This is a Contractor Notional Work Plan for maintenance services in the Yuma, Arizona and El Centro, California sectors under a Customs and Border Protection (CBP) solicitation (20154783). The plan outlines six primary maintenance tasks to be performed across two geographic sectors during FY26, with work organized into multiple cost line items (CLINs).
The notional work plan encompasses the following task categories: (1) ELC IBR Vegetation and Debris Removal—quarterly vegetation control over 21 miles including mowing, vine removal (50 tons), and routine inspections for repairs; (2) Alamo vegetation control and debris removal over 12 acres with rough terrain considerations and 50 tons of debris hauling, performed outside migratory bird nesting season; (3) Blowouts/erosion road maintenance on TI and FC-3 roads in El Centro including grading, compacting, and filling potholes with 300 tons of native material across 2 miles; (4) Mount Signal TI Roads maintenance over approximately 4 miles involving grading, compacting in lifts not exceeding 4 inches, and potholes/washboarding removal; (5) New River Gate Maintenance—inspection and servicing of six pulley gate panels including hydraulic, electrical, and mechanical component checks plus 50 tons of debris removal and transport; and (6) C1 Sand Dunes border road maintenance in Buttercup Sand Dunes, Yuma involving clearing sand in a 20-foot swath for safe vehicle traffic with 500 tons of sand relocation. Each task includes detailed work estimate forms with line items for labor, travel, equipment, materials, mobilization/demobilization, and other costs, with specific GPS coordinates provided for all locations.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Notional Work Plan
| Notional Work Plan | ||||||||
| Task # | Task Description | Quantity | Asset Objective | Work Category | Location Coordinates | Location | Sector | |
| Start Coord. | Stop Coord. | |||||||
| 1 | ELC IBR V&D - Perform quarterly cycle of vegetation control covering approximately 21 miles. Perform routine vegetation control work on entire enforcement zone to include 5 ft swath on maintenance road. Mow grass to a mimimum of 4 inches and not to exceed 6 inches. Remove and dispose of all grass and trimmings off the road to include 50 tons of vine removal from the fence and debris/trash and dispose to an approved landfill. While completing vegetation/debris removal, perform inspections to identify repair needs while performing normal vegetation control i.e., a fence breach, loose grounding wires, C-wire, sinkholes, graffiti, etc. | 21 Miles | Maintain clear line of site and accessibility for agents. | V&DR | 32.67785, -115.31301 | 32.65196, -115.67151 | El Centro, CA | ELC |
| 2 | Alamo - Perform vegatation control and mow approximately 12 acres in all areas (including water) not to exceed 6 inches and a minimum of 4 inches to include the rivers edge. Assume rough terrain with steep slopes in various areas. Assume 50 tons of debris to be hauled off site to a approved location. Work to be performed outside the Migratory Bird nesting season. | 12 Acres | Maintain clear line of site and accessibility for agents. | V&DR | 32.67731, -115.36956 | 32.67501, -115.37016 | El Centro, CA | ELC |
| 3 | Blowouts/erosion adding material-Contractor is to provide maintenance of TI, FC-3 roads located in El Centro CA to facilitate traffic. Contractor will be required to water, compact and grade native material at a nominal width not to exceed (20 feet), fill potholes with native material. Assume 300 tons needed to fill potholes. All water must be provided by the Contractor. Grade and shape the existing traveled way, including turnouts, to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface. All aggregates pulled up while grading must be bladed back into the road. Maintain existing berms to the condition of adjacent segments. Do not create new berms. Immediately following the spreading of the aggregates, it shall be compacted to the full width by rolling with vibratory roller. Rolling shall continue until the road is fully compacted to minimum of 90%. All drainage points must be cleaned out of any debris and no new drainage is allowed. Do not allow materials resulting from work under this section to remain on or in structures, such as bridges, culverts, fences, or drainage dips. No windrows allowed. | 2 Miles | Maintain safe and reliable roadway for BP operations. | R&B | 32.6958, -115.2832 | 32.6797, -115.2895 | El Centro, CA | ELC |
| 4 | Mount Signal TI Roads -Contractor is to provide maintenance of Mount Signal TI Road (Approximately 4 miles), located in El Centro CA to facilitate traffic and provide proper drainage as scheduled by the COR. Contractor will be required to water, compact and grade native material to remove all potholes and washboarding, compact in lifts not to exceed 4 inches at a nominal width not to exceed (20 feet). Water must be provided by the Contractor.Grade and shape the existing traveled way, including turnouts, to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface. Maintain existing berms to the condition of adjacent segments. Do not create new berms. Vibratory rolling shall continue until the road is compacted. All drainage points must be cleaned out of any debris and no new drainage is allowed. No windrows allowed. | 2 Miles | Maintain safe and reliable roadway for BP operations. | R&B | 32.6794, -115.6918 | 32.6507, -115.6923 | El Centro, CA | ELC |
| 5 | New River Gate Maintenance -Contractor is to provide maintenance of New River gates, located in El Centro CA to facilitate 50 tons debris removal and transport to an approved landfill to allow proper flow and function as scheduled by the COR. Contractor will be required to check hydraulics, electrical components, mechanical components overall condition of 6 pulley gate panels. | 6 ea | Maintain safe gates for BP operations. | F&G | 32.66558, -115.50180 | 32.66674, -115.50445 | Calexico, CA | ELC |
| 6 | C1 Sand Dunes -Contractor is to provide maintenance of of the border road, located in Buttercup Sand Dunes Yuma, AZ as scheduled by the COR. Contractor will be required to clear sand North and South of outriggers along the IBR in a 20' swath to allow safe 4x4 vehicle traffic for BP Agents. Assune that 500 tons of sand will be required to be relocated and piled at the starting coordinates | 8.5 | Maintain safe IBR travel for BP operations. | R&B | 32.71105, -114.83498 | 32.70593, -114.90997 | Yuma, AZ | YUM |
Task 1
| Work Estimate Form | Task Order Description: ELC IBR V&D - Perform quarterly cycle of vegetation control covering approximately 21 miles. Perform routine vegetation control work on entire enforcement zone to include 5 ft swath on maintenance road. Mow grass to a mimimum of 4 inches and not to exceed 6 inches. Remove and dispose of all grass and trimmings off the road to include 50 tons of vine removal from the fence and debris/trash and dispose to an approved landfill. While completing vegetation/debris removal, perform inspections to identify repair needs while performing normal vegetation control i.e., a fence breach, loose grounding wires, C-wire, sinkholes, graffiti, etc. | |||||||
| Offeror: | Date: | |||||||
| WORK DESCRIPTION | ||||||||
| Work Category: | CLIN 5 - Vegetation/Debris | Sector: | ELC | |||||
| Notional Work Task: | ELC IBR V&D | |||||||
| Asset Objective: | Routine | Work Duration: | ||||||
| GPS Coordinates: | Start Lat. | Start Long. | Stop Lat. | Stop Long. | ||||
| 32.67785 | -115.31301 | 32.65196 | -115.67151 | |||||
| DETAILED ESTIMATE | ||||||||
| Item | Unit of Meas | Qty | ||||||
| Labor |
Travel
Equipment
Materials
Mobilization/Demobilization
Other
Task 2 Work Estimate Form Task Order Description:
Alamo - Perform vegatation control and mow approximately 12 acres in all areas (including water) not to exceed 6 inches and a minimum of 4 inches to include the rivers edge. Assume rough terrain with steep slopes in various areas. Assume 50 tons of debris to be hauled off site to a approved location. Work to be performed outside the Migratory Bird nesting season.
| Offeror: | Date: | ||||||
| WORK DESCRIPTION | |||||||
| Work Category: | CLIN 5-Vegetation/Debris | Sector: | ELC | ||||
| Notional Work Task: | Alamo | ||||||
| Asset Objective: | Routine | Work Duration: | |||||
| GPS Coordinates: | Start Lat. | Start Long. | Stop Lat. | Stop Long. | |||
| 32.67731 | -115.36956 | 32.67501 | -115.37016 | ||||
| DETAILED ESTIMATE | |||||||
| Item | Unit of Meas | Qty | |||||
| Labor |
Travel
Equipment
Materials
Mobilization/Demobilization
Other
Task 3
| Work Estimate Form | Task Order Description: Blowouts/erosion adding material-Contractor is to provide maintenance of TI, FC-3 roads located in El Centro CA to facilitate traffic. Contractor will be required to water, compact and grade native material at a nominal width not to exceed (20 feet), fill potholes with native material. Assume 300 tons needed to fill potholes. All water must be provided by the Contractor. Grade and shape the existing traveled way, including turnouts, to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface. All aggregates pulled up while grading must be bladed back into the road. Maintain existing berms to the condition of adjacent segments. Do not create new berms. Immediately following the spreading of the aggregates, it shall be compacted to the full width by rolling with vibratory roller. Rolling shall continue until the road is fully compacted to minimum of 90%. All drainage points must be cleaned out of any debris and no new drainage is allowed. Do not allow materials resulting from work under this section to remain on or in structures, such as bridges, culverts, fences, or drainage dips. No windrows allowed. | ||||||
| Offeror: | Date: | ||||||
| WORK DESCRIPTION | |||||||
| Work Category: | CLIN 2 - Roads and Bridges | Sector: | ELC | ||||
| Notional Work Task: | Blowouts/Erosion | ||||||
| Asset Objective: | Routine | Work Duration: | |||||
| GPS Coordinates: | Start Lat. | Start Long. | Stop Lat. | Stop Long. |
| DETAILED ESTIMATE | ||
| Item | Unit of Meas | Qty |
| Labor |
Travel
Equipment
Materials
Mobilization/Demobilization
Other
Task 4 Work Estimate Form Task Order Description:
Mount Signal TI Roads -Contractor is to provide maintenance of Mount Signal TI Road (Approximately 4 miles), located in El Centro CA to facilitate traffic and provide proper drainage as scheduled by the COR. Contractor will be required to water, compact and grade native material to remove all potholes and washboarding, compact in lifts not to exceed 4 inches at a nominal width not to exceed (20 feet). Water must be provided by the Contractor. Grade and shape the existing traveled way, including turnouts, to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface. Maintain existing berms to the condition of adjacent segments. Do not create new berms. Vibratory rolling shall continue until the road is compacted. All drainage points must be cleaned out of any debris and no new drainage is allowed. No windrows allowed.
| Offeror: | Date: | ||||||
| WORK DESCRIPTION | |||||||
| Work Category: | CLIN 2-Roads and Bridges | Sector: | ELC | ||||
| Notional Work Task: | Mt Signal TI Road Maintenance | ||||||
| Asset Objective: | Routine | Work Duration: | |||||
| GPS Coordinates: | Start Lat. | Start Long. | Stop Lat. | Stop Long. | |||
| 32.6794 | -115.6918 | 32.6507 | -115.6923 | ||||
| DETAILED ESTIMATE | |||||||
| Item | Unit of Meas | Qty | |||||
| Labor |
Travel
Equipment
Materials
Mobilization/Demobilization
Other
Task 5 Work Estimate Form Task Order Description:
New River Gate Maintenance -Contractor is to provide maintenance of New River gates, located in El Centro CA to facilitate 50 tons debris removal and transport to an approved landfill to allow proper flow and function as scheduled by the COR. Contractor will be required to check hydraulics, electrical components, mechanical components overall condition of 6 pulley gate panels.
| Offeror: | Date: | ||||||
| WORK DESCRIPTION | |||||||
| Work Category: | CLIN 1-Fence and Gates | Sector: | ELC | ||||
| Notional Work Task: | New River Gate Maintenance | ||||||
| Asset Objective: | Routine | Work Duration: | |||||
| GPS Coordinates: | Start Lat. | Start Long. | Stop Lat. | Stop Long. | |||
| 32.66558 | -115.5018 | 32.66674 | -115.50445 | ||||
| DETAILED ESTIMATE | |||||||
| Item | Unit of Meas | Qty | |||||
| Labor |
Travel
Equipment
Materials
Mobilization/Demobilization
Other
Task 6 Work Estimate Form Task Order Description:
C1 Sand Dunes -Contractor is to provide maintenance of of the border road, located in Buttercup Sand Dunes Yuma, AZ as scheduled by the COR. Contractor will be required to clear sand North and South of outriggers along the IBR in a 20' swath to allow safe 4x4 vehicle traffic for BP Agents. Assune that 500 tons of sand will be required to be relocated and piled at the starting coordinates.
| Offeror: | Date: | ||||||
| WORK DESCRIPTION | |||||||
| Work Category: | CLIN 2-Roads and Bridges | Sector: | YUM | ||||
| Notional Work Task: | C1 Dunes TI Road Maintenance | ||||||
| Asset Objective: | Routine | Work Duration: | |||||
| GPS Coordinates: | Start Lat. | Start Long. | Stop Lat. | Stop Long. | |||
| 32.6794 | -115.6918 | 32.6507 | -115.6923 | ||||
| DETAILED ESTIMATE | |||||||
| Item | Unit of Meas | Qty | |||||
| Labor |
Travel
Equipment
Materials
Mobilization/Demobilization
Other