066 M104.PDF

PDF 133 KB Posted

Attached to
RECOVERY-CRWU062071-Repair-Wing Headquarters, Building. 706
Solicitation number
W912LC-09-B-5001
Issued by

About this file

Adendum to Drawings and Specifications dated 2 September 2009.

View the file

Other files

File Type Posted
bafbrwhq15732.pdf PDF
025 A108.PDF PDF
090 E006.PDF PDF
068 M202.PDF PDF
058 M002.PDF PDF
07530 - ELASTOMERIC SINGLE PLY MEMBRANE-FINAL REV-2 _2_.pdf PDF
106 E602.pdf PDF
TEMP TRAILERS-SITE UTILITY.pdf PDF
104 E502.PDF PDF
062 M006.PDF PDF
098 E206.PDF PDF
105 E601.pdf PDF
102 E404.PDF PDF
067 M201.PDF PDF
023 A106.PDF PDF
002 G001.PDF PDF
Summary SOW 6 Aug 09.pdf PDF
018 A026.PDF PDF
TEMP TRAILERS-ARCH.pdf PDF
Bid Addendum 1a CRWU 06-2071.pdf PDF
Bid Schedule Repair Wing HQ final.doc DOC document
BAFBRWHQ 05120.pdf PDF
BAFBRWHQ 03050.pdf PDF
bafbrwhq15732.pdf PDF
bafbrwhq15486.pdf PDF
bafbrwhq15840.pdf PDF
bafbrwhq15820.pdf PDF
bafbrwhq15150.pdf PDF
bafbrwhq15140.pdf PDF
bafbrwhq15415.pdf PDF
bafbrwhq15995.pdf PDF
bafbrwhq15785.pdf PDF
bafbrwhq15181.pdf PDF
bafbrwhq15815.pdf PDF
bafbrwhq15950.pdf PDF
bafbrwhq15838.pdf PDF
bafbrwhq15145.pdf PDF
bafbrwhq15195.pdf PDF
bafbrwhq15155.pdf PDF
bafbrwhq15550.pdf PDF
bafbrwhq15410.pdf PDF
bafbrwhq15855.pdf PDF
bafbrwhq15900.pdf PDF
bafbrwhq15075.pdf PDF
bafbrwhq15140.pdf PDF
bafbrwhq15055.pdf PDF
bafbrwhq13915.pdf PDF
bafbrwhq15145.pdf PDF
bafbrwhq15122.pdf PDF
bafbrwhq15110.pdf PDF
Show 40 more

Latest 50 of 254 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1-1/2" VENT(E)

2" VENT(E)

2" VENT(E)

4"RD(E)

4"RD(E)

3" VENT(E)

2" VENT(E)

4"RD(E)4"RD(E)

4"RD(E) 4"RD(E)

2" VENT(E)

2" VENT(E)

4"RD(E)

4"RD(E)

4"RD(E)

4"RD(E)

3" VENT(E)

3" VENT(E)

2" VENT(E)

2-1/2" VENT(E)

3"RD(E) 3"RD(E)

3"RD(E)3"RD(E)

3"RD(E)

3"RD(E)

3"RD(E)

3"RD(E)

3"RD(E)

EF-5(E)

EF-13(E)

RTU-1

EF-4(E)

RTU-4(E)

3" VENT(E)

EF-6(E)

EF-2(E)

EF-11(E)

EF-15(E)

EF-10(E)EF-12(E)

ROOF HATCH(E)

EF-14(E)

R

TU

-2 (E

ROOF HATCH(E)

4"RD(E)4"RD(E)

EF-11(E)

EF-3(E)

EF-7(E)

EF-8

16x16

20x20

RTU-3 (E)

ERU-1

14x14 40x8

40x8

OUTSIDE AIR

PLENUM

16" DIA FLUE

16x16 DOWN, SEE

DWG M102 FOR

CONTINUATION

M-1

M-2

2 3 4 5 6 1811 12 13 14 15 16 179.79.38.57.77.3 987 10

K

H

F

C

L

H.5

F.8

J.6

PAGE NUMBER

SHEET NO.

OF

DATE

DRAWING TITLE:

COMMUNICATION

PROJECT TITLE:

PROJECT NUMBER:

DESIGNED BY

DRAWN BY

SAFETY

USING AGENCY

SECURITY POLICE

CHIEF OF ENGRG.

BASE CIVIL ENGINEER

BIO-ENVIR. ENGR.

CHIEF OF OPS. FIRE CHIEF

MSG COMMANDER

WING COMMANDER

MARK REVISION DATE

COLORADO

OFFICE OF THE BASE CIVIL ENGR.

AIR NATIONAL GUARD

Burns & McDonnell Proj No 51047

CRWU 06-2071

6-9-2009

REPAIR WING

BUILDING 706

HEADQUARTERS

NORTH

DINING

ADMIN.

SECURITY

AREA 2

AREA 3 AREA 1

KEY PLAN

N.T.S.

COMPASS

NORTH

PROJECT

24'

SCALE IN FEET

0 8' 16'

M104

P. HUNTZINGER

B. BIRGE

HVAC ROOF PLAN

KEYED NOTES:

CONTRACTOR SHALL PROVIDE NEW DUCTWORK GASKETS AND

PROVIDE A WATER TIGHT SEAL AROUND ALL DUCTWORK

JOINTS INCLUDING DUCT CONNECTIONS TO THE UNIT ROOF

CURB.

CONTRACTOR SHALL INSULATE DUCTWORK AS INDICATED IN

SPECIFICATION SECTION 15080 - MECHANICAL INSULATION.

FOR TYPICAL ROOF OPENING DETAIL REFER TO DWG S102.

CONTRACTOR SHALL PROVIDE A ROOF CURB FOR THE DUCT

SIMILAR TO DETAIL 7 ON DWG A613. CONTRACTOR SHALL SEAL

AROUND THE DUCT TO ENSURE A WATER TIGHT SEAL.

CONTRACTOR SHALL PROVIDE A NEW PACKAGED ROOF TOP

UNIT (RTU-1) TO REPLACE EXISTING. CONTRACTOR IS

RESPONSIBLE FOR MODIFYING THE EXISTING ROOF CURB,

DUCTWORK AND HEATING HYDRONIC PIPING AS NECESSARY

TO ACCOMMODATE THE NEW UNIT.

CONTRACTOR SHALL PROVIDE A NEW OUTSIDE AIR PLENUM

BOX WITH MOTORIZED DAMPER ON EXSTING RTU-3. THE

PLENUM BOX SHALL BE LARGE ENOUGH TO HANDLE 100%

OUTSIDE AIR WHEN UNIT IS IN ECONOMIZER MODE.

HVAC ROOF PLAN

HVAC DUCTWORK

ROOFTOP SUPPORT,

B-LINE MODEL DB29 OR

APPROVED EQUAL (TYP

EACH SIDE)

UNI-STRUT, GALVANIZED 12

GAUGE (TYP OF ALL)

GALVANIZED

STEEL STRAP

GALVANIZED

STEEL STRAP

ROOF DUCTWORK SUPPORT DETAIL

NOT TO SCALE

FOR DUCTWORK DIMENSIONS AND LOCATIONS OF DUCTWORK SUPPORTS

REFER TO DWGS M111.

CONTRACTOR SHALL PROVIDE 22GA GALVANIZED STEEL SHEET FORMED

AROUND THE SIDES AND TOP OF DUCT TO PREVENT DAMAGE TO THE

INSULATION FROM THE STEEL STRAPS. FORMED STEEL SHEET SHALL

BE A MIN OF 12" WIDE.

NOTES:

1.

2.

INSULATION

DUCT

GALV FORMED

SHEET METAL

A

ASECTION

NOT TO SCALE

WIDTH AS

REQUIRED FOR

DUCT AND

INSULATION

CORRECTIONS

File details come from the government source that posted it. Updated .