090 E006.PDF

PDF 138 KB Posted

Attached to
RECOVERY-CRWU062071-Repair-Wing Headquarters, Building. 706
Solicitation number
W912LC-09-B-5001
Issued by

About this file

Adendum to Drawings and Specifications dated 2 September 2009.

View the file

Other files

File Type Posted
bafbrwhq15732.pdf PDF
025 A108.PDF PDF
068 M202.PDF PDF
058 M002.PDF PDF
07530 - ELASTOMERIC SINGLE PLY MEMBRANE-FINAL REV-2 _2_.pdf PDF
106 E602.pdf PDF
TEMP TRAILERS-SITE UTILITY.pdf PDF
104 E502.PDF PDF
062 M006.PDF PDF
098 E206.PDF PDF
105 E601.pdf PDF
102 E404.PDF PDF
067 M201.PDF PDF
023 A106.PDF PDF
002 G001.PDF PDF
Summary SOW 6 Aug 09.pdf PDF
018 A026.PDF PDF
TEMP TRAILERS-ARCH.pdf PDF
Bid Addendum 1a CRWU 06-2071.pdf PDF
066 M104.PDF PDF
Bid Schedule Repair Wing HQ final.doc DOC document
BAFBRWHQ 05120.pdf PDF
BAFBRWHQ 03050.pdf PDF
bafbrwhq15732.pdf PDF
bafbrwhq15486.pdf PDF
bafbrwhq15840.pdf PDF
bafbrwhq15820.pdf PDF
bafbrwhq15150.pdf PDF
bafbrwhq15140.pdf PDF
bafbrwhq15415.pdf PDF
bafbrwhq15995.pdf PDF
bafbrwhq15785.pdf PDF
bafbrwhq15181.pdf PDF
bafbrwhq15815.pdf PDF
bafbrwhq15950.pdf PDF
bafbrwhq15838.pdf PDF
bafbrwhq15145.pdf PDF
bafbrwhq15195.pdf PDF
bafbrwhq15155.pdf PDF
bafbrwhq15550.pdf PDF
bafbrwhq15410.pdf PDF
bafbrwhq15855.pdf PDF
bafbrwhq15900.pdf PDF
bafbrwhq15075.pdf PDF
bafbrwhq15140.pdf PDF
bafbrwhq15055.pdf PDF
bafbrwhq13915.pdf PDF
bafbrwhq15145.pdf PDF
bafbrwhq15122.pdf PDF
bafbrwhq15110.pdf PDF
Show 40 more

Latest 50 of 254 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROOF AREA

ELECTRICAL DEMOLITION PLAN

DINING

ADMIN.

SECURITY

AREA 2

AREA 3 AREA 1

KEY PLAN

N.T.S.

COMPASS

NORTH

PROJECT

KEYED NOTES:

MECHANICAL EQUIPMENT BEING REMOVED.

2 REMOVE WIRING DEVICES INDICATED INCLUDING DISCONNECT CONDUIT,

CONDUCTORS AND BREAKERS IN PANELBOARD.

3 DEMOLISH EXISTING 400A DISCONNECT, CONDUCTORS AND CIRCUIT BREAKERS

IN MAIN SWITCHBOARD. CONDUIT RACEWAY SHALL REMAIN FOR INSTALLATION

OF NEW CONDUCTORS. VERIFY CONDUIT IS 3" OR LARGER PRIOR TO ANY DEMO

WORK. IF NOT NOTIFY ENGINEER.

M

M1

2EXISTING

RTU-3

EF

EF

L L L L L L L

L

L

L

L L

L L

L

L

L L L

L L L

L

L

L L

L

L

LLL

L L L LL

L

L L

L

L

L

L

L L

L

L L

LLLLL

L

L

L

L

L

L

L

L

L

1EXISTING

RTU-1

1 2 3 4 5 6 1811 12 13 14 15 16 179.79.38.57.77.3 987 10

PAGE NUMBER

SHEET NO.

OF

DATE

DRAWING TITLE:

COMMUNICATION

PROJECT TITLE:

PROJECT NUMBER:

DESIGNED BY

DRAWN BY

SAFETY

USING AGENCY

SECURITY POLICE

CHIEF OF ENGRG.

BASE CIVIL ENGINEER

BIO-ENVIR. ENGR.

CHIEF OF OPS. FIRE CHIEF

MSG COMMANDER

WING COMMANDER

MARK REVISION DATE

COLORADO

OFFICE OF THE BASE CIVIL ENGR.

AIR NATIONAL GUARD

Burns & McDonnell Proj No 51047

CRWU 06-2071

6-9-2009

REPAIR WING

BUILDING 706

HEADQUARTERS

E006

L. CREED

M. McNUTT

ROOF AREA

ELECTRICAL

DEMOLITION PLAN

J:\BUCKLEY AFB\51047-BUCKLEY WING HQ RREPAIR\CADD\ELEC\51047E006.DWG 07-20-2009 10:39 LCREED

DEMOLITION NOTES:

1. COORDINATE AND DISCONNECT ALL LIGHTNING PROTECTION BONDS TO

EXISTING METAL BODIES LOCATED ON ROOF WITH ROOFING CONTRACTOR.

COIL CONDUCTORS BACK TO CONNECTION POINT FOR REPAIR OF ROOF.

2. LIGHTNING PROTECTION SHALL REMAIN AS INTACT AS MUCH AS POSSIBLE

DURING REPAIR OF ROOF.

CORRECTIONS

File details come from the government source that posted it. Updated .