Scheduled Work Bid Form ELC FY26 2-18-26.xlsx
XLSX spreadsheet 38 KB Posted
- Solicitation number
- 20154783
About this file
This is a Scheduled Work Bid Form for the El Centro Sector (ELC) maintenance contract under the Yuma, Arizona and El Centro, California Sectors-TI Maintenance Solicitation (20154783). The form requires offerors to complete pricing for a Base Period (04/01/26 - 03/31/27) and four option periods through 03/31/31, with all costs structured on a Fixed-Price basis. The primary cost driver is Unscheduled Maintenance, with Base Period pricing of $4,278,420.03 and total evaluated price across all periods of $22,714,712.97. Offerors must also propose coefficient pricing factors for scheduled and unscheduled maintenance, as well as program management costs, with the coefficient percentage to be submitted on the summary sheet. The form indicates that Scheduled Maintenance costs are currently zero, suggesting offerors will bid maintenance activities for specific assets including New River motorized swing gates (2 units, 24 events), Monument swing gates (17 units, 1 event), water wells (5 units, 4 events), border lighting circuit panels (50 units, 6 events), and grate cleaning (3 units, 2 events).
Offerors must complete Yellow-highlighted cells for labor, equipment, material/Other Direct Costs (ODC), and total costs for each service category across all five contract periods. The form automatically transfers scheduled amounts to the summary sheet for evaluation purposes. Per the solicitation requirements, only vendors that attended mandatory site visits on January 26-27, 2026 are eligible to submit proposals, and all submissions must comply with the amendment instructions and updated notional work plan addressing previous questions and answers.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions ELC
| PMO Scheduled Work Bid Form |
| The Offeror shall complete the sheets for the Base Period, Option Period 1, Option Period 2, Option Period 3 and Option Period 4 for ELC by filling the cells highlighted in YELLOW. In addition, the offeror shall propose the co-efficient price by completing Row 11- 17, and propose its coefficient % on the Summary sheet. For the Base, OY1, OY2, & OY3 the Scheduled amounts will transfer automatically to the summary sheet to give the total evaluated price. |
Summary
| El Centro Sector (ELC) | |||||||
| Requirement | Base Period: | ||||||
| 04/01/26 - 03/31/27 | Option 1: | ||||||
| 04/01/27 - 03/31/28 | Option 2: | ||||||
| 04/01/28 - 03/31/2029 | Option 3: | ||||||
| 04/01/29 - 03/31/2030 | Option 4: | ||||||
| 04/01/30 - 03/31/2031 | Total | ||||||
| Scheduled Maintenance (ELC)- FFP | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Unscheduled Maintenance (ELC) | $ 4,278,420.03 | $ 4,406,772.63 | $ 4,538,975.81 | $ 4,675,145.08 | $ 4,815,399.43 | $ 22,714,712.97 | |
| Subtotal: | $ 4,278,420.03 | $ 4,406,772.63 | $ 4,538,975.81 | $ 4,675,145.08 | $ 4,815,399.43 | $ 22,714,712.97 | |
| Scheduled Maintenance Co-Efficient ($) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Unscheduled Maintenance Co-Efficient ($) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Program Management Costs - Co-Efficient Subtotal: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Total Estimated Cost: | $ 4,278,420.03 | $ 4,406,772.63 | $ 4,538,975.81 | $ 4,675,145.08 | $ 4,815,399.43 | $ 22,714,712.97 |
| Co-Efficient Factor (ELC) - Percentage % |
| Summary of Co-Efficient Value: |
| Overhead |
| G&A |
| Bond Rate |
| Fee |
| Use Tax |
| Scheduled Maintenance referenced in SOW C.4.1, C.5.1 |
| Coefficient referenced in SOW C.5.4 |
BASE Period (ELC)
| Category | Opt PERIOD 1: ELC SCHEDULED MAINT [FFP] | Description of Service | Qty of Asset | Count of Events | Duration (days) | Total Cost* | Cost/Event* | Labor ($) | Equipment ($) | Material/ODC ($) | ODC ($) |
| F&G | New River Motorized Swing Gates | Routine: Exercise , Clean (pests and debris), Lubricate and Inspect | 2 ea | 24 | $ - 0 | $ - 0 | |||||
| F&G | Monument Swing gate | Routine: Exercise , Clean (pests and debris), Lubricate and Inspect | 17 ea | 1 | $ - 0 | $ - 0 | |||||
| L&E | Maintenace Water Wells | Routine: Excercise, Clean and Inspect. Include Gallons Per Minute (GPM) report. | 5 ea | 4 | $ - 0 | $ - 0 | |||||
| L&E | Maintenance SLU Border Lighting Circuit Panels | Routine: Inspect, clean and check for failed components , ie fuses, breakers and photocells | 50 ea | 6 | $ - 0 | $ - 0 | |||||
| D&G | Grate Cleaning | Routine: Inspect for and clear debris accumulation in culverts | 3 ea | 2 | $ - 0 | $ - 0 | |||||
| Scheduled Subtotal | $ - 0 |
OPT 1 Period (ELC)
| Category | Opt PERIOD 1: ELC SCHEDULED MAINT [FFP] | Description of Service | Qty of Asset | Count of Events | Duration (days) | Total Cost* | Cost/Event* | Labor ($) | Equipment ($) | Material/ODC ($) | ODC ($) |
| F&G | New River Motorized Swing Gates | Routine: Exercise , Clean (pests and debris), Lubricate and Inspect | 2 ea | 24 | $ - 0 | $ - 0 | |||||
| F&G | Monument Swing gate | Routine: Exercise , Clean (pests and debris), Lubricate and Inspect | 17 ea | 1 | $ - 0 | $ - 0 | |||||
| L&E | Maintenace Water Wells | Routine: Excercise, Clean and Inspect. Include Gallons Per Minute (GPM) report. | 5 ea | 4 | $ - 0 | $ - 0 | |||||
| L&E | Maintenance SLU Border Lighting Circuit Panels | Routine: Inspect, clean and check for failed components , ie fuses, breakers and photocells | 50 ea | 6 | $ - 0 | $ - 0 | |||||
| D&G | Grate Cleaning | Routine: Inspect for and clear debris accumulation in culverts | 3 ea | 2 | $ - 0 | $ - 0 | |||||
| Scheduled Subtotal | $ - 0 |
OPT 2 Period (ELC)
| Category | Opt PERIOD 1: ELC SCHEDULED MAINT [FFP] | Description of Service | Qty of Asset | Count of Events | Duration (days) | Total Cost* | Cost/Event* | Labor ($) | Equipment ($) | Material/ODC ($) | ODC ($) |
| F&G | New River Motorized Swing Gates | Routine: Exercise , Clean (pests and debris), Lubricate and Inspect | 2 ea | 24 | $ - 0 | $ - 0 | |||||
| F&G | Monument Swing gate | Routine: Exercise , Clean (pests and debris), Lubricate and Inspect | 17 ea | 1 | $ - 0 | $ - 0 | |||||
| L&E | Maintenace Water Wells | Routine: Excercise, Clean and Inspect. Include Gallons Per Minute (GPM) report. | 5 ea | 4 | $ - 0 | $ - 0 | |||||
| L&E | Maintenance SLU Border Lighting Circuit Panels | Routine: Inspect, clean and check for failed components , ie fuses, breakers and photocells | 50 ea | 6 | $ - 0 | $ - 0 | |||||
| D&G | Grate Cleaning | Routine: Inspect for and clear debris accumulation in culverts | 3 ea | 2 | $ - 0 | $ - 0 | |||||
| Scheduled Subtotal | $ - 0 |
OPT 3 Period (ELC)
| Category | Opt PERIOD 1: ELC SCHEDULED MAINT [FFP] | Description of Service | Qty of Asset | Count of Events | Duration (days) | Total Cost* | Cost/Event* | Labor ($) | Equipment ($) | Material/ODC ($) | ODC ($) |
| F&G | New River Motorized Swing Gates | Routine: Exercise , Clean (pests and debris), Lubricate and Inspect | 2 ea | 24 | $ - 0 | $ - 0 | |||||
| F&G | Monument Swing gate | Routine: Exercise , Clean (pests and debris), Lubricate and Inspect | 17 ea | 1 | $ - 0 | $ - 0 | |||||
| L&E | Maintenace Water Wells | Routine: Excercise, Clean and Inspect. Include Gallons Per Minute (GPM) report. | 5 ea | 4 | $ - 0 | $ - 0 | |||||
| L&E | Maintenance SLU Border Lighting Circuit Panels | Routine: Inspect, clean and check for failed components , ie fuses, breakers and photocells | 50 ea | 6 | $ - 0 | $ - 0 | |||||
| D&G | Grate Cleaning | Routine: Inspect for and clear debris accumulation in culverts | 3 ea | 2 | $ - 0 | $ - 0 | |||||
| Scheduled Subtotal | $ - 0 |
OPT 4 Period (ELC)
| Category | Opt PERIOD 1: ELC SCHEDULED MAINT [FFP] | Description of Service | Qty of Asset | Count of Events | Duration (days) | Total Cost* | Cost/Event* | Labor ($) | Equipment ($) | Material/ODC ($) | ODC ($) |
| F&G | New River Motorized Swing Gates | Routine: Exercise , Clean (pests and debris), Lubricate and Inspect | 2 ea | 24 | $ - 0 | $ - 0 | |||||
| F&G | Monument Swing gate | Routine: Exercise , Clean (pests and debris), Lubricate and Inspect | 17 ea | 1 | $ - 0 | $ - 0 | |||||
| L&E | Maintenace Water Wells | Routine: Excercise, Clean and Inspect. Include Gallons Per Minute (GPM) report. | 5 ea | 4 | $ - 0 | $ - 0 | |||||
| L&E | Maintenance SLU Border Lighting Circuit Panels | Routine: Inspect, clean and check for failed components , ie fuses, breakers and photocells | 50 ea | 6 | $ - 0 | $ - 0 | |||||
| D&G | Grate Cleaning | Routine: Inspect for and clear debris accumulation in culverts | 3 ea | 2 | $ - 0 | $ - 0 | |||||
| Scheduled Subtotal | $ - 0 |