BONDS (DEC 2022)

II.43 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JUL 2000)

II.44 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)

II.45 52.228-15 PERFORMANCE AND PAYMENT BONDS - CONSTRUCTION (JUN 2020) (DEVIATION May 2023)

II.46 52.229-4 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

II.47 52.232-17 INTEREST (MAY 2014)

II.48 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

II.49 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)

II.50 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)

II.5…