058 M002.PDF
PDF 104 KB Posted
- Solicitation number
- W912LC-09-B-5001
About this file
Adendum to Drawings and Specifications dated 2 September 2009.
View the file
Other files
Show 40 more
Latest 50 of 254 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FAN MOUNTING
BLADE/WHEEL TYPE
DRIVE TYPE
ELECTRICAL DATA (VOLTS/PHASE/HERTZ)
APPROX WHEEL RPM
EXTERNAL STATIC PRESSURE (INCHES WG)
AIR FLOW (CFM)
FAN ALTITUDE (FT)
SERVICE USED FOR
FAN SCHEDULE
FAN TYPE
LOCATION
LOCATION DRAWING NUMBER
FAN NUMBER
MAXIMUM MOTOR HP
EF-8
M104
1.25
5,662
AREA 3 ROOF
BELT
1,800 3/4
480/3/60
IN-LINE
EXHAUST
1,160
ROOF
CENTRIFUGAL
- 4 WAY
- 3 WAY
- 2 WAY
- ADJUSTABLE
- FIXED
LR - LINEAR
3-W
- EGGCRATEEGG
4-W
- SQUARE
- PERFORATED
FACE TYPE:
ACCESSORIES
FACE TYPE
MOUNTING TYPE
DAMPER TYPE
PATTERN TYPE
FINISH
SQ
PR
MAX NC
FX
2-W
ADJ
PATTERNS:
DIFFUSER REGISTER AND GRILLE SCHEDULE
TAG NO
MATERIAL
- EQUALIZING DEFLECTORS
MATERIAL:
- OPPOSED BLADEO-B
- INTEGRALITGL
- STEEL
- ALUMINUM
DAMPERS:
ST
AL
- WHITE ENAMEL
FINISHES:
W-E
- SURFACE MOUNT
FL - FLUSH
- LAY-IN
- SNAP-IN
L-I S-I S
MOUNTING:
ACCESSORIES:
- PLASTER RING
- SMUDGE RING
E-D
P-R S-R
ST
SQ
L-I
2-W O-B N/A W-E
SD-1
W-E N/A N/A
FX
L-I
PR
ST
RG-1
W-E N/A N/A
FX
S
PR
ST
TG-1
ST
SQ
L-1 3-W O-B N/A W-E
SD-2
W-E N/A N/A
FX
S
PR
ST
EG-1
APPROXIMATE WEIGHT (LBS) 150
NOTES -
VARIABLE AIR VOLUME (VAV) BOX SCHEDULE
TAG NO VAV-1 VAV-2 VAV-3 VAV-4 VAV-5 VAV-6 VAV-7 VAV-8 VAV-9 VAV-10 VAV-11
LOCATION DRAWING NO M102 M102
DESIGN CFM 510 455 710 440 730 650 190 195 550 780 740
MAX PRESSURE DROP (IN. WC) 0.10 0.10 0.10 0.17 0.34 0.10 0.17 0.17 0.10 0.34 0.34
MAX SOUND POWER LEVEL - (NC) 20
INLET SIZE - (IN) 8 8 10 8 10 8 8 8 8 10 10
QUANTITY 1 1 1 1 1 1 1 1 1 1 1
---1.
NOTES:
WINTER ENT. AIR TEMP. (ÁF)
WINTER PRESS. DROP (IN WC)
WINTER LVG. AIR TEMP. (ÁF)
SUPPLY
SUMMER ENT. AIR TEMP. (ÁF)
SUMMER PRESS. DROP (IN WC)
SUMMER LVG. AIR TEMP. (ÁF)
ENERGY RECOVERY UNIT SCHEDULE
EXHAUST
NO. ERU-1
TYPE AIR TO AIR
87.39
0.154 9.97
1,160
0.150
CFM
ENERGY RECOVERY UNIT SHALL BE SUPPLIED
WITH ELECTRIC CONTROLS PACKAGE.
THE ENERGY RECOVERY UNIT IS A REVERSE
AIRFLOW STATE.
1.
2.
NOTES:
MINIMUM SUMMER EFFECTIVENESS - %
REMARKS
1,2
WINTER ENT. AIR TEMP. (ÁF)
WINTER PRESS. DROP (IN WC)
WINTER LVG. AIR TEMP. (ÁF)
SUMMER ENT. AIR TEMP. (ÁF)
SUMMER PRESS. DROP (IN WC)
SUMMER LVG. AIR TEMP. (ÁF)
3.3
80.4
0.174 55.78
1,160
0.143
CFM
MINIMUM WINTER EFFECTIVENESS - %
LOCATION DRAWING NUMBER M104
TOTAL NUMBER OF CASSETTES 6
2,400APPROX. UNIT WEIGHT
0.240NORMAL STATIC (IN WC)
0.240NORMAL STATIC (IN WC)
MOTOR RPM
LAT - DB (ÁF)
TOTAL COOLING LOAD (MBH)
MAX. FACE VELOCITY - (FT/MIN)
SENSIBLE (MBH)
EAT - DB (ÁF)
ELECTRICAL DATA - (V/PH/HZ)
COIL AIR QUANTITY - CFM
MIN. COIL OUTSIDE AIR QUANTITY - CFM
FAN RPM
MOTOR - FAN SUPPLY
MOTOR HP
TYPE/WHEEL DIAMETER - IN.
EXT. STATIC PRESSURE - (IN. W.G.)
TOTAL CFM
SITE ELEVATION (FT)
SERVICE
PACKAGED ROOF TOP UNIT SCHEDULE
NO. (TAG):
SUPPLY FAN
TYPE
DX COOLING COIL
FILTER
CFM
TYPE
FINAL EFFICIENCY
CLEAN PRESSURE DROP - (IN. W.G.)
DIRTY FILTER(S) ALLOWANCE
(TOTAL PRESSURE DROP - IN. W.G.)
NOTES
NOTES:
MAX. ROWS / MAX. FPI
90% - MERV 13
0.5
3/120
30,180 10,000
480/3/60
BELT
2-FC / 27"
2.9
30,180
AREA 1
5,662
RTU-1
30,180
0.03
CONDENSATE PIPE SIZE (IN) -
SUMMER OUTSIDE AIR - F (DB/WB) 90/63
10,000
51.5
HYDRONIC
LAT - DB (ÁF)
MIN OUTPUT HEATING LOAD (MBH)
MIN. EAT - DB (ÁF)
COIL AIR QUANTITY - CFM
COIL OUTSIDE AIR QUANTITY - CFM
PREHEATING COIL
TYPE
WINTER OUTSIDE AIR (F)
THROWAWAY
1,2,3,4
LOCATION
M104
UNIT TO BE SUPPLIED WITH DOWN DISCHARGE SUPPLY/RETURN OPENINGS
AND THROUGH BASE UTILITY PROVISIONS. REFER TO SPECIFICATION
SECTION 15732 - "PACKAGED OUTDOOR, CENTRAL STATION AIR-HANDLING
UNITS."
CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY CONTROL
INTERFACES BETWEEN CONTROLS PROVIDED WITH THE NEW UNIT AND ANY
EXISTING REMOTELY INSTALLED CONTROL COMPONENTS.
THE WEIGHT OF THE NEW UNIT CANNOT EXCEED THE WEIGHT OF THE
EXISTING UNIT BY MORE THAN 5%.
CONTRACTOR SHALL REPLACE RTU-1 WITH A NEW IDENTICAL PACKAGED
ROOF TOP UNIT.
ITEMS IN BOLD ARE THE CAPACITIES CHANGES REQUIRED FOR RTU-3.
APPROX. UNIT WEIGHT - (LBS) 18,000
CAPACITY (MBH)
ENTERING AIR TEMP (F)
ENTERING WATER TEMP (F)
FLOW (GPM)
WATER PRESSURE DROP (FT WG)
M102 M102 M102 M102 M102 M102 M102 M102 M102
4.8 4.6 6.8 6.5 6.8 9.3 2.5 1.9 5.1 7.3 7.0
1.5 1.5 1.5 0.5 1.0 1.5 0.5 0.5 1.5 1.0 1.0
0.9 0.9 0.9 0.2 1.0 0.9 0.2 0.2 0.9 1.0 1.0
180 180 180 180 180 180 180 180 180 180
EXISTING VAV BOX TO BE REUSED VAV-2 VAV-2 N/A VAV-1 VAV-3 N/A VAV-1 VAV-1 N/A VAV-3 N/A
20 20 20 20 20 20 20 20 20 20
MANUFACTURER
MODEL
TITUS
TMS 8R
TITUS
8R
TITUSTITUS
TMS 8F
TITUS
ST
LR
S
ADJ
O-B N/A W-E
SG-3
TITUS
300RL
W-E N/A N/A
FX
S
LR
ST
TG-2
T-700L
TITUS
LEAVING AIR TEMP (F) 100
EER 9.6
MINIMUM CFM 155 150 220 210 220 300 80 60 165 235 225
100 100 100 100 100 100 100 100 100 100
65 65 65 65 65 65 65 65 65 65
ST
SQ
L-I
1-W O-B N/A W-E
SD-4
TITUS
TMS
- 1 WAY1-W
90% - MERV 8
4/15
137.4 150.8
5,950 1,160
480/3/60
BELT
1,750
FC / 18x18
1.1
5,950
AREA 3
5,662
RTU-3 (E)
5,670
90/63
THROWAWAY
M104
PREFILTER EFFICIENCY 90% - MERV 8 -
1.
2.
3.
4.
5.
PAGE NUMBER
SHEET NO.
OF
DATE
DRAWING TITLE:
COMMUNICATION
PROJECT TITLE:
PROJECT NUMBER:
DESIGNED BY
DRAWN BY
SAFETY
USING AGENCY
SECURITY POLICE
CHIEF OF ENGRG.
BASE CIVIL ENGINEER
BIO-ENVIR. ENGR.
CHIEF OF OPS. FIRE CHIEF
MSG COMMANDER
WING COMMANDER
MARK REVISION DATE
COLORADO
OFFICE OF THE BASE CIVIL ENGR.
AIR NATIONAL GUARD
Burns & McDonnell Proj No 51047
CRWU 06-2071
6-9-2009
REPAIR WING
BUILDING 706
HEADQUARTERS
M002
P. HUNTZINGER
B. BIRGE
MECHANICAL
SCHEDULES
CORRECTIONS
File details come from the government source that posted it. Updated .