Adendum to Drawings and Specifications dated 2 September 2009.

View the file

Other files

File Type Posted
bafbrwhq15732.pdf PDF
090 E006.PDF PDF
068 M202.PDF PDF
058 M002.PDF PDF
07530 - ELASTOMERIC SINGLE PLY MEMBRANE-FINAL REV-2 _2_.pdf PDF
106 E602.pdf PDF
TEMP TRAILERS-SITE UTILITY.pdf PDF
104 E502.PDF PDF
062 M006.PDF PDF
098 E206.PDF PDF
105 E601.pdf PDF
102 E404.PDF PDF
067 M201.PDF PDF
023 A106.PDF PDF
002 G001.PDF PDF
Summary SOW 6 Aug 09.pdf PDF
018 A026.PDF PDF
TEMP TRAILERS-ARCH.pdf PDF
Bid Addendum 1a CRWU 06-2071.pdf PDF
066 M104.PDF PDF
Bid Schedule Repair Wing HQ final.doc DOC document
BAFBRWHQ 05120.pdf PDF
BAFBRWHQ 03050.pdf PDF
bafbrwhq15732.pdf PDF
bafbrwhq15486.pdf PDF
bafbrwhq15840.pdf PDF
bafbrwhq15820.pdf PDF
bafbrwhq15150.pdf PDF
bafbrwhq15140.pdf PDF
bafbrwhq15415.pdf PDF
bafbrwhq15995.pdf PDF
bafbrwhq15785.pdf PDF
bafbrwhq15181.pdf PDF
bafbrwhq15815.pdf PDF
bafbrwhq15950.pdf PDF
bafbrwhq15838.pdf PDF
bafbrwhq15145.pdf PDF
bafbrwhq15195.pdf PDF
bafbrwhq15155.pdf PDF
bafbrwhq15550.pdf PDF
bafbrwhq15410.pdf PDF
bafbrwhq15855.pdf PDF
bafbrwhq15900.pdf PDF
bafbrwhq15075.pdf PDF
bafbrwhq15140.pdf PDF
bafbrwhq15055.pdf PDF
bafbrwhq13915.pdf PDF
bafbrwhq15145.pdf PDF
bafbrwhq15122.pdf PDF
bafbrwhq15110.pdf PDF
Show 40 more

Latest 50 of 254 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

K

H

F

C

L

H.5

F.8

J.6

'-8

'-3

4' -7

'-5

'-4

8'

-1 1"

8' -1

1 2 3 4 5 6 7

18'-10" 18'-10" 18'-10" 18'-10" 18'-10" 2'-10"

H A403

J A403

A301

A302

A301

A302

A621

A621

A621

A621

A621

A611

A611

A611

A611

A611

A611

A611

A611

A611

A611

A611

A611

A611

R1 R1

R1

R2

R2

R2

R2

R2

R2

R2

R3

R3

R18

R5

R5

R6

R6

R6

R7

R7

R8R8

R8 R8

R9R9

R10

R10

R11 R11

A612

A613

A612

R12

R12

R15

R15

R15

A613 SIM

R16

R16 R17

R17

R19R19

A613

A613

R4 G1 R20

R5 G1 R20

NORTH

PAGE NUMBER

SHEET NO.

OF

DATE

DRAWING TITLE:

COMMUNICATION

PROJECT TITLE:

PROJECT NUMBER:

DESIGNED BY

DRAWN BY

SAFETY

USING AGENCY

SECURITY POLICE

CHIEF OF ENGRG.

BASE CIVIL ENGINEER

BIO-ENVIR. ENGR.

CHIEF OF OPS. FIRE CHIEF

MSG COMMANDER

WING COMMANDER

MARK REVISION DATE

COLORADO

OFFICE OF THE BASE CIVIL ENGR.

AIR NATIONAL GUARD

CRWU 06-2071

6-9-2009

REPAIR WING

BUILDING 706

HEADQUARTERS

1666 SOUTH UNIVERSITY BOULEVARD

DENVER, COLORADO 80210

PHONE: 303-733-3717 FAX: 303-777-7494

A.I.A.

A R C H I T E C T S

16'8'4'0

SCALE IN FEET

1/8" = 1'-0"

LEVEL 2 ROOF PLAN AREA 3 1

A108

DINING

ADMIN.

SECURITY

AREA 2

AREA 3 AREA 1

KEY PLAN

N.T.S.

COMPASS

NORTH

PROJECT

DRAWING NOTES:

ROOF:

R1 (N)EPDM ROOF ON (E)

4-3/4"POLYISOCYANURATE RIGID

INSULATION ON (E) METAL DECK ON (E) BAR

JOISTS, REMOVE (E) EPDM, INSTALL NEW

EPDM ON 1/2" COVER BOARD, REINSTALL

EXIST. BALLAST

R2 (N) ROOF PARAPET CAP, GALV.

R3 (E) CONCRETE ROOF PAVER, REINSTALL

R4 (E) ROOFTOP UNIT RTU-3.

R5 (E) ROOFTOP EQUIPMENT

R6 (E) TAPERED INSULATION

R7 (E) ROOF DRAIN

R8 (E) OVERFLOW SCUPPER, SEE DETAILS

1/A611, 6/A612, 7/A612 & 8/A612.

R9 (N) FLASHING - SEE DETAILS 9&10/A621.

R10 (N) CATWALK, SEE STRUC. DWGS.

R11 (N) LADDER, SEE STRUC DWGS.

R12 (N) PROVIDE ALL NEW PLATFORM EPDM

AND SEALANT, REMOVE EXIST., LAP EPDM

ONTO EXIST.

R13 NOT USED

R14 (E) ROOFTOP EQUIPMENT ON EXIST.

ROOF CURB, RE: MECH

R15 (N) 2'X2' CONCRETE ROOF PAVER, MATCH

EXISTING, NOT ATTACHED.

R16 (E) ROOF CURB TO REMAIN.

R17 (N) DUCT ON ROOF, RE: MECH.,

FLASH SUPPORTS SIM. TO 6/A613.

R18 (E) DUCT DOWN EXIST. ROOF OPENING, RE:

MECH.

R19 (N) ROOFTOP EQUIPMENT ON A STAND,

SEE MECH. & STRUC. DWGS., REMOVE AND

REPLACE EPDM & INSULATION AS

REQUIRED, LAP EPDM ONTO EXIST EPDM.

R20 WATER TEST REQUIRED, SEE SPECS.

GENERAL:

G1 VERIFY FLASHING AT ALL EXIST. ROOFTOP

UNITS AND FLASH OR RE-SEAL CURB TO

PROVIDE A WATERTIGHT CONDITION.

G2 (E) LIGHTENING PROTECTION TO BE

REINSTALLED RE: ELEC.

G3 REMOVE EXISTING EPDM ROOF & PROVIDE

15% IN BID ESTIMATE FOR REPLACEMENT

OF DAMAGED INSULATION, BACKING

AND/OR SUBSTRATE.

A108

P. HUNTZINGER

B. BIRGE

LEVEL 2 ROOF

PLAN AREA 3

CORRECTIONS

File details come from the government source that posted it. Updated .