The file's text, extracted by GovTribe without its formatting.
Service Delivery Summary - 21
| Work Activity (WA) Number: | | ERROR:#REF! | Date(s): | ##/##/#### | REV: | 0 |
| WORK DESCRIPTION | | | | | | |
| TI Asset Description: | ERROR:#REF! | | | | | |
| Asset Objective(s): | | | ERROR:#REF! | | | | | | | | | | |
| Work Category: | | | ERROR:#REF! | | | | Location: | ERROR:#REF! | | | | | |
| Work Classification: | | | ERROR:#REF! | | | | Sector: | ERROR:#REF! | | | | | |
| Work Subdivisions: | | | ERROR:#REF! | | | | GPS: | BEG | N: | | | | |
| W: | ERROR:#REF! | END | N: | | | | | | | | | | | |
| W: | ERROR:#REF! | | | | | | | | | | | | | |
| M&R Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Cerrudo Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Pricing Schedule | | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | | |
| Item | | | | | | | | UoM | | Qty | | Price | Total |
| Labor Sub Total | $ - 0 |
| Travel Labor | | |
| Travel Labor Sub Total | $ - 0 |
| Equipment | | |
| Equipment Sub Total | $ - 0 |
| Material | | |
| Material Sub Total | $ - 0 |
| Mobilization | | |
| | | Mobilization Sub Total | | | | $ - 0 |
| Other Costs | | | | | | | |
| | | | | | | $ - 0 |
| | | Other Costs Sub Total | | | | $ - 0 |
| | | | | | Grand Total: | $ - 0 |
| KBR Representative: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
| Subcontractor: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
&"Times New Roman,Bold"&18&KFF0000&G&"-,Regular"&11&K01+000 &10PSC-CTIMR-SO0009-CLIN 1,2,3,4 and 5 Cerrudo Tucson, CLIN 4 Yuma &"Times New Roman,Bold"&22Daily Service Delivery Summary &G
&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 22
| Work Activity (WA) Number: | | ERROR:#REF! | Date(s): | ##/##/#### | REV: | 0 |
| WORK DESCRIPTION | | | | | | |
| TI Asset Description: | ERROR:#REF! | | | | | |
| Asset Objective(s): | | | ERROR:#REF! | | | | | | | | | | |
| Work Category: | | | ERROR:#REF! | | | | Location: | ERROR:#REF! | | | | | |
| Work Classification: | | | ERROR:#REF! | | | | Sector: | ERROR:#REF! | | | | | |
| Work Subdivisions: | | | ERROR:#REF! | | | | GPS: | BEG | N: | | | | |
| W: | ERROR:#REF! | END | N: | | | | | | | | | | | |
| W: | ERROR:#REF! | | | | | | | | | | | | | |
| M&R Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Cerrudo Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Pricing Schedule | | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | | |
| Item | | | | | | | | UoM | | Qty | | Price | Total |
| Labor Sub Total | $ - 0 |
| Travel Labor | | |
| Travel Labor Sub Total | $ - 0 |
| Equipment | | |
| Equipment Sub Total | $ - 0 |
| Material | | |
| Material Sub Total | $ - 0 |
| Mobilization | | |
| | | Mobilization Sub Total | | | | $ - 0 |
| Other Costs | | | | | | | |
| | | | | | | $ - 0 |
| | | Other Costs Sub Total | | | | $ - 0 |
| | | | | | Grand Total: | $ - 0 |
| KBR Representative: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
| Subcontractor: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
&"Times New Roman,Bold"&22Daily Service Delivery Summary &G
&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 23
| Work Activity (WA) Number: | | ERROR:#REF! | Date(s): | ##/##/#### | REV: | 0 |
| WORK DESCRIPTION | | | | | | |
| TI Asset Description: | ERROR:#REF! | | | | | |
| Asset Objective(s): | | | ERROR:#REF! | | | | | | | | | | |
| Work Category: | | | ERROR:#REF! | | | | Location: | ERROR:#REF! | | | | | |
| Work Classification: | | | ERROR:#REF! | | | | Sector: | ERROR:#REF! | | | | | |
| Work Subdivisions: | | | ERROR:#REF! | | | | GPS: | BEG | N: | | | | |
| W: | ERROR:#REF! | END | N: | | | | | | | | | | | |
| W: | ERROR:#REF! | | | | | | | | | | | | | |
| M&R Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Cerrudo Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Pricing Schedule | | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | | |
| Item | | | | | | | | UoM | | Qty | | Price | Total |
| Labor Sub Total | $ - 0 |
| Travel Labor | | |
| Travel Labor Sub Total | $ - 0 |
| Equipment | | |
| Equipment Sub Total | $ - 0 |
| Material | | |
| Material Sub Total | $ - 0 |
| Mobilization | | |
| | | Mobilization Sub Total | | | | $ - 0 |
| Other Costs | | | | | | | |
| | | | | | | $ - 0 |
| | | Other Costs Sub Total | | | | $ - 0 |
| | | | | | Grand Total: | $ - 0 |
| KBR Representative: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
| Subcontractor: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
&"Times New Roman,Bold"&22Daily Service Delivery Summary &G
&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 24
| Work Activity (WA) Number: | | ERROR:#REF! | Date(s): | ##/##/#### | REV: | 0 |
| WORK DESCRIPTION | | | | | | |
| TI Asset Description: | ERROR:#REF! | | | | | |
| Asset Objective(s): | | | ERROR:#REF! | | | | | | | | | | |
| Work Category: | | | ERROR:#REF! | | | | Location: | ERROR:#REF! | | | | | |
| Work Classification: | | | ERROR:#REF! | | | | Sector: | ERROR:#REF! | | | | | |
| Work Subdivisions: | | | ERROR:#REF! | | | | GPS: | BEG | N: | | | | |
| W: | ERROR:#REF! | END | N: | | | | | | | | | | | |
| W: | ERROR:#REF! | | | | | | | | | | | | | |
| M&R Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Cerrudo Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Pricing Schedule | | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | | |
| Item | | | | | | | | UoM | | Qty | | Price | Total |
| Labor Sub Total | $ - 0 |
| Travel Labor | | |
| Travel Labor Sub Total | $ - 0 |
| Equipment | | |
| Equipment Sub Total | $ - 0 |
| Material | | |
| Material Sub Total | $ - 0 |
| Mobilization | | |
| | | Mobilization Sub Total | | | | $ - 0 |
| Other Costs | | | | | | | |
| | | | | | | $ - 0 |
| | | Other Costs Sub Total | | | | $ - 0 |
| | | | | | Grand Total: | $ - 0 |
| KBR Representative: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
| Subcontractor: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
&"Times New Roman,Bold"&22Daily Service Delivery Summary &G
&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 25
| Work Activity (WA) Number: | | ERROR:#REF! | Date(s): | ##/##/#### | REV: | 0 |
| WORK DESCRIPTION | | | | | | |
| TI Asset Description: | ERROR:#REF! | | | | | |
| Asset Objective(s): | | | ERROR:#REF! | | | | | | | | | | |
| Work Category: | | | ERROR:#REF! | | | | Location: | ERROR:#REF! | | | | | |
| Work Classification: | | | ERROR:#REF! | | | | Sector: | ERROR:#REF! | | | | | |
| Work Subdivisions: | | | ERROR:#REF! | | | | GPS: | BEG | N: | | | | |
| W: | ERROR:#REF! | END | N: | | | | | | | | | | | |
| W: | ERROR:#REF! | | | | | | | | | | | | | |
| M&R Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Cerrudo Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Pricing Schedule | | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | | |
| Item | | | | | | | | UoM | | Qty | | Price | Total |
| Labor Sub Total | $ - 0 |
| Travel Labor | | |
| Travel Labor Sub Total | $ - 0 |
| Equipment | | |
| Equipment Sub Total | $ - 0 |
| Material | | |
| Material Sub Total | $ - 0 |
| Mobilization | | |
| | | Mobilization Sub Total | | | | $ - 0 |
| Other Costs | | | | | | | |
| | | | | | | $ - 0 |
| | | Other Costs Sub Total | | | | $ - 0 |
| | | | | | Grand Total: | $ - 0 |
| KBR Representative: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
| Subcontractor: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
&"Times New Roman,Bold"&22Daily Service Delivery Summary &G
&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 26
| Work Activity (WA) Number: | | ERROR:#REF! | Date(s): | ##/##/#### | REV: | 0 |
| WORK DESCRIPTION | | | | | | |
| TI Asset Description: | ERROR:#REF! | | | | | |
| Asset Objective(s): | | | ERROR:#REF! | | | | | | | | | | |
| Work Category: | | | ERROR:#REF! | | | | Location: | ERROR:#REF! | | | | | |
| Work Classification: | | | ERROR:#REF! | | | | Sector: | ERROR:#REF! | | | | | |
| Work Subdivisions: | | | ERROR:#REF! | | | | GPS: | BEG | N: | | | | |
| W: | ERROR:#REF! | END | N: | | | | | | | | | | | |
| W: | ERROR:#REF! | | | | | | | | | | | | | |
| M&R Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Cerrudo Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Pricing Schedule | | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | | |
| Item | | | | | | | | UoM | | Qty | | Price | Total |
| Labor Sub Total | $ - 0 |
| Travel Labor | | |
| Travel Labor Sub Total | $ - 0 |
| Equipment | | |
| Equipment Sub Total | $ - 0 |
| Material | | |
| Material Sub Total | $ - 0 |
| Mobilization | | |
| | | Mobilization Sub Total | | | | $ - 0 |
| Other Costs | | | | | | | |
| | | | | | | $ - 0 |
| | | Other Costs Sub Total | | | | $ - 0 |
| | | | | | Grand Total: | $ - 0 |
| KBR Representative: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
| Subcontractor: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
&"Times New Roman,Bold"&22Daily Service Delivery Summary &G
&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 27
| Work Activity (WA) Number: | | ERROR:#REF! | Date(s): | ##/##/#### | REV: | 0 |
| WORK DESCRIPTION | | | | | | |
| TI Asset Description: | ERROR:#REF! | | | | | |
| Asset Objective(s): | | | ERROR:#REF! | | | | | | | | | | |
| Work Category: | | | ERROR:#REF! | | | | Location: | ERROR:#REF! | | | | | |
| Work Classification: | | | ERROR:#REF! | | | | Sector: | ERROR:#REF! | | | | | |
| Work Subdivisions: | | | ERROR:#REF! | | | | GPS: | BEG | N: | | | | |
| W: | ERROR:#REF! | END | N: | | | | | | | | | | | |
| W: | ERROR:#REF! | | | | | | | | | | | | | |
| M&R Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Cerrudo Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Pricing Schedule | | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | | |
| Item | | | | | | | | UoM | | Qty | | Price | Total |
| Labor Sub Total | $ - 0 |
| Travel Labor | | |
| Travel Labor Sub Total | $ - 0 |
| Equipment | | |
| Equipment Sub Total | $ - 0 |
| Material | | |
| Material Sub Total | $ - 0 |
| Mobilization | | |
| | | Mobilization Sub Total | | | | $ - 0 |
| Other Costs | | | | | | | |
| | | | | | | $ - 0 |
| | | Other Costs Sub Total | | | | $ - 0 |
| | | | | | Grand Total: | $ - 0 |
| KBR Representative: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
| Subcontractor: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
&"Times New Roman,Bold"&22Daily Service Delivery Summary &G
&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 28
| Work Activity (WA) Number: | | ERROR:#REF! | Date(s): | ##/##/#### | REV: | 0 |
| WORK DESCRIPTION | | | | | | |
| TI Asset Description: | ERROR:#REF! | | | | | |
| Asset Objective(s): | | | ERROR:#REF! | | | | | | | | | | |
| Work Category: | | | ERROR:#REF! | | | | Location: | ERROR:#REF! | | | | | |
| Work Classification: | | | ERROR:#REF! | | | | Sector: | ERROR:#REF! | | | | | |
| Work Subdivisions: | | | ERROR:#REF! | | | | GPS: | BEG | N: | | | | |
| W: | ERROR:#REF! | END | N: | | | | | | | | | | | |
| W: | ERROR:#REF! | | | | | | | | | | | | | |
| M&R Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Cerrudo Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Pricing Schedule | | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | | |
| Item | | | | | | | | UoM | | Qty | | Price | Total |
| Labor Sub Total | $ - 0 |
| Travel Labor | | |
| Travel Labor Sub Total | $ - 0 |
| Equipment | | |
| Equipment Sub Total | $ - 0 |
| Material | | |
| Material Sub Total | $ - 0 |
| Mobilization | | |
| | | Mobilization Sub Total | | | | $ - 0 |
| Other Costs | | | | | | | |
| | | | | | | $ - 0 |
| | | Other Costs Sub Total | | | | $ - 0 |
| | | | | | Grand Total: | $ - 0 |
| KBR Representative: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
| Subcontractor: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
&"Times New Roman,Bold"&22Daily Service Delivery Summary &G
&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 29
| Work Activity (WA) Number: | | ERROR:#REF! | Date(s): | ##/##/#### | REV: | 0 |
| WORK DESCRIPTION | | | | | | |
| TI Asset Description: | ERROR:#REF! | | | | | |
| Asset Objective(s): | | | ERROR:#REF! | | | | | | | | | | |
| Work Category: | | | ERROR:#REF! | | | | Location: | ERROR:#REF! | | | | | |
| Work Classification: | | | ERROR:#REF! | | | | Sector: | ERROR:#REF! | | | | | |
| Work Subdivisions: | | | ERROR:#REF! | | | | GPS: | BEG | N: | | | | |
| W: | ERROR:#REF! | END | N: | | | | | | | | | | | |
| W: | ERROR:#REF! | | | | | | | | | | | | | |
| M&R Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Cerrudo Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Pricing Schedule | | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | | |
| Item | | | | | | | | UoM | | Qty | | Price | Total |
| Labor Sub Total | $ - 0 |
| Travel Labor | | |
| Travel Labor Sub Total | $ - 0 |
| Equipment | | |
| Equipment Sub Total | $ - 0 |
| Material | | |
| Material Sub Total | $ - 0 |
| Mobilization | | |
| | | Mobilization Sub Total | | | | $ - 0 |
| Other Costs | | | | | | | |
| | | | | | | $ - 0 |
| | | Other Costs Sub Total | | | | $ - 0 |
| | | | | | Grand Total: | $ - 0 |
| KBR Representative: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
| Subcontractor: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
&"Times New Roman,Bold"&22Daily Service Delivery Summary &G
&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 30
| Work Activity (WA) Number: | | ERROR:#REF! | Date(s): | ##/##/#### | REV: | 0 |
| WORK DESCRIPTION | | | | | | |
| TI Asset Description: | ERROR:#REF! | | | | | |
| Asset Objective(s): | | | ERROR:#REF! | | | | | | | | | | |
| Work Category: | | | ERROR:#REF! | | | | Location: | ERROR:#REF! | | | | | |
| Work Classification: | | | ERROR:#REF! | | | | Sector: | ERROR:#REF! | | | | | |
| Work Subdivisions: | | | ERROR:#REF! | | | | GPS: | BEG | N: | | | | |
| W: | ERROR:#REF! | END | N: | | | | | | | | | | | |
| W: | ERROR:#REF! | | | | | | | | | | | | | |
| M&R Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Cerrudo Lead Contact: | | | | Name: | ERROR:#REF! | Ph: | ERROR:#REF! | | | Email: | ERROR:#REF! | | |
| Pricing Schedule | | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | | |
| Item | | | | | | | | UoM | | Qty | | Price | Total |
| Labor Sub Total | $ - 0 |
| Travel Labor | | |
| Travel Labor Sub Total | $ - 0 |
| Equipment | | |
| Equipment Sub Total | $ - 0 |
| Material | | |
| Material Sub Total | $ - 0 |
| Mobilization | | |
| | | Mobilization Sub Total | | | | $ - 0 |
| Other Costs | | | | | | | |
| | | | | | | $ - 0 |
| | | Other Costs Sub Total | | | | $ - 0 |
| | | | | | Grand Total: | $ - 0 |
| KBR Representative: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
| Subcontractor: | | | Date: | | | |
| | Name, Signature | | | DD/MM/YYYY | | |
&"Times New Roman,Bold"&22Daily Service Delivery Summary &G
&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Mob-Demob
| EL CENTRO SECTOR | | | | | | | | | |
| MOBILIZATION / DEMOBILIZATION PER PIECE OF EQUIPMENT | | | | | | | | | |
| Zone | Start | | Reference | End | | Reference | Geo Reference | Distance (linear miles) | Station |
| 1 | 32.61871 | -116.10637 | Mon 231 | 32.62695 | -115.99706 | Mon 230 | ELS | 5.60 | El Centro |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
| 2 | 32.62695 | -115.99706 | Mon 230 | 32.63197 | -115.93282 | Mon 229 | ELS | 4.69 | El Centro |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
| 3 | 32.63197 | -115.93282 | Mon 229 | 32.63915 | -115.83916 | EXIT 6 | ELS | 5.44 | El Centro |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
| 4 | 32.63915 | -115.83916 | EXIT 6 | 32.64485 | -115.76439 | Mon 226 | EXIT 5 | 4.37 | El Centro |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
| 5 | 32.64485 | -115.76439 | Mon 226 | 32.64755 | -115.72875 | Mon 225 | EXIT 4 | 2.10 | El Centro |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
| 6 | 32.64755 | -115.72875 | Mon 225 | 32.65031 | -115.69208 | Mt Signal Rd | ELS | 2.14 | El Centro |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
| 7 | 32.65031 | -115.69208 | Mt Signal Rd | 32.65257 | -115.66208 | Westside main | ELS | 1.75 | El Centro |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
| 8 | 32.65257 | -115.66208 | Westside main | 32.65633 | -115.61197 | Woodbine Can | ELS | 2.95 | El Centro |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
| 9 | 32.65633 | -115.61197 | Woodbine Can | 32.65955 | -115.56855 | Weed Rd | ELS | 2.55 | El Centro |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
| 10 | 32.65955 | -115.56855 | Weed Rd | 32.6622 | -115.53177 | All American | ELS | 2.16 | El Centro |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
| 11 | 32.6622 | -115.53177 | All American | 32.66424 | -115.50539461 | MON 221 | CALEXICO | 1.55 | Calexico |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
| 12 | 32.66424 | -115.50539461 | MON 221 | 32.66486 | -115.49673 | MON 220A | CALEXICO | 0.51 | Calexico |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
| 13 | 32.66486 | -115.49673 | MON 220A | 32.66622 | -115.47838 | MON 220 | CALEXICO | 1.07 | Calexico |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
| 14 | 32.66622 | -115.47838 | MON 220 | 32.66963 | -115.43105 | MON 219 | CALEXICO | 2.78 | Calexico |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
| 15 | 32.66963 | -115.43105 | MON 219 | 32.67417 | -115.36780 | MON 218 | ALAMO RIVER | 3.71 | Calexico |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
| 16 | 32.67417 | -115.36780 | MON 218 | 32.68018 | -115.28269 | E. HIGHLINE | CALEXICO | 4.98 | Calexico |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
| 17 | 32.68018 | -115.28269 | E. HIGHLINE | 32.68466 | -115.21904 | MON 216 | DROP 4 | 3.72 | Calexico |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
| 18 | 32.68466 | -115.21904 | MON 216 | 32.69342 | -115.09323 | MON 214 | CALEXICO | 7.37 | Calexico |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
| 19 | 32.69342 | -115.09323 | MON 214 | 32.70330 | -114.94891 | MON 211 | DROP 1 | 8.47 | Calexico |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
| 20 | 32.70330 | -114.94891 | MON 211 | 32.70599 | -114.91007 | MON 210 | C1 Dunes | 2.27 | Calexico |
| Mobilization | | | | | | | | | |
| Demobilization | | | | | | | | | |
Labor
| El Centro Sector | | | | | | |
| Labor Itemized Pricing List | | | | | | |
| CLIN 1 Fences and Gates | | | | | Crew Composition | |
| Line Item | Description | UoM | Unit Rate | Trade | Qty |
| 1 | Routine Repair & Maintenance for | Daily work crew to perform routine maintenance and | Day | Welder | 1 |
| El Centro Sector | repairs per SOW | | Welder Helper | 1 |
| | (Routine work Performed during daylight hours, | | | |
| | based on 8 hour workday Mon-Fri) | | | |
| 2 | Urgent Repair & Maintenance for | Hourly work crew to perform urgent maintenance | Hour | Welder | 1 |
| El Centro Sector | and repairs per SOW | | Welder Helper | 1 |
| | (Urgent work performed during daylight hours, | | | |
| | based on 8 hour workday Mon-Fri) | | | |
| 3 | Urgent After-Hour Repair & | Hourly work crew to perform urgent maintenance | Hour | Welder | 1 |
| Maintenance for El Centro Sector | and repairs outside of the standard 8 hour M-F | | Welder Helper | 1 |
| | schedule, inclusive of nights, weekends and holidays | | | |
| CLIN 2 Roads and Bridges | | | | | Crew Composition | |
| Line Item | Description | UoM | Unit Rate | Trade | Qty |
| 1 | Routine Repair & Maintenance for | Daily work crew to perform routine maintenance and | Day | Equipment Operator | 2 |
| El Centro Sector | repairs per SOW | | Labor | 1 |
| | (Routine work Performed during daylight hours, | | | |
| | based on 8 hour workday Mon-Fri) | | | |
| 2 | Urgent Repair & Maintenance for | Hourly work crew to perform urgent maintenance | Hour | Equipment Operator | 2 |
| El Centro Sector | and repairs per SOW | | Labor | 1 |
| | (Urgent work performed during daylight hours, | | | |
| | based on 8 hour workday Mon-Fri) | | | |
| 3 | Urgent After-Hour Repair & | Hourly work crew to perform urgent maintenance | Hour | Equipment Operator | 2 |
| Maintenance for El Centro Sector | and repairs outside of the standard 8 hour M-F | | Labor | 1 |
| | schedule, inclusive of nights, weekends and holidays | | | |
| CLIN 3 Drainage and Grates | | | | | Crew Composition | |
| Line Item | Description | UoM | Unit Rate | Trade | Qty |
| 1 | Routine Repair & Maintenance for | Daily work crew to perform routine maintenance and | Day | Equipment Operator | 2 |
| El Centro Sector | repairs per SOW | | Labor | 1 |
| | (Routine work Performed during daylight hours, | | | |
| | based on 8 hour workday Mon-Fri) | | | |
| 2 | Urgent Repair & Maintenance for | Hourly work crew to perform urgent maintenance | Hour | Equipment Operator | 2 |
| El Centro Sector | and repairs per SOW | | Labor | 1 |
| | (Urgent work performed during daylight hours, | | | |
| | based on 8 hour workday Mon-Fri) | | | |
| 3 | Urgent After-Hour Repair & | Hourly work crew to perform urgent maintenance | Hour | Equipment Operator | 2 |
| Maintenance for El Centro Sector | and repairs outside of the standard 8 hour M-F | | Labor | 1 |
| | schedule, inclusive of nights, weekends and holidays | | | |
| CLIN 4 Lighting and Electrical | | | | | Crew Composition | |
| Line Item | Description | UoM | Unit Rate | Trade | Qty |
| 1 | Routine Repair & Maintenance for | Daily work crew to perform routine maintenance and | Day | Electrican Med Volt | 2 |
| El Centro Sector | repairs per SOW | | | |
| | (Routine work Performed during daylight hours, | | | |
| | based on 8 hour workday Mon-Fri) | | | |
| 2 | Urgent Repair & Maintenance for | Hourly work crew to perform urgent maintenance | Hour | Electrican Med Volt | 2 |
| El Centro Sector | and repairs per SOW | | | |
| | (Urgent work performed during daylight hours, | | | |
| | based on 8 hour workday Mon-Fri) | | | |
| 3 | Urgent After-Hour Repair & | Hourly work crew to perform urgent maintenance | Hour | Electrican Med Volt | 2 |
| Maintenance for El Centro Sector | and repairs outside of the standard 8 hour M-F | | | |
| | schedule, inclusive of nights, weekends and holidays | | | |
| CLIN 5 Vegetation Control and Debris Removal | | | | | Crew Composition | |
| Line Item | Description | UoM | Unit Rate | Trade | Qty |
| 1 | Routine Repair & Maintenance for | Daily work crew to perform routine maintenance and | Day | Equipment Operator | 1 |
| El Centro Sector | repairs per SOW | | Labor | 2 |
| | (Routine work Performed during daylight hours, | | | |
| | based on 8 hour workday Mon-Fri) | | | |
| 2 | Urgent Repair & Maintenance for | Hourly work crew to perform urgent maintenance | Hour | Equipment Operator | 1 |
| El Centro Sector | and repairs per SOW | | Labor | 2 |
| | (Urgent work performed during daylight hours, | | | |
| | based on 8 hour workday Mon-Fri) | | | |
| 3 | Urgent After-Hour Repair & | Hourly work crew to perform urgent maintenance | Hour | Equipment Operator | 1 |
| Maintenance for El Centro Sector | and repairs outside of the standard 8 hour M-F | | Labor | 2 |
| | schedule, inclusive of nights, weekends and holidays | | | |
| Additional Crew Members to Supplement Crew Composition | | | | | | |
| Line Item | Description | UoM | Unit Rate | UoM | Unit Rate |
| 1 | Laborer - California - Routine | Laborer rate in California | Hour | | Day | |
| 2 | Operator - California - Routine | Operator rate in California | Hour | | Day | |
| 3 | Truck Driver - California - Routine | Truck Driver rate in California | Hour | | Day | |
| 4 | Welder - California - Routine | Welder rate in California | Hour | | Day | |
| 5 | Laborer - California - Urgent | Urgent Laborer rate in California | Hour | | Day | |
| 6 | Operator - California - Urgent | Urgent Operator rate in California | Hour | | Day | |
| 7 | Truck Driver - California - Urgent | Urgent Truck Driver rate in California | Hour | | Day | |
| 8 | Welder - California - Urgent | Urgent Welder rate in California | Hour | | Day | |
| Over Time and or Travel Rates if Authorized | | | | |
| Line Item | Description | UoM | Unit Rate |
| 1 | CLIN 1 - Work Crew Overtime for | Over Time Rate Crew CLIN 1 | Hour | |
| Routine Work Activities | | | |
| 2 | CLIN 2 - Work Crew Overtime for | Over Time Rate Crew CLIN 2 | Hour | |
| Routine Work Activities | | | |
| 3 | CLIN 3 - Work Crew Overtime for | Over Time Rate Crew CLIN 3 | Hour | |
| Routine Work Activities | | | |
| 4 | CLIN 4 - Work Crew Overtime for | Over Time Rate Crew CLIN 4 | Hour | |
| Routine Work Activities | | | |
| 5 | CLIN 5 - Work Crew Overtime for | Over Time Rate Crew CLIN 5 | Hour | |
| Routine Work Activities | | | |
| 6 | Laborer - California (Overtime) | Routine Labor Over Time Rate in California | Hour | |
| 7 | Operator - California (Overtime) | Routine Operator Over Time Rate in California | Hour | |
| 8 | Truck Driver - California (Overtime) | Routine Truck Driver Over Time Rate in California | Hour | |
| 9 | Welder - California (Overtime) | Routine Welder Over Time Rate in California | Hour | |
| 10 | Laborer - California (Overtime) | Urgent Labor Over Time Rate in California | Hour | |
| 11 | Operator - California (Overtime) | Urgent Operator Over Time Rate in California | Hour | |
| 12 | Truck Driver - California (Overtime) | Urgent Truck Driver Over Time Rate in California | Hour | |
| 13 | Welder - California (Overtime) | Urgent Welder Over Time Rate in California | Hour | |
| CLIN 5 Pest Control and Dead Animal Carcus Removal | | | | |
| Line Item | Description | UoM | Unit Rate |
| 1 | Routine Services Associated with the | Perform routine services associated with the | Hour | |
| Disposal of Dead Animals | disposal of dead animals per the SOW | | |
| | (Routine work Performed during daylight hours, | | |
| | based on 8 hour workday Mon-Fri) | | |
| 2 | Routine Services Associated with the | Perform routine services associated with the | Day |
| Disposal of Dead Animals | disposal of dead animals per the SOW | |
| | (Routine work Performed during daylight hours, | |
| | based on 8 hour workday Mon-Fri) | |
| 3 | Urgent Services Associated with the | Perform urgent services associated with the | Hour |
| Disposal of Dead Animals | disposal of dead animals per SOW | |
| | (Urgent work performed during daylight hours, | |
| | based on 8 hour workday Mon-Fri) | |
| 4 | Urgent After-Hour Services | Perform urgent services associated with the | Hour |
| Associated with the Disposal of Dead | disposal of dead animals per SOW outside of the | |
| Animals | standard 8 hour M-F schedule, inclusive of nights, | |
| | weekends and holidays | |
| 5 | Routine Services Associated with the | Perform routine services associated with the | Hour |
| Removal of Active Bee Hives | removal of active bee hives per the SOW | |
| | (Routine work Performed during daylight hours, | |
| | based on 8 hour workday Mon-Fri) | |
| 6 | Routine Services Associated with the | Perform routine services associated with the | Day |
| Removal of Active Bee Hives | removal of active bee hives per the SOW | |
| | (Routine work Performed during daylight hours, | |
| | based on 8 hour workday Mon-Fri) | |
| 7 | Urgent Services Associated with the | Perform urgent services associated with the removal | Hour |
| Removal of Active Bee Hives | of active bee hives per SOW | |
| | (Urgent work performed during daylight hours, | |
| | based on 8 hour workday Mon-Fri) | |
| 8 | Urgent After-Hour Services | Perform urgent services associated with the removal | Hour |
| Associated with the Removal of | of active bee hives per SOW outside of the standard | |
| Active Bee Hives | 8 hour M-F schedule, inclusive of nights, weekends | |
| | and holidays | |
| 9 | Routine Services Associated with the | Perform routine services associated with the repair | Hour |
| Repair of Animal Burrows | of animal burrows per the SOW | |
| | (Routine work Performed during daylight hours, | |
| | based on 8 hour workday Mon-Fri) | |
| 10 | Routine Services Associated with the | Perform routine services associated with the repair | Day |
| Repair of Animal Burrows | of animal burrows per the SOW | |
| | (Routine work Performed during daylight hours, | |
| | based on 8 hour workday Mon-Fri) | |
| 11 | Urgent Services Associated with the | Perform urgent services associated with the repair | Hour |
| Repair of Animal Burrows | of animal burrows per SOW | |
| | (Urgent work performed during daylight hours, | |
| | based on 8 hour workday Mon-Fri) | |
| 12 | Urgent After-Hour Services | Perform urgent services associated with the repair | Hour |
| Associated with the Repair of Animal | of animal burrows per SOW outside of the standard | |
| Burrows | 8 hour M-F schedule, inclusive of nights, weekends | |
| | and holidays | |
Materials
| Materials Itemized Pricing List | | | | | |
| ALL CLIN's - Materials | | | | | |
| Materials | Description | UoM | Use | Unit Price | Comment |
| Materials | BARRIER | EA | Barrier |
| Materials | Guardrail Terminal | EA | Barrier |
| Materials | Jersey Barrier | EA | Barrier |
| Materials | Pre Cast Concrete Lego Style Block (2' x 2' x 6') | EA | Barrier |
| Materials | Sheet Pile Corrugated Stock (W 18"-48" L 15'-30') | Sq. FT | Barrier |
| Materials | Sheet Pile Flat Stock (W 18"-48" L 15'-30') | Sq. FT | Barrier |
| Materials | DRAINAGE | | Draiange |
| Materials | Apron Endwalls for Corrugated Pipe Steel 12" Pipe | EA | Drainage |
| Materials | Apron Endwalls for Corrugated Pipe Steel 15" Pipe | EA | Drainage |
| Materials | Apron Endwalls for Corrugated Pipe Steel 18" Pipe | EA | Drainage |
| Materials | Apron Endwalls for Corrugated Pipe Steel 21" Pipe | EA | Drainage |
| Materials | Apron Endwalls for Corrugated Pipe Steel 24" Pipe | EA | Drainage |
| Materials | Apron Endwalls for Corrugated Pipe Steel 30" Pipe | EA | Drainage |
| Materials | Apron Endwalls for Corrugated Pipe Steel 36" Pipe | EA | Drainage |
| Materials | Apron Endwalls for Corrugated Pipe Steel 42" Pipe | EA | Drainage |
| Materials | Apron Endwalls for Corrugated Pipe Steel 48" Pipe | EA | Drainage |
| Materials | Culvert Pipe Corrugated Steel 10" dia | LF | Drainage |
| Materials | Culvert Pipe Corrugated Steel 12" dia | LF | Drainage |
| Materials | Culvert Pipe Corrugated Steel 15" dia | LF | Drainage |
| Materials | Culvert Pipe Corrugated Steel 18" dia | LF | Drainage |
| Materials | Culvert Pipe Corrugated Steel 21" dia | LF | Drainage |
| Materials | Culvert Pipe Corrugated Steel 24" dia | LF | Drainage |
| Materials | Culvert Pipe Corrugated Steel 30" dia | LF | Drainage |
| Materials | Culvert Pipe Corrugated Steel 36" dia | LF | Drainage |
| Materials | Culvert Pipe Corrugated Steel 42" dia | LF | Drainage |
| Materials | Culvert Pipe Corrugated Steel 48" dia | LF | Drainage |
| Materials | ELECTRICAL | | Electrical |
| Materials | 200 amp Load Break Elbow | EA | Electrical - COMPONENT |
| Materials | 3P 200amp 600V Circuit Breaker | EA | Electrical - COMPONENT |
| Materials | Switch, 2P 20A 120/277 Comm. Ground | EA | Electrical - COMPONENT |
| Materials | Capacitor, 480 Volt | EA | Electrical - COMPONENT |
| Materials | Fuse, 600 Volt | EA | Electrical - COMPONENT |
| Materials | Fuse, Cutout Type XS w/ hardware | EA | Electrical - COMPONENT |
| Materials | Hubbell CS6365C CA STD Plug, 50 Amp | EA | Electrical - COMPONENT |
| Materials | Hubbell CS6369 #2 Large Receptacle | EA | Electrical - COMPONENT |
| Materials | Transformer Primary 13,200 volts, Secondary 240 Volts | EA | Electrical - COMPONENT |
| Materials | Transformer Primary 7,200 volts, Secondary 240 Volts | EA | Electrical - COMPONENT |
| Materials | 2" Rigid Radius Sweep | EA | Electrical - CONDUIT |
| Materials | 2" Schedule 40 PVC Electrical | FT | Electrical - CONDUIT |
| Materials | Electrical Box Cover, 2G | EA | Electrical - CONDUIT |
| Materials | Electrical Box Cover, MX1050S Flat/Waterproof | EA | Electrical - CONDUIT |
| Materials | Electrical Box, 2G Deep, DD5100XS | EA | Electrical - CONDUIT |
| Materials | Electrical Box Cover, MX1050S Flat/Waterproof | EA | Electrical - CONDUIT |
| Materials | 100W LED Electronic Driver, Optotronic OT100W/UNV/1250C/2DIM/P6 | EA | Electrical - LIGHTS |
| Materials | 150W LED Electronic Driver, XITANIUM 1.05A, 0-10V Dimming (XH150C105V140CNF1) | EA | Electrical - LIGHTS |
| Materials | 180W LED Electronic Driver, Optotronic OT180W/UNV1250C/2DIM/P6 | EA | Electrical - LIGHTS |
| Materials | Ballast 240 Volts | EA | Electrical - LIGHTS |
| Materials | Bulb high pressure sodium lamps 1000-watt | EA | Electrical - LIGHTS |
| Materials | Bulb metal halide lamps 1000-watt | EA | Electrical - LIGHTS |
| Materials | Bulb, 36881 HPS Lamp | EA | Electrical - LIGHTS |
| Materials | High Pressure Sodium Ballast Kit, 1000W | EA | Electrical - LIGHTS |
| Materials | LED Failsafe Light | EA | Electrical - LIGHTS |
| Materials | Fixture-Galleon 6-Bar LED SL2 Optics,45d Ambient | EA | Electrical - LIGHTS |
| Materials | Fixture-Galleon 6-Bar LED T2 Optics,45d Ambient | EA | Electrical - LIGHTS |
| Materials | Fixture-Galleon 10-Bar LED 5WQ Optics,45d Ambient | EA | Electrical - LIGHTS |
| Materials | Fixture-Galleon 10-Bar LED T4W Optics,45d Ambient | EA | Electrical - LIGHTS |
| Materials | Fixture-Galleon 10-Bar LED T4W Optics,90d Ambient Rotated Right | EA | Electrical - LIGHTS |
| Materials | Fixture-Galleon 10-Bar LED T4W Optics,90d Ambient Rotated Left | EA | Electrical - LIGHTS |
| Materials | Fixture-Galleon 8-Bar LED T2 Optics,45d Ambient | EA | Electrical - LIGHTS |
| Materials | Fixture-Galleon 8-Bar LED T2 Optics,90d Ambient Rotated Right | EA | Electrical - LIGHTS |
| Materials | Fixture-Galleon 8-Bar LED T2 Optics,90d Ambient Rotated Left | EA | Electrical - LIGHTS |
| Materials | Bridge Light Fixture Line 2.0, Symmetric, 72” V2 High Output,3000K | EA | Electrical - LIGHTS |
| Materials | 100W Driver for Line 2.0 Symmetric (special 480V) | EA | Electrical - LIGHTS |
| Materials | Filter | EA | Electrical - LIGHTS |
| Materials | Thermostat | EA | Electrical - LIGHTS |
| Materials | Fan | EA | Electrical - LIGHTS |
| Materials | LED Fixture, Galleon 8-Bar LED (GLEON-AE-08-LED-E1-AFL-HSS-ADJS ) | EA | Electrical - LIGHTS |
| Materials | LED Fixture, Galleon 8-Bar LED T4 (GLEON-AF-08-T4FT-ADJS) | EA | Electrical - LIGHTS |
| Materials | LED Replacement Square, Cooper Lighting (CLP0010305G01) 57W Max | EA | Electrical - LIGHTS |
| Materials | LED Stadium Lighting Fixture, Ephesus 1000W 240-480VAC (SD-1000-2-56-BLK-NC) | EA | Electrical - LIGHTS |
| Materials | Light Fixture GE PFlS07SOMHlDB | EA | Electrical - LIGHTS |
| Materials | Light Pole, Round Tapered Steel Heavy Duty 45' Mounting Height | EA | Electrical - LIGHTS |
| Materials | Light Pole, Round Tapered Steel Heavy Duty 60' Mounting Height | EA | Electrical - LIGHTS |
| Materials | Lights Quarts 74 Watts | EA | Electrical - LIGHTS |
| Materials | Luminary photo cell Intermatic K4321 | EA | Electrical - LIGHTS |
| Materials | Photocell Control Relay | EA | Electrical - LIGHTS |
| Materials | Sport light Fixture Hubbell SL51000S-158 | EA | Electrical - LIGHTS |
| Materials | Steel/Aluminum Power Pole 60FT | EA | Electrical - LIGHTS |
| Materials | T-5 Fluorescent Light Bulb | EA | Electrical - LIGHTS |
| Materials | T-8 Fluorescent Bulbs | EA | Electrical - LIGHTS |
| Materials | Waterproof Fluorescent Light Fixtures | EA | Electrical - LIGHTS |
| Materials | Electrical Burial Warning Tape | R | Electrical - MARKER |
| Materials | Label, Warning Arc Flash, NFPA 70 E | EA | Electrical - MARKER |
| Materials | .75" Copper Clad Steel Grounding Rod 10' L | EA | Electrical - WIRE |
| Materials | #6 Bare Solid Copper Wire Ground | 25 FT | Electrical - WIRE |
| Materials | 1/0 Copper, 15kV THWN or XHHW | FT | Electrical - WIRE |
| Materials | Copper Ground Wire 8 ga. | 25 FT | Electrical - WIRE |
| Materials | Electrical Cord 6/4, SEOW 600V | FT | Electrical - WIRE |
| Materials | Wire Electrical 12 AWG various colors | 50 LF | Electrical - WIRE |
| Materials | EROSION CONTROL | | Erosion |
| Materials | Filter Fabric Synthetic | Sq. YD | Erosion |
| Materials | Straw Waddle Fiber Roll 8" x 25' | EA | Erosion |
| Materials | FENCING | | Fence |
| Materials | 6' Steel T Post | EA | Fence - Barbed Wire |
| Materials | Barbed Wire | FT | Fence - Barbed Wire |
| Materials | .375" Dia Galvanized Truss Rod | EA | Fence - Chainlink |
| Materials | 1.375" Dia Aluminum Rail End | EA | Fence - Chainlink |
| Materials | 1.375" Dia Dome Caps | EA | Fence - Chainlink |
| Materials | 1.375" Dia Galvanized Single Brace Bands | EA | Fence - Chainlink |
| Materials | 1.375" Dia Galvanized Tension Bands | EA | Fence - Chainlink |
| Materials | 1.375" Dia Galvanized Top/Bottom Rail Tubing Schedule 80, | EA | Fence - Chainlink |
| Materials | 2.875" Dia Dome Caps | EA | Fence - Chainlink |
| Materials | 2.875" Dia Galvanized Brace Rail Tubing Schedule 80, | EA | Fence - Chainlink |
| Materials | 2.875" Dia Galvanized Line Post Tubing Schedule 80, for 10' Mesh Fence | EA | Fence - Chainlink |
| Materials | 2.875" Dia Galvanized Line Post Tubing Schedule 80, for 6' Mesh Fence | EA | Fence - Chainlink |
| Materials | 2.875" Dia Galvanized Line Post Tubing Schedule 80, for 8' Mesh Fence | EA | Fence - Chainlink |
| Materials | 2.875" Dia Galvanized Single Brace Bands | EA | Fence - Chainlink |
| Materials | 2.875" Dia Galvanized Tension Bands | EA | Fence - Chainlink |
| Materials | 2" Diamond Chain Link Fence Fabric 9 ga. 10' H, (50' roll) Galvanized, Zinc or Alum coating? | FT | Fence - Chainlink |
| Materials | 2" Diamond Chain Link Fence Fabric 9 ga. 6' H, (50' roll) Galvanized, Zinc or Alum coating? | FT | Fence - Chainlink |
| Materials | 2" Diamond Chain Link Fence Fabric 9 ga. 8' H, (50' roll) Galvanized, Zinc or Alum coating? | FT | Fence - Chainlink |
| Materials | 3" Diam Sched 40 Steel Pipe, L= 2.25", w/ .5" Wide Slot | EA | Fence - Chainlink |
| Materials | 3" Schedule 40 Stainless Steel Pipe, L=2.25", w/ 0.5" Wide Slot | EA | Fence - Chainlink |
| Materials | 4.0" Dia Dome Caps | EA | Fence - Chainlink |
| Materials | 4.0" Dia Galvanized Line Post/ Corner/ End/ Pull Tubing Schedule 80, | EA | Fence - Chainlink |
| Materials | 4.0" Dia Galvanized Line Post/ Corner/ End/ Pull Tubing Schedule 80, | EA | Fence - Chainlink |
| Materials | 4.0" Dia Galvanized Single Brace Bands | EA | Fence - Chainlink |
| Materials | 4.0" Dia Galvanized Tension Bands | EA | Fence - Chainlink |
| Materials | Barbed Wire Arms Three Stand 45 Deg Galvanized | EA | Fence - Chainlink |
| Materials | Barbed Wire Arms V Shaped Six Stand 45 Deg Galvanized | EA | Fence - Chainlink |
| Materials | Bolt 1/4 x 2 1/2 | EA | Fence - Chainlink |
| Materials | Chain link custom swing gate, 16’Hx21’W | EA | Fence - Chainlink |
| Materials | Nut 1/4 in | EA | Fence - Chainlink |
| Materials | Tension Bar Galvanized .187" x .75" x 10' | EA | Fence - Chainlink |
| Materials | Tension Wire 12 ga. | FT | Fence - Chainlink |
| Materials | Truss Rod Tightner Hardware | EA | Fence - Chainlink |
| Materials | Washer 3/4 in Dia x 1/4 center | EA | Fence - Chainlink |
| Materials | 7 1/2 in Stainless Steel Hasp | EA | Fence - Hardware |
| Materials | Bollard Sleeve Temporary Repair (Yellow) | EA | Fence - Hardware |
| Materials | Bollard Sleeve Temporary Repair Storage Box | EA | Fence - Hardware |
| Materials | Concertina Wire | FT | Fence - Hardware |
| Materials | King Kong Barrel Hinges | EA | Fence - Hardware |
| Materials | Puck Lock | EA | Fence - Hardware |
| Materials | Razor Wire, 36" Daimeter SS/Steel Core | RL | Fence - Hardware |
| Materials | Rectangular Laminated Rubber Dock Bumper (6"H x 38"W x 4.5"D) | EA | Fence - Hardware |
| Materials | Steel Wire Tie 9 ga. | EA | Fence - Hardware |
| Materials | Wheel Roller, Cast Iron 4" Diam, 1-1/2" Tread Width, 600lb Capacity (CA0410110) | EA | Fence - Hardware |
| Materials | 11 Gage Top of Bollard Cap Plates | EA | Fence - Steel |
| Materials | 11 Gage Top of Gate Post Cap Plates | EA | Fence - Steel |
| Materials | Anchor Plate Assembly (12"x12"x1/2") | EA | Fence - Steel |
| Materials | Angle Iron 4.5" x 6" x .25" thickness, unequal legs, ASTM A36 | FT | Fence - Steel |
| Materials | Angle Iron 4" x 4" x .25" thickness, equal legs, ASTM A36 | FT | Fence - Steel |
| Materials | Bar Steel 1.5" x 3" Solid, ASTM A36 | FT | Fence - Steel |
| Materials | Bar Steel 1"x1" Solid, Steel Picket | FT | Fence - Steel |
| Materials | HP 12 x 53, ASTM572 Grade 50 | FT | Fence - Steel |
| Materials | HSS .25" Round Bar Solid, ASTM A36 | FT | Fence - Steel |
| Materials | HSS 1.5" Round Bar Solid, ASTM A36 | FT | Fence - Steel |
| Materials | HSS 1" x 1" Square Bar Solid, ASTM A36 | FT | Fence - Steel |
| Materials | HSS 12" x 12"x .25", ASTM A500, Grade B | FT | Fence - Steel |
| Materials | HSS 2" x 2" x .187" Steel Bollard, ASTM A500, Grade B | FT | Fence - Steel |
| Materials | HSS 2" x 4" x .187" Steel, A500, Grade B | FT | Fence - Steel |
| Materials | HSS 4" x 4" x .187" Steel Bollard, ASTM A500, Grade B | FT | Fence - Steel |
| Materials | HSS 6" x 6" x .187" Steel Bollard, ASTM A500, Grade B | FT | Fence - Steel |
| Materials | HSS 6" x 6" x .25" Steel Bollard, ASTM A500, Grade B | FT | Fence - Steel |
| Materials | HSS 6x6x1/2” Steel Bollard, ASTM A500, Grade B | FT | Fence - Steel |
| Materials | HSS 7" x 7" x .25" Steel Bollard, ASTM A500, Grade B | FT | Fence - Steel |
| Materials | HSS 7" x 7" x .25" Steel Rail Sleeve, ASTM A500, Grade B | FT | Fence - Steel |
| Materials | HSS 9" x 3" x .187" Member Framing, ASTM A500 | FT | Fence - Steel |
| Materials | HSS Steel Bar .5" x 4", ASTM A36 | EA | Fence - Steel |
| Materials | Mesh Welded Wire 2" x 2", 6 ga | Sq. FT | Fence - Steel |
| Materials | Mesh Welded Wire 3" x .5", 6 ga | Sq. FT | Fence - Steel |
| Materials | Plate Steel 5' x 6'-4" 11 Gage Steel Sheathing | EA | Fence - Steel |
| Materials | Angle Iron, 1"x1"x0.125", Equal Legs | FT | Fence - Steel |
| Materials | Plate Steel 6"x8.5", 11 Gage Steel | EA | Fence - Steel |
| Materials | Plate Steel .187" thickness, ASTM A36 | Sq. FT | Fence - Steel |
| Materials | Razor Wire, Galvanized | RL | Fence - Steel |
| Materials | Plate Steel .5" thickness x 4" wide , ASTM A36 | FT | Fence - Steel |
| Materials | Plate Steel .5" thickness x 6" wide , ASTM A36 | FT | Fence - Steel |
| Materials | Plate Steel 10" x 12" x 1" thickness, ASTM A36 | EA | Fence - Steel |
| Materials | Plate Steel 11.75" x 16.5" Bollard Cap 45 Deg, 11 ga | EA | Fence - Steel |
| Materials | Plate Steel 4" x .5" thickness, ASTM A36 | FT | Fence - Steel |
| Materials | Plate Steel 4" x 4" x .187" thickness, ASTM A36 | EA | Fence - Steel |
| Materials | Plate Steel 6" x 3" x .187" thickness, ASTM A36 | EA | Fence - Steel |
| Materials | Plate Steel 6" x 6" x .187" thickness, ASTM A36 | EA | Fence - Steel |
| Materials | Plate Steel 6" x 8.5" Bollard Cap 45 Deg, 11 ga | EA | Fence - Steel |
| Materials | Plate Steel 6" x 8.5" Bollard Cap 45 Deg, 11 ga | EA | Fence - Steel |
| Materials | Plate Steel 8.5" x 1' Bollard Cap 45 Deg, w/ bollard rotated 45 Deg, 11 ga | EA | Fence - Steel |
| Materials | Plate Steel 8.5" x 1' Bollard Cap 45 Deg, w/ bollard rotated 45 Deg, 11 ga | EA | Fence - Steel |
| Materials | Plate Steel 8" x 9" x .187" thickness, ASTM A36 | EA | Fence - Steel |
| Materials | Plate Steel 9" x 3" x .187" thickness, ASTM A36 | EA | Fence - Steel |
| Materials | Plate Steel, 0.5" Thick x 1.5" Wide, Stainless Steel | FT | Fence - Steel |
| Materials | Plate Steel, 4'x8'x1/4" | EA | Fence - Steel |
| Materials | Stamped Bollard Cap, 11 Ga Steel | EA | Fence - Steel |
| Materials | Stamped Bollard Cap, 11 Gage Steel | EA | Fence - Steel |
| Materials | Steel Bar Solid 1" Dia x 7-5/16", ASTM A36 | EA | Fence - Steel |
| Materials | Steel Sheathing 5' x 8' , 11 ga | EA | Fence - Steel |
| Materials | Steel Sheathing 5' x 8' , 11 ga | EA | Fence - Steel |
| Materials | W 6 x 15 Wide Flange Beam ASTM A36 | FT | Fence - Steel |
| Materials | W 6 x 25 Wide Flange Beam ASTM A36 | FT | Fence - Steel |
| Materials | W 6 x 9 Wide Flange Beam ASTM A36 | FT | Fence - Steel |
| Materials | GATES | | Gate |
| Materials | DookKing Chain Tray Kit, 10FT Section for Slide Gate (2601-270) | EA | Gate |
| Materials | DoorKing Slide Gate Operator Unit 9570-382, 7.5HP | EA | Gate |
| Materials | DoorKing Slide Gate Operator Unit 9575 | EA | Gate |
| Materials | Gate Remote Clickers (Multi Code made by Linear) | EA | Gate |
| Materials | Hy Security Gate Opener 8" Drive Wheels | EA | Gate |
| Materials | Hy Security Gate Opener Batteries | EA | Gate |
| Materials | HY Security Gate Opener Battery Charger | EA | Gate |
| Materials | Hy Security Gate Opener Guide Wheels | EA | Gate |
| Materials | HY Security Gate Opener Limit Switches | EA | Gate |
| Materials | HY Security Gate Opener Power Supply | EA | Gate |
| Materials | HY Security Gate Opener Receivers | EA | Gate |
| Materials | Hy Security Operator- Model Slide Driver 200 UPS | EA | Gate |
| Materials | HySecurity Operator - HydraSwing 80F Linear Actuator (8,000LB) | EA | Gate |
| Materials | MISCELLANEOUS HARDWARE | | Hardware |
| Materials | Chain Hoist, Electric 2 Ton, 8 Ft/Min | EA | Hardware |
| Materials | 1.5 Ton Chan Hoist | EA | Hardware |
| Materials | Hardened Chain | FT | Hardware |
| Materials | Chain ½” Stainless Steel 3 Ton | EA | Hardware |
| Materials | Columbus McKinnon Level Hoist 3 Ton | EA | Hardware |
| Materials | Combination Pad Lock | EA | Hardware |
| Materials | HAS-R ½” x 6 ½” SS 316 Anchor Bolts | EA | Hardware |
| Materials | HY200 Dispenser | EA | Hardware |
| Materials | HY200-R Epoxy | EA | Hardware |
| Materials | Shackle 2 Ton | EA | Hardware |
| Materials | U-Bolt, ¼” | EA | Hardware |
| Materials | U-Bolt, ½” | EA | Hardware |
| Materials | 3/8" Drive Torx Socket | EA | Hardware |
| Materials | 3/8" Drive, Ratchet | EA | Hardware |
| Materials | Welding Rod, 7018 MR, 5/32", 14" L - 10 lbs. | BX | Fence |
| Materials | IMPORTED AGGREGATES | | Import Aggregates |
| Materials | Certified weed free base rock 3/8" - JACUMBA | Ton | Import Aggregates |
| Materials | Certified weed free base rock 3/8" - LA MEDIA | Ton | Import Aggregates |
| Materials | Certified weed free base rock 3/8" - WHISKEY-8 | Ton | Import Aggregates |
| Materials | Certified weed free base rock 3/4" - JACUMBA | Ton | Import Aggregates |
| Materials | Certified weed free base rock 3/4" - LA MEDIA | Ton | Import Aggregates |
| Materials | Certified weed free base rock 3/4" - WHISKEY-8 | Ton | Import Aggregates |
| Materials | Certified weed free base rock - GORDON WELLS - INTERSTATE 8 | Ton | Import Aggregates |
| Materials | Certified weed free base rock - CALEXICO ENTRY | Ton | Import Aggregates |
| Materials | Certified weed free base rock - MOUHJT SIGNAL & HWY 98 | Ton | Import Aggregates |
| Materials | Certified weed free base rock - OCOTILLO | Ton | Import Aggregates |
| Materials | Certified weed free base rock - INKOPAH | Ton | Import Aggregates |
| Materials | Class II Base (Weed Free) - JACUMBA | Ton | Import Aggregates |
| Materials | Class II Base (Weed Free) - LA MEDIA | Ton | Import Aggregates |
| Materials | Class II Base (Weed Free) - WHISKEY - 8 | Ton | Import Aggregates |
| Materials | Class II Base (Weed Free) - GORDON WELLS - INTERSTATE 8 | Ton | Import Aggregates |
| Materials | Class II Base (Weed Free) - CALEXICO ENTRY | Ton | Import Aggregates |
| Materials | Class II Base (Weed Free) - MOUNT SIGNAL & HWY 98 | Ton | Import Aggregates |
| Materials | Class II Base (Weed Free) -- OCOTILLO | Ton | Import Aggregates |
| Materials | Class II Base (Weed Free) - INKOPAH | Ton | Import Aggregates |
| Materials | Class II Road Base - GORDON WELLS - INTERSTATE 8 | Ton | Import Aggregates |
| Materials | Class II Road Base - CALEXICO ENTRY | Ton | Import Aggregates |
| Materials | Class II Road Base - MOUNT SIGNAL & HWY 98 | Ton | Import Aggregates |
| Materials | Class II Road Base - OCOTILLO | Ton | Import Aggregates |
| Materials | Class II Road Base - INKOPAH | Ton | Import Aggregates |
| Materials | Crusher Fines - LA MEDIA | Ton | Import Aggregates |
| Materials | Crusher Fines - JACUMBA TRUCK STOP & I-8 | Ton | Import Aggregates |
| Materials | Crusher Fines - WHISKEY-8 & BORDER | Ton | Import Aggregates |
| Materials | Crusher Fines - GORDON WELLS - INTERSTATE 8 | Ton | Import Aggregates |
| Materials | Crusher Fines - CALEXICO ENTRY | Ton | Import Aggregates |
| Materials | Crusher Fines - MOUNT SIGNAL & HWY 98 | Ton | Import Aggregates |
| Materials | Crusher Fines - OCOTILLO | Ton | Import Aggregates |
| Materials | Crusher Fines - INKOPAH | Ton | Import Aggregates |
| Materials | Gravel Crushed 3/4" - WHISKEY - 8 | Ton | Import Aggregates |
| Materials | Gravel Crushed 3/4" - OTAY MESA | Ton | Import Aggregates |
| Materials | Gravel Crushed 3/4" - JACUMBA | Ton | Import Aggregates |
| Materials | Gravel Crushed 3/4" - GORDON WELLS - INTERSTATE 8 | Ton | Import Aggregates |
| Materials | Gravel Crushed 3/4" - CALEXICO ENTRY | Ton | Import Aggregates |
| Materials | Gravel Crushed 3/4" - MOUNT SIGNAL & HWY 98 | Ton | Import Aggregates |
| Materials | Gravel Crushed 3/4" - OCOTILLO | Ton | Import Aggregates |
| Materials | Gravel Crushed 3/4" - INKOPAH | Ton | Import Aggregates |
| Materials | Gravel Pea 3/8" - WHISKEY - 8 | Ton | Import Aggregates |
| Materials | Gravel Pea 3/8" - OTAY MESA | Ton | Import Aggregates |
| Materials | Gravel Pea 3/8" - JACUMBA | Ton | Import Aggregates |
| Materials | Gravel Pea 3/8" - GORDON WELLS - INTERSTATE 8 | Ton | Import Aggregates |
| Materials | Gravel Pea 3/8" - CALEXICO ENTRY | Ton | Import Aggregates |
| Materials | Gravel Pea 3/8" - MOUNT SIGNAL & HWY 98 | Ton | Import Aggregates |
| Materials | Gravel Pea 3/8" - OCOTILLO | Ton | Import Aggregates |
| Materials | Gravel Pea 3/8" - INKOPAH | Ton | Import Aggregates |
| Materials | Riprap 12"- 24" average 18" - San Diego | Ton | Import Aggregates |
| Materials | Riprap 18"- 30" average 24" - San Diego | Ton | Import Aggregates |
| Materials | Riprap 4"- 12" average 6" - San Diego | Ton | Import Aggregates |
| Materials | Riprap 6"- 18" average 12" - San Diego | Ton | Import Aggregates |
| Materials | Riprap 4"- 12" average 6" - El Centro | Ton | Import Aggregates |
| Materials | Riprap 6"- 18" average 12" - El Centro | Ton | Import Aggregates |
| Materials | Riprap 12"- 24" average 18" - El Centro | Ton | Import Aggregates |
| Materials | Riprap 18"- 30" average 24" - El centro | Ton | Import Aggregates |
| Materials | PAINTING AND MARKING | | Marking |
| Materials | Spray Paint, 12 oz. can | EA | Marking |
| Materials | Stencil Set, Metal 6" | EA | Marking |
| Materials | | | |
| Materials | PLUMBING | | Plumbing |
| Materials | 3" Ball Valve | EA | Plumbing |
| Materials | 3" Black Pipe, Threaded | FT | Plumbing |
| Materials | 3" Close Nipple | EA | Plumbing |
| Materials | 8" Flange Kit | EA | Plumbing |
| Materials | 8" Gate Valve, Flanged | EA | Plumbing |
| Materials | READYMIX PRODUCTS / CONCRETE | | |
| Materials | Cast-In-Place Concrete, f'c = 3000 psi | | |
| Grout, f'c = 3,000 psi | Cu. FT | Readymix | | |
| Materials | Quickrete concrete mix | Bag | |
| Materials | Cast in Place Concrete, f'c = 3000 psi | Cu. YD | Readymix |
| Materials | Grout, f'c = 3,000 psi - WHISKEY - 8 | Cu. YD | Readymix |
| Materials | Grout, f'c = 3,000 psi - OTAY MESA | Cu. YD | Readymix |
| Materials | Grout, f'c = 3,000 psi - JACUMBA | Cu. YD | Readymix |
| Materials | 2 sack Concrete Slurry | Cu. YD | Readymix |
| Materials | Concrete Mix 90 lbs. High Strength | Bag | Readymix |
| Materials | #4 Carbon Steel Grating, 2'x4' Panel | EA | Steel |
| Materials | Concrete Form 18” Diameter | FT | CONC - Form |
| Materials | Geocell Cellular Confinement (15'x35') | EA | CONC - Form |
| Materials | #4 Reinforcing Bar, ASTM A615 Grade 60 | FT | CONC - REINFORCING |
| Materials | #4 Reinforcing Bar, ASTM A615 Grade 60 | FT | CONC - REINFORCING |
| Materials | #5 Reinforcing Bar, ASTM A615 Grade 60 | FT | CONC - REINFORCING |
| Materials | #5 Reinforcing Bar, ASTM A615 Grade 60 | FT | CONC - REINFORCING |
| Materials | #6 Reinforcing Bar, ASTM A615 Grade 60 | FT | CONC - REINFORCING |
| Materials | #6 Reinforcing Bar, ASTM A615 Grade 60 | FT | CONC - REINFORCING |
| Materials | SOIL BINDER | | Vegetation |
| Materials | Lignin Sulfonate | Ton | Soil Binder |
| Materials | SoilTac ( San Diego) | TOTE | Soil Binder |
| Materials | Pennz Suppress | TOTE | Soil Binder |
| Materials | Envirotac (El Centro) | TOTE | Soil Binder |
| Materials | VEGETATION | | Vegetation |
| Materials | Glyphosate Weed Preventer (2.5 Gallon) | EA | Vegetation |
| Materials | WATER | | Vegetation |
| Materials | Water | Gal | Misc |
Equipment
| El Centro Sector | | | | | | |
| Equipment Itemized Pricing List | | | | | | |
| ALL CLIN's - Equipment | | | | | | |
| No: | Equipment | Description | Use | Rate per hour | Rate per Day | Rate per Month | Comments |
| 1 | Equipment | 20' Storage Container | Multiple | | | | |
| 2 | Equipment | 30' Travel Trailer | Multiple | | | | |
| 3 | Equipment | 40 Ton Articulated Dump Truck | Multiple | | | | |
| 4 | Equipment | 8" Pull Behind Wood Chipper | Veg Debris | | | | |
| 5 | Equipment | Backhoe | Multiple | | | | |
| 6 | Equipment | Bucket Truck | Electrical | | | | |
| 7 | Equipment | Chainsaw | Veg Debris | | | | 24", Gas Stihl/MS440 or 460 |
| 8 | Equipment | Chipper Grinder | Veg Debris | | | | |
| 9 | Equipment | Cleaning of equipment | Multiple | | | | Forest Service Cleaning (Industry Standard for Equip Dealers) - PER PIECE ONLY |
| 10 | Equipment | Compactor | Multiple | | | | |
| 11 | Equipment | Compactor Rammer Jumping Jack | Multiple | | | | |
| 12 | Equipment | Concrete Pump Truck | Multiple | | | | with operator |
| 13 | Equipment | Concrete Saw | Multiple | | | | |
| 14 | Equipment | Crew Utility Truck (F550) | Multiple | | | | |
| 15 | Equipment | Dozer | Multiple | | | | D4 or equivalent |
| 16 | Equipment | Dozer D6 | Multiple | | | | |
| 17 | Equipment | Dozer D8 | Multiple | | | | Caterpillar D8T or equivalent |
| 18 | Equipment | Dump Truck (14 yd capacity) | Multiple | | | | |
| 19 | Equipment | Dump Truck (5 yd capacity) | Multiple | | | | |
| 20 | Equipment | Dump Truck Belly End Dump | Multiple | | | | |
| 21 | Equipment | Excavator | Multiple | | | | CAT 320 or equvalent |
| 22 | Equipment | Excavator Long Reach | Multiple | | | | |
| 23 | Equipment | Forklift | Multiple | | | | 10,000 lb capacity |
| 24 | Equipment | Generator portable 5-10Kw | Multiple | | | | |
| 25 | Equipment | Grader | Multiple | | | | |
| 26 | Equipment | Heavy Haul Transport Trailer | Multiple | | | | Tandem Axle |
| 27 | Equipment | Heavy Haul Transport Truck/Trailer/Operator | Multiple | | | | |
| 28 | Equipment | Hoist Truck | Fence | | | | |
| 29 | Equipment | Horizontal/Vertical Band Saw | Fence | | | | |
| 30 | Equipment | Loader | Multiple | | | | 950 or equivalent |
| 31 | Equipment | Man Lift | Fence | | | | Genie S-60 or equivalent |
| 32 | Equipment | Mini excavator | Multiple | | | | |
| 33 | Equipment | Mini Skid Steer | Multiple | | | | Max 3ft width with bucket |
| 34 | Equipment | Mowers | Veg Debris | | | | |
| 35 | Equipment | Pile Driving Machine | Multiple | | | | |
| 36 | Equipment | Portable Cement Mixer | Multiple | | | | |
| 37 | Equipment | Portable Magnetic Drill | Fence | | | | Horizontial Boring Machine |
| 38 | Equipment | Portable Trailer Mounted Port-a-John | Multiple | | | | |
| 39 | Equipment | Professional Paint Sprayer, Ultramax II 490 | Tunnel Painting | | | | |
| 40 | Equipment | Scraper 17CY | Multiple | | | | Caterpillar 613C or equivalent |
| 41 | Equipment | Service Truck | Multiple | | | | |
| 42 | Equipment | Side x Side UTV | Multiple | | | | |
| 43 | Equipment | Snorkel Lift | Fence | | | | |
| 44 | Equipment | Stand with Water Tank | Multiple | | | | Klein, 10,000 gallon |
| 45 | Equipment | Sweeper - Ride On | Veg Debris | | | | |
| 46 | Equipment | Trench Compactor walk behind | Fence Foundation | | | | King Louie Complete rebuild compact trench after demo |
| 47 | Equipment | Vacuum Trailer with Pump | Debris Removal | | | | Vermeer VX30-500LT |
| 48 | Equipment | Water Buffalo 500 Gal | Multiple | | | | |
| 49 | Equipment | Water Tank, 21,000 Gallon | Multiple | | | | |
| 50 | Equipment | Water Truck | Multiple | | | | Articulating Water Pull 6,000-8,000 gallon capacity |
| 51 | Equipment | Water Truck | Multiple | | | | 4,000 Gallon |
| 52 | Equipment | Weed Eaters | Veg Debris | | | | |
| 53 | Equipment | Welding Rig | Fence | | | | |
Work Activity Report Form
| Work Activity (WA) Number: | | Date(s): | REV: | 0 |
| WORK DESCRIPTION | | | | |
| TI Asset Description: | Work Category: | | | |
Work Category Sub Type:
| Asset Objective(s): | | | Damage Extent: | | | |
| Work Category: | | | | Location: | | |
| Work Classification: | | | | Sector: | | |
| Work Subdivisions: | | | | GPS: | BEG | N: |
| W: | | END | N: | | | | |
W:
| Prime Lead Contact: | Name: | Ph: | | Email: |
| SUB Lead Contact: | Name: | Ph: | | Email: |
| GOV Lead Contact: | Name: | Ph: | | Email: |
| WORK PERFORMANCE | | | | |
| Inspection: | | | Frequency: | |
| Scope of Work: | | | | |
Work Standards/ QC Metrics:
| Work Duration: | Days: ## | WAR STATUS: | | Initial |
| ACCESS | | | | |
| Access Issues (including any expiration dates): | | | Access Stakeholder(s): | |
| Stakeholder Type: | | | | | |
| ENVIRONMENTAL | | | | | |
| Applicable | | | | | |
| Environmental Regulations and Sources (_): | | Applicable Environmental BMPs: | BMP’s reviewed and implemented? | | Yes | |
| | | | Survey by Biologist if required? | | No |
| COST | | |
| Est. Labor Costs: | Act. Labor Costs: | Other Notes/Photos |
| Est. Travel Costs: | Act. Travel Costs: | Other Notes/Photos |
Nearest CBP facility: xxx Avg.
This is the start of the file's text. The full file is on GovTribe.