ELC Unit Price Bid Sheets Blank FY26 v1.xlsx

XLSX spreadsheet 197 KB Posted

Attached to
Yuma, Arizona and El Centro, California Sectors-TI Maintenance Solicitation
Solicitation number
20154783
Issued by

About this file

The file is an Excel-based Unit Price Bid Sheets template for a federal contract opportunity involving maintenance services for the Yuma, Arizona and El Centro, California border sectors. The pricing schedule covers five Contract Line Item Numbers (CLINs) with detailed labor, equipment, and material pricing for specific maintenance tasks: (1) Fences and Gates, (2) Roads and Bridges, (3) Drainage and Grates, (4) Lighting and Electrical, and (5) Vegetation Control, Debris Removal, and Pest Control. The document includes comprehensive pricing breakdowns for routine, urgent, and after-hours work, with specific crew compositions and rates for various trades including welders, equipment operators, electricians, and laborers.

The pricing template also includes an extensive materials pricing section covering categories such as barriers, drainage materials, electrical components, fencing materials, gates, imported aggregates, concrete, and equipment rentals. The document is associated with Contract #HSBP1016C00008 and is designed for daily service delivery reporting. Mobilization and travel costs are included, with GPS coordinates and location references for work zones in the El Centro sector. The template provides a structured approach for contractors to price out detailed maintenance services for border infrastructure, with flexibility for different work scenarios and comprehensive material and labor cost tracking.

View the file

Other files

File Type Posted
Amendment_07_-_ 70B01R26R00000018_-_SF_30 3-2-2026.pdf PDF
QA Phase 2.pdf PDF
Amendment_06_-_ 70B01R26R00000018_-_SF_30.pdf PDF
Amendment_05_-_ 70B01R26R00000018_-_SF_30.pdf PDF
TAB 1.1.3 SOW YUM ELC TI Maint FY26 2-18-26.pdf PDF
Contractor Notional Work Plan YUM ELC TIM Maint FY26 2-18-26.xlsx XLSX spreadsheet
YUM Unit Price Bid Sheet Blank FY26 2-18-26.xlsx XLSX spreadsheet
CUS1449 RFP - UPDATED 70B01C26R00000018 2-18-26.pdf PDF
Scheduled Work Bid Form YUM FY26 2-18-26.xlsx XLSX spreadsheet
Amendment_04_-_ 70B01R26R00000018_-_SF_30.pdf PDF
Scheduled Work Bid Form ELC FY26 2-18-26.xlsx XLSX spreadsheet
ELC Unit Price Bid Sheets Blank FY26 2-18-26.xlsx XLSX spreadsheet
Amendment_03_-_70B01C24Q00000004_-_SF_30.pdf PDF
QA- TI Maintenance Yuma ELC 1-30-26.xlsx XLSX spreadsheet
Corporate Questions YUM ELC TI Maint FY26.docx DOCX document
Contractor Notional Work Plan YUM ELC TIM Maint 1-30-26.xlsx XLSX spreadsheet
Amendment_02_-_70B01C24Q00000004_-_SF_30.pdf PDF
Scheduled Work Bid Form YUM FY26 1-28-26.xlsx XLSX spreadsheet
TAB 1.1.3 SOW YUM ELC TI Maint 1-28-26.pdf PDF
Scheduled Work Bid Form ELC FY26 1-28-26.xlsx XLSX spreadsheet
Amendment_01_-_70B01C24Q00000004_-_SF_30.pdf PDF
Exhibit C TI Design Standards v6 YUM ELC TI Maint FY26.pdf PDF
Yum-ELC Notional Work Plan_01.28.26.xlsx XLSX spreadsheet
CUS1449 RFP - UPDATED 70B01C26R00000018 1-28-26.pdf PDF
SCA WAGES YUMA.pdf PDF
Scheduled Work Bid Form ELC FY26 v3.xlsx XLSX spreadsheet
Notional Work Plan YUM ELC TIM Maint FY26 rev1.xlsx XLSX spreadsheet
DBA WAGES EL CENTROpdf.pdf PDF
SOW YUM ELC TI Maint FY26 1-16-26.pdf PDF
Scheduled Work Bid Form YUM FY26 v3.xlsx XLSX spreadsheet
YUM Unit Price Bid Sheet Blank FY26.xlsx XLSX spreadsheet
SCA WAGES EL CENTRO.pdf PDF
DBA WAGES YUMA.pdf PDF
CUS1449 RFP - Commercial Items (SF1449) 1-16-26.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Service Delivery Summary - 21

Work Activity (WA) Number:ERROR:#REF!Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):ERROR:#REF!
Work Category:ERROR:#REF!Location:ERROR:#REF!
Work Classification:ERROR:#REF!Sector:ERROR:#REF!
Work Subdivisions:ERROR:#REF!GPS:BEGN:
W:ERROR:#REF!ENDN:
W:ERROR:#REF!
M&R Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Cerrudo Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&18&KFF0000&G&"-,Regular"&11&K01+000 &10PSC-CTIMR-SO0009-CLIN 1,2,3,4 and 5 Cerrudo Tucson, CLIN 4 Yuma &"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 22

Work Activity (WA) Number:ERROR:#REF!Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):ERROR:#REF!
Work Category:ERROR:#REF!Location:ERROR:#REF!
Work Classification:ERROR:#REF!Sector:ERROR:#REF!
Work Subdivisions:ERROR:#REF!GPS:BEGN:
W:ERROR:#REF!ENDN:
W:ERROR:#REF!
M&R Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Cerrudo Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 23

Work Activity (WA) Number:ERROR:#REF!Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):ERROR:#REF!
Work Category:ERROR:#REF!Location:ERROR:#REF!
Work Classification:ERROR:#REF!Sector:ERROR:#REF!
Work Subdivisions:ERROR:#REF!GPS:BEGN:
W:ERROR:#REF!ENDN:
W:ERROR:#REF!
M&R Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Cerrudo Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 24

Work Activity (WA) Number:ERROR:#REF!Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):ERROR:#REF!
Work Category:ERROR:#REF!Location:ERROR:#REF!
Work Classification:ERROR:#REF!Sector:ERROR:#REF!
Work Subdivisions:ERROR:#REF!GPS:BEGN:
W:ERROR:#REF!ENDN:
W:ERROR:#REF!
M&R Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Cerrudo Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 25

Work Activity (WA) Number:ERROR:#REF!Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):ERROR:#REF!
Work Category:ERROR:#REF!Location:ERROR:#REF!
Work Classification:ERROR:#REF!Sector:ERROR:#REF!
Work Subdivisions:ERROR:#REF!GPS:BEGN:
W:ERROR:#REF!ENDN:
W:ERROR:#REF!
M&R Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Cerrudo Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 26

Work Activity (WA) Number:ERROR:#REF!Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):ERROR:#REF!
Work Category:ERROR:#REF!Location:ERROR:#REF!
Work Classification:ERROR:#REF!Sector:ERROR:#REF!
Work Subdivisions:ERROR:#REF!GPS:BEGN:
W:ERROR:#REF!ENDN:
W:ERROR:#REF!
M&R Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Cerrudo Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 27

Work Activity (WA) Number:ERROR:#REF!Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):ERROR:#REF!
Work Category:ERROR:#REF!Location:ERROR:#REF!
Work Classification:ERROR:#REF!Sector:ERROR:#REF!
Work Subdivisions:ERROR:#REF!GPS:BEGN:
W:ERROR:#REF!ENDN:
W:ERROR:#REF!
M&R Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Cerrudo Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 28

Work Activity (WA) Number:ERROR:#REF!Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):ERROR:#REF!
Work Category:ERROR:#REF!Location:ERROR:#REF!
Work Classification:ERROR:#REF!Sector:ERROR:#REF!
Work Subdivisions:ERROR:#REF!GPS:BEGN:
W:ERROR:#REF!ENDN:
W:ERROR:#REF!
M&R Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Cerrudo Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 29

Work Activity (WA) Number:ERROR:#REF!Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):ERROR:#REF!
Work Category:ERROR:#REF!Location:ERROR:#REF!
Work Classification:ERROR:#REF!Sector:ERROR:#REF!
Work Subdivisions:ERROR:#REF!GPS:BEGN:
W:ERROR:#REF!ENDN:
W:ERROR:#REF!
M&R Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Cerrudo Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Service Delivery Summary - 30

Work Activity (WA) Number:ERROR:#REF!Date(s):##/##/####REV:0
WORK DESCRIPTION
TI Asset Description:ERROR:#REF!
Asset Objective(s):ERROR:#REF!
Work Category:ERROR:#REF!Location:ERROR:#REF!
Work Classification:ERROR:#REF!Sector:ERROR:#REF!
Work Subdivisions:ERROR:#REF!GPS:BEGN:
W:ERROR:#REF!ENDN:
W:ERROR:#REF!
M&R Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Cerrudo Lead Contact:Name:ERROR:#REF!Ph:ERROR:#REF!Email:ERROR:#REF!
Pricing Schedule
Labor
ItemUoMQtyPriceTotal
Labor Sub Total$ - 0
Travel Labor
Travel Labor Sub Total$ - 0
Equipment
Equipment Sub Total$ - 0
Material
Material Sub Total$ - 0
Mobilization
Mobilization Sub Total$ - 0
Other Costs
$ - 0
Other Costs Sub Total$ - 0
Grand Total:$ - 0
KBR Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY

&"Times New Roman,Bold"&22Daily Service Delivery Summary &G

&"Times New Roman,Regular"&10Form: FO-US-CTIMR-QM-0001b Contract # HSBP1016C00008 &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 12/05/2016 mailto:Andre.Reichert@KBR.commailto:Glenn@CERRUDO.com Mob-Demob

EL CENTRO SECTOR
MOBILIZATION / DEMOBILIZATION PER PIECE OF EQUIPMENT
ZoneStartReferenceEndReferenceGeo ReferenceDistance (linear miles)Station
132.61871-116.10637Mon 23132.62695-115.99706Mon 230ELS5.60El Centro
Mobilization
Demobilization
232.62695-115.99706Mon 23032.63197-115.93282Mon 229ELS4.69El Centro
Mobilization
Demobilization
332.63197-115.93282Mon 22932.63915-115.83916EXIT 6ELS5.44El Centro
Mobilization
Demobilization
432.63915-115.83916EXIT 632.64485-115.76439Mon 226EXIT 54.37El Centro
Mobilization
Demobilization
532.64485-115.76439Mon 22632.64755-115.72875Mon 225EXIT 42.10El Centro
Mobilization
Demobilization
632.64755-115.72875Mon 22532.65031-115.69208Mt Signal RdELS2.14El Centro
Mobilization
Demobilization
732.65031-115.69208Mt Signal Rd32.65257-115.66208Westside mainELS1.75El Centro
Mobilization
Demobilization
832.65257-115.66208Westside main32.65633-115.61197Woodbine CanELS2.95El Centro
Mobilization
Demobilization
932.65633-115.61197Woodbine Can32.65955-115.56855Weed RdELS2.55El Centro
Mobilization
Demobilization
1032.65955-115.56855Weed Rd32.6622-115.53177All AmericanELS2.16El Centro
Mobilization
Demobilization
1132.6622-115.53177All American32.66424-115.50539461MON 221CALEXICO1.55Calexico
Mobilization
Demobilization
1232.66424-115.50539461MON 22132.66486-115.49673MON 220ACALEXICO0.51Calexico
Mobilization
Demobilization
1332.66486-115.49673MON 220A32.66622-115.47838MON 220CALEXICO1.07Calexico
Mobilization
Demobilization
1432.66622-115.47838MON 22032.66963-115.43105MON 219CALEXICO2.78Calexico
Mobilization
Demobilization
1532.66963-115.43105MON 21932.67417-115.36780MON 218ALAMO RIVER3.71Calexico
Mobilization
Demobilization
1632.67417-115.36780MON 21832.68018-115.28269E. HIGHLINECALEXICO4.98Calexico
Mobilization
Demobilization
1732.68018-115.28269E. HIGHLINE32.68466-115.21904MON 216DROP 43.72Calexico
Mobilization
Demobilization
1832.68466-115.21904MON 21632.69342-115.09323MON 214CALEXICO7.37Calexico
Mobilization
Demobilization
1932.69342-115.09323MON 21432.70330-114.94891MON 211DROP 18.47Calexico
Mobilization
Demobilization
2032.70330-114.94891MON 21132.70599-114.91007MON 210C1 Dunes2.27Calexico
Mobilization
Demobilization

Labor

El Centro Sector
Labor Itemized Pricing List
CLIN 1 Fences and GatesCrew Composition
Line ItemDescriptionUoMUnit RateTradeQty
1Routine Repair & Maintenance forDaily work crew to perform routine maintenance andDayWelder1
El Centro Sectorrepairs per SOWWelder Helper1
(Routine work Performed during daylight hours,
based on 8 hour workday Mon-Fri)
2Urgent Repair & Maintenance forHourly work crew to perform urgent maintenanceHourWelder1
El Centro Sectorand repairs per SOWWelder Helper1
(Urgent work performed during daylight hours,
based on 8 hour workday Mon-Fri)
3Urgent After-Hour Repair &Hourly work crew to perform urgent maintenanceHourWelder1
Maintenance for El Centro Sectorand repairs outside of the standard 8 hour M-FWelder Helper1
schedule, inclusive of nights, weekends and holidays
CLIN 2 Roads and BridgesCrew Composition
Line ItemDescriptionUoMUnit RateTradeQty
1Routine Repair & Maintenance forDaily work crew to perform routine maintenance andDayEquipment Operator2
El Centro Sectorrepairs per SOWLabor1
(Routine work Performed during daylight hours,
based on 8 hour workday Mon-Fri)
2Urgent Repair & Maintenance forHourly work crew to perform urgent maintenanceHourEquipment Operator2
El Centro Sectorand repairs per SOWLabor1
(Urgent work performed during daylight hours,
based on 8 hour workday Mon-Fri)
3Urgent After-Hour Repair &Hourly work crew to perform urgent maintenanceHourEquipment Operator2
Maintenance for El Centro Sectorand repairs outside of the standard 8 hour M-FLabor1
schedule, inclusive of nights, weekends and holidays
CLIN 3 Drainage and GratesCrew Composition
Line ItemDescriptionUoMUnit RateTradeQty
1Routine Repair & Maintenance forDaily work crew to perform routine maintenance andDayEquipment Operator2
El Centro Sectorrepairs per SOWLabor1
(Routine work Performed during daylight hours,
based on 8 hour workday Mon-Fri)
2Urgent Repair & Maintenance forHourly work crew to perform urgent maintenanceHourEquipment Operator2
El Centro Sectorand repairs per SOWLabor1
(Urgent work performed during daylight hours,
based on 8 hour workday Mon-Fri)
3Urgent After-Hour Repair &Hourly work crew to perform urgent maintenanceHourEquipment Operator2
Maintenance for El Centro Sectorand repairs outside of the standard 8 hour M-FLabor1
schedule, inclusive of nights, weekends and holidays
CLIN 4 Lighting and ElectricalCrew Composition
Line ItemDescriptionUoMUnit RateTradeQty
1Routine Repair & Maintenance forDaily work crew to perform routine maintenance andDayElectrican Med Volt2
El Centro Sectorrepairs per SOW
(Routine work Performed during daylight hours,
based on 8 hour workday Mon-Fri)
2Urgent Repair & Maintenance forHourly work crew to perform urgent maintenanceHourElectrican Med Volt2
El Centro Sectorand repairs per SOW
(Urgent work performed during daylight hours,
based on 8 hour workday Mon-Fri)
3Urgent After-Hour Repair &Hourly work crew to perform urgent maintenanceHourElectrican Med Volt2
Maintenance for El Centro Sectorand repairs outside of the standard 8 hour M-F
schedule, inclusive of nights, weekends and holidays
CLIN 5 Vegetation Control and Debris RemovalCrew Composition
Line ItemDescriptionUoMUnit RateTradeQty
1Routine Repair & Maintenance forDaily work crew to perform routine maintenance andDayEquipment Operator1
El Centro Sectorrepairs per SOWLabor2
(Routine work Performed during daylight hours,
based on 8 hour workday Mon-Fri)
2Urgent Repair & Maintenance forHourly work crew to perform urgent maintenanceHourEquipment Operator1
El Centro Sectorand repairs per SOWLabor2
(Urgent work performed during daylight hours,
based on 8 hour workday Mon-Fri)
3Urgent After-Hour Repair &Hourly work crew to perform urgent maintenanceHourEquipment Operator1
Maintenance for El Centro Sectorand repairs outside of the standard 8 hour M-FLabor2
schedule, inclusive of nights, weekends and holidays
Additional Crew Members to Supplement Crew Composition
Line ItemDescriptionUoMUnit RateUoMUnit Rate
1Laborer - California - RoutineLaborer rate in CaliforniaHourDay
2Operator - California - RoutineOperator rate in CaliforniaHourDay
3Truck Driver - California - RoutineTruck Driver rate in CaliforniaHourDay
4Welder - California - RoutineWelder rate in CaliforniaHourDay
5Laborer - California - UrgentUrgent Laborer rate in CaliforniaHourDay
6Operator - California - UrgentUrgent Operator rate in CaliforniaHourDay
7Truck Driver - California - UrgentUrgent Truck Driver rate in CaliforniaHourDay
8Welder - California - UrgentUrgent Welder rate in CaliforniaHourDay
Over Time and or Travel Rates if Authorized
Line ItemDescriptionUoMUnit Rate
1CLIN 1 - Work Crew Overtime forOver Time Rate Crew CLIN 1Hour
Routine Work Activities
2CLIN 2 - Work Crew Overtime forOver Time Rate Crew CLIN 2Hour
Routine Work Activities
3CLIN 3 - Work Crew Overtime forOver Time Rate Crew CLIN 3Hour
Routine Work Activities
4CLIN 4 - Work Crew Overtime forOver Time Rate Crew CLIN 4Hour
Routine Work Activities
5CLIN 5 - Work Crew Overtime forOver Time Rate Crew CLIN 5Hour
Routine Work Activities
6Laborer - California (Overtime)Routine Labor Over Time Rate in CaliforniaHour
7Operator - California (Overtime)Routine Operator Over Time Rate in CaliforniaHour
8Truck Driver - California (Overtime)Routine Truck Driver Over Time Rate in CaliforniaHour
9Welder - California (Overtime)Routine Welder Over Time Rate in CaliforniaHour
10Laborer - California (Overtime)Urgent Labor Over Time Rate in CaliforniaHour
11Operator - California (Overtime)Urgent Operator Over Time Rate in CaliforniaHour
12Truck Driver - California (Overtime)Urgent Truck Driver Over Time Rate in CaliforniaHour
13Welder - California (Overtime)Urgent Welder Over Time Rate in CaliforniaHour
CLIN 5 Pest Control and Dead Animal Carcus Removal
Line ItemDescriptionUoMUnit Rate
1Routine Services Associated with thePerform routine services associated with theHour
Disposal of Dead Animalsdisposal of dead animals per the SOW
(Routine work Performed during daylight hours,
based on 8 hour workday Mon-Fri)
2Routine Services Associated with thePerform routine services associated with theDay
Disposal of Dead Animalsdisposal of dead animals per the SOW
(Routine work Performed during daylight hours,
based on 8 hour workday Mon-Fri)
3Urgent Services Associated with thePerform urgent services associated with theHour
Disposal of Dead Animalsdisposal of dead animals per SOW
(Urgent work performed during daylight hours,
based on 8 hour workday Mon-Fri)
4Urgent After-Hour ServicesPerform urgent services associated with theHour
Associated with the Disposal of Deaddisposal of dead animals per SOW outside of the
Animalsstandard 8 hour M-F schedule, inclusive of nights,
weekends and holidays
5Routine Services Associated with thePerform routine services associated with theHour
Removal of Active Bee Hivesremoval of active bee hives per the SOW
(Routine work Performed during daylight hours,
based on 8 hour workday Mon-Fri)
6Routine Services Associated with thePerform routine services associated with theDay
Removal of Active Bee Hivesremoval of active bee hives per the SOW
(Routine work Performed during daylight hours,
based on 8 hour workday Mon-Fri)
7Urgent Services Associated with thePerform urgent services associated with the removalHour
Removal of Active Bee Hivesof active bee hives per SOW
(Urgent work performed during daylight hours,
based on 8 hour workday Mon-Fri)
8Urgent After-Hour ServicesPerform urgent services associated with the removalHour
Associated with the Removal ofof active bee hives per SOW outside of the standard
Active Bee Hives8 hour M-F schedule, inclusive of nights, weekends
and holidays
9Routine Services Associated with thePerform routine services associated with the repairHour
Repair of Animal Burrowsof animal burrows per the SOW
(Routine work Performed during daylight hours,
based on 8 hour workday Mon-Fri)
10Routine Services Associated with thePerform routine services associated with the repairDay
Repair of Animal Burrowsof animal burrows per the SOW
(Routine work Performed during daylight hours,
based on 8 hour workday Mon-Fri)
11Urgent Services Associated with thePerform urgent services associated with the repairHour
Repair of Animal Burrowsof animal burrows per SOW
(Urgent work performed during daylight hours,
based on 8 hour workday Mon-Fri)
12Urgent After-Hour ServicesPerform urgent services associated with the repairHour
Associated with the Repair of Animalof animal burrows per SOW outside of the standard
Burrows8 hour M-F schedule, inclusive of nights, weekends
and holidays

Materials

Materials Itemized Pricing List
ALL CLIN's - Materials
MaterialsDescriptionUoMUseUnit PriceComment
MaterialsBARRIEREABarrier
MaterialsGuardrail TerminalEABarrier
MaterialsJersey BarrierEABarrier
MaterialsPre Cast Concrete Lego Style Block (2' x 2' x 6')EABarrier
MaterialsSheet Pile Corrugated Stock (W 18"-48" L 15'-30')Sq. FTBarrier
MaterialsSheet Pile Flat Stock (W 18"-48" L 15'-30')Sq. FTBarrier
MaterialsDRAINAGEDraiange
MaterialsApron Endwalls for Corrugated Pipe Steel 12" PipeEADrainage
MaterialsApron Endwalls for Corrugated Pipe Steel 15" PipeEADrainage
MaterialsApron Endwalls for Corrugated Pipe Steel 18" PipeEADrainage
MaterialsApron Endwalls for Corrugated Pipe Steel 21" PipeEADrainage
MaterialsApron Endwalls for Corrugated Pipe Steel 24" PipeEADrainage
MaterialsApron Endwalls for Corrugated Pipe Steel 30" PipeEADrainage
MaterialsApron Endwalls for Corrugated Pipe Steel 36" PipeEADrainage
MaterialsApron Endwalls for Corrugated Pipe Steel 42" PipeEADrainage
MaterialsApron Endwalls for Corrugated Pipe Steel 48" PipeEADrainage
MaterialsCulvert Pipe Corrugated Steel 10" diaLFDrainage
MaterialsCulvert Pipe Corrugated Steel 12" diaLFDrainage
MaterialsCulvert Pipe Corrugated Steel 15" diaLFDrainage
MaterialsCulvert Pipe Corrugated Steel 18" diaLFDrainage
MaterialsCulvert Pipe Corrugated Steel 21" diaLFDrainage
MaterialsCulvert Pipe Corrugated Steel 24" diaLFDrainage
MaterialsCulvert Pipe Corrugated Steel 30" diaLFDrainage
MaterialsCulvert Pipe Corrugated Steel 36" diaLFDrainage
MaterialsCulvert Pipe Corrugated Steel 42" diaLFDrainage
MaterialsCulvert Pipe Corrugated Steel 48" diaLFDrainage
MaterialsELECTRICALElectrical
Materials200 amp Load Break ElbowEAElectrical - COMPONENT
Materials3P 200amp 600V Circuit BreakerEAElectrical - COMPONENT
MaterialsSwitch, 2P 20A 120/277 Comm. GroundEAElectrical - COMPONENT
MaterialsCapacitor, 480 VoltEAElectrical - COMPONENT
MaterialsFuse, 600 VoltEAElectrical - COMPONENT
MaterialsFuse, Cutout Type XS w/ hardwareEAElectrical - COMPONENT
MaterialsHubbell CS6365C CA STD Plug, 50 AmpEAElectrical - COMPONENT
MaterialsHubbell CS6369 #2 Large ReceptacleEAElectrical - COMPONENT
MaterialsTransformer Primary 13,200 volts, Secondary 240 VoltsEAElectrical - COMPONENT
MaterialsTransformer Primary 7,200 volts, Secondary 240 VoltsEAElectrical - COMPONENT
Materials2" Rigid Radius SweepEAElectrical - CONDUIT
Materials2" Schedule 40 PVC ElectricalFTElectrical - CONDUIT
MaterialsElectrical Box Cover, 2GEAElectrical - CONDUIT
MaterialsElectrical Box Cover, MX1050S Flat/WaterproofEAElectrical - CONDUIT
MaterialsElectrical Box, 2G Deep, DD5100XSEAElectrical - CONDUIT
MaterialsElectrical Box Cover, MX1050S Flat/WaterproofEAElectrical - CONDUIT
Materials100W LED Electronic Driver, Optotronic OT100W/UNV/1250C/2DIM/P6EAElectrical - LIGHTS
Materials150W LED Electronic Driver, XITANIUM 1.05A, 0-10V Dimming (XH150C105V140CNF1)EAElectrical - LIGHTS
Materials180W LED Electronic Driver, Optotronic OT180W/UNV1250C/2DIM/P6EAElectrical - LIGHTS
MaterialsBallast 240 VoltsEAElectrical - LIGHTS
MaterialsBulb high pressure sodium lamps 1000-wattEAElectrical - LIGHTS
MaterialsBulb metal halide lamps 1000-wattEAElectrical - LIGHTS
MaterialsBulb, 36881 HPS LampEAElectrical - LIGHTS
MaterialsHigh Pressure Sodium Ballast Kit, 1000WEAElectrical - LIGHTS
MaterialsLED Failsafe LightEAElectrical - LIGHTS
MaterialsFixture-Galleon 6-Bar LED SL2 Optics,45d AmbientEAElectrical - LIGHTS
MaterialsFixture-Galleon 6-Bar LED T2 Optics,45d AmbientEAElectrical - LIGHTS
MaterialsFixture-Galleon 10-Bar LED 5WQ Optics,45d AmbientEAElectrical - LIGHTS
MaterialsFixture-Galleon 10-Bar LED T4W Optics,45d AmbientEAElectrical - LIGHTS
MaterialsFixture-Galleon 10-Bar LED T4W Optics,90d Ambient Rotated RightEAElectrical - LIGHTS
MaterialsFixture-Galleon 10-Bar LED T4W Optics,90d Ambient Rotated LeftEAElectrical - LIGHTS
MaterialsFixture-Galleon 8-Bar LED T2 Optics,45d AmbientEAElectrical - LIGHTS
MaterialsFixture-Galleon 8-Bar LED T2 Optics,90d Ambient Rotated RightEAElectrical - LIGHTS
MaterialsFixture-Galleon 8-Bar LED T2 Optics,90d Ambient Rotated LeftEAElectrical - LIGHTS
MaterialsBridge Light Fixture Line 2.0, Symmetric, 72” V2 High Output,3000KEAElectrical - LIGHTS
Materials100W Driver for Line 2.0 Symmetric (special 480V)EAElectrical - LIGHTS
MaterialsFilterEAElectrical - LIGHTS
MaterialsThermostatEAElectrical - LIGHTS
MaterialsFanEAElectrical - LIGHTS
MaterialsLED Fixture, Galleon 8-Bar LED (GLEON-AE-08-LED-E1-AFL-HSS-ADJS )EAElectrical - LIGHTS
MaterialsLED Fixture, Galleon 8-Bar LED T4 (GLEON-AF-08-T4FT-ADJS)EAElectrical - LIGHTS
MaterialsLED Replacement Square, Cooper Lighting (CLP0010305G01) 57W MaxEAElectrical - LIGHTS
MaterialsLED Stadium Lighting Fixture, Ephesus 1000W 240-480VAC (SD-1000-2-56-BLK-NC)EAElectrical - LIGHTS
MaterialsLight Fixture GE PFlS07SOMHlDBEAElectrical - LIGHTS
MaterialsLight Pole, Round Tapered Steel Heavy Duty 45' Mounting HeightEAElectrical - LIGHTS
MaterialsLight Pole, Round Tapered Steel Heavy Duty 60' Mounting HeightEAElectrical - LIGHTS
MaterialsLights Quarts 74 WattsEAElectrical - LIGHTS
MaterialsLuminary photo cell Intermatic K4321EAElectrical - LIGHTS
MaterialsPhotocell Control RelayEAElectrical - LIGHTS
MaterialsSport light Fixture Hubbell SL51000S-158EAElectrical - LIGHTS
MaterialsSteel/Aluminum Power Pole 60FTEAElectrical - LIGHTS
MaterialsT-5 Fluorescent Light BulbEAElectrical - LIGHTS
MaterialsT-8 Fluorescent BulbsEAElectrical - LIGHTS
MaterialsWaterproof Fluorescent Light FixturesEAElectrical - LIGHTS
MaterialsElectrical Burial Warning TapeRElectrical - MARKER
MaterialsLabel, Warning Arc Flash, NFPA 70 EEAElectrical - MARKER
Materials.75" Copper Clad Steel Grounding Rod 10' LEAElectrical - WIRE
Materials#6 Bare Solid Copper Wire Ground25 FTElectrical - WIRE
Materials1/0 Copper, 15kV THWN or XHHWFTElectrical - WIRE
MaterialsCopper Ground Wire 8 ga.25 FTElectrical - WIRE
MaterialsElectrical Cord 6/4, SEOW 600VFTElectrical - WIRE
MaterialsWire Electrical 12 AWG various colors50 LFElectrical - WIRE
MaterialsEROSION CONTROLErosion
MaterialsFilter Fabric SyntheticSq. YDErosion
MaterialsStraw Waddle Fiber Roll 8" x 25'EAErosion
MaterialsFENCINGFence
Materials6' Steel T PostEAFence - Barbed Wire
MaterialsBarbed WireFTFence - Barbed Wire
Materials.375" Dia Galvanized Truss RodEAFence - Chainlink
Materials1.375" Dia Aluminum Rail EndEAFence - Chainlink
Materials1.375" Dia Dome CapsEAFence - Chainlink
Materials1.375" Dia Galvanized Single Brace BandsEAFence - Chainlink
Materials1.375" Dia Galvanized Tension BandsEAFence - Chainlink
Materials1.375" Dia Galvanized Top/Bottom Rail Tubing Schedule 80,EAFence - Chainlink
Materials2.875" Dia Dome CapsEAFence - Chainlink
Materials2.875" Dia Galvanized Brace Rail Tubing Schedule 80,EAFence - Chainlink
Materials2.875" Dia Galvanized Line Post Tubing Schedule 80, for 10' Mesh FenceEAFence - Chainlink
Materials2.875" Dia Galvanized Line Post Tubing Schedule 80, for 6' Mesh FenceEAFence - Chainlink
Materials2.875" Dia Galvanized Line Post Tubing Schedule 80, for 8' Mesh FenceEAFence - Chainlink
Materials2.875" Dia Galvanized Single Brace BandsEAFence - Chainlink
Materials2.875" Dia Galvanized Tension BandsEAFence - Chainlink
Materials2" Diamond Chain Link Fence Fabric 9 ga. 10' H, (50' roll) Galvanized, Zinc or Alum coating?FTFence - Chainlink
Materials2" Diamond Chain Link Fence Fabric 9 ga. 6' H, (50' roll) Galvanized, Zinc or Alum coating?FTFence - Chainlink
Materials2" Diamond Chain Link Fence Fabric 9 ga. 8' H, (50' roll) Galvanized, Zinc or Alum coating?FTFence - Chainlink
Materials3" Diam Sched 40 Steel Pipe, L= 2.25", w/ .5" Wide SlotEAFence - Chainlink
Materials3" Schedule 40 Stainless Steel Pipe, L=2.25", w/ 0.5" Wide SlotEAFence - Chainlink
Materials4.0" Dia Dome CapsEAFence - Chainlink
Materials4.0" Dia Galvanized Line Post/ Corner/ End/ Pull Tubing Schedule 80,EAFence - Chainlink
Materials4.0" Dia Galvanized Line Post/ Corner/ End/ Pull Tubing Schedule 80,EAFence - Chainlink
Materials4.0" Dia Galvanized Single Brace BandsEAFence - Chainlink
Materials4.0" Dia Galvanized Tension BandsEAFence - Chainlink
MaterialsBarbed Wire Arms Three Stand 45 Deg GalvanizedEAFence - Chainlink
MaterialsBarbed Wire Arms V Shaped Six Stand 45 Deg GalvanizedEAFence - Chainlink
MaterialsBolt 1/4 x 2 1/2EAFence - Chainlink
MaterialsChain link custom swing gate, 16’Hx21’WEAFence - Chainlink
MaterialsNut 1/4 inEAFence - Chainlink
MaterialsTension Bar Galvanized .187" x .75" x 10'EAFence - Chainlink
MaterialsTension Wire 12 ga.FTFence - Chainlink
MaterialsTruss Rod Tightner HardwareEAFence - Chainlink
MaterialsWasher 3/4 in Dia x 1/4 centerEAFence - Chainlink
Materials7 1/2 in Stainless Steel HaspEAFence - Hardware
MaterialsBollard Sleeve Temporary Repair (Yellow)EAFence - Hardware
MaterialsBollard Sleeve Temporary Repair Storage BoxEAFence - Hardware
MaterialsConcertina WireFTFence - Hardware
MaterialsKing Kong Barrel HingesEAFence - Hardware
MaterialsPuck LockEAFence - Hardware
MaterialsRazor Wire, 36" Daimeter SS/Steel CoreRLFence - Hardware
MaterialsRectangular Laminated Rubber Dock Bumper (6"H x 38"W x 4.5"D)EAFence - Hardware
MaterialsSteel Wire Tie 9 ga.EAFence - Hardware
MaterialsWheel Roller, Cast Iron 4" Diam, 1-1/2" Tread Width, 600lb Capacity (CA0410110)EAFence - Hardware
Materials11 Gage Top of Bollard Cap PlatesEAFence - Steel
Materials11 Gage Top of Gate Post Cap PlatesEAFence - Steel
MaterialsAnchor Plate Assembly (12"x12"x1/2")EAFence - Steel
MaterialsAngle Iron 4.5" x 6" x .25" thickness, unequal legs, ASTM A36FTFence - Steel
MaterialsAngle Iron 4" x 4" x .25" thickness, equal legs, ASTM A36FTFence - Steel
MaterialsBar Steel 1.5" x 3" Solid, ASTM A36FTFence - Steel
MaterialsBar Steel 1"x1" Solid, Steel PicketFTFence - Steel
MaterialsHP 12 x 53, ASTM572 Grade 50FTFence - Steel
MaterialsHSS .25" Round Bar Solid, ASTM A36FTFence - Steel
MaterialsHSS 1.5" Round Bar Solid, ASTM A36FTFence - Steel
MaterialsHSS 1" x 1" Square Bar Solid, ASTM A36FTFence - Steel
MaterialsHSS 12" x 12"x .25", ASTM A500, Grade BFTFence - Steel
MaterialsHSS 2" x 2" x .187" Steel Bollard, ASTM A500, Grade BFTFence - Steel
MaterialsHSS 2" x 4" x .187" Steel, A500, Grade BFTFence - Steel
MaterialsHSS 4" x 4" x .187" Steel Bollard, ASTM A500, Grade BFTFence - Steel
MaterialsHSS 6" x 6" x .187" Steel Bollard, ASTM A500, Grade BFTFence - Steel
MaterialsHSS 6" x 6" x .25" Steel Bollard, ASTM A500, Grade BFTFence - Steel
MaterialsHSS 6x6x1/2” Steel Bollard, ASTM A500, Grade BFTFence - Steel
MaterialsHSS 7" x 7" x .25" Steel Bollard, ASTM A500, Grade BFTFence - Steel
MaterialsHSS 7" x 7" x .25" Steel Rail Sleeve, ASTM A500, Grade BFTFence - Steel
MaterialsHSS 9" x 3" x .187" Member Framing, ASTM A500FTFence - Steel
MaterialsHSS Steel Bar .5" x 4", ASTM A36EAFence - Steel
MaterialsMesh Welded Wire 2" x 2", 6 gaSq. FTFence - Steel
MaterialsMesh Welded Wire 3" x .5", 6 gaSq. FTFence - Steel
MaterialsPlate Steel 5' x 6'-4" 11 Gage Steel SheathingEAFence - Steel
MaterialsAngle Iron, 1"x1"x0.125", Equal LegsFTFence - Steel
MaterialsPlate Steel 6"x8.5", 11 Gage SteelEAFence - Steel
MaterialsPlate Steel .187" thickness, ASTM A36Sq. FTFence - Steel
MaterialsRazor Wire, GalvanizedRLFence - Steel
MaterialsPlate Steel .5" thickness x 4" wide , ASTM A36FTFence - Steel
MaterialsPlate Steel .5" thickness x 6" wide , ASTM A36FTFence - Steel
MaterialsPlate Steel 10" x 12" x 1" thickness, ASTM A36EAFence - Steel
MaterialsPlate Steel 11.75" x 16.5" Bollard Cap 45 Deg, 11 gaEAFence - Steel
MaterialsPlate Steel 4" x .5" thickness, ASTM A36FTFence - Steel
MaterialsPlate Steel 4" x 4" x .187" thickness, ASTM A36EAFence - Steel
MaterialsPlate Steel 6" x 3" x .187" thickness, ASTM A36EAFence - Steel
MaterialsPlate Steel 6" x 6" x .187" thickness, ASTM A36EAFence - Steel
MaterialsPlate Steel 6" x 8.5" Bollard Cap 45 Deg, 11 gaEAFence - Steel
MaterialsPlate Steel 6" x 8.5" Bollard Cap 45 Deg, 11 gaEAFence - Steel
MaterialsPlate Steel 8.5" x 1' Bollard Cap 45 Deg, w/ bollard rotated 45 Deg, 11 gaEAFence - Steel
MaterialsPlate Steel 8.5" x 1' Bollard Cap 45 Deg, w/ bollard rotated 45 Deg, 11 gaEAFence - Steel
MaterialsPlate Steel 8" x 9" x .187" thickness, ASTM A36EAFence - Steel
MaterialsPlate Steel 9" x 3" x .187" thickness, ASTM A36EAFence - Steel
MaterialsPlate Steel, 0.5" Thick x 1.5" Wide, Stainless SteelFTFence - Steel
MaterialsPlate Steel, 4'x8'x1/4"EAFence - Steel
MaterialsStamped Bollard Cap, 11 Ga SteelEAFence - Steel
MaterialsStamped Bollard Cap, 11 Gage SteelEAFence - Steel
MaterialsSteel Bar Solid 1" Dia x 7-5/16", ASTM A36EAFence - Steel
MaterialsSteel Sheathing 5' x 8' , 11 gaEAFence - Steel
MaterialsSteel Sheathing 5' x 8' , 11 gaEAFence - Steel
MaterialsW 6 x 15 Wide Flange Beam ASTM A36FTFence - Steel
MaterialsW 6 x 25 Wide Flange Beam ASTM A36FTFence - Steel
MaterialsW 6 x 9 Wide Flange Beam ASTM A36FTFence - Steel
MaterialsGATESGate
MaterialsDookKing Chain Tray Kit, 10FT Section for Slide Gate (2601-270)EAGate
MaterialsDoorKing Slide Gate Operator Unit 9570-382, 7.5HPEAGate
MaterialsDoorKing Slide Gate Operator Unit 9575EAGate
MaterialsGate Remote Clickers (Multi Code made by Linear)EAGate
MaterialsHy Security Gate Opener 8" Drive WheelsEAGate
MaterialsHy Security Gate Opener BatteriesEAGate
MaterialsHY Security Gate Opener Battery ChargerEAGate
MaterialsHy Security Gate Opener Guide WheelsEAGate
MaterialsHY Security Gate Opener Limit SwitchesEAGate
MaterialsHY Security Gate Opener Power SupplyEAGate
MaterialsHY Security Gate Opener ReceiversEAGate
MaterialsHy Security Operator- Model Slide Driver 200 UPSEAGate
MaterialsHySecurity Operator - HydraSwing 80F Linear Actuator (8,000LB)EAGate
MaterialsMISCELLANEOUS HARDWAREHardware
MaterialsChain Hoist, Electric 2 Ton, 8 Ft/MinEAHardware
Materials1.5 Ton Chan HoistEAHardware
MaterialsHardened ChainFTHardware
MaterialsChain ½” Stainless Steel 3 TonEAHardware
MaterialsColumbus McKinnon Level Hoist 3 TonEAHardware
MaterialsCombination Pad LockEAHardware
MaterialsHAS-R ½” x 6 ½” SS 316 Anchor BoltsEAHardware
MaterialsHY200 DispenserEAHardware
MaterialsHY200-R EpoxyEAHardware
MaterialsShackle 2 TonEAHardware
MaterialsU-Bolt, ¼”EAHardware
MaterialsU-Bolt, ½”EAHardware
Materials3/8" Drive Torx SocketEAHardware
Materials3/8" Drive, RatchetEAHardware
MaterialsWelding Rod, 7018 MR, 5/32", 14" L - 10 lbs.BXFence
MaterialsIMPORTED AGGREGATESImport Aggregates
MaterialsCertified weed free base rock 3/8" - JACUMBATonImport Aggregates
MaterialsCertified weed free base rock 3/8" - LA MEDIATonImport Aggregates
MaterialsCertified weed free base rock 3/8" - WHISKEY-8TonImport Aggregates
MaterialsCertified weed free base rock 3/4" - JACUMBATonImport Aggregates
MaterialsCertified weed free base rock 3/4" - LA MEDIATonImport Aggregates
MaterialsCertified weed free base rock 3/4" - WHISKEY-8TonImport Aggregates
MaterialsCertified weed free base rock - GORDON WELLS - INTERSTATE 8TonImport Aggregates
MaterialsCertified weed free base rock - CALEXICO ENTRYTonImport Aggregates
MaterialsCertified weed free base rock - MOUHJT SIGNAL & HWY 98TonImport Aggregates
MaterialsCertified weed free base rock - OCOTILLOTonImport Aggregates
MaterialsCertified weed free base rock - INKOPAHTonImport Aggregates
MaterialsClass II Base (Weed Free) - JACUMBATonImport Aggregates
MaterialsClass II Base (Weed Free) - LA MEDIATonImport Aggregates
MaterialsClass II Base (Weed Free) - WHISKEY - 8TonImport Aggregates
MaterialsClass II Base (Weed Free) - GORDON WELLS - INTERSTATE 8TonImport Aggregates
MaterialsClass II Base (Weed Free) - CALEXICO ENTRYTonImport Aggregates
MaterialsClass II Base (Weed Free) - MOUNT SIGNAL & HWY 98TonImport Aggregates
MaterialsClass II Base (Weed Free) -- OCOTILLOTonImport Aggregates
MaterialsClass II Base (Weed Free) - INKOPAHTonImport Aggregates
MaterialsClass II Road Base - GORDON WELLS - INTERSTATE 8TonImport Aggregates
MaterialsClass II Road Base - CALEXICO ENTRYTonImport Aggregates
MaterialsClass II Road Base - MOUNT SIGNAL & HWY 98TonImport Aggregates
MaterialsClass II Road Base - OCOTILLOTonImport Aggregates
MaterialsClass II Road Base - INKOPAHTonImport Aggregates
MaterialsCrusher Fines - LA MEDIATonImport Aggregates
MaterialsCrusher Fines - JACUMBA TRUCK STOP & I-8TonImport Aggregates
MaterialsCrusher Fines - WHISKEY-8 & BORDERTonImport Aggregates
MaterialsCrusher Fines - GORDON WELLS - INTERSTATE 8TonImport Aggregates
MaterialsCrusher Fines - CALEXICO ENTRYTonImport Aggregates
MaterialsCrusher Fines - MOUNT SIGNAL & HWY 98TonImport Aggregates
MaterialsCrusher Fines - OCOTILLOTonImport Aggregates
MaterialsCrusher Fines - INKOPAHTonImport Aggregates
MaterialsGravel Crushed 3/4" - WHISKEY - 8TonImport Aggregates
MaterialsGravel Crushed 3/4" - OTAY MESATonImport Aggregates
MaterialsGravel Crushed 3/4" - JACUMBATonImport Aggregates
MaterialsGravel Crushed 3/4" - GORDON WELLS - INTERSTATE 8TonImport Aggregates
MaterialsGravel Crushed 3/4" - CALEXICO ENTRYTonImport Aggregates
MaterialsGravel Crushed 3/4" - MOUNT SIGNAL & HWY 98TonImport Aggregates
MaterialsGravel Crushed 3/4" - OCOTILLOTonImport Aggregates
MaterialsGravel Crushed 3/4" - INKOPAHTonImport Aggregates
MaterialsGravel Pea 3/8" - WHISKEY - 8TonImport Aggregates
MaterialsGravel Pea 3/8" - OTAY MESATonImport Aggregates
MaterialsGravel Pea 3/8" - JACUMBATonImport Aggregates
MaterialsGravel Pea 3/8" - GORDON WELLS - INTERSTATE 8TonImport Aggregates
MaterialsGravel Pea 3/8" - CALEXICO ENTRYTonImport Aggregates
MaterialsGravel Pea 3/8" - MOUNT SIGNAL & HWY 98TonImport Aggregates
MaterialsGravel Pea 3/8" - OCOTILLOTonImport Aggregates
MaterialsGravel Pea 3/8" - INKOPAHTonImport Aggregates
MaterialsRiprap 12"- 24" average 18" - San DiegoTonImport Aggregates
MaterialsRiprap 18"- 30" average 24" - San DiegoTonImport Aggregates
MaterialsRiprap 4"- 12" average 6" - San DiegoTonImport Aggregates
MaterialsRiprap 6"- 18" average 12" - San DiegoTonImport Aggregates
MaterialsRiprap 4"- 12" average 6" - El CentroTonImport Aggregates
MaterialsRiprap 6"- 18" average 12" - El CentroTonImport Aggregates
MaterialsRiprap 12"- 24" average 18" - El CentroTonImport Aggregates
MaterialsRiprap 18"- 30" average 24" - El centroTonImport Aggregates
MaterialsPAINTING AND MARKINGMarking
MaterialsSpray Paint, 12 oz. canEAMarking
MaterialsStencil Set, Metal 6"EAMarking
Materials
MaterialsPLUMBINGPlumbing
Materials3" Ball ValveEAPlumbing
Materials3" Black Pipe, ThreadedFTPlumbing
Materials3" Close NippleEAPlumbing
Materials8" Flange KitEAPlumbing
Materials8" Gate Valve, FlangedEAPlumbing
MaterialsREADYMIX PRODUCTS / CONCRETE
MaterialsCast-In-Place Concrete, f'c = 3000 psi
Grout, f'c = 3,000 psiCu. FTReadymix
MaterialsQuickrete concrete mixBag
MaterialsCast in Place Concrete, f'c = 3000 psiCu. YDReadymix
MaterialsGrout, f'c = 3,000 psi - WHISKEY - 8Cu. YDReadymix
MaterialsGrout, f'c = 3,000 psi - OTAY MESACu. YDReadymix
MaterialsGrout, f'c = 3,000 psi - JACUMBACu. YDReadymix
Materials2 sack Concrete SlurryCu. YDReadymix
MaterialsConcrete Mix 90 lbs. High StrengthBagReadymix
Materials#4 Carbon Steel Grating, 2'x4' PanelEASteel
MaterialsConcrete Form 18” DiameterFTCONC - Form
MaterialsGeocell Cellular Confinement (15'x35')EACONC - Form
Materials#4 Reinforcing Bar, ASTM A615 Grade 60FTCONC - REINFORCING
Materials#4 Reinforcing Bar, ASTM A615 Grade 60FTCONC - REINFORCING
Materials#5 Reinforcing Bar, ASTM A615 Grade 60FTCONC - REINFORCING
Materials#5 Reinforcing Bar, ASTM A615 Grade 60FTCONC - REINFORCING
Materials#6 Reinforcing Bar, ASTM A615 Grade 60FTCONC - REINFORCING
Materials#6 Reinforcing Bar, ASTM A615 Grade 60FTCONC - REINFORCING
MaterialsSOIL BINDERVegetation
MaterialsLignin SulfonateTonSoil Binder
MaterialsSoilTac ( San Diego)TOTESoil Binder
MaterialsPennz SuppressTOTESoil Binder
MaterialsEnvirotac (El Centro)TOTESoil Binder
MaterialsVEGETATIONVegetation
MaterialsGlyphosate Weed Preventer (2.5 Gallon)EAVegetation
MaterialsWATERVegetation
MaterialsWaterGalMisc

Equipment

El Centro Sector
Equipment Itemized Pricing List
ALL CLIN's - Equipment
No:EquipmentDescriptionUseRate per hourRate per DayRate per MonthComments
1Equipment20' Storage ContainerMultiple
2Equipment30' Travel TrailerMultiple
3Equipment40 Ton Articulated Dump TruckMultiple
4Equipment8" Pull Behind Wood ChipperVeg Debris
5EquipmentBackhoeMultiple
6EquipmentBucket TruckElectrical
7EquipmentChainsawVeg Debris24", Gas Stihl/MS440 or 460
8EquipmentChipper GrinderVeg Debris
9EquipmentCleaning of equipmentMultipleForest Service Cleaning (Industry Standard for Equip Dealers) - PER PIECE ONLY
10EquipmentCompactorMultiple
11EquipmentCompactor Rammer Jumping JackMultiple
12EquipmentConcrete Pump TruckMultiplewith operator
13EquipmentConcrete SawMultiple
14EquipmentCrew Utility Truck (F550)Multiple
15EquipmentDozerMultipleD4 or equivalent
16EquipmentDozer D6Multiple
17EquipmentDozer D8MultipleCaterpillar D8T or equivalent
18EquipmentDump Truck (14 yd capacity)Multiple
19EquipmentDump Truck (5 yd capacity)Multiple
20EquipmentDump Truck Belly End DumpMultiple
21EquipmentExcavatorMultipleCAT 320 or equvalent
22EquipmentExcavator Long ReachMultiple
23EquipmentForkliftMultiple10,000 lb capacity
24EquipmentGenerator portable 5-10KwMultiple
25EquipmentGraderMultiple
26EquipmentHeavy Haul Transport TrailerMultipleTandem Axle
27EquipmentHeavy Haul Transport Truck/Trailer/OperatorMultiple
28EquipmentHoist TruckFence
29EquipmentHorizontal/Vertical Band SawFence
30EquipmentLoaderMultiple950 or equivalent
31EquipmentMan LiftFenceGenie S-60 or equivalent
32EquipmentMini excavatorMultiple
33EquipmentMini Skid SteerMultipleMax 3ft width with bucket
34EquipmentMowersVeg Debris
35EquipmentPile Driving MachineMultiple
36EquipmentPortable Cement MixerMultiple
37EquipmentPortable Magnetic DrillFenceHorizontial Boring Machine
38EquipmentPortable Trailer Mounted Port-a-JohnMultiple
39EquipmentProfessional Paint Sprayer, Ultramax II 490Tunnel Painting
40EquipmentScraper 17CYMultipleCaterpillar 613C or equivalent
41EquipmentService TruckMultiple
42EquipmentSide x Side UTVMultiple
43EquipmentSnorkel LiftFence
44EquipmentStand with Water TankMultipleKlein, 10,000 gallon
45EquipmentSweeper - Ride OnVeg Debris
46EquipmentTrench Compactor walk behindFence FoundationKing Louie Complete rebuild compact trench after demo
47EquipmentVacuum Trailer with PumpDebris RemovalVermeer VX30-500LT
48EquipmentWater Buffalo 500 GalMultiple
49EquipmentWater Tank, 21,000 GallonMultiple
50EquipmentWater TruckMultipleArticulating Water Pull 6,000-8,000 gallon capacity
51EquipmentWater TruckMultiple4,000 Gallon
52EquipmentWeed EatersVeg Debris
53EquipmentWelding RigFence

Work Activity Report Form

Work Activity (WA) Number:Date(s):REV:0
WORK DESCRIPTION
TI Asset Description:Work Category:

Work Category Sub Type:

Asset Objective(s):Damage Extent:
Work Category:Location:
Work Classification:Sector:
Work Subdivisions:GPS:BEGN:
W:ENDN:

W:

Prime Lead Contact:Name:Ph:Email:
SUB Lead Contact:Name:Ph:Email:
GOV Lead Contact:Name:Ph:Email:
WORK PERFORMANCE
Inspection:Frequency:
Scope of Work:

Work Standards/ QC Metrics:

Work Duration:Days: ##WAR STATUS:Initial
ACCESS
Access Issues (including any expiration dates):Access Stakeholder(s):
Stakeholder Type:
ENVIRONMENTAL
Applicable
Environmental Regulations and Sources (_):Applicable Environmental BMPs:BMP’s reviewed and implemented?Yes
Survey by Biologist if required?No
COST
Est. Labor Costs:Act. Labor Costs:Other Notes/Photos
Est. Travel Costs:Act. Travel Costs:Other Notes/Photos

Nearest CBP facility: xxx Avg.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .