Bid Addendum 1a CRWU 06-2071.pdf

PDF 127 KB Posted

Attached to
RECOVERY-CRWU062071-Repair-Wing Headquarters, Building. 706
Solicitation number
W912LC-09-B-5001
Issued by

About this file

Bid Addendum 1a CRWU 06-2071 dated 2 September 2009.

View the file

Other files

File Type Posted
bafbrwhq15732.pdf PDF
025 A108.PDF PDF
090 E006.PDF PDF
068 M202.PDF PDF
058 M002.PDF PDF
07530 - ELASTOMERIC SINGLE PLY MEMBRANE-FINAL REV-2 _2_.pdf PDF
106 E602.pdf PDF
TEMP TRAILERS-SITE UTILITY.pdf PDF
104 E502.PDF PDF
062 M006.PDF PDF
098 E206.PDF PDF
105 E601.pdf PDF
102 E404.PDF PDF
067 M201.PDF PDF
023 A106.PDF PDF
002 G001.PDF PDF
Summary SOW 6 Aug 09.pdf PDF
018 A026.PDF PDF
TEMP TRAILERS-ARCH.pdf PDF
066 M104.PDF PDF
Bid Schedule Repair Wing HQ final.doc DOC document
BAFBRWHQ 05120.pdf PDF
BAFBRWHQ 03050.pdf PDF
bafbrwhq15732.pdf PDF
bafbrwhq15486.pdf PDF
bafbrwhq15840.pdf PDF
bafbrwhq15820.pdf PDF
bafbrwhq15150.pdf PDF
bafbrwhq15140.pdf PDF
bafbrwhq15415.pdf PDF
bafbrwhq15995.pdf PDF
bafbrwhq15785.pdf PDF
bafbrwhq15181.pdf PDF
bafbrwhq15815.pdf PDF
bafbrwhq15950.pdf PDF
bafbrwhq15838.pdf PDF
bafbrwhq15145.pdf PDF
bafbrwhq15195.pdf PDF
bafbrwhq15155.pdf PDF
bafbrwhq15550.pdf PDF
bafbrwhq15410.pdf PDF
bafbrwhq15855.pdf PDF
bafbrwhq15900.pdf PDF
bafbrwhq15075.pdf PDF
bafbrwhq15140.pdf PDF
bafbrwhq15055.pdf PDF
bafbrwhq13915.pdf PDF
bafbrwhq15145.pdf PDF
bafbrwhq15122.pdf PDF
bafbrwhq15110.pdf PDF
Show 40 more

Latest 50 of 254 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COLORADO AIR NATIONAL GUARD

BUCKLEY AIR FORCE BASE – 140 CES

PROJECT NO. CRWU 02-9003

Repair Wing Headquarters Bldg 706 Buckley Air Force Base, Aurora, CO

BID ADDENDUM NUMBER 1

2 September 2009

REPAIR WING HEADQUARTERS

PROJECT NO. CRWU 06-2071

PART I – PROJECT REQUIREMENTS

1. The Contractor is to provide all plant, material, equipment, and labor necessary to perform the work outlined in this Addendum.

2. All work shall be performed in accordance with the contract drawings and specifications.

3. The Contractor is to include the following changes to Specifications and drawings as indicated below.

4. The Contractor shall remove data and phone lines from rooms to be demolished in Area 3, Level 1 from the communications wall outlet to the communications rack in Room 111A. All surface mounted communications Panduit® shall be removed. No other communications demolition is required outside of Area 3, Level 1.

5. The Contractor shall maintain the integrity of the existing Public Address system and re-install speakers as necessary.

PART II – TECHNICAL SPECIFICATIONS

1. Section 01010 – Scope of Work, Paragraph 1.6, Miscellaneous Requirements.

ADD “G. The contractor shall be responsible for the movement, including the proper disassembly and re-assembly as required, of all furniture whose relocation is necessary as part of this project. This includes the relocation of furniture from Level 1, Area 3 of Building 706 to the temporary facility that will be located North of Building 830.

2. Delete Specifications Sections 07530 and 15732

3. Insert Attached Sections 07530 and 15732

PART III – CONTRACT DRAWINGS

1. Drawing G001, Delete existing Drawing, Insert New G001

2. Drawing C102, titled “Concrete Replacement Site Plan” is revised to denote that contractor shall replace two shattered concrete slabs in the loading dock pavement at the North East corner of the building. Contractor shall remove each of the damaged slabs and replace by matching thickness of existing pavement. One of the shattered slabs is rectangular in shape measuring approximately 68 sq ft. The other shattered slab is irregular in shape measuring approximately 18 sq ft.

3. Drawing A012, delete “Remove canopy and supports” From Drawing Note DM13 so that it reads “Remove Pass-Thru window and frame”.

4. Drawing A026, Delete existing Drawing, Insert New A026

5. Drawing A106, Delete existing Drawing, Insert New A106

6. Drawing A108, Delete existing Drawing, Insert New A108

COLORADO AIR NATIONAL GUARD

BUCKLEY AIR FORCE BASE – 140 CES

PROJECT NO. CRWU 02-9003

Repair Wing Headquarters Bldg 706 Buckley Air Force Base, Aurora, CO

2 September 2009

REPAIR WING HEADQUARTERS

PROJECT NO. CRWU 06-2071

BID ADDENDUM NUMBER 1

7. Drawing M002, Delete existing Drawing, Insert New M002

8. Drawing M003, Keyed Note 3. ADD: The flues from the new Water Heaters and existing Boiler shall be replaced in their entirety.

9. Drawing M006, Delete existing Drawing, Insert New M-006

10. Drawing M101, Keyed Note 3. ADD: The flues from the new Water Heaters and existing Boiler shall be replaced in their entirety.

11. Drawing M104, Delete existing Drawing, Insert New M104

12. Drawing M201, Delete existing Drawing, Insert New M201

13. Add Drawing M202

14. Drawing E003, Delete Note 3 and Note 5. ADD: Note 8. Protect devices and cabling to remain.

15. Drawing E004, Delete Note 5. ADD: Note 8. Protect devices and cabling to remain.

16. Drawing E005, Delete Note 3 and Note 5. ADD: Note 8. Protect devices and cabling to remain.

17. Drawing E006, Delete existing Drawing, Insert New E006

18. Drawing E206, Delete existing Drawing, Insert New E206

19. Drawing E303, Delete all new combination data and telephone outlets and delete wall mounted telephone outlets.

20. Drawing E304, Delete all new combination data and telephone outlets and delete wall mounted telephone outlets.

21. Drawing E404, Delete existing Drawing, Insert New E404

22. Drawing E502, Delete existing Drawing, Insert New E502

23. Drawing E601, Delete existing Drawing, Insert New E601

24. Drawing E602, Delete existing Drawing, Insert New E602

25. Add Trailer Drawing Temp Trailers – Arch A1

26. Add Trailer Drawing Temp Trailers – Site & Utility C1

END OF ADDENDUM 1