QA Phase 2.pdf

PDF 281 KB Posted

Attached to
Yuma, Arizona and El Centro, California Sectors-TI Maintenance Solicitation
Solicitation number
20154783
Issued by

About this file

This is a Questions and Answers (QA) document for Phase 2 of federal contract opportunity 70B01R26R00000018. The document addresses contractor inquiries regarding key personnel requirements, proposal submission format, and technical scope clarifications.

Regarding key personnel, the document confirms that one Program Manager may cover both the Yuma and El Centro sectors, while Project Engineer/Quality Control/Safety Managers must be separate individuals for each sector. A Senior Program Manager requires a minimum of 10 years combined experience as a Civil Engineer and/or Maintenance Program Manager, while other program managers and Project Engineers require at least 5 years of experience in program management and safety programs. An Analyst position requires 5 years minimum experience and must obtain Government clearance through a Background Investigation. For proposal submission, Key Personnel Resumes must be included in Factor 2 (Management Approach and Key Personnel Resumes) only, and the four-page length limit for each resume does not count toward the 15-page limit for that factor. Regarding the Sanchez Canal Bridge inspection and certification requirements, the government directs contractors to reference the notional work plan and provide their approach accordingly, without confirming specific requirements for Professional Engineer-stamped certification, load rating, or full structural analysis, nor committing to providing prior inspection reports or known structural deficiencies.

View the file

Other files

File Type Posted
Amendment_07_-_ 70B01R26R00000018_-_SF_30 3-2-2026.pdf PDF
Amendment_06_-_ 70B01R26R00000018_-_SF_30.pdf PDF
Amendment_05_-_ 70B01R26R00000018_-_SF_30.pdf PDF
TAB 1.1.3 SOW YUM ELC TI Maint FY26 2-18-26.pdf PDF
Scheduled Work Bid Form YUM FY26 2-18-26.xlsx XLSX spreadsheet
Amendment_04_-_ 70B01R26R00000018_-_SF_30.pdf PDF
YUM Unit Price Bid Sheet Blank FY26 2-18-26.xlsx XLSX spreadsheet
CUS1449 RFP - UPDATED 70B01C26R00000018 2-18-26.pdf PDF
Scheduled Work Bid Form ELC FY26 2-18-26.xlsx XLSX spreadsheet
ELC Unit Price Bid Sheets Blank FY26 2-18-26.xlsx XLSX spreadsheet
Contractor Notional Work Plan YUM ELC TIM Maint FY26 2-18-26.xlsx XLSX spreadsheet
Amendment_03_-_70B01C24Q00000004_-_SF_30.pdf PDF
Amendment_02_-_70B01C24Q00000004_-_SF_30.pdf PDF
Corporate Questions YUM ELC TI Maint FY26.docx DOCX document
Contractor Notional Work Plan YUM ELC TIM Maint 1-30-26.xlsx XLSX spreadsheet
QA- TI Maintenance Yuma ELC 1-30-26.xlsx XLSX spreadsheet
TAB 1.1.3 SOW YUM ELC TI Maint 1-28-26.pdf PDF
Scheduled Work Bid Form ELC FY26 1-28-26.xlsx XLSX spreadsheet
Amendment_01_-_70B01C24Q00000004_-_SF_30.pdf PDF
Exhibit C TI Design Standards v6 YUM ELC TI Maint FY26.pdf PDF
Yum-ELC Notional Work Plan_01.28.26.xlsx XLSX spreadsheet
CUS1449 RFP - UPDATED 70B01C26R00000018 1-28-26.pdf PDF
Scheduled Work Bid Form YUM FY26 1-28-26.xlsx XLSX spreadsheet
Scheduled Work Bid Form YUM FY26 v3.xlsx XLSX spreadsheet
Scheduled Work Bid Form ELC FY26 v3.xlsx XLSX spreadsheet
ELC Unit Price Bid Sheets Blank FY26 v1.xlsx XLSX spreadsheet
Notional Work Plan YUM ELC TIM Maint FY26 rev1.xlsx XLSX spreadsheet
DBA WAGES EL CENTROpdf.pdf PDF
SOW YUM ELC TI Maint FY26 1-16-26.pdf PDF
YUM Unit Price Bid Sheet Blank FY26.xlsx XLSX spreadsheet
SCA WAGES EL CENTRO.pdf PDF
DBA WAGES YUMA.pdf PDF
CUS1449 RFP - Commercial Items (SF1449) 1-16-26.pdf PDF
SCA WAGES YUMA.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QA Phase 2 - 70B01R26R00000018

• SOW; On page 19, Section C.5.2 Key Personnel Qualifications Standards.

Program Manager and will have at least 5 years’ experience in program management and safety programs. Please confirm if Yuma and El Centro will require separate individuals: One Project Engineer/Program Manager for each sector? One Program Manager may cover both sectors.

o Senior (SR) Program Manager will have a minimum of a combined total of

10 years’ experience as a Civil Engineer and/or Maintenance Program

Manager.

o Project Engineer/Quality Control/Safety Managers will have at least 5 years’ experience in program management, quality control processes. Yuma and El

Centro will require separate individuals o Analyst must have 5 years minimum experience. This individual must acquire Government clearance through a Background Investigation (BI).

• RFP; On pages 63-64, under section III.13 52.212-2 EVALUATION –

COMMERCIAL PRODUCTS and COMMERCIAL SERVICES (AUG 2025)

(DEVIATION 25-21), both Factor 2 (Management Approach and Key Personnel

Resumes) and Factor 3 (Technical Capabilities and Key Personnel Resumes) include “Key Personnel Resumes”. Please confirm which Factor the “Key

Personnel Resumes” should be included in the proposal (Factor 2 or Factor

3)

Factor 2.

• So far just 1 clarification since the documents were revised with amendment

0004. Specifically, we want to clarify the correct number of key personnel required as a sentence was removed from the key personnel section of the SOW in the amendment 0004 documents. See Previous answer.

• In the RFP, the requirement for key personnel resumes is specified under both Factor 2 and Factor 3.

• To ensure our submission meets all requirements and expectations, we respectfully request clarification on the following points:

1. For which Factor would you like the resumes to be included: Factor 2, Factor 3, or both? See previous answer.

2. Does the four-page length limit for the resumes count toward the 15-page limit for

Factor 2 or the 25-page limit for Factor 3, or is each resume considered separately?

The 4-page length of each resume does not count toward the 15-page limit.

• Request clarification regarding the inspection and certification requirements for the

Sanchez Canal Bridge to ensure accurate pricing and compliance:

1. Please confirm whether the inspection requires a Professional Engineer-stamped certification and whether the scope includes load rating and full structural analysis, and

2. Will the government provide prior inspection reports or known structural deficiencies to assist with planning and cost estimation.

See notional work plan and provide your approach accordingly