102 E404.PDF

PDF 132 KB Posted

Attached to
RECOVERY-CRWU062071-Repair-Wing Headquarters, Building. 706
Solicitation number
W912LC-09-B-5001
Issued by

About this file

Adendum to Drawings and Specifications dated 2 September 2009.

View the file

Other files

File Type Posted
bafbrwhq15732.pdf PDF
025 A108.PDF PDF
090 E006.PDF PDF
068 M202.PDF PDF
058 M002.PDF PDF
07530 - ELASTOMERIC SINGLE PLY MEMBRANE-FINAL REV-2 _2_.pdf PDF
106 E602.pdf PDF
TEMP TRAILERS-SITE UTILITY.pdf PDF
104 E502.PDF PDF
062 M006.PDF PDF
098 E206.PDF PDF
105 E601.pdf PDF
067 M201.PDF PDF
023 A106.PDF PDF
002 G001.PDF PDF
Summary SOW 6 Aug 09.pdf PDF
018 A026.PDF PDF
TEMP TRAILERS-ARCH.pdf PDF
Bid Addendum 1a CRWU 06-2071.pdf PDF
066 M104.PDF PDF
Bid Schedule Repair Wing HQ final.doc DOC document
BAFBRWHQ 05120.pdf PDF
BAFBRWHQ 03050.pdf PDF
bafbrwhq15732.pdf PDF
bafbrwhq15486.pdf PDF
bafbrwhq15840.pdf PDF
bafbrwhq15820.pdf PDF
bafbrwhq15150.pdf PDF
bafbrwhq15140.pdf PDF
bafbrwhq15415.pdf PDF
bafbrwhq15995.pdf PDF
bafbrwhq15785.pdf PDF
bafbrwhq15181.pdf PDF
bafbrwhq15815.pdf PDF
bafbrwhq15950.pdf PDF
bafbrwhq15838.pdf PDF
bafbrwhq15145.pdf PDF
bafbrwhq15195.pdf PDF
bafbrwhq15155.pdf PDF
bafbrwhq15550.pdf PDF
bafbrwhq15410.pdf PDF
bafbrwhq15855.pdf PDF
bafbrwhq15900.pdf PDF
bafbrwhq15075.pdf PDF
bafbrwhq15140.pdf PDF
bafbrwhq15055.pdf PDF
bafbrwhq13915.pdf PDF
bafbrwhq15145.pdf PDF
bafbrwhq15122.pdf PDF
bafbrwhq15110.pdf PDF
Show 40 more

Latest 50 of 254 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3 3 3

3LO

C

A C

U

FA

C P

F

F

F

F

3:108 3:107

3:105

3:127

3:125

3:

3:101

3:134

3:137

3:128

3:129

3:1313:130

2:113

2:112

2:109

2:111

3:103

3:104A

2:111A

3:102

3:106

3:124

3:140

3:117

3:118

3:126

3:112

3:

3:123 3:104

3:135

3:123A

3:112A

6 6 6

6 6

LOC

EXISTING PUBLIC

ADDRESS

AMPLIFIER

PAGE NUMBER

SHEET NO.

OF

DATE

DRAWING TITLE:

COMMUNICATION

PROJECT TITLE:

PROJECT NUMBER:

DESIGNED BY

DRAWN BY

SAFETY

USING AGENCY

SECURITY POLICE

CHIEF OF ENGRG.

BASE CIVIL ENGINEER

BIO-ENVIR. ENGR.

CHIEF OF OPS. FIRE CHIEF

MSG COMMANDER

WING COMMANDER

MARK REVISION DATE

COLORADO

OFFICE OF THE BASE CIVIL ENGR.

AIR NATIONAL GUARD

Burns & McDonnell Proj No 51047

CRWU 06-2071

6-9-2009

REPAIR WING

BUILDING 706

HEADQUARTERS

E404

L. CREED

M. McNUTT

1ST FLOOR AREA

3 NEW FIRE

ALARM & MNS

PLAN

NORTH

SCALE IN FEET

0 2' 4' 8'

1ST FLOOR AREA 3 NEW

FIRE ALARM AND MNS PLAN

DINING

ADMIN.

SECURITY

AREA 2

AREA 3 AREA 1

KEY PLAN

N.T.S.

COMPASS

NORTH

PROJECT

J:\BUCKLEY AFB\51047-BUCKLEY WING HQ RREPAIR\CADD\ELEC\51047E404.DWG 07-20-2009 13:53 LCREED

NOTES:

1. FOR LEGEND AND GENERAL NOTES, SEE

DRAWING E001.

2. FOR MNS AND FIRE ALARM SYSTEM

DIAGRAM, SEE DRAWING E502

3. REINSTALL EXISTING PUBLIC ADDRESS

SPEAKERS AS INDICATED ON PLANS.

RECONNECT SPEAKERS TO EXISTING CABLE

COILED ABOVE CEILING. IF CABLE RUN IS

TOO SHORT OR IS DAMAGED OR THERE IS

NO CABLE IN AREA PROVIDE NEW CABLE

ROUTED BACK TO AMPLIFIER. VERIFY PRIOR

TO ANY ROUGH-IN.

4. ROUTE ALL CABLES IN EXPOSED CEILING

AREAS IN CONDUIT.

5. COORDINATE LOCATION OF LOCAL

OPERATOR CONTROLLER (LOC) WITH

CONTRACTING OFFICER PRIOR TO ANY

ROUGH-IN.

KEYED NOTES:

SURFACE MOUNT SPEAKER HORN/STROBE AND

AMBER ON CEILING. VERIFY INTERFERENCES WITH

OTHER TRADES, MOUNT BELOW BUILDING

SUPPORTS.

F.8

H.5

J.6

H

L

K

F

C

76 7.3 7.754321

CORRECTIONS

File details come from the government source that posted it. Updated .