BID SCHEDULE
PROJECT TITLE: RECOVERY – PROJECT NUMBER - CRWU 06-2071, Repair Wing Headquarters, Building 706. Buckley AFB, CO
PROJECT NUMBER: CRWU 062071
BASE BID SCHEDULE: Reference Spec Section 01010, Scope of Work
| ITEM |
| DESCRIPTION |
| UNIT OF |
| QTY |
| UNIT |
| TOTAL |
MEASURE
| PRICE |
| PRICE |
| 1 – Basic |
| FFP - Furnish all plant, labor, tools, new and current material, supplies, equipment, services, permits, insurance and supervision necessary to Repair Wing Headquarters, Building 706, Buckley AFB, CO. |
| LS |
| 1 |
| 2 - Basic |
| FFP – TEMP FACILITY. Installation and delivery charges to include site preparation work , utility connections (water, sewer, electrical (to include pad mounted 3-phase transformer), communications), and any additional required features in the statement of work to provide a complete and usable temporary office facility. These costs include all work required to transport, set-up and connect the facility to current condition utility system. . |
Tear down and removal costs to include disassembly, packaging, blocking and bracing, transporting and refurbishment to remove the facility and all accessories and appurtenances from the site
| LS |
| 1 |
| 3- Basic |
| FFP – TEMP FACILITY. Lease cost per month for a term of 12 months for a temporary 5,059 SF facility and its maintenance as described in the statement of work. Includes the properly configured office facility, stairs, ramps, skirting and tie-downs and any other required appurtenances and accessories for a complete and usable facility. |
| Cost/Month |
| 12 Months |
PP 1 of 2
| 4- ABI 1 |
| FFP – TEMP FACILITY. Option to extend lease to a total of 24 months for a temporary 5,059 sf facility and its maintenance as described in the statement of work. Includes the properly configured office facility, stairs, ramps, skirting and tie-downs and any other required appurtenances and accessories for a complete and usable facility. |
| Cost/Month |
| 12 Months |
| 5 – ABI 2 |
| FFP – B/706. Furnish all plant, labor, tools, new and current material, supplies, equipment, services, permits, insurance and supervision necessary to Communications, public address and data cabling |
| LS |
| 1 |
| 6 – ABI 3 |
| FFP – B/706. Furnish all plant, labor, tools, new and current material, supplies, equipment, services, permits, insurance and supervision necessary to Lockers and Benches |
| LS |
| 1 |
| 7 – ABI 4 |
| FFP – B/706. Furnish all plant, labor, tools, new and current material, supplies, equipment, services, permits, insurance and supervision necessary to Recondition Roof in lieu of replacement |
| LS |
| 1 |
PP 2 of 2