bafbrwhq15150.pdf

PDF 74 KB Posted

Attached to
RECOVERY-CRWU062071-Repair-Wing Headquarters, Building. 706
Solicitation number
W912LC-09-B-5001
Issued by

About this file

MECHANICAL SPECIFICATIONS RECOVERY - CRWU262071 - Repair Wing Headquarters Building. 706

View the file

Other files

File Type Posted
bafbrwhq15732.pdf PDF
025 A108.PDF PDF
090 E006.PDF PDF
068 M202.PDF PDF
058 M002.PDF PDF
07530 - ELASTOMERIC SINGLE PLY MEMBRANE-FINAL REV-2 _2_.pdf PDF
106 E602.pdf PDF
TEMP TRAILERS-SITE UTILITY.pdf PDF
104 E502.PDF PDF
062 M006.PDF PDF
098 E206.PDF PDF
105 E601.pdf PDF
102 E404.PDF PDF
067 M201.PDF PDF
023 A106.PDF PDF
002 G001.PDF PDF
Summary SOW 6 Aug 09.pdf PDF
018 A026.PDF PDF
TEMP TRAILERS-ARCH.pdf PDF
Bid Addendum 1a CRWU 06-2071.pdf PDF
066 M104.PDF PDF
Bid Schedule Repair Wing HQ final.doc DOC document
BAFBRWHQ 05120.pdf PDF
BAFBRWHQ 03050.pdf PDF
bafbrwhq15732.pdf PDF
bafbrwhq15486.pdf PDF
bafbrwhq15840.pdf PDF
bafbrwhq15820.pdf PDF
bafbrwhq15150.pdf PDF
bafbrwhq15140.pdf PDF
bafbrwhq15415.pdf PDF
bafbrwhq15995.pdf PDF
bafbrwhq15785.pdf PDF
bafbrwhq15181.pdf PDF
bafbrwhq15815.pdf PDF
bafbrwhq15950.pdf PDF
bafbrwhq15838.pdf PDF
bafbrwhq15145.pdf PDF
bafbrwhq15195.pdf PDF
bafbrwhq15155.pdf PDF
bafbrwhq15550.pdf PDF
bafbrwhq15410.pdf PDF
bafbrwhq15855.pdf PDF
bafbrwhq15900.pdf PDF
bafbrwhq15075.pdf PDF
bafbrwhq15140.pdf PDF
bafbrwhq15055.pdf PDF
bafbrwhq13915.pdf PDF
bafbrwhq15145.pdf PDF
bafbrwhq15122.pdf PDF
Show 40 more

Latest 50 of 254 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 15150 REPAIR WING HEADQUARTERS, BLDG 706

SANITARY WASTE AND VENT PIPING CRWU 06-2071

06/09/09 15150-1 BUCKLEY AFB

SECTION 15150 - SANITARY WASTE AND VENT PIPING

PART 1 - GENERAL

1.01 SUMMARY:

A. This Section includes the following for soil, waste, and vent piping inside the building:

1. Pipe, tube, and fittings.

2. Special pipe fittings.

3. Encasement for underground metal piping.

1.02 REFERENCES: (Latest Edition):

A. Applicable Standards:

1. American Society of Civil Engineers (ASCE):

a. 7 - Minimum Design Loads for Buildings and Other Structures.

2. American Society of Sanitary Engineering (ASSE):

a. 1043 - Cast Iron Sovent Sanitary Drainage Systems.

3. American Water Works Association (AWWA):

a. C105 - Polyethylene Encasement for Ductile-Iron Pipe Systems.

b. C110 - Ductile-Iron and Gray-Iron Fittings, 3 In. through 48 In. (75 mm through

1200 mm), for Water and Other Liquids.

c. C111 - Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings.

d. C151 - Ductile-Iron Pipe Centrifugally Cast, for Water.

e. C153 - Ductile-Iron Compact Fittings for Water Service.

f. C219 - Bolted, Sleeve-Type Couplings for Plain-End Pipe.

g. C600 - Installation of Ductile-Iron Water Mains and Their Appurtenances.

h. C606 - Grooved and Shouldered Joints.

4. ASME International (ASME):

a. A112.3.1 - Performance Standard and Installation Procedures for Stainless Steel

Drainage Systems for Sanitary, Storm, and Chemical Applications, above and below Ground.

b. B16.1 - Cast Iron Pipe Flanges and Flanged Fittings.

c. B16.4 - Gray Iron Threaded Fittings.

d. B16.12 - Cast Iron Threaded Drainage Fittings.

e. B16.18 - Cast Copper Alloy Solder Joint Pressure Fittings.

f. B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings.

g. B16.23 - Cast Copper Alloy Solder Joint Drainage Fittings (DWV).

h. B16.24 - Cast Copper Alloy Pipe Flanges, Class 150, 300, 400, 600, 900, 1500, and

2500, and Flanged Fittings, Class 150 and 300.

i. B16.29 - Wrought Copper and Wrought Copper Alloy Solder Joint Drainage

Fittings - DWV.

j. B16.39 - Malleable Iron Threaded Pipe Unions.

k. B16.45 - Cast Iron Fittings for Sovent® Drainage Systems.

5. ASTM International (ASTM):

a. A47/A47M - Ferritic Malleable Iron Castings.

b. A48/A48M - Gray Iron Castings.

c. A53/A53M - Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and

Seamless.

d. A74 - Cast Iron Soil Pipe and Fittings.

SECTION 15150 REPAIR WING HEADQUARTERS, BLDG 706

SANITARY WASTE AND VENT PIPING CRWU 06-2071

BUCKLEY AFB 15150-2 06/09/09

e. A106 - Seamless Carbon Steel Pipe for High-Temperature Service.

f. A536 - Ductile Iron Castings.

g. A674 - Polyethylene Encasement for Ductile iron Pipe for Water or Other Liquids.

h. A733 - Welded and Seamless Carbon Steel and Austenitic Stainless Steel Pipe

Nipples.

i. A888 - Hubless Cast Iron Soil Pipe and Fittings for Sanitary and Storm Drain, Waste, and Vent Piping Applications.

j. B29 - Refined Lead.

k. C564 - Rubber Gaskets for Cast Iron Soil Pipe and Fittings.

l. C1173 - Flexible Transition Couplings for Underground Piping Systems.

m. C1277 - Shielded Couplings Joining Hubless Cast Iron Soil Pipe and Fittings.

n. C1440 - Thermoplastic Elastomeric (TPE) Gasket Materials for Drain, Waste, and

Vent (DWV), Sewer, Sanitary and Storm Plumbing Systems.

o. C1460 - Shield Transition Couplings for Use with Dissimilar DWV Pipe and

Fittings Above Ground.

p. C1461 - Mechanical Coupling Using Thermoplastic Elastomeric (TPE) Gaskets for

Joining Drain, Waste and Vent (DWV), Sewer, Sanitary, and Storm Plumbing Systems for above and below Ground Use.

6. Cast Iron Soil Pipe Institute (CISPI):

a. 301 - Hubless Cast Iron Soil Pipe and Fittings for Sanitary and Storm Drain, Waste, and Vent Piping Applications.

b. 310 - Coupling for Use in Connection with Hubless Cast Iron Soil Pipe and Fittings for Sanitary and Storm Drain, Waste, and Vent Piping Applications.

c. Cast Iron Soil Pipe and Fittings Handbook. 2002.

7. Copper Development Association Inc.:

a. Copper Tube Handbook. 2002.

8. Manufacturers Standardization Society of the Valve and Fittings Industry inc. (MSS):

a. SP-69 - Pipe Hangers and Supports - Selection and Application.

b. SP-123 - Non-Ferrous Threaded and Solder-Joint Unions for Use with Copper

Water Tube.

1.03 DEFINITIONS:

A. EPDM: Ethylene-propylene-diene terpolymer rubber.

B. LLDPE: Linear, low-density polyethylene plastic.

C. NBR: Acrylonitrile-butadiene rubber.

D. TPE: Thermoplastic elastomer.

1.04 PERFORMANCE REQUIREMENTS

A. Components and installation shall be capable of withstanding the following minimum working pressure, unless otherwise indicated:

1. Soil, Waste, and Vent Piping: 10-foot head of water (30 kPa).

B. Seismic Performance: Soil, waste, and vent piping and support and installation shall be capable of withstanding the effects of seismic events determined according to ASCE 7.

1.05 SUBMITTALS:

A. General: Submit the following as specified in SECTION 15050 - BASIC MECHANICAL

MATERIALS AND METHODS.

B. Product Data: For pipe, tube, fittings, and couplings.

SECTION 15150 REPAIR WING HEADQUARTERS, BLDG 706

SANITARY WASTE AND VENT PIPING CRWU 06-2071

06/09/09 15150-3 BUCKLEY AFB

C. Field quality-control inspection and test reports.

1.06 QUALITY ASSURANCE:

A. Piping materials shall bear label, stamp, or other markings of specified testing agency.

PART 2 - PRODUCTS

2.01 MANUFACTURERS:

A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the manufacturers specified.

2.02 PIPING MATERIALS:

A. Refer to Part 3 "Piping Applications" Article for applications of pipe, tube, fitting, and joining materials.

2.03 HUB-AND-SPIGOT, CAST-IRON SOIL PIPE AND FITTINGS:

A. Pipe and Fittings: ASTM A74, Service class(es).

B. Gaskets: ASTM C564, rubber.

C. Lead and Oakum: ASTM B29, pure lead and oakum or hemp fiber.

2.04 HUBLESS CAST-IRON SOIL PIPE AND FITTINGS:

A. Pipe and Fittings: ASTM A888 or CISPI 301.

B. Shielded Couplings: ASTM C1277 assembly of metal shield or housing, corrosion-resistant fasteners, and rubber sleeve with integral, center pipe stop.

1. Standard, Shielded, Stainless-Steel Couplings: CISPI 310, with stainless-steel corrugated shield; stainless-steel bands and tightening devices; and ASTM C564, rubber sleeve.

a. Manufacturers:

(1) ANACO.

(2) Fernco, Inc.

(3) Ideal Div.; Stant Corp.

(4) Mission Rubber Co.

(5) Tyler Pipe; Soil Pipe Div.

2. Heavy-Duty, Shielded, Stainless-Steel Couplings: With stainless-steel shield, stainless-steel bands and tightening devices, and ASTM C564, rubber sleeve.

a. Manufacturers:

(1) ANACO.

(2) Clamp-All Corp.

(3) Ideal Div.; Stant Corp.

(4) Mission Rubber Co.

(5) Tyler Pipe; Soil Pipe Div.

3. Heavy-Duty, Shielded, Cast-Iron Couplings: ASTM A 48/A 48M, two-piece, cast-iron housing; stainless-steel bolts and nuts; and ASTM C 564, rubber sleeve.

a. Manufacturers:

(1) MG Piping Products Co.

(2) Insert manufacturer's name.

SECTION 15150 REPAIR WING HEADQUARTERS, BLDG 706

SANITARY WASTE AND VENT PIPING CRWU 06-2071

BUCKLEY AFB 15150-4 06/09/09

C. Rigid, Unshielded Couplings: ASTM C1461, sleeve-type, reducing- or transition-type mechanical coupling molded from ASTM C1440, TPE material with corrosion-resistant-metal tension band and tightening mechanism on each end.

1. Manufacturers:

a. ANACO.

2.05 STEEL PIPE AND FITTINGS:

A. Steel Pipe: ASTM A53/A53M, Type E or S, Grade A or B, Standard Weight or Schedule 40, galvanized. Include ends matching joining method.

B. Drainage Fittings: ASME B16.12, threaded, cast-iron drainage pattern.

2.06 SPECIAL PIPE FITTINGS:

A. Flexible, Nonpressure Pipe Couplings: Comply with ASTM C1173, elastomeric, sleeve-type, reducing or transition pattern. Include shear ring, ends of same sizes as piping to be joined, and corrosion-resistant-metal tension band and tightening mechanism on each end.

1. Manufacturers:

a. Dallas Specialty & Mfg. Co.

b. Fernco, Inc.

c. Logan Clay Products Company (The).

d. Mission Rubber Co.

e. NDS, Inc.

f. Plastic Oddities, Inc.

2. Sleeve Materials:

a. For Cast-Iron Soil Pipes: ASTM C564, rubber.

b. For Plastic Pipes: ASTM F477, elastomeric seal or ASTM D5926, PVC.

c. For Dissimilar Pipes: ASTM D5926, PVC or other material compatible with pipe materials being joined.

B. Shielded Nonpressure Pipe Couplings: ASTM C1460, elastomeric or rubber sleeve with full-length, corrosion-resistant outer shield and corrosion-resistant-metal tension band and tightening mechanism on each end.

1. Manufacturers:

a. Cascade Waterworks Mfg. Co.

b. Mission Rubber Co.

C. Rigid, Unshielded, Nonpressure Pipe Couplings: ASTM C1461, sleeve-type reducing- or transition-type mechanical coupling molded from ASTM C1440, TPE material with corrosion-resistant-metal tension band and tightening mechanism on each end.

1. Manufacturers:

a. ANACO.

D. Wall-Penetration Fittings: Compound, ductile-iron coupling fitting with sleeve and flexing sections for up to 20-degree deflection, gaskets, and restrained-joint ends complying with AWWA C110 or AWWA C153. Include AWWA C111, ductile-iron glands, rubber gaskets, and steel bolts.

1. Manufacturers:

a. SIGMA Corp.

2.07 ENCASEMENT FOR UNDERGROUND METAL PIPING:

A. Description: ASTM A674 or AWWA C105, high-density, crosslaminated PE film of 0.004-inch (0.10-mm) minimum thickness.

SECTION 15150 REPAIR WING HEADQUARTERS, BLDG 706

SANITARY WASTE AND VENT PIPING CRWU 06-2071

06/09/09 15150-5 BUCKLEY AFB

B. Form: Sheet or tube.

C. Color: Black or natural.

PART 3 - EXECUTION

3.01 EXCAVATION:

A. Refer to DIVISION 2 Section for excavating, trenching, and backfilling.

3.02 PIPING APPLICATIONS:

A. Aboveground, soil and waste piping NPS 4 (DN 100) and smaller shall be any of the following:

1. Service class, cast-iron soil pipe and fittings; gaskets; and compression joints.

2. Hubless cast-iron soil pipe and fittings; standard, shielded, stainless-steel and rigid, unshielded couplings; and hubless-coupling joints.

3. Steel pipe, drainage fittings, and threaded joints.

B. Aboveground, vent piping NPS 4 (DN 100) and smaller shall be any of the following:

1. Service class, cast-iron soil pipe and fittings; gaskets; and compression joints.

2. Hubless cast-iron soil pipe and fittings; standard, shielded, stainless-steel and rigid, unshielded couplings; and hubless-coupling joints.

3. Steel pipe, drainage fittings, and threaded joints.

C. Underground, soil, waste, and vent piping NPS 4 (DN 100) and smaller shall be the following:

1. Service class, cast-iron soil piping; gaskets; and gasketed joints.

3.03 PIPING INSTALLATION:

A. Sanitary sewer piping outside the building is specified in DIVISION 2.

B. Basic piping installation requirements are specified in SECTION 15050.

C. Install cleanouts at grade and extend to where building sanitary drains connect to building sanitary sewers.

D. Install cleanout fitting with closure plug inside the building in sanitary force-main piping.

E. Install cast-iron sleeve with water stop and mechanical sleeve seal at each service pipe penetration through foundation wall. Select number of interlocking rubber links required to make installation watertight. Sleeves and mechanical sleeve seals are specified in SECTION

15050 - BASIC MECHANICAL MATERIALS AND METHODS.

F. Install cast-iron soil piping according to CISPI's "Cast Iron Soil Pipe and Fittings Handbook," Chapter IV, "Installation of Cast Iron Soil Pipe and Fittings."

1. Install encasement on underground piping according to ASTM A674 or AWWA C105.

G. Make changes in direction for soil and waste drainage and vent piping using appropriate branches, bends, and long-sweep bends. Sanitary tees and short-sweep 1/4 bends may be used on vertical stacks if change in direction of flow is from horizontal to vertical. Use long-turn, double Y-branch and 1/8-bend fittings if 2 fixtures are installed back to back or side by side with common drain pipe. Straight tees, elbows, and crosses may be used on vent lines. Do not change direction of flow more than 90 degrees. Use proper size of standard increasers and reducers if pipes of different sizes are connected. Reducing size of drainage piping in direction of flow is prohibited.

H. Lay buried building drainage piping beginning at low point of each system. Install true to grades and alignment indicated, with unbroken continuity of invert. Place hub ends of piping upstream. Install required gaskets according to manufacturer's written instructions for use of

SECTION 15150 REPAIR WING HEADQUARTERS, BLDG 706

SANITARY WASTE AND VENT PIPING CRWU 06-2071

BUCKLEY AFB 15150-6 06/09/09

lubricants, cements, and other installation requirements. Maintain swab in piping and pull past each joint as completed.

I. Install soil and waste drainage and vent piping at the following minimum slopes, unless otherwise indicated:

1. Building Sanitary Drain: 2% downward in direction of flow for piping NPS 3 (DN 80) and smaller; 1% downward in direction of flow for piping NPS 4 (DN 100) and larger.

2. Horizontal Sanitary Drainage Piping: 2% downward in direction of flow.

3. Vent Piping: 1% down toward vertical fixture vent or toward vent stack.

J. Sleeves are not required for cast-iron soil piping passing through concrete slabs-on-grade if slab is without membrane waterproofing.

K. Do not enclose, cover, or put piping into operation until it is inspected and approved by authorities having jurisdiction.

3.04 JOINT CONSTRUCTION:

A. Basic piping joint construction requirements are specified in SECTION 15050 - BASIC

MECHANICAL MATERIALS AND METHODS.

B. Join hub-and-spigot, cast-iron soil piping with gasket joints according to CISPI's "Cast Iron

Soil Pipe and Fittings Handbook" for compression joints.

C. Join hub-and-spigot, cast-iron soil piping with calked joints according to CISPI's "Cast Iron

Soil Pipe and Fittings Handbook" for lead and oakum calked joints.

D. Join hubless cast-iron soil piping according to CISPI 310 and CISPI's "Cast Iron Soil Pipe and

Fittings Handbook" for hubless-coupling joints.

E. Grooved Joints: Assemble joint with keyed coupling, gasket, lubricant, and bolts according to coupling and fitting manufacturer's written instructions.

3.05 HANGER AND SUPPORT INSTALLATION:

A. Pipe hangers and supports are specified in SECTION 15060 - HANGERS AND SUPPORTS.

Install the following:

1. Vertical Piping: MSS Type 8 or Type 42, clamps.

2. Install individual, straight, horizontal piping runs according to the following:

a. 100 Feet (30 m) and Less: MSS Type 1, adjustable, steel clevis hangers.

b. Longer Than 100 Feet (30 m): MSS Type 43, adjustable roller hangers.

c. Longer Than 100 Feet (30 m), if Indicated: MSS Type 49, spring cushion rolls.

3. Multiple, Straight, Horizontal Piping Runs 100 Feet (30 m) or Longer: MSS Type 44, pipe rolls. Support pipe rolls on trapeze.

4. Base of Vertical Piping: MSS Type 52, spring hangers.

B. Install supports according to SECTION 15060 - HANGERS AND SUPPORTS.

C. Support vertical piping and tubing at base and at each floor.

D. Rod diameter may be reduced 1 size for double-rod hangers, with 3/8-inch (10-mm) minimum rods.

E. Install hangers for cast-iron soil piping with the following maximum horizontal spacing and minimum rod diameters:

1. NPS 1-1/2 and NPS 2 (DN 40 and DN 50): 60 inches (1500 mm) with 3/8-inch (10-mm) rod.

2. NPS 3 (DN 80): 60 inches (1500 mm) with 1/2-inch (13-mm) rod.

3. NPS 4 and NPS 5 (DN 100 and DN 125): 60 inches (1500 mm) with 5/8-inch (16-mm) rod.

F. Install supports for vertical cast-iron soil piping every 15 feet (4.5 m).

SECTION 15150 REPAIR WING HEADQUARTERS, BLDG 706

SANITARY WASTE AND VENT PIPING CRWU 06-2071

06/09/09 15150-7 BUCKLEY AFB

G. Install hangers for steel piping with the following maximum horizontal spacing and minimum rod diameters:

1. NPS 1-1/4 (DN 32): 84 inches (2100 mm) with 3/8-inch (10-mm) rod.

2. NPS 1-1/2 (DN 40): 108 inches (2700 mm) with 3/8-inch (10-mm) rod.

3. NPS 2 (DN 50): 10 feet (3 m) with 3/8-inch (10-mm) rod.

4. NPS 2-1/2 (DN 65): 11 feet (3.4 m) with 1/2-inch (13-mm) rod.

5. NPS 3 (DN 80): 12 feet (3.7 m) with 1/2-inch (13-mm) rod.

6. NPS 4 and NPS 5 (DN 100 and DN 125): 12 feet (3.7 m) with 5/8-inch (16-mm) rod.

H. Install supports for vertical steel piping every 15 feet (4.5 m).

I. Support piping and tubing not listed above according to MSS SP-69 and manufacturer's written instructions.

3.06 CONNECTIONS:

A. Drawings indicate general arrangement of piping, fittings, and specialties.

B. Connect soil and waste piping to exterior sanitary sewerage piping. Use transition fitting to join dissimilar piping materials.

C. Connect drainage and vent piping to the following:

1. Plumbing Fixtures: Connect drainage piping in sizes indicated, but not smaller than required by plumbing code.

2. Plumbing Fixtures and Equipment: Connect atmospheric vent piping in sizes indicated, but not smaller than required by authorities having jurisdiction.

3. Plumbing Specialties: Connect drainage and vent piping in sizes indicated, but not smaller than required by plumbing code.

4. Equipment: Connect drainage piping as indicated. Provide shutoff valve, if indicated, and union for each connection. Use flanges instead of unions for connections NPS 2-1/2 (DN 65) and larger.

3.07 FIELD QUALITY CONTROL:

A. During installation, notify authorities having jurisdiction at least 24 hours before inspection must be made. Perform tests specified below in presence of authorities having jurisdiction.

1. Roughing-in Inspection: Arrange for inspection of piping before concealing or closing-in after roughing-in and before setting fixtures.

2. Final Inspection: Arrange for final inspection by authorities having jurisdiction to observe tests specified below and to ensure compliance with requirements.

B. Reinspection: If authorities having jurisdiction find that piping will not pass test or inspection, make required corrections and arrange for reinspection.

C. Reports: Prepare inspection reports and have them signed by authorities having jurisdiction.

D. Test sanitary drainage and vent piping according to procedures of authorities having jurisdiction or, in absence of published procedures, as follows:

1. Test for leaks and defects in new piping and parts of existing piping that have been altered, extended, or repaired. If testing is performed in segments, submit separate report for each test, complete with diagram of portion of piping tested.

2. Leave uncovered and unconcealed new, altered, extended, or replaced drainage and vent piping until it has been tested and approved. Expose work that was covered or concealed before it was tested.

3. Roughing-in Plumbing Test Procedure: Test drainage and vent piping, except outside leaders, on completion of roughing-in. Close openings in piping system and fill with water to point of overflow, but not less than 10-foot head of water (30 kPa). From 15

SECTION 15150 REPAIR WING HEADQUARTERS, BLDG 706

SANITARY WASTE AND VENT PIPING CRWU 06-2071

BUCKLEY AFB 15150-8 06/09/09

minutes before inspection starts to completion of inspection, water level must not drop.

Inspect joints for leaks.

4. Finished Plumbing Test Procedure: After plumbing fixtures have been set and traps filled with water, test connections and prove they are gastight and watertight. Plug vent-stack openings on roof and building drains where they leave building. Introduce air into piping system equal to pressure of 1-inch wg (250 Pa). Use U-tube or manometer inserted in trap of water closet to measure this pressure. Air pressure must remain constant without introducing additional air throughout period of inspection. Inspect plumbing fixture connections for gas and water leaks.

5. Repair leaks and defects with new materials and retest piping, or portion thereof, until satisfactory results are obtained.

6. Prepare reports for tests and required corrective action.

3.08 CLEANING:

A. Clean interior of piping. Remove dirt and debris as work progresses.

B. Protect drains during remainder of construction period to avoid clogging with dirt and debris and to prevent damage from traffic and construction work.

C. Place plugs in ends of uncompleted piping at end of day and when work stops.

END OF SECTION 15150

File details come from the government source that posted it. Updated .