Scheduled Work Bid Form ELC FY26 1-28-26.xlsx

XLSX spreadsheet 38 KB Posted

Attached to
Yuma, Arizona and El Centro, California Sectors-TI Maintenance Solicitation
Solicitation number
20154783
Issued by

About this file

This is a Scheduled Work Bid Form for the Yuma, Arizona and El Centro, California Sectors Technology and Infrastructure (TI) Maintenance Solicitation (Solicitation Number 20154783) issued by the Department of Homeland Security Customs and Border Protection. The form is a pricing template designed for contractors to submit their bids for maintenance services across multiple infrastructure categories.

The solicitation requires contractors to provide expert technical solutions and maintenance services for: (a) roads and bridges including boat ramps and floating boat slips; (b) fence and gates including concertina/razor wire; (c) vegetation control and debris removal; (d) border lighting and electrical systems; (e) clearing and repairing drainage and grate systems; (f) tunnel remediation; and (g) Technology and Infrastructure attributes including cameras, shelters, and generators. Site visits were mandatory for both Yuma and El Centro on January 26th and 27th, 2026, with attendance lists due to Contracting Officer Kevin Sarff by January 21st, 2026. Only vendors that attended the mandatory site visits are eligible to proceed with the proposal process and must submit their questions and questionnaires in accordance with solicitation instructions and amendments. Questions regarding the solicitation were due by 12:00 PM EST on the specified deadline.

View the file

Other files

File Type Posted
Amendment_07_-_ 70B01R26R00000018_-_SF_30 3-2-2026.pdf PDF
QA Phase 2.pdf PDF
Amendment_06_-_ 70B01R26R00000018_-_SF_30.pdf PDF
Amendment_05_-_ 70B01R26R00000018_-_SF_30.pdf PDF
TAB 1.1.3 SOW YUM ELC TI Maint FY26 2-18-26.pdf PDF
CUS1449 RFP - UPDATED 70B01C26R00000018 2-18-26.pdf PDF
YUM Unit Price Bid Sheet Blank FY26 2-18-26.xlsx XLSX spreadsheet
Scheduled Work Bid Form ELC FY26 2-18-26.xlsx XLSX spreadsheet
ELC Unit Price Bid Sheets Blank FY26 2-18-26.xlsx XLSX spreadsheet
Contractor Notional Work Plan YUM ELC TIM Maint FY26 2-18-26.xlsx XLSX spreadsheet
Amendment_04_-_ 70B01R26R00000018_-_SF_30.pdf PDF
Scheduled Work Bid Form YUM FY26 2-18-26.xlsx XLSX spreadsheet
Amendment_03_-_70B01C24Q00000004_-_SF_30.pdf PDF
Contractor Notional Work Plan YUM ELC TIM Maint 1-30-26.xlsx XLSX spreadsheet
QA- TI Maintenance Yuma ELC 1-30-26.xlsx XLSX spreadsheet
Corporate Questions YUM ELC TI Maint FY26.docx DOCX document
Amendment_02_-_70B01C24Q00000004_-_SF_30.pdf PDF
Scheduled Work Bid Form YUM FY26 1-28-26.xlsx XLSX spreadsheet
CUS1449 RFP - UPDATED 70B01C26R00000018 1-28-26.pdf PDF
Yum-ELC Notional Work Plan_01.28.26.xlsx XLSX spreadsheet
Exhibit C TI Design Standards v6 YUM ELC TI Maint FY26.pdf PDF
TAB 1.1.3 SOW YUM ELC TI Maint 1-28-26.pdf PDF
Amendment_01_-_70B01C24Q00000004_-_SF_30.pdf PDF
Scheduled Work Bid Form YUM FY26 v3.xlsx XLSX spreadsheet
SCA WAGES EL CENTRO.pdf PDF
SCA WAGES YUMA.pdf PDF
DBA WAGES YUMA.pdf PDF
CUS1449 RFP - Commercial Items (SF1449) 1-16-26.pdf PDF
YUM Unit Price Bid Sheet Blank FY26.xlsx XLSX spreadsheet
Notional Work Plan YUM ELC TIM Maint FY26 rev1.xlsx XLSX spreadsheet
DBA WAGES EL CENTROpdf.pdf PDF
Scheduled Work Bid Form ELC FY26 v3.xlsx XLSX spreadsheet
ELC Unit Price Bid Sheets Blank FY26 v1.xlsx XLSX spreadsheet
SOW YUM ELC TI Maint FY26 1-16-26.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions ELC

PMO Scheduled Work Bid Form
The Offeror shall complete the sheets for the Base Period, Option Period 1, Option Period 2, Option Period 3 and Option Period 4 for ELC by filling the cells highlighted in YELLOW. In addition, the offeror shall propose the co-efficient price by completing Row 11- 17, and propose its coefficient % on the Summary sheet. For the Base, OY1, OY2, & OY3 the Scheduled amounts will transfer automatically to the summary sheet to give the total evaluated price.

Summary

El Centro Sector (ELC)
RequirementBase Period:
04/01/26 - 03/31/27Option 1:
04/01/27 - 03/31/28Option 2:
04/01/28 - 03/31/2029Option 3:
04/01/29 - 03/31/2030Option 4:
04/01/30 - 03/31/2031Total
Scheduled Maintenance (ELC)- FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unscheduled Maintenance (ELC)$ 4,278,420.03$ 4,406,772.63$ 4,538,975.81$ 4,675,145.08$ 4,815,399.43$ 22,714,712.97
Subtotal:$ 4,278,420.03$ 4,406,772.63$ 4,538,975.81$ 4,675,145.08$ 4,815,399.43$ 22,714,712.97
Scheduled Maintenance Co-Efficient ($)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unscheduled Maintenance Co-Efficient ($)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Management Costs - Co-Efficient Subtotal:$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Estimated Cost:$ 4,278,420.03$ 4,406,772.63$ 4,538,975.81$ 4,675,145.08$ 4,815,399.43$ 22,714,712.97
Co-Efficient Factor (ELC) - Percentage %
Summary of Co-Efficient Value:
Overhead
G&A
Bond Rate
Fee
Use Tax
Scheduled Maintenance referenced in SOW C.4.1, C.5.1
Coefficient referenced in SOW C.5.4

BASE Period (ELC)

CategoryOpt PERIOD 1: ELC SCHEDULED MAINT [FFP]Description of ServiceQty of AssetCount of EventsDuration (days)Total Cost*Cost/Event*Labor ($)Equipment ($)Material/ODC ($)ODC ($)
F&GNew River Motorized Swing GatesRoutine: Exercise , Clean (pests and debris), Lubricate and Inspect2 ea24$ - 0$ - 0
F&GMonument Swing gateRoutine: Exercise , Clean (pests and debris), Lubricate and Inspect17 ea1$ - 0$ - 0
L&EMaintenace Water WellsRoutine: Excercise, Clean and Inspect. Include Gallons Per Minute (GPM) report.5 ea4$ - 0$ - 0
L&EMaintenance SLU Border Lighting Circuit PanelsRoutine: Inspect, clean and check for failed components , ie fuses, breakers and photocells50 ea6$ - 0$ - 0
D&GGrate CleaningRoutine: Inspect for and clear debris accumulation in culverts3 ea2$ - 0$ - 0
Scheduled Subtotal$ - 0

OPT 1 Period (ELC)

CategoryOpt PERIOD 1: ELC SCHEDULED MAINT [FFP]Description of ServiceQty of AssetCount of EventsDuration (days)Total Cost*Cost/Event*Labor ($)Equipment ($)Material/ODC ($)ODC ($)
F&GNew River Motorized Swing GatesRoutine: Exercise , Clean (pests and debris), Lubricate and Inspect2 ea24$ - 0$ - 0
F&GMonument Swing gateRoutine: Exercise , Clean (pests and debris), Lubricate and Inspect17 ea1$ - 0$ - 0
L&EMaintenace Water WellsRoutine: Excercise, Clean and Inspect. Include Gallons Per Minute (GPM) report.5 ea4$ - 0$ - 0
L&EMaintenance SLU Border Lighting Circuit PanelsRoutine: Inspect, clean and check for failed components , ie fuses, breakers and photocells50 ea6$ - 0$ - 0
D&GGrate CleaningRoutine: Inspect for and clear debris accumulation in culverts3 ea2$ - 0$ - 0
Scheduled Subtotal$ - 0

OPT 2 Period (ELC)

CategoryOpt PERIOD 1: ELC SCHEDULED MAINT [FFP]Description of ServiceQty of AssetCount of EventsDuration (days)Total Cost*Cost/Event*Labor ($)Equipment ($)Material/ODC ($)ODC ($)
F&GNew River Motorized Swing GatesRoutine: Exercise , Clean (pests and debris), Lubricate and Inspect2 ea24$ - 0$ - 0
F&GMonument Swing gateRoutine: Exercise , Clean (pests and debris), Lubricate and Inspect17 ea1$ - 0$ - 0
L&EMaintenace Water WellsRoutine: Excercise, Clean and Inspect. Include Gallons Per Minute (GPM) report.5 ea4$ - 0$ - 0
L&EMaintenance SLU Border Lighting Circuit PanelsRoutine: Inspect, clean and check for failed components , ie fuses, breakers and photocells50 ea6$ - 0$ - 0
D&GGrate CleaningRoutine: Inspect for and clear debris accumulation in culverts3 ea2$ - 0$ - 0
Scheduled Subtotal$ - 0

OPT 3 Period (ELC)

CategoryOpt PERIOD 1: ELC SCHEDULED MAINT [FFP]Description of ServiceQty of AssetCount of EventsDuration (days)Total Cost*Cost/Event*Labor ($)Equipment ($)Material/ODC ($)ODC ($)
F&GNew River Motorized Swing GatesRoutine: Exercise , Clean (pests and debris), Lubricate and Inspect2 ea24$ - 0$ - 0
F&GMonument Swing gateRoutine: Exercise , Clean (pests and debris), Lubricate and Inspect17 ea1$ - 0$ - 0
L&EMaintenace Water WellsRoutine: Excercise, Clean and Inspect. Include Gallons Per Minute (GPM) report.5 ea4$ - 0$ - 0
L&EMaintenance SLU Border Lighting Circuit PanelsRoutine: Inspect, clean and check for failed components , ie fuses, breakers and photocells50 ea6$ - 0$ - 0
D&GGrate CleaningRoutine: Inspect for and clear debris accumulation in culverts3 ea2$ - 0$ - 0
Scheduled Subtotal$ - 0

OPT 4 Period (ELC)

CategoryOpt PERIOD 1: ELC SCHEDULED MAINT [FFP]Description of ServiceQty of AssetCount of EventsDuration (days)Total Cost*Cost/Event*Labor ($)Equipment ($)Material/ODC ($)ODC ($)
F&GNew River Motorized Swing GatesRoutine: Exercise , Clean (pests and debris), Lubricate and Inspect2 ea24$ - 0$ - 0
F&GMonument Swing gateRoutine: Exercise , Clean (pests and debris), Lubricate and Inspect17 ea1$ - 0$ - 0
L&EMaintenace Water WellsRoutine: Excercise, Clean and Inspect. Include Gallons Per Minute (GPM) report.5 ea4$ - 0$ - 0
L&EMaintenance SLU Border Lighting Circuit PanelsRoutine: Inspect, clean and check for failed components , ie fuses, breakers and photocells50 ea6$ - 0$ - 0
D&GGrate CleaningRoutine: Inspect for and clear debris accumulation in culverts3 ea2$ - 0$ - 0
Scheduled Subtotal$ - 0