058 M002.PDF

PDF 104 KB Posted

Attached to
RECOVERY-CRWU062071-Repair-Wing Headquarters, Building. 706
Solicitation number
W912LC-09-B-5001
Issued by

About this file

Adendum to Drawings and Specifications dated 2 September 2009.

View the file

Other files

File Type Posted
bafbrwhq15732.pdf PDF
025 A108.PDF PDF
090 E006.PDF PDF
068 M202.PDF PDF
07530 - ELASTOMERIC SINGLE PLY MEMBRANE-FINAL REV-2 _2_.pdf PDF
106 E602.pdf PDF
TEMP TRAILERS-SITE UTILITY.pdf PDF
104 E502.PDF PDF
062 M006.PDF PDF
098 E206.PDF PDF
105 E601.pdf PDF
102 E404.PDF PDF
067 M201.PDF PDF
023 A106.PDF PDF
002 G001.PDF PDF
Summary SOW 6 Aug 09.pdf PDF
018 A026.PDF PDF
TEMP TRAILERS-ARCH.pdf PDF
Bid Addendum 1a CRWU 06-2071.pdf PDF
066 M104.PDF PDF
Bid Schedule Repair Wing HQ final.doc DOC document
BAFBRWHQ 05120.pdf PDF
BAFBRWHQ 03050.pdf PDF
bafbrwhq15732.pdf PDF
bafbrwhq15486.pdf PDF
bafbrwhq15840.pdf PDF
bafbrwhq15820.pdf PDF
bafbrwhq15150.pdf PDF
bafbrwhq15140.pdf PDF
bafbrwhq15415.pdf PDF
bafbrwhq15995.pdf PDF
bafbrwhq15785.pdf PDF
bafbrwhq15181.pdf PDF
bafbrwhq15815.pdf PDF
bafbrwhq15950.pdf PDF
bafbrwhq15838.pdf PDF
bafbrwhq15145.pdf PDF
bafbrwhq15195.pdf PDF
bafbrwhq15155.pdf PDF
bafbrwhq15550.pdf PDF
bafbrwhq15410.pdf PDF
bafbrwhq15855.pdf PDF
bafbrwhq15900.pdf PDF
bafbrwhq15075.pdf PDF
bafbrwhq15140.pdf PDF
bafbrwhq15055.pdf PDF
bafbrwhq13915.pdf PDF
bafbrwhq15145.pdf PDF
bafbrwhq15122.pdf PDF
bafbrwhq15110.pdf PDF
Show 40 more

Latest 50 of 254 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FAN MOUNTING

BLADE/WHEEL TYPE

DRIVE TYPE

ELECTRICAL DATA (VOLTS/PHASE/HERTZ)

APPROX WHEEL RPM

EXTERNAL STATIC PRESSURE (INCHES WG)

AIR FLOW (CFM)

FAN ALTITUDE (FT)

SERVICE USED FOR

FAN SCHEDULE

FAN TYPE

LOCATION

LOCATION DRAWING NUMBER

FAN NUMBER

MAXIMUM MOTOR HP

EF-8

M104

1.25

5,662

AREA 3 ROOF

BELT

1,800 3/4

480/3/60

IN-LINE

EXHAUST

1,160

ROOF

CENTRIFUGAL

- 4 WAY

- 3 WAY

- 2 WAY

- ADJUSTABLE

- FIXED

LR - LINEAR

3-W

- EGGCRATEEGG

4-W

- SQUARE

- PERFORATED

FACE TYPE:

ACCESSORIES

FACE TYPE

MOUNTING TYPE

DAMPER TYPE

PATTERN TYPE

FINISH

SQ

PR

MAX NC

FX

2-W

ADJ

PATTERNS:

DIFFUSER REGISTER AND GRILLE SCHEDULE

TAG NO

MATERIAL

- EQUALIZING DEFLECTORS

MATERIAL:

- OPPOSED BLADEO-B

- INTEGRALITGL

- STEEL

- ALUMINUM

DAMPERS:

ST

AL

- WHITE ENAMEL

FINISHES:

W-E

- SURFACE MOUNT

FL - FLUSH

- LAY-IN

- SNAP-IN

L-I S-I S

MOUNTING:

ACCESSORIES:

- PLASTER RING

- SMUDGE RING

E-D

P-R S-R

ST

SQ

L-I

2-W O-B N/A W-E

SD-1

W-E N/A N/A

FX

L-I

PR

ST

RG-1

W-E N/A N/A

FX

S

PR

ST

TG-1

ST

SQ

L-1 3-W O-B N/A W-E

SD-2

W-E N/A N/A

FX

S

PR

ST

EG-1

APPROXIMATE WEIGHT (LBS) 150

NOTES -

VARIABLE AIR VOLUME (VAV) BOX SCHEDULE

TAG NO VAV-1 VAV-2 VAV-3 VAV-4 VAV-5 VAV-6 VAV-7 VAV-8 VAV-9 VAV-10 VAV-11

LOCATION DRAWING NO M102 M102

DESIGN CFM 510 455 710 440 730 650 190 195 550 780 740

MAX PRESSURE DROP (IN. WC) 0.10 0.10 0.10 0.17 0.34 0.10 0.17 0.17 0.10 0.34 0.34

MAX SOUND POWER LEVEL - (NC) 20

INLET SIZE - (IN) 8 8 10 8 10 8 8 8 8 10 10

QUANTITY 1 1 1 1 1 1 1 1 1 1 1

---1.

NOTES:

WINTER ENT. AIR TEMP. (ÁF)

WINTER PRESS. DROP (IN WC)

WINTER LVG. AIR TEMP. (ÁF)

SUPPLY

SUMMER ENT. AIR TEMP. (ÁF)

SUMMER PRESS. DROP (IN WC)

SUMMER LVG. AIR TEMP. (ÁF)

ENERGY RECOVERY UNIT SCHEDULE

EXHAUST

NO. ERU-1

TYPE AIR TO AIR

87.39

0.154 9.97

1,160

0.150

CFM

ENERGY RECOVERY UNIT SHALL BE SUPPLIED

WITH ELECTRIC CONTROLS PACKAGE.

THE ENERGY RECOVERY UNIT IS A REVERSE

AIRFLOW STATE.

1.

2.

NOTES:

MINIMUM SUMMER EFFECTIVENESS - %

REMARKS

1,2

WINTER ENT. AIR TEMP. (ÁF)

WINTER PRESS. DROP (IN WC)

WINTER LVG. AIR TEMP. (ÁF)

SUMMER ENT. AIR TEMP. (ÁF)

SUMMER PRESS. DROP (IN WC)

SUMMER LVG. AIR TEMP. (ÁF)

3.3

80.4

0.174 55.78

1,160

0.143

CFM

MINIMUM WINTER EFFECTIVENESS - %

LOCATION DRAWING NUMBER M104

TOTAL NUMBER OF CASSETTES 6

2,400APPROX. UNIT WEIGHT

0.240NORMAL STATIC (IN WC)

0.240NORMAL STATIC (IN WC)

MOTOR RPM

LAT - DB (ÁF)

TOTAL COOLING LOAD (MBH)

MAX. FACE VELOCITY - (FT/MIN)

SENSIBLE (MBH)

EAT - DB (ÁF)

ELECTRICAL DATA - (V/PH/HZ)

COIL AIR QUANTITY - CFM

MIN. COIL OUTSIDE AIR QUANTITY - CFM

FAN RPM

MOTOR - FAN SUPPLY

MOTOR HP

TYPE/WHEEL DIAMETER - IN.

EXT. STATIC PRESSURE - (IN. W.G.)

TOTAL CFM

SITE ELEVATION (FT)

SERVICE

PACKAGED ROOF TOP UNIT SCHEDULE

NO. (TAG):

SUPPLY FAN

TYPE

DX COOLING COIL

FILTER

CFM

TYPE

FINAL EFFICIENCY

CLEAN PRESSURE DROP - (IN. W.G.)

DIRTY FILTER(S) ALLOWANCE

(TOTAL PRESSURE DROP - IN. W.G.)

NOTES

NOTES:

MAX. ROWS / MAX. FPI

90% - MERV 13

0.5

3/120

30,180 10,000

480/3/60

BELT

2-FC / 27"

2.9

30,180

AREA 1

5,662

RTU-1

30,180

0.03

CONDENSATE PIPE SIZE (IN) -

SUMMER OUTSIDE AIR - F (DB/WB) 90/63

10,000

51.5

HYDRONIC

LAT - DB (ÁF)

MIN OUTPUT HEATING LOAD (MBH)

MIN. EAT - DB (ÁF)

COIL AIR QUANTITY - CFM

COIL OUTSIDE AIR QUANTITY - CFM

PREHEATING COIL

TYPE

WINTER OUTSIDE AIR (F)

THROWAWAY

1,2,3,4

LOCATION

M104

UNIT TO BE SUPPLIED WITH DOWN DISCHARGE SUPPLY/RETURN OPENINGS

AND THROUGH BASE UTILITY PROVISIONS. REFER TO SPECIFICATION

SECTION 15732 - "PACKAGED OUTDOOR, CENTRAL STATION AIR-HANDLING

UNITS."

CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY CONTROL

INTERFACES BETWEEN CONTROLS PROVIDED WITH THE NEW UNIT AND ANY

EXISTING REMOTELY INSTALLED CONTROL COMPONENTS.

THE WEIGHT OF THE NEW UNIT CANNOT EXCEED THE WEIGHT OF THE

EXISTING UNIT BY MORE THAN 5%.

CONTRACTOR SHALL REPLACE RTU-1 WITH A NEW IDENTICAL PACKAGED

ROOF TOP UNIT.

ITEMS IN BOLD ARE THE CAPACITIES CHANGES REQUIRED FOR RTU-3.

APPROX. UNIT WEIGHT - (LBS) 18,000

CAPACITY (MBH)

ENTERING AIR TEMP (F)

ENTERING WATER TEMP (F)

FLOW (GPM)

WATER PRESSURE DROP (FT WG)

M102 M102 M102 M102 M102 M102 M102 M102 M102

4.8 4.6 6.8 6.5 6.8 9.3 2.5 1.9 5.1 7.3 7.0

1.5 1.5 1.5 0.5 1.0 1.5 0.5 0.5 1.5 1.0 1.0

0.9 0.9 0.9 0.2 1.0 0.9 0.2 0.2 0.9 1.0 1.0

180 180 180 180 180 180 180 180 180 180

EXISTING VAV BOX TO BE REUSED VAV-2 VAV-2 N/A VAV-1 VAV-3 N/A VAV-1 VAV-1 N/A VAV-3 N/A

20 20 20 20 20 20 20 20 20 20

MANUFACTURER

MODEL

TITUS

TMS 8R

TITUS

8R

TITUSTITUS

TMS 8F

TITUS

ST

LR

S

ADJ

O-B N/A W-E

SG-3

TITUS

300RL

W-E N/A N/A

FX

S

LR

ST

TG-2

T-700L

TITUS

LEAVING AIR TEMP (F) 100

EER 9.6

MINIMUM CFM 155 150 220 210 220 300 80 60 165 235 225

100 100 100 100 100 100 100 100 100 100

65 65 65 65 65 65 65 65 65 65

ST

SQ

L-I

1-W O-B N/A W-E

SD-4

TITUS

TMS

- 1 WAY1-W

90% - MERV 8

4/15

137.4 150.8

5,950 1,160

480/3/60

BELT

1,750

FC / 18x18

1.1

5,950

AREA 3

5,662

RTU-3 (E)

5,670

90/63

THROWAWAY

M104

PREFILTER EFFICIENCY 90% - MERV 8 -

1.

2.

3.

4.

5.

PAGE NUMBER

SHEET NO.

OF

DATE

DRAWING TITLE:

COMMUNICATION

PROJECT TITLE:

PROJECT NUMBER:

DESIGNED BY

DRAWN BY

SAFETY

USING AGENCY

SECURITY POLICE

CHIEF OF ENGRG.

BASE CIVIL ENGINEER

BIO-ENVIR. ENGR.

CHIEF OF OPS. FIRE CHIEF

MSG COMMANDER

WING COMMANDER

MARK REVISION DATE

COLORADO

OFFICE OF THE BASE CIVIL ENGR.

AIR NATIONAL GUARD

Burns & McDonnell Proj No 51047

CRWU 06-2071

6-9-2009

REPAIR WING

BUILDING 706

HEADQUARTERS

M002

P. HUNTZINGER

B. BIRGE

MECHANICAL

SCHEDULES

CORRECTIONS

File details come from the government source that posted it. Updated .