Bid Schedule Repair Wing HQ final.doc

DOC document 49 KB Posted

Attached to
RECOVERY-CRWU062071-Repair-Wing Headquarters, Building. 706
Solicitation number
W912LC-09-B-5001
Issued by

About this file

BID SCHEDULE RECOVERY - CRWU062071 - Repair Wing Headquarters Building. 706

View the file

Other files

File Type Posted
bafbrwhq15732.pdf PDF
025 A108.PDF PDF
090 E006.PDF PDF
068 M202.PDF PDF
058 M002.PDF PDF
07530 - ELASTOMERIC SINGLE PLY MEMBRANE-FINAL REV-2 _2_.pdf PDF
106 E602.pdf PDF
TEMP TRAILERS-SITE UTILITY.pdf PDF
104 E502.PDF PDF
062 M006.PDF PDF
098 E206.PDF PDF
105 E601.pdf PDF
102 E404.PDF PDF
067 M201.PDF PDF
023 A106.PDF PDF
002 G001.PDF PDF
Summary SOW 6 Aug 09.pdf PDF
018 A026.PDF PDF
TEMP TRAILERS-ARCH.pdf PDF
Bid Addendum 1a CRWU 06-2071.pdf PDF
066 M104.PDF PDF
BAFBRWHQ 05120.pdf PDF
BAFBRWHQ 03050.pdf PDF
bafbrwhq15732.pdf PDF
bafbrwhq15486.pdf PDF
bafbrwhq15840.pdf PDF
bafbrwhq15820.pdf PDF
bafbrwhq15150.pdf PDF
bafbrwhq15140.pdf PDF
bafbrwhq15415.pdf PDF
bafbrwhq15995.pdf PDF
bafbrwhq15785.pdf PDF
bafbrwhq15181.pdf PDF
bafbrwhq15815.pdf PDF
bafbrwhq15950.pdf PDF
bafbrwhq15838.pdf PDF
bafbrwhq15145.pdf PDF
bafbrwhq15195.pdf PDF
bafbrwhq15155.pdf PDF
bafbrwhq15550.pdf PDF
bafbrwhq15410.pdf PDF
bafbrwhq15855.pdf PDF
bafbrwhq15900.pdf PDF
bafbrwhq15075.pdf PDF
bafbrwhq15140.pdf PDF
bafbrwhq15055.pdf PDF
bafbrwhq13915.pdf PDF
bafbrwhq15145.pdf PDF
bafbrwhq15122.pdf PDF
bafbrwhq15110.pdf PDF
Show 40 more

Latest 50 of 254 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

PROJECT TITLE: RECOVERY – PROJECT NUMBER - CRWU 06-2071, Repair Wing Headquarters, Building 706. Buckley AFB, CO

PROJECT NUMBER: CRWU 062071

BASE BID SCHEDULE: Reference Spec Section 01010, Scope of Work

ITEM
DESCRIPTION
UNIT OF
QTY
UNIT
TOTAL

MEASURE

PRICE
PRICE
1 – Basic
FFP - Furnish all plant, labor, tools, new and current material, supplies, equipment, services, permits, insurance and supervision necessary to Repair Wing Headquarters, Building 706, Buckley AFB, CO.
LS
1
2 - Basic
FFP – TEMP FACILITY. Installation and delivery charges to include site preparation work , utility connections (water, sewer, electrical (to include pad mounted 3-phase transformer), communications), and any additional required features in the statement of work to provide a complete and usable temporary office facility. These costs include all work required to transport, set-up and connect the facility to current condition utility system. .

Tear down and removal costs to include disassembly, packaging, blocking and bracing, transporting and refurbishment to remove the facility and all accessories and appurtenances from the site

LS
1
3- Basic
FFP – TEMP FACILITY. Lease cost per month for a term of 12 months for a temporary 5,059 SF facility and its maintenance as described in the statement of work. Includes the properly configured office facility, stairs, ramps, skirting and tie-downs and any other required appurtenances and accessories for a complete and usable facility.
Cost/Month
12 Months

PP 1 of 2

4- ABI 1
FFP – TEMP FACILITY. Option to extend lease to a total of 24 months for a temporary 5,059 sf facility and its maintenance as described in the statement of work. Includes the properly configured office facility, stairs, ramps, skirting and tie-downs and any other required appurtenances and accessories for a complete and usable facility.
Cost/Month
12 Months
5 – ABI 2
FFP – B/706. Furnish all plant, labor, tools, new and current material, supplies, equipment, services, permits, insurance and supervision necessary to Communications, public address and data cabling
LS
1
6 – ABI 3
FFP – B/706. Furnish all plant, labor, tools, new and current material, supplies, equipment, services, permits, insurance and supervision necessary to Lockers and Benches
LS
1
7 – ABI 4
FFP – B/706. Furnish all plant, labor, tools, new and current material, supplies, equipment, services, permits, insurance and supervision necessary to Recondition Roof in lieu of replacement
LS
1

PP 2 of 2