098 E206.PDF
PDF 145 KB Posted
- Solicitation number
- W912LC-09-B-5001
About this file
Adendum to Drawings and Specifications dated 2 September 2009.
View the file
Other files
Show 40 more
Latest 50 of 254 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EF-8
480V/3PH
3/4 HP
ERU-1
208V/1PH - 7 FLA
120V -3.3 FLA
ROOF NEW
ELECTRICAL PLAN
L
L
L
L
L
L LLLL
L L
L
L L
L
L
L
LLL
L L
L
L L L L L
L L
L
L
L L L
LLL
L
L
L L
L L
L
LLLL LLLL
L L
L
L
L
L
L
L
L
L
L L
L L
EF-5(E)
EF-13(E)
EF-4(E) RTU-4(E)
EF-6(E)
EF-2(E)
EF-11(E)
EF-15(E)
EF-10(E)EF-12(E)
ROOF HATCH(E)
EF-14(E)
R
TU
-2 (E
ROOF HATCH(E)
EF-11(E)
EF-3(E)
EF-7(E)
ROOF HATCH(E)
KEYED NOTES:
PROVIDE NEW 400A 3P DISCONNECT WITH 300A FRS-R FUSES. ROUTE NEW
CONDUCTORS IN EXISTING CONDUITS. VERIFY CONDUIT IS 3" OR LARGER. IF
NOT NOTIFY ENGINEER.
EXISTING GFI, WEATHER PROOF RECEPTACLE, PROVIDE NEW IN-USE
WEATHERPROOF COVER ON RECEPTACLE.
PROVIDE NEW 20A 1P WEATHERPROOF SWITCH FOR NEW AIR DAMPER
CONTROL. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS. VERIFY NEW
DAMPERS ELECTRICAL REQUIREMENTS PRIOR TO ANY ROUGH-IN.
NEW MOTORIZED HVAC DAMPER'S CONTROL SHALL BE CONTROLLED WITH
EXISTING MOTORIZED HVAC DAMPERS. VERIFY CONTROL REQUIREMENTS WITH
HVAC CONTROL CONTRACTOR PRIOR TO ANY ROUGH-INS.
SWP
SWP
SWP
SWP
SWP
SWP
SWP
SWP
SWP
SWP
SWP
SWP
SWP
M
HS1-8, 10, 12
(3#12 8#12 CU GRD)
3/4"C
W P
J J
LS1B-4, 6
LS1B-8
WP
2 LM-24
30A,3P,NF,WP
COMBO
DISCONNECT
L
L
L
L
L
L
EXISTING
RTU-3
SWP
SWP
RTU-1(N)
480V/3PH
MCA=251A
MOCP=300A
NEW 400A 3P,
300A FRS-R
NEMA 3R
MDS
(3#350 kcmil, 1#4 GRD) EXISTING 3"C
1 2 3 4 5 6 1811 12 13 14 15 16 179.79.38.57.77.3 987 10
PAGE NUMBER
SHEET NO.
OF
DATE
DRAWING TITLE:
COMMUNICATION
PROJECT TITLE:
PROJECT NUMBER:
DESIGNED BY
DRAWN BY
SAFETY
USING AGENCY
SECURITY POLICE
CHIEF OF ENGRG.
BASE CIVIL ENGINEER
BIO-ENVIR. ENGR.
CHIEF OF OPS. FIRE CHIEF
MSG COMMANDER
WING COMMANDER
MARK REVISION DATE
COLORADO
OFFICE OF THE BASE CIVIL ENGR.
AIR NATIONAL GUARD
Burns & McDonnell Proj No 51047
CRWU 06-2071
6-9-2009
REPAIR WING
BUILDING 706
HEADQUARTERS
E206
L. CREED
M. McNUTT
ROOF NEW
ELECTRICAL PLAN
DINING
ADMIN.
SECURITY
AREA 2
AREA 3 AREA 1
KEY PLAN
N.T.S.
COMPASS
NORTH
PROJECT
NOTES:
1. PROVIDE 120VAC 20A 1P AND 208VAC 2A SINGLE PHASE CIRCUITS TO EACH
MECHANICAL UNIT ON ROOF FOR NEW MOTORIZED DAMPERS.
2. RECONNECT EXISTING LIGHTNING PROTECTION SYSTEM TO EXISTING
CONDITIONS FROM ROOF REPLACEMENT.
3. RECERTIFY LIGHTNING PROTECTION TO UL STANDARD 96A FOR MASTER
LABELED LIGHTNING PROTECTION SYSTEMS AND REQUREMENTS OF NFPA
CODE NO. 78 CURRENT EDITION.
J:\BUCKLEY AFB\51047-BUCKLEY WING HQ RREPAIR\CADD\ELEC\51047E206.DWG 07-20-2009 13:51 LCREED
CORRECTIONS
File details come from the government source that posted it. Updated .