The file's text, extracted by GovTribe without its formatting.
COVERSHEET
| 00010 BIDDING SCHEDULE |
| PROJECT TABLE OF CONTENTS |
| PROJECT TABLE OF CONTENTS |
| REGISTER |
| 02 09 20 |
| EXPOSURE ASSESSMENT FOR WORKERS EXPOSED TO LEAD-CONTAINING PAINT |
| 02 09 20 - EXPOSURE ASSESSMENT FOR WORKERS EXPOSED TO LEAD-CONTAINING PAINT |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 Action Level |
| 1.2.2 Area Monitoring |
| 1.2.3 Industrial Hygienist IH: |
| 1.2.4 Industrial Hygiene Technician IHT: |
| 1.2.5 Eight-Hour Time Weighted Average TWA |
| 1.2.6 Lead |
| 1.2.7 Lead Control Area |
| 1.2.8 Lead Permissible Exposure Limit PEL |
| 1.2.9 Personal Monitoring |
| 1.2.10 Exposure Assessment |
| 1.3 Quality ASSURANCE |
| 1.3.1 Medical Examinations |
| 1.3.2 IH Responsibilities |
| 1.3.3 IHT Responsibilities |
| 1.3.4 Training |
| 1.3.5 Respiratory Protection Program |
| 1.3.6 Pre-Construction Conference |
| 1.4 SUBMITTALS |
| 1.5 REMOVAL |
| 1.6 QUALIFICATIONS OF IH |
| 1.7 LEAD-CONTAINING PAINT WORK PLAN |
| 1.8 TESTING LABORATORY |
| 1.9 EQUIPMENT |
| 1.9.1 Respirators |
| 1.9.2 Special Protective Clothing |
| 1.9.3 Hygiene Facilities |
| 1.9.4 Change Area |
| 1.9.5 Hand Washing Facilities |
| PART 2 PRODUCTS Not applicable |
| PART 3 EXECUTION |
| 3.1 PROTECTION |
| 3.1.1 Lead Control Area Requirements |
| 3.1.2 Protection of Existing Work to Remain |
| 3.1.3 Boundary Requirements |
| 3.1.4 Furnishings |
| 3.1.5 Personnel Protection |
| 3.1.6 Warning Signs |
| 3.1.7 Monitoring |
| 3.2 CLEANUP AND DISPOSAL |
| 3.2.1 Cleanup |
| 3.2.2 Certification |
| 3.2.3 Disposal |
3.3 TOXICITY CHARACTERISTIC LEACHING PROCEDURE TCLP
| OUAD A BUILDING 130, 131 & 132 HAZARDOUS MATERIAL SURVEY REPORT |
| 02 09 30 |
| EXPOSURE ASSESSMENT FOR WORKERS EXPOSED TO RODENT DROPPING |
| 02 09 30 - EXPOSURE ASSESSMENT FOR WORKERS EXPOSED TO RODENT DROPPING |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 Industrial Hygienist IH: |
| 1.2.2 Industrial Hygiene Technician IHT: |
| 1.3 Quality ASSURANCE |
| 1.3.1 Medical Examinations |
| 1.3.2 IH Responsibilities |
| 1.3.3 IHT Responsibilities |
| 1.3.4 Training |
| 1.3.5 Respiratory Protection Program |
| 1.3.6 Pre-Construction Conference |
| 1.4 SUBMITTALS |
| 1.5 REMOVAL |
| 1.6 QUALIFICATIONS OF IH |
| 1.7 CLEANUP WORK PLAN |
| 1.8 EQUIPMENT |
| 1.8.1 Respirators |
| 1.8.2 Special Protective Clothing |
| 1.8.3 Hygiene Facilities |
| 1.8.4 Change Area |
| 1.8.5 Hand Washing Facilities |
| PART 2 PRODUCTS Not applicable |
| PART 3 EXECUTION |
| 3.1 PROTECTION |
| 3.1.1 Control Area Requirements |
| 3.1.2 Protection of Existing Work to Remain |
| 3.1.3 Boundary Requirements |
| 3.1.4 Furnishings |
| 3.1.5 Personnel Protection |
| 3.1.6 Warning Signs |
| 3.2 CLEANUP AND DISPOSAL |
| 3.2.1 Cleanup |
| 3.2.2 Certification |
| 3.2.3 Disposal |
| 02 41 00 |
| DEMOLITION |
| 02 41 00 - DEMOLITION |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 PROJECT DESCRIPTION |
| 1.2.1 Demolition Plan |
| 1.2.2 General Requirements |
| 1.3 ITEMS TO REMAIN IN PLACE |
| 1.3.1 Existing Construction Limits and Protection |
| 1.3.2 Weather Protection |
| 1.3.3 Trees |
| 1.3.4 Utility Service |
| 1.3.5 Facilities |
| 1.4 BURNING |
| 1.5 SUBMITTALS |
| 1.6 QUALITY ASSURANCE |
| 1.6.1 Hawaii Requirements |
| 1.6.2 Dust and Debris Control |
| 1.7 PROTECTION |
| 1.7.1 Traffic Control Signs |
| 1.7.2 Protection of Personnel |
| 1.8 RELOCATIONS |
| 1.9 EXISTING CONDITIONS |
| PART 2 PRODUCTS |
| 2.1 FILL MATERIAL |
| PART 3 EXECUTION |
| 3.1 EXISTING FACILITIES TO BE REMOVED |
| 3.1.1 Structures |
| 3.1.2 Utilities and Related Equipment |
| 3.1.2.1 General Requirements |
| 3.1.2.2 Disconnecting Existing Utilities |
| 3.1.3 Chain Link Fencing |
| 3.1.4 Paving and Slabs |
| 3.1.5 Roofing |
| 3.1.6 Masonry |
| 3.1.7 Concrete |
| 3.1.8 Structural Steel |
| 3.1.9 Miscellaneous Metal |
| 3.1.10 Carpentry |
| 3.1.11 Carpet |
| 3.1.12 Acoustic Ceiling Tile |
| 3.1.13 Patching |
| 3.1.14 Air Conditioning Equipment |
| 3.1.15 Locksets on Swinging Doors |
| 3.1.16 Mechanical Equipment and Fixtures |
| 3.1.16.1 Preparation for Storage |
| 3.1.16.2 Piping |
| 3.1.16.3 Ducts |
| 3.1.16.4 Fixtures, Motors and Machines |
| 3.1.17 Electrical Equipment and Fixtures |
| 3.1.17.1 Fixtures |
| 3.1.17.2 Electrical Devices |
| 3.1.17.3 Wiring Ducts or Troughs |
| 3.1.17.4 Conduit and Miscellaneous Items |
| 3.2 CONCURRENT EARTH-MOVING OPERATIONS |
| 3.3 DISPOSITION OF MATERIAL |
| 3.3.1 Title to Materials |
| 3.3.2 Reuse of Materials and Equipment |
| 3.3.3 Disposal of Ozone Depleting Substance ODS |
| 3.3.3.1 Special Instructions |
| 3.3.4 Transportation Guidance |
| 3.3.5 Unsalvageable and Non-Recyclable Material |
| 3.4 CLEANUP |
| 3.5 DISPOSAL OF REMOVED MATERIALS |
| 3.5.1 Regulation of Removed Materials |
| 3.5.2 Burning on Government Property |
| 3.5.3 Removal to Spoil Areas on Government Property |
| 3.5.4 Removal from Government Property |
3.6 REUSE OF SALVAGED ITEMS
| 02 85 00 |
| MOLD REMEDIATION |
| 02 85 00 - MOLD REMEDIATION |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 AIHA |
| 1.2.2 AIHA EMLAP |
| 1.2.3 AFU |
| 1.2.4 Categories of Water |
| 1.2.5 Certified Industrial Hygienist CIH |
| 1.2.6 Complete Interior Building Demolition Complete Gut |
| 1.2.7 Containment |
| 1.2.7.1 Source Containment |
| 1.2.7.2 Unoccupied Building Containment |
| 1.2.7.3 Cleaning Containment |
| 1.2.8 Decontamination Unit Airlock |
| 1.2.9 Dehumidifier |
| 1.2.10 Disinfectants or Biocide Sanitizing Solutions |
| 1.2.11 EPA |
| 1.2.12 Fungal Growth Structures |
| 1.2.13 Fungicidal Agents, EPA |
| 1.2.14 HEPA Filter |
| 1.2.15 HVAC |
| 1.2.16 Industrial Hygienist IH |
| 1.2.17 Microbial Remediation Supervisor |
| 1.2.18 Non-Porous Material |
| 1.2.19 Occupied Spaces Areas |
| 1.2.20 Personal Protective Equipment PPE |
| 1.2.21 Poly |
| 1.2.22 Porous Material |
| 1.2.23 Pressure Differential Measuring Instrument |
| 1.2.24 Semi-porous Material |
| 1.2.25 Ventilation System Mold Remediator Qualifications VSMR |
| 1.2.26 Work Area |
| 1.3 REQUIREMENTS |
| 1.3.1 Description of Work |
| 1.4 SUBMITTALS |
| 1.4.1 Preconstruction Submittals |
| 1.4.1.1 Preliminary Visual Assessment Report |
| 1.4.1.2 Microbial Remediation Plan |
| 1.4.1.3 Respiratory Protection Program |
| 1.4.1.4 Worker Records |
| 1.4.1.5 Certified Industrial Hygienist CIHIndustrial Hygienist IH |
| 1.4.1.6 Microbial Remediation Supervisor Qualifications |
| 1.4.2 Product Data |
| 1.4.3 IH Daily Reports |
| 1.4.4 Submittals at Completion of Remediation Work |
| 1.5 RECORD KEEPING |
| 1.5.1 Daily Project Log |
| PART 2 PRODUCTS |
| 2.1 DISINFECTANTS, BIOCIDES, SANITIZING SOLUTIONS AND FUNGICIDAL AGENTS, |
| 2.2 HAZARD COMMUNICATION |
| PART 3 EXECUTION |
| 3.1 EQUIPMENT |
| 3.1.1 Respirators |
| 3.1.2 Protective Clothing |
| 3.1.3 Warning Signs and Labels |
| 3.1.4 Dehumidifiers |
| 3.1.5 Air Filtration Units AFU |
| 3.1.6 Vacuum Cleaners Equipped with HEPA Filters |
| 3.2 GENERAL REQUIREMENTS |
| 3.2.1 Pre-Microbial Remediation Work Conference |
| 3.2.2 Containment Entry / Exit Procedure |
| 3.3 REMOVAL PROCEDURES |
| 3.3.1 Protection of Existing Work Areas |
| 3.3.2 Remediation of Fungally Contaminated Building Materials |
| 3.3.3 Remediation Procedures |
| 3.3.3.1 Remediation of Non-Porous Materials |
| 3.3.3.2 Porous Materials |
| 3.4 DETAILED SEQUENCE OF WORK FOR MOLD REMOVAL UNDER CONTAINMENT |
| 3.4.1 Preparation for Remediation Work |
| 3.4.2 Demolition |
| 3.4.3 Post-Demolition Inspection |
| 3.4.4 Cleaning after Demolition, and Cleaning of Settled Spores from Porous |
| 3.5 FIRE PROTECTION |
| 3.6 CONSTRUCTION BARRIERS |
| 3.7 QUALITY ASSURANCE / QUALITY CONTROL REQUIREMENTS |
| 3.7.1 Contractor Qualifications |
| 3.7.2 Waste Management and Removal |
| 3.7.3 Post-Remediation Inspection |
| 3.7.3.1 Clearance |
| 3.8 CLEAN-UP AND DISPOSAL |
| 3.8.1 Disposal of Material |
| 3.8.2 Material Packaging |
| 3.8.3 Building Exit Waste Disposal |
| 3.8.4 Hazardous Material |
3.9 APPENDICES
| 03 01 00 |
| REHABILITATION OF CONCRETE |
| 03 01 00 - REHABILITATION OF CONCRETE |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 DEFINITIONS |
| 1.2.1 Bracing |
| 1.2.2 Delamination |
| 1.2.3 Rehabilitation |
| 1.2.4 Repair |
| 1.2.5 Shoring |
| 1.2.6 Termination Joint |
| 1.2.7 Unsound Concrete |
| 1.3 REFERENCES |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.5.1 General Requirements |
| 1.5.2 Quality Control Plan |
| 1.5.3 Qualifications |
| 1.5.3.1 Testing Agencies |
| 1.5.3.2 Quality Control Personnel |
| 1.5.3.3 Contractor Qualifications |
| 1.5.3.4 Worker Qualifications |
| 1.5.4 Work Plan |
| 1.5.5 Applicators |
| 1.5.5.1 Training |
| 1.5.5.2 Experience |
| 1.5.6 Regulatory Requirements |
| 1.5.7 Pre-installation Meetings |
| 1.6 System Manufacturer |
| 1.7 ACCEPTANCE OF REHABILITATION WORK |
| 1.7.1 General Requirements |
| 1.7.2 Tolerances |
| 1.7.3 Appearance |
| 1.8 DELIVERY, STORAGE, AND HANDLING |
| 1.8.1 Labeling |
| 1.8.2 Storage |
| 1.9 PROJECT/SITE CONDITIONS |
| 1.9.1 Environmental Requirements |
| 1.9.1.1 Application Temperature |
| 1.9.1.2 Wet or Damp Surfaces |
1.9.2 Work Coordination
| 1.10 PROTECTION OF COMPLETED REHABILITATION WORK |
| 1.11 WARRANTY |
| PART 2 PRODUCTS |
| 2.1 MATERIALS FOR SHORING AND BRACING |
| 2.1.1 Shoring and Bracing Systems |
| 2.1.2 Design Requirements |
| 2.2 EQUIPMENT FOR CONCRETE PREPARATION |
| 2.2.1 Equipment for Concrete Removal |
| 2.2.2 Surface preparation and cleaning equipment |
| 2.3 MATERIALS FOR FORMWORK AND EMBEDDED ITEMS |
| 2.4 REINFORCEMENT AND REINFORCEMENT SUPPORTS |
| 2.4.1 Fiber-Reinforced Polymers |
| 2.5 POLYMERS |
| 2.5.1 Epoxies |
| 2.6 MIXTURE PROPORTIONING |
| 2.7 COMPONENTS |
| 2.7.1 FRP Composite System |
| 2.7.1.1 Wet Lay-up System |
| 2.7.1.2 Precured System |
| 2.7.2 Use of Primer/Filler |
| 2.7.3 Finish and Coating |
| 2.8 ACCESSORIES |
| 2.8.1 Anchors |
| 2.8.2 Miscellaneous |
2.9 MIXES
| PART 3 EXECUTION |
| 3.1 GENERAL REQUIREMENTS |
| 3.1.1 Protection |
| 3.1.2 Formwork and Shoring |
| 3.1.2.1 Formwork |
| 3.1.2.2 Shoring |
| 3.1.3 Concrete preparation |
| 3.1.4 Quality Control |
| 3.1.4.1 Quality control of surface preparation |
| 3.1.5 Clean up |
| 3.1.6 Safety |
| 3.2 CRACK REPAIR |
| 3.2.1 Preparation |
| 3.2.1.1 General Requirements |
| 3.2.1.2 Crack routing |
| 3.2.1.3 Sealing |
| 3.2.2 Application |
| 3.2.2.1 Epoxy injection |
| 3.2.2.2 Gravity fill |
3.2.3 Quality Control
| 3.3 CORROSION AND SURFACE REPAIR |
| 3.3.1 Preparation |
| 3.3.1.1 Preparation of Concrete Substrate Surface |
| 3.3.2 Application |
| 3.3.2.1 Placement of Other Repair Materials |
3.3.3 Quality Control
| 3.4 CONCRETE STRENGTHENING |
| 3.4.1 SUBSTRATE, TEMPERATURE, AND ENVIRONMENT |
| 3.4.1.1 Examination |
| 3.4.1.2 Environmental Temperature |
| 3.4.1.3 Other Environmental Factors |
| 3.4.2 Preparation |
| 3.4.2.1 Materials Testing |
| 3.4.2.2 Worksite Ventilation |
| 3.4.2.3 Substrate Repair |
| 3.4.2.3.1 Surface |
| 3.4.2.3.2 Sub-surface |
| 3.4.2.4 Surface Preparation |
| 3.4.2.4.1 Surface Cleaning |
3.4.2.5 Cleaned Surface Protection
| 3.4.3 Surface Plane Variation Tolerance |
| 3.4.4 Obstructions, Corners and Non-Planar Surfaces |
| 3.4.5 Surface Moisture |
| 3.4.6 Application |
| 3.4.6.1 Externally bonded systems |
| 3.4.6.1.1 Fiber-reinforced Polymer Laminates |
| 3.4.6.1.2 Primer |
| 3.4.6.1.3 Putty/Filler |
| 3.4.6.1.4 Wet Lay-Up and Prepreg Systems |
| 3.4.6.1.5 Precured Systems |
| 3.4.6.1.6 Lap Splices |
| 3.4.6.1.7 Curing of Resins |
| 3.4.6.1.8 Surface Finish - Coating Application |
| 3.4.6.1.8.1 Preparation |
| 3.4.6.1.8.2 Multiple Coats |
| 3.4.6.1.9 Installation Procedure Modification |
| 3.4.6.1.10 System Placement Tolerances |
| 3.5 Quality Control |
| 3.5.1 Independent Special Inspector |
| 3.5.2 Laboratory Qualifications |
| 3.6 Laboratory Testing |
| 3.6.1 Witness Panels |
| 3.6.1.1 Wet Lay-Up Prepreg |
| 3.6.1.2 Precured |
| 3.6.2 Panel Testing |
| 3.6.3 Report |
| 3.7 Field Testing |
| 3.7.1 Mixed Resin Hardness |
| 3.7.1.1 Testing |
| 3.7.1.2 Report |
| 3.7.1.3 Remedial Measures |
| 3.7.2 In-Place FRP Hardness |
| 3.7.2.1 Testing |
| 3.7.2.2 Report |
| 3.7.2.3 Remedial Measures |
| 3.7.3 Adhesion Strength |
| 3.7.3.1 Testing |
| 3.7.3.2 Report |
| 3.7.3.3 Remedial Measures |
| 3.7.3.4 Test Repair |
3.7.4 Laminate Thickness and Number of Plies
| 3.8 QC/QA INSPECTION |
| 3.8.1 Special Inspector Duties |
| 3.8.2 Daily Inspection Records |
| 3.8.3 Void Detection |
| 3.8.4 Delaminations |
| 3.8.4.1 Wet Lay-Up and Prepreg Systems |
| 3.8.4.2 Pre-Cured Systems |
| 3.8.5 Fiber Orientation |
| 3.8.6 Record Retention |
| 3.9 REPAIRS |
| 3.9.1 Application Defects |
| 3.9.2 Tears in the Reinforcing Fibers |
| 3.9.3 Remedial Measures for Defects |
3.10 WORK AREA CLEAN UP
| 03 30 00 |
| CAST-IN-PLACE CONCRETE |
| 03 30 00 - CAST-IN-PLACE CONCRETE |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.3 SUBMITTALS |
| 1.4 MODIFICATION OF REFERENCES |
| 1.5 DELIVERY, STORAGE, AND HANDLING |
| 1.5.1 Reinforcement |
| 1.6 QUALITY ASSURANCE |
| 1.6.1 Design Data |
| 1.6.1.1 Concrete Mix Design |
| 1.6.2 Shop Drawings |
| 1.6.2.1 Reinforcing Steel |
| 1.6.3 Control Submittals |
| 1.6.3.1 Concrete Curing Plan |
| 1.6.3.2 Pumping Concrete |
| 1.6.3.3 Safety Data Sheets |
| 1.6.4 Quality Control Plan |
| 1.6.5 Quality Control Personnel Certifications |
| 1.6.5.1 Quality Manager Qualifications |
| 1.6.5.2 Field Testing Technician and Testing Agency |
| 1.6.6 Laboratory Qualifications for Concrete Qualification Testing |
| 1.6.7 Laboratory Accreditation |
| 1.7 ENVIRONMENTAL REQUIREMENTS |
| 1.7.1 Submittals for Environmental Performance |
1.8 QUALIFICATIONS FOR WELDING WORK
| PART 2 PRODUCTS |
| 2.1 MATERIALS FOR FORMS |
| 2.1.1 Wood Forms |
| 2.1.1.1 Concrete Form Plywood Standard Rough |
| 2.1.1.2 Overlaid Concrete Form Plywood Standard Smooth |
2.1.2 Steel Forms
| 2.2 FORM TIES AND ACCESSORIES |
| 2.3 CONCRETE MIX DESIGN |
| 2.3.1 Contractor-Furnished Mix Design |
| 2.3.1.1 Footings |
| 2.3.1.2 Foundation Walls |
| 2.3.1.3 Slab-on-Grade |
| 2.3.1.4 Suspended Slabs |
| 2.3.1.5 Concrete Toppings |
| 2.3.1.6 Building Walls |
| 2.3.1.7 Other Concrete |
| 2.3.1.8 Mix Proportions for Normal Weight Concrete |
| 2.3.1.9 Required Average Strength of Mix Design |
| 2.3.2 Ready-Mix Concrete |
| 2.3.3 Concrete Curing Materials |
| 2.4 MATERIALS |
| 2.4.1 Cementitious Materials |
| 2.4.1.1 Portland Cement |
| 2.4.2 Water |
| 2.4.3 Aggregates |
| 2.4.4 Nonshrink Grout |
| 2.4.5 Admixtures |
| 2.4.5.1 High Range Water Reducer HRWR Superplasticizers |
| 2.4.6 Vapor Retarder |
| 2.4.7 Expansion/Contraction Joint Filler |
| 2.4.8 Joint Sealants |
| 2.4.8.1 Horizontal Surfaces, 3 Percent Slope, Maximum |
| 2.4.8.2 Vertical Surfaces Greater Than 3 Percent Slope |
| 2.5 REINFORCEMENT |
| 2.5.1 Reinforcing Bars |
| 2.5.2 Mechanical Reinforcing Bar Connectors |
| 2.5.3 Wire |
| 2.5.3.1 Welded Wire Reinforcement |
| 2.5.3.2 Steel Wire |
2.5.4 Reinforcing Bar Supports
| 2.6 FLOOR FINISH MATERIALS |
| 2.6.1 Liquid Chemical Floor Hardener |
| PART 3 EXECUTION |
| 3.1 EXAMINATION |
| 3.2 PREPARATION |
| 3.2.1 General |
| 3.2.2 Subgrade Under Foundations and Footings |
| 3.2.3 Subgrade Under Slabs on Ground |
| 3.2.4 Edge Forms and Screed Strips for Slabs |
| 3.2.5 Reinforcement and Other Embedded Items |
| 3.3 FORMS |
| 3.3.1 Coating |
| 3.3.2 Reshoring |
| 3.3.3 Reuse |
| 3.3.4 Forms for Standard Rough Form Finish |
| 3.3.5 Forms for Standard Smooth Form Finish |
| 3.3.6 Form Ties |
| 3.3.7 Forms for Concrete Pan Joist Construction |
| 3.3.8 Tolerances for Form Construction |
| 3.4 PLACING REINFORCEMENT AND MISCELLANEOUS MATERIALS |
| 3.4.1 General |
| 3.4.2 Vapor Retarder |
| 3.4.3 Reinforcement Supports |
| 3.4.4 Splicing |
| 3.4.5 Future Bonding |
| 3.4.6 Setting Miscellaneous Material |
| 3.4.7 Fabrication |
| 3.4.8 Placing Reinforcement |
| 3.4.9 Spacing of Reinforcing Bars |
| 3.4.10 Concrete Protection for Reinforcement |
| 3.5 BATCHING, MEASURING, MIXING, AND TRANSPORTING CONCRETE |
| 3.5.1 Measuring |
| 3.5.2 Mixing |
| 3.5.3 Transporting |
| 3.6 PLACING CONCRETE |
| 3.6.1 Footing Placement |
| 3.6.2 Pumping |
| 3.6.3 Hot Weather |
| 3.6.4 Bonding |
| 3.7 WASTE MANAGEMENT |
| 3.7.1 Mixing Equipment |
| 3.7.2 Reinforcing Steel |
| 3.7.3 Other Waste |
| 3.8 SURFACE FINISHES EXCEPT FLOOR, SLAB, AND PAVEMENT FINISHES |
| 3.8.1 Defects |
| 3.8.2 Not Against Forms Top of Walls |
| 3.8.3 Formed Surfaces |
| 3.8.3.1 Tolerances |
| 3.8.3.2 As-Cast Rough Form |
| 3.8.3.3 Standard Smooth Finish |
| 3.9 FLOOR, SLAB, AND PAVEMENT FINISHES AND MISCELLANEOUS CONSTRUCTION |
| 3.9.1 Finish |
| 3.9.1.1 Scratched |
| 3.9.1.2 Floated |
| 3.9.1.3 Steel Troweled |
| 3.9.1.4 Broomed |
| 3.9.2 Concrete Walks |
| 3.9.3 Splash Blocks |
| 3.10 JOINTS |
| 3.10.1 Construction Joints |
| 3.10.1.1 Maximum Allowable Construction Joint Spacing |
| 3.10.1.2 Construction Joints for Constructability Purposes |
| 3.10.2 Isolation Joints in Slabs on Ground |
| 3.10.3 Contraction Joints in Slabs on Ground |
| 3.10.4 Sealing Joints in Slabs on Ground |
| 3.11 CURING AND PROTECTION |
| 3.11.1 Curing Periods |
| 3.11.2 Curing Formed Surfaces |
| 3.11.3 Curing Unformed Surfaces |
| 3.11.4 Temperature of Concrete During Curing |
| 3.11.5 Protection from Mechanical Injury |
| 3.11.6 Protection After Curing |
| 3.12 FIELD QUALITY CONTROL |
| 3.12.1 Sampling |
| 3.12.2 Testing |
| 3.12.2.1 Slump Tests |
| 3.12.2.2 Temperature Tests |
| 3.12.2.3 Compressive Strength Tests |
| 3.12.2.4 Strength of Concrete Structure |
| 3.12.2.5 Non-Conforming Materials |
| 3.12.2.6 Testing Concrete Structure for Strength |
| 3.13 REPAIR, REHABILITATION AND REMOVAL |
| 3.13.1 Crack Repair |
| 3.13.2 Repair of Weak Surfaces |
| 3.13.3 Failure of Quality Assurance Test Results |
| 03 42 13.00 10 |
| PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE CONSTRUCTION |
| 03 42 13.00 10 - PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE CONSTRUCTION |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 QUALITY ASSURANCE |
| 1.3.1 NPCA and ACPA Plant Certification |
| 1.3.2 Qualifications, Quality Control and Inspection |
| 1.3.2.1 Qualifications |
| 1.3.2.2 Quality Control Procedures |
| 1.3.2.2.1 Slump |
| 1.3.2.2.2 Temperature |
| 1.3.2.2.3 Compressive Strength |
| 1.3.2.2.4 Air Content |
| 1.3.2.2.5 Unit Weight |
| 1.3.2.3 Inspection |
| 1.3.2.4 Test Reports |
| 1.3.2.4.1 Material Certifications or Laboratory Test Reports |
| 1.3.2.4.2 Mix Test |
| 1.3.2.4.3 Self-Consolidating Concrete |
| 1.3.2.4.4 In-Plant QA/QC Inspection Reports |
| 1.4 DELIVERY, STORAGE, AND HANDLING |
| 1.4.1 Delivery |
| 1.4.2 Storage |
| 1.4.3 Handling |
| PART 2 PRODUCTS |
| 2.1 SYSTEM DESCRIPTION |
| 2.1.1 Standard Precast Units |
| 2.1.2 Custom-Made Precast Units |
| 2.1.3 Proprietary Precast Units |
| 2.1.4 Joints and Sealants |
| 2.1.5 Concrete Mix Design |
| 2.1.5.1 Concrete Mix Proportions |
| 2.1.5.2 Concrete Strength |
| 2.1.5.3 Water-to-Cement Ratio |
| 2.1.5.4 Air Content |
| 2.1.5.5 Corrosion Control for Sanitary Sewer Systems |
| 2.2 MATERIALS |
| 2.2.1 Material Sustainability Criteria |
| 2.2.2 Pigments |
| 2.2.3 Reinforcement |
| 2.2.3.1 Reinforcing Bars |
| 2.2.3.2 Reinforcing Wire |
| 2.2.3.3 Welded Wire Reinforcement |
| 2.2.3.4 Epoxy Coated Reinforcement |
| 2.2.3.5 Galvanized Reinforcement |
| 2.2.4 Synthetic Fiber Reinforcement |
| 2.2.5 Inserts and Embedded Metal |
| 2.2.6 Accessories |
| 2.2.7 Pipe Entry Connectors |
| 2.2.8 Grout |
| PART 3 EXECUTION |
| 3.1 FABRICATION AND PLACEMENT |
| 3.1.1 Forms |
| 3.1.2 Reinforcement |
| 3.1.3 Embedded Items |
| 3.1.4 Synthetic Fiber Reinforced Concrete |
| 3.2 CONCRETE |
| 3.2.1 Concrete Mixing |
| 3.2.2 Concrete Placing |
| 3.2.2.1 Cold Weather Concreting |
| 3.2.2.2 Hot Weather Concreting |
| 3.2.3 Concrete Curing |
| 3.2.3.1 Curing by Moisture Retention |
| 3.2.3.2 Curing with Heat and Moisture |
| 3.2.4 Surface Finish |
| 3.2.4.1 Formed Non-Architectural Surfaces |
| 3.2.4.2 Unformed Surfaces |
| 3.2.4.3 Special Finishes |
| 3.2.5 Stripping Products from Forms |
| 3.2.6 Patching and Repair |
| 3.2.6.1 Repairing Minor Defects |
| 3.2.6.2 Repairing Honeycombed Areas |
| 3.2.6.3 Repairing Major Defects |
3.2.7 Shipping Products
| 3.3 INSTALLATION |
| 3.3.1 Site Access |
| 3.3.2 General Requirements |
| 3.3.3 Water Tightness |
| 3.4 FIELD QUALITY CONTROL |
| 3.4.1 Site Tests |
| 3.4.2 Vacuum Testing |
| 3.4.3 Water Testing |
| 04 20 00 |
| UNIT MASONRY |
| 04 20 00 - UNIT MASONRY |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 QUALITY ASSURANCE |
| 1.3.1 Special Masonry Inspector Qualifications |
| 1.4 DELIVERY, STORAGE, AND HANDLING |
| 1.4.1 Masonry Units |
| 1.4.2 Reinforcement, Anchors, and Ties |
| 1.4.3 Cementitious Materials, Sand and Aggregates |
1.5 PROJECT/SITE CONDITIONS
| PART 2 PRODUCTS |
| 2.1 SYSTEM DESCRIPTION |
| 2.1.1 Design - Specified Compressive Strength of Masonry |
| 2.1.2 Performance - Verify Masonry Compressive Strength |
| 2.2 MANUFACTURED UNITS |
| 2.2.1 General Requirements |
| 2.2.2 Concrete Units |
| 2.2.2.1 Aggregates |
| 2.2.2.2 Concrete Masonry Units CMU |
| 2.2.2.2.1 Cement |
| 2.2.2.2.2 Size |
| 2.2.2.2.3 Surfaces |
| 2.2.2.2.4 Weather Exposure |
| 2.2.2.2.5 Unit Types |
| 2.2.3 Precast Concrete Units |
| 2.2.3.1 General |
| 2.2.3.2 Precast Concrete Sills and Copings |
| 2.3 EQUIPMENT |
| 2.3.1 Vibrators |
| 2.3.2 Grout Pumps |
| 2.4 MATERIALS |
| 2.4.1 Mortar Materials |
| 2.4.1.1 Cementitious Materials |
| 2.4.1.2 Hydrated Lime and Alternates |
| 2.4.1.3 Aggregate and Water |
| 2.4.2 Grout and Ready-Mix Grout Materials |
| 2.4.2.1 Cementitious Materials for Grout |
| 2.4.2.2 Aggregate and Water |
| 2.5 MORTAR AND GROUT MIXES |
| 2.5.1 Mortar Mix |
| 2.5.2 Grout and Ready Mix Grout Mix |
| 2.6 ACCESSORIES |
| 2.6.1 Anchors, Ties, and Bar Positioners |
| 2.6.1.1 General |
| 2.6.1.2 Bar Positioners |
| 2.6.2 Joint Reinforcement |
| 2.6.3 Reinforcing Steel Bars |
| 2.6.4 Concrete Masonry Control Joint Keys |
| PART 3 EXECUTION |
| 3.1 EXAMINATION |
| 3.2 PREPARATION |
| 3.2.1 Stains |
| 3.2.2 Loads |
| 3.2.3 Concrete Surfaces |
| 3.2.4 Shelf Angles |
| 3.2.5 Bracing |
| 3.3 ERECTION |
| 3.3.1 General |
| 3.3.1.1 Jointing |
| 3.3.1.1.1 Tooled Joints |
| 3.3.1.1.2 Flush Joints |
| 3.3.1.1.3 Door and Window Frame Joints |
| 3.3.1.1.4 Joint Widths |
| 3.3.1.2 Cutting and Fitting |
| 3.3.1.3 Unfinished Work |
| 3.3.1.4 Control Joints |
| 3.3.2 Reinforced, Single Wythe Concrete Masonry Units Walls |
| 3.3.2.1 Concrete Masonry Unit Placement |
| 3.3.2.2 Preparation for Reinforcement |
| 3.3.3 ANCHORAGE |
| 3.3.3.1 Anchorage at Intersecting Walls |
| 3.3.4 Lintels |
| 3.3.4.1 Masonry Lintels |
3.3.5 Sills and Copings
| 3.4 INSTALLATION |
| 3.4.1 Bar Reinforcement Installation |
| 3.4.1.1 Preparation |
| 3.4.1.2 Positioning Bars |
| 3.4.1.3 Splices of Bar Reinforcement |
| 3.4.2 Placing Grout |
| 3.4.2.1 General |
| 3.4.2.2 Grout Holes and Cleanouts |
| 3.4.2.2.1 Grout Holes |
| 3.4.2.2.2 Cleanouts for Hollow Unit Masonry Construction |
3.4.2.3 Grout Placement
| 3.4.3 Joint Reinforcement Installation |
| 3.4.4 Bond Beams |
| 3.5 APPLICATION |
| 3.5.1 Interface with Other Products |
| 3.5.1.1 Built-In Items |
| 3.5.1.2 Door and Window Frame Joints |
| 3.5.1.3 Bearing Plates |
3.5.2 Tolerances
| 3.6 FIELD QUALITY CONTROL |
| 3.6.1 Tests |
| 3.6.1.1 Prism Tests |
3.6.2 Special Inspection
| 3.7 POINTING AND CLEANING |
| 3.7.1 Dry-Brushing Concrete Masonry |
3.8 PROTECTION
| 05 12 00 |
| STRUCTURAL STEEL |
| 05 12 00 - STRUCTURAL STEEL |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 QUALITY ASSURANCE |
| 1.3.1 Preconstruction Submittals |
| 1.3.1.1 Erection Drawings |
| 1.3.2 Fabrication Drawing Requirements |
| 1.3.3 Certifications |
| 1.3.3.1 Welding Procedures and Qualifications |
| PART 2 PRODUCTS |
| 2.1 SYSTEM DESCRIPTION |
| 2.2 STEEL |
| 2.2.1 Structural Steel |
| 2.3 BOLTS, NUTS, AND WASHERS |
| 2.3.1 Common Grade Bolts |
| 2.3.1.1 Bolts |
| 2.3.1.2 Nuts |
| 2.3.1.3 Washers |
| 2.3.2 Foundation Anchorage |
| 2.3.2.1 Anchor Rods |
| 2.3.2.2 Anchor Nuts |
| 2.3.2.3 Anchor Washers |
| 2.3.2.4 Anchor Plate Washers |
| 2.4 STRUCTURAL STEEL ACCESSORIES |
| 2.4.1 Welding Electrodes and Rods |
| 2.4.2 Non-Shrink Grout |
| 2.4.3 Welded Shear Stud Connectors |
| 2.5 GALVANIZING |
| 2.6 FABRICATION |
| 2.6.1 Markings |
| 2.6.2 Shop Primer |
| 2.6.2.1 Cleaning |
| PART 3 EXECUTION |
| 3.1 ERECTION |
| 3.1.1 STORAGE |
| 3.2 CONNECTIONS |
| 3.2.1 Common Grade Bolts |
| 3.3 GAS CUTTING |
| 3.4 WELDING |
| 3.5 SHOP PRIMER REPAIR |
| 3.5.1 Field Priming |
| 3.6 GALVANIZING REPAIR |
| 3.7 FIELD QUALITY CONTROL |
| 3.7.1 Welds |
| 3.7.1.1 Visual Inspection |
| 05 50 13 |
| MISCELLANEOUS METAL FABRICATIONS |
| 05 50 13 - MISCELLANEOUS METAL FABRICATIONS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 QUALIFICATION OF WELDERS |
| 1.3 DELIVERY, STORAGE, AND PROTECTION |
| 1.4 MISCELLANEOUS REQUIREMENTS |
| 1.4.1 Fabrication Drawings |
| 1.4.2 Installation Drawings |
| PART 2 PRODUCTS |
| 2.1 RECYCLED CONTENT |
| 2.2 MATERIALS |
| 2.2.1 Structural Carbon Steel |
| 2.2.2 Structural Tubing |
| 2.2.3 Steel Pipe |
| 2.2.4 Expanded Metal |
| 2.2.5 Anchor Bolts |
| 2.2.5.1 Expansion Anchors, Sleeve Anchors |
| 2.2.5.2 Lag Screws and Bolts |
| 2.2.5.3 Toggle Bolts |
| 2.2.5.4 Bolts, Nuts, Studs and Rivets |
| 2.2.5.5 Powder Actuated Fasteners |
| 2.2.5.6 Screws |
| 2.2.5.7 Washers |
| 2.3 FABRICATION FINISHES |
| 2.3.1 Galvanizing |
| 2.3.2 Galvanize |
| 2.3.3 Shop Cleaning and Painting |
| 2.3.3.1 Surface Preparation |
| 2.3.3.2 Pretreatment, Priming and Painting |
| 2.3.4 Aluminum Surfaces |
| 2.3.4.1 Surface Condition |
| 2.3.4.2 Aluminum Finishes |
| 2.4 MISCELLANEOUS PLATES AND SHAPES |
| 2.5 Metal Safety Nosing |
| PART 3 EXECUTION |
| 3.1 GENERAL INSTALLATION REQUIREMENTS |
| 3.2 WORKMANSHIP |
| 3.3 ANCHORAGE, FASTENINGS, AND CONNECTIONS |
| 3.4 BUILT-IN WORK |
| 3.5 WELDING |
| 3.6 DISSIMILAR METALS |
| 3.7 PREPARATION |
| 3.7.1 Material Coatings and Surfaces |
| 3.7.2 Environmental Conditions |
| 05 52 00 |
| METAL RAILINGS |
| 05 52 00 - METAL RAILINGS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 QUALITY CONTROL |
| 1.3.1 Welding Procedures |
| 1.3.2 Welder Qualification |
| PART 2 PRODUCTS |
| 2.1 FABRICATION |
| 2.1.1 Aluminum Railings |
| 2.2 COMPONENTS |
| 2.2.1 Aluminum Railings And Handrails |
| PART 3 EXECUTION |
| 3.1 PREPARATION |
| 3.2 INSTALLATION |
| 3.2.1 Aluminum Handrail |
| 3.3 FIELD QUALITY CONTROL |
| 3.3.1 Field Welding |
| 06 10 00 |
| ROUGH CARPENTRY |
| 06 10 00 - ROUGH CARPENTRY |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DELIVERY AND STORAGE |
| 1.4 GRADING AND MARKING |
| 1.4.1 Lumber |
| 1.4.2 Plywood |
| 1.4.3 Preservative-Treated Lumber and Plywood |
| 1.5 SIZES AND SURFACING |
| 1.6 MOISTURE CONTENT |
| 1.7 PRESERVATIVE TREATMENT |
| 1.8 CERTIFICATIONS |
| 1.8.1 Certified Wood Grades |
| PART 2 PRODUCTS |
| 2.1 LUMBER |
| 2.1.1 Framing Lumber |
| 2.2 OTHER MATERIALS |
| 2.2.1 Miscellaneous Wood Members |
| 2.2.1.1 Blocking |
| 2.2.1.2 Rough Bucks and Frames |
| 2.3 ROUGH HARDWARE |
| 2.3.1 Bolts, Nuts, Studs, and Rivets |
| 2.3.2 Anchor Bolts |
| 2.3.3 Expansion Shields |
| 2.3.4 Lag Screws and Lag Bolts |
| 2.3.5 Wood Screws |
| 2.3.6 Nails |
| 2.3.7 Wire Nails |
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.2 MISCELLANEOUS |
| 3.2.1 Wood and Blocking |
| 3.2.2 Wood Blocking |
| 06 20 00 |
| FINISH CARPENTRY |
| 06 20 00 - FINISH CARPENTRY |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 SHOP DRAWINGS |
| 1.4 PRODUCT DATA |
| 1.5 SAMPLES |
| 1.6 DELIVERY, STORAGE, AND HANDLING |
| 1.7 QUALITY ASSURANCE |
| 1.7.1 Lumber |
| 1.7.2 Plywood |
| 1.7.3 Pressure Treated Lumber and Plywood |
| 1.7.4 Non-Pressure Treated Woodwork and Millwork |
| 1.7.5 Fire-Retardant Treated Lumber |
| PART 2 PRODUCTS |
| 2.1 WOOD PRODUCTS |
| 2.1.1 Sizes and Patterns of Wood Products |
| 2.1.2 Species and Grades |
| 2.1.3 Trim, Finish, and Frames |
| 2.1.4 Softwood Plywood |
| 2.1.5 Hardwood Plywood |
| 2.1.6 Wood Seats |
| 2.2 MOISTURE CONTENT OF WOOD PRODUCTS |
| 2.3 PRESERVATIVE TREATMENT OF WOOD PRODUCTS |
| 2.3.1 Non-Pressure Treatment |
| 2.3.2 Pressure Treatment |
| 2.4 FIRE-RETARDANT TREATMENT |
| 2.4.1 Wood Products |
| 2.5 HARDWARE AND ACCESSORIES |
| 2.5.1 Wood Screws |
| 2.5.2 Bolts, Nuts, Lag Screws, and Studs |
| 2.5.3 Nails |
| 2.5.4 Adjustable Shelf Standards |
| 2.5.5 Closet Hanger Rods |
| 2.6 FABRICATION |
| 2.6.1 Quality Standards QS |
| 2.6.1.1 Grades |
| 2.6.1.2 Adhesives |
| 2.6.2 Cabinets |
| 2.6.2.1 Cabinet Hardware |
| 2.6.2.2 Finish |
| 2.6.3 Casework with Transparent Finish CTF |
| 2.6.3.1 AWI Quality Grade |
| 2.6.3.2 Construction |
| 2.6.3.3 Exposed Parts |
| 2.6.3.4 Semi-Exposed Parts |
| PART 3 EXECUTION |
| 3.1 FINISH WORK |
| 3.2 CLOTHES HANGER RODS |
| 3.3 MISCELLANEOUS |
| 3.3.1 Cabinets |
| 3.3.2 Wood Seats |
| 06 61 16 |
| SOLID SURFACING FABRICATIONS |
| 06 61 16 - SOLID SURFACING FABRICATIONS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SYSTEM DESCRIPTION |
| 1.3 SUBMITTALS |
| 1.4 CERTIFICATIONS |
| 1.4.1 Indoor Air Quality |
| 1.4.1.1 Indoor Air Quality for Solid Surface Fabricated Products |
| 1.5 QUALITY ASSURANCE |
| 1.5.1 Qualifications |
| 1.5.2 Shop Drawings |
| 1.6 DELIVERY, STORAGE, AND HANDLING |
| 1.7 WARRANTY |
| PART 2 PRODUCTS |
| 2.1 MATERIAL |
| 2.1.1 Cast, 100 Percent Acrylic Polymer Solid Surfacing Material SS1 |
| 2.1.2 Material Patterns and Colors |
| 2.1.3 Surface Finish |
| 2.2 ACCESSORY PRODUCTS |
| 2.2.1 Seam Adhesive |
| 2.2.2 Panel Adhesive |
| 2.2.3 Silicone Sealant |
| 2.2.4 Seam and Sealant Emissions |
| 2.2.5 Mounting Hardware |
| 2.3 FABRICATIONS |
| 2.3.1 Joints and Seams |
| 2.3.2 Edge Finishing |
| 2.3.3 Counter and Vanity Top Splashes |
| 2.3.3.1 Permanently Attached Backsplash |
| 2.3.3.2 End Splashes |
| 2.3.4 Window Stools |
| 2.3.5 Counter and Vanity Tops |
| 2.3.5.1 Counter Top With Sink |
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.1.1 Components |
| 3.1.1.1 Loose Counter Top End Splashes |
| 3.1.2 Silicone Sealant |
| 3.1.3 Plumbing |
3.2 CLEAN-UP
| 07 05 23 |
| PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS |
| 07 05 23 - PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 REFERENCES |
| 1.3 DEFINITIONS |
| 1.3.1 Air Barrier Envelope |
| 1.3.2 Air Leakage Rate |
| 1.3.3 Bias Pressure |
| 1.3.4 Blower Door |
| 1.3.5 Environmental Separator |
| 1.3.6 Pressure Test |
| 1.3.6.1 Negative Pressure Test Depressurization Test |
| 1.3.6.2 Positive Pressure Test Pressurization Test |
| 1.4 WORK PLAN |
| 1.5 SUBMITTALS |
| 1.6 QUALITY ASSURANCE |
| 1.6.1 Modification of References |
| 1.6.2 Qualifications |
| 1.6.2.1 Pressure Test Agency |
| 1.6.2.2 Thermographer Qualifications |
1.6.3 Test Instruments And Date Of Last Calibration
| 1.7 CLIMATE CONDITIONS SUITABLE FOR A PRESSURE TEST |
| 1.7.1 Rain |
| 1.7.2 Wind |
| PART 2 PRODUCTS |
| 2.1 PRESSURE TEST EQUIPMENT |
| 2.1.1 Blower Door Fans and Trailer Mounted Fans |
| 2.1.2 Digital Gages as Test Instruments |
2.2 THERMAL IMAGING CAMERA REQUIREMENTS
| PART 3 EXECUTION |
| 3.1 PRESSURE TEST AGENCY |
| 3.1.1 Field Work |
| 3.1.2 Reporting Work |
| 3.2 ENVELOPE SURFACE AREA CALCULATION |
| 3.3 PREPARING THE BUILDING ENVELOPE FOR THE PRESSURE TEST |
| 3.3.1 Testing During Construction |
| 3.3.2 Sealing The Air Barrier Envelope |
| 3.3.3 Sealing Plumbing |
| 3.3.4 Close and Lock Doors |
| 3.3.5 Hold Excluded Building Areas at the Outdoor Pressure Level |
| 3.3.6 Maintain an Even Pressure within the Envelope |
| 3.3.7 Maintain Access to Mechanical and Electrical Rooms |
| 3.3.8 Minimize Potential for Blowing Dust and Debris |
| 3.3.9 De-energize Air Moving Devices |
| 3.3.10 Installing Blower Door Equipment in a Door Opening |
| 3.4 BUILDING ENVELOPE AIR TIGHTNESS REQUIREMENT |
| 3.4.1 Architectural Only Test |
| 3.4.1.1 Test Goal |
| 3.4.1.2 Preparing The Envelope For The Pressure Test - Seal All Openings |
| 3.4.2 Architectural Plus HVAC System Test |
| 3.4.2.1 Test Goal |
| 3.4.2.2 Preparing the Building for the Pressure Test |
| 3.5 CONDUCTING THE PRESSURE TEST |
| 3.5.1 Extend Pneumatic Tubes and Establish a Reference Differential |
| 3.5.2 Bias Pressure Readings |
| 3.5.3 Testing in Both Positive and Negative Directions |
| 3.5.4 Single Direction Testing |
| 3.5.5 Pressure Testing - Special Cases |
| 3.5.5.1 Pressure Testing a Multiple Isolated Zoned Building |
| 3.5.6 Failed Pressure Test |
| 3.5.7 Air Leakage Test Report |
| 3.6 LOCATING LEAKS BY DIAGNOSTIC TESTING |
| 3.6.1 Find Test |
| 3.6.2 Feel Test |
| 3.6.3 Infrared Thermography Test |
| 3.6.3.1 Thermography Test Methods |
| 3.6.3.1.1 Thermography Testing of the Air Barrier |
| 3.6.3.1.2 Thermography Testing of the Insulation Envelope to Find |
| 3.6.3.1.3 Thermography Testing of Thermal Bridging |
3.6.3.2 Thermography Test Results
| 3.6.4 Fog Test |
| 3.6.5 Diagnostic Test Report |
| 3.6.5.1 Thermographic Investigation Report |
| 3.6.5.2 Fog Test Report |
| 3.7 CALCULATION PROGRAM |
| 3.8 AFTER COMPLETION OF THE PRESSURE AND/OR DIAGNOSTIC TEST |
| 3.9 REPAIR AND PROTECTION |
| 3.10 APPENDICES |
| 07 21 16 |
| 07 24 00 |
| EXTERIOR INSULATION AND FINISH SYSTEMS |
| 07 24 00 - EXTERIOR INSULATION AND FINISH SYSTEMS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SYSTEM DESCRIPTION AND REQUIREMENTS |
| 1.2.1 System Requirements and Tests |
| 1.2.1.1 Water Penetration |
| 1.2.1.2 Wind Load |
| 1.2.1.3 Full scale or intermediate scale fire test |
| 1.2.1.4 Mock-Up Installation of EIFS |
| 1.2.2 Component Requirements and Tests |
| 1.2.2.1 Surface Burning Characteristics |
| 1.2.2.2 Radiant Heat |
| 1.2.2.3 Impact Resistance |
| 1.2.3 Sub-Component Requirements and Tests |
| 1.2.3.1 Abrasion Resistance |
| 1.2.3.2 Accelerated Weathering |
| 1.2.3.3 Mildew Resistance |
| 1.2.3.4 Salt Spray Resistance |
| 1.2.3.5 Water Resistance |
| 1.2.3.6 Absorption-Freeze/Thaw |
| 1.2.3.7 Sample Boards |
1.2.4 Moisture Analysis
| 1.3 SUBMITTALS |
| 1.4 QUALITY ASSURANCE |
| 1.4.1 Qualifications of EIFS Manufacturer |
| 1.4.2 Qualification of EIFS Installer |
| 1.4.3 Qualification of Sealant Applicator |
| 1.4.4 Qualifications of Third Party Inspector |
| 1.4.5 Insulation Board |
| 1.4.6 Pre-Installation Conference |
| 1.5 DELIVERY AND STORAGE |
| 1.6 ENVIRONMENTAL CONDITIONS |
| 1.7 WARRANTY |
| PART 2 PRODUCTS |
| 2.1 COMPATIBILITY |
| 2.2 SHEATHING BOARD |
| 2.2.1 Glass Mat Gypsum Sheathing Board |
| 2.3 ADHESIVE |
| 2.4 LATHING AND FURRING |
| 2.5 MECHANICAL FASTENERS |
| 2.6 THERMAL INSULATION |
| 2.6.1 Manufacturer's Recommendations |
| 2.6.2 Insulation Board |
| 2.7 BASE COAT |
| 2.8 PORTLAND CEMENT |
| 2.9 REINFORCING FABRIC |
| 2.10 FINISH COAT |
| 2.11 SEALANT PRIMER |
| 2.12 ACCESSORIES |
| 2.13 JOINT SEALANT |
| 2.14 BOND BREAKER |
| 2.15 BACKER ROD |
| PART 3 EXECUTION |
| 3.1 EXAMINATION |
| 3.2 SURFACE PREPARATION |
| 3.3 INSTALLATION |
| 3.3.1 Sheathing Board |
| 3.3.2 Insulation Board |
| 3.3.2.1 Mechanically Fastened Insulation Boards |
| 3.3.2.2 Adhesively Fastened Insulation Boards |
| 3.3.3 Base Coat and Reinforcing Fabric Mesh, |
| 3.3.3.1 Class PB Systems |
3.3.4 Finish Coat
| 3.4 JOINT SEALING |
| 3.4.1 Surface Preparation, Backer Rod, and Primer |
| 3.4.2 Sealant |
| 3.5 FIELD QUALITY CONTROL |
| 3.5.1 Inspection Check List |
3.6 CLEANUP
| 07 27 10.00 10 |
| BUILDING AIR BARRIER SYSTEM |
| 07 27 10.00 10 - BUILDING AIR BARRIER SYSTEM |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 REFERENCES |
| 1.3 DEFINITIONS |
| 1.3.1 Air Barrier Accessory |
| 1.3.2 Air Barrier Assembly |
| 1.3.3 Air Barrier Component |
| 1.3.4 Air Barrier Envelope |
| 1.3.5 Air Barrier Material |
| 1.3.6 Air Barrier System |
| 1.3.7 Air Leakage Rate |
| 1.3.8 Air Leakage |
| 1.3.9 Air Permeance |
| 1.3.10 Environmental Separator |
| 1.4 PREPARATORY PHASE OR PRECONSTRUCTION CONFERENCE |
| 1.5 SUBMITTALS |
| 1.6 AIR BARRIER ENVELOPE SURFACE AREA AND LEAKAGE REQUIREMENTS |
| 1.7 AIR BARRIER INSPECTOR |
| 1.8 DESIGN REVIEW |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 QUALITY CONTROL |
| 3.1.1 Documentation and Reporting |
| 3.1.2 Quality Control Testing And Inspection |
3.2 REPAIR AND PROTECTION
| 07 27 26 |
| FLUID-APPLIED MEMBRANE AIR BARRIERS |
| 07 27 26 - FLUID-APPLIED MEMBRANE AIR BARRIERS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 RELATED REQUIREMENTS |
| 1.3 SUBMITTALS |
| 1.4 MISCELLANEOUS REQUIREMENTS |
| 1.4.1 Shop Drawings |
| 1.4.2 Product Data |
| 1.4.3 Mockup |
| 1.4.4 Test Reports |
| 1.5 DELIVERY, STORAGE, AND HANDLING |
| 1.5.1 Delivery |
| 1.5.2 Storage |
| 1.6 CAPILLARY MOISTURE TEST |
| 1.7 FIELD PEEL ADHESION TEST |
| 1.8 AIR BARRIER TESTING |
| 1.9 QUALITY ASSURANCE |
| 1.9.1 Qualifications of Manufacturer |
| 1.9.2 Qualifications of Installer |
| 1.10 PRECONSTRUCTION MEETING |
| 1.11 ENVIRONMENTAL CONDITIONS |
| 1.11.1 Temperature |
| 1.11.2 Exposure to Weather |
| PART 2 PRODUCTS |
| 2.1 FLUID-APPLIED MEMBRANE AIR BARRIER |
| 2.1.1 Physical Properties |
| 2.2 PRIMERS, ADHESIVES, AND MASTICS |
| 2.3 SHEET METAL FLASHING |
| 2.4 JOINT SEALANTS |
| 2.5 REINFORCEMENT |
| PART 3 EXECUTION |
| 3.1 EXAMINATION |
| 3.2 PREPARATION |
| 3.3 INSTALLATION |
| 3.3.1 Installation of Flashing |
| 3.3.2 Installation of Fluid-Applied Membrane Air Barrier |
| 3.3.3 Installation of Reinforcement |
| 3.4 FIELD QUALITY CONTROL |
| 3.4.1 Site Inspections and Testing |
| 3.5 PROTECTION AND CLEANING |
| 3.5.1 Protection |
| 3.5.2 Cleaning of Adjacent Surfaces |
3.6 CLEANUP OF SPILLS
| 07 60 00 |
| FLASHING AND SHEET METAL |
| 07 60 00 - FLASHING AND SHEET METAL |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 GENERAL REQUIREMENTS |
| 1.3 SUBMITTALS |
| 1.4 MISCELLANEOUS REQUIREMENTS |
| 1.4.1 Product Data |
| 1.4.2 Finish Samples |
1.5 DELIVERY, HANDLING, AND STORAGE
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 Exposed Sheet Metal Items |
| 2.1.2 Steel Sheet, Zinc-Coated Galvanized |
| 2.1.3 Solder |
| 2.1.4 Fasteners |
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.1.1 Workmanship |
| 3.1.2 Nailing |
| 3.1.3 Cleats |
| 3.1.4 Bolts, Rivets, and Screws |
| 3.1.5 Seams |
| 3.1.5.1 Flat-lock Seams |
| 3.1.5.2 Lap Seams |
| 3.1.5.3 Loose-Lock Expansion Seams |
| 3.1.5.4 Flat Seams |
| 3.1.6 Soldering |
| 3.1.6.1 Edges |
| 3.1.7 Protection from Contact with Dissimilar Materials |
| 3.1.7.1 Metal Surfaces |
| 3.1.8 Expansion and Contraction |
| 3.1.9 Fasciae |
| 3.1.9.1 Edge Strip |
| 3.1.9.2 Joints |
| 3.1.10 Metal Drip Edges |
| 3.1.11 Gutters |
| 3.1.12 Downspouts |
| 3.1.12.1 Terminations |
3.1.13 Eave Flashing
| 3.2 CLEANING |
| 3.3 REPAIRS TO FINISH |
| 3.4 FIELD QUALITY CONTROL |
| 3.4.1 Procedure |
| 07 84 00 |
| FIRESTOPPING |
| 07 84 00 - FIRESTOPPING |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 REFERENCES |
| 1.3 SEQUENCING |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.5.1 Installer |
1.6 DELIVERY, STORAGE, AND HANDLING
| PART 2 PRODUCTS |
| 2.1 FIRESTOPPING SYSTEM |
| 2.2 FIRESTOPPING MATERIALS |
| 2.2.1 Fire Hazard Classification |
| 2.2.2 Toxicity |
| 2.2.3 Fire Resistance Rating |
| 2.2.3.1 Through-Penetrations |
| 2.2.3.1.1 Penetrations of Fire Resistance Rated Walls and Partitions |
| 2.2.3.1.2 Penetrations of Fire and Smoke Resistance Rated Walls |
2.2.3.2 Construction Joints and Gaps
2.2.4 Material Certification
| PART 3 EXECUTION |
| 3.1 PREPARATION |
| 3.2 INSTALLATION |
| 3.2.1 Insulated Pipes and Ducts |
| 3.2.2 Fire Dampers |
| 3.2.3 Data and Communication Cabling |
| 3.2.3.1 Re-Enterable Devices |
| 3.2.3.2 Re-Sealable Products |
| 3.3 INSPECTION |
| 3.3.1 Inspection Standards |
| 3.3.2 Inspection Reports |
| 07 92 00 |
| JOINT SEALANTS |
| 07 92 00 - JOINT SEALANTS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 PRODUCT DATA |
| 1.4 CERTIFICATIONS |
| 1.4.1 Indoor Air Quality Certifications |
| 1.4.1.1 Adhesives and Sealants |
| 1.5 ENVIRONMENTAL CONDITIONS |
| 1.6 DELIVERY AND STORAGE |
| 1.7 QUALITY ASSURANCE |
| 1.7.1 Compatibility with Substrate |
| 1.7.2 Joint Tolerance |
| 1.7.3 Adhesion |
| PART 2 PRODUCTS |
| 2.1 SEALANTS |
| 2.1.1 Interior Sealants |
| 2.1.2 Exterior Sealants |
| 2.1.3 Floor Joint Sealants |
| 2.1.4 Acoustical Sealants |
| 2.1.5 Preformed Sealants |
| 2.1.5.1 Tape |
| 2.1.5.2 Foam Strip |
| 2.2 PRIMERS |
| 2.3 BOND BREAKERS |
| 2.4 BACKSTOPS |
| 2.4.1 Rubber |
| 2.4.2 Synthetic Rubber |
| 2.4.3 Neoprene |
| 2.4.4 Silicone Rubber Base |
2.5 CLEANING SOLVENTS
| PART 3 EXECUTION |
| 3.1 FIELD QUALITY CONTROL |
| 3.2 SURFACE PREPARATION |
| 3.2.1 Steel Surfaces |
| 3.2.2 Aluminum Surfaces |
| 3.2.3 Concrete and Masonry Surfaces |
| 3.2.4 Wood Surfaces |
| 3.3 SEALANT PREPARATION |
| 3.4 APPLICATION |
| 3.4.1 Joint Width-To-Depth Ratios |
| 3.4.2 Unacceptable Sealant Use |
| 3.4.3 Masking Tape |
| 3.4.4 Backstops |
| 3.4.5 Primer |
| 3.4.6 Bond Breaker |
| 3.4.7 Sealants |
| 3.5 PROTECTION AND CLEANING |
| 3.5.1 Protection |
| 3.5.2 Final Cleaning |
| 08 11 13 |
| STEEL DOORS AND FRAMES |
| 08 11 13 - STEEL DOORS AND FRAMES |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DELIVERY, STORAGE, AND HANDLING |
| 1.4 Structural |
| 1.4.1 Exterior Unglazed Doors and Glazed Doors |
| PART 2 PRODUCTS |
| 2.1 STANDARD STEEL DOORS |
| 2.1.1 Classification - Level, Performance, Model |
| 2.1.1.1 Extra Heavy Duty Doors |
| 2.1.1.2 Maximum Duty Doors |
2.1.2 Wind Pressure Requirements
| 2.2 INSULATED STEEL DOOR SYSTEMS |
| 2.3 ACCESSORIES |
| 2.3.1 Louvers |
| 2.3.2 Astragals |
| 2.3.3 Moldings |
| 2.4 INSULATION CORES |
| 2.5 STANDARD STEEL FRAMES |
| 2.5.1 Welded Frames |
| 2.5.2 Anchors |
| 2.5.2.1 Wall Anchors |
| 2.5.2.2 Floor Anchors |
| 2.6 FIRE AND SMOKE DOORS AND FRAMES |
| 2.6.1 Labels |
| 2.6.2 Oversized Doors |
| 2.7 WEATHERSTRIPPING |
| 2.8 HARDWARE PREPARATION |
| 2.9 FINISHES |
| 2.9.1 Hot-Dip Zinc-Coated and Factory-Primed Finish |
| 2.10 FABRICATION AND WORKMANSHIP |
| 2.10.1 Grouted Frames |
2.11 PROVISIONS FOR GLAZING
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.1.1 Frames |
| 3.1.2 Doors |
| 3.1.3 Fire and Smoke Doors and Frames |
| 3.2 PROTECTION |
| 3.3 CLEANING |
| 08 11 16 |
| ALUMINUM DOORS AND FRAMES |
| 08 11 16 - ALUMINUM DOORS AND FRAMES |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 PERFORMANCE REQUIREMENTS |
| 1.2.1 Structural Calculations |
| 1.2.1.1 Minimum Antiterrorism Performance |
| 1.2.2 Wind Borne Debris |
| 1.2.3 Air Infiltration |
| 1.2.4 Water Penetration |
| 1.2.5 Thermal Transmittance, Solar Heat Gain, Visible Light Transmittance |
| 1.2.5.1 U-Factor |
| 1.2.5.2 Solar Heat Gain Coefficient SHGC |
| 1.2.5.3 Visible Light Transmittance VLT |
| 1.3 SUBMITTALS |
| 1.4 DELIVERY, STORAGE, AND HANDLING |
| 1.5 QUALITY CONTROL |
| 1.5.1 Shop Drawing |
| 1.5.2 Finish Samples |
| 1.5.3 Design Analysis |
| 1.5.4 Operation and Maintenance Data |
| 1.6 QUALITY ASSURANCE |
| 1.6.1 Engineer Qualifications for Blast Design |
| PART 2 PRODUCTS |
| 2.1 DOORS AND FRAMES |
| 2.2 MATERIALS |
| 2.2.1 Anchors |
| 2.2.2 Thresholds, Gasketing, and Sweeps |
| 2.2.2.1 Weather Stripping Gasketing |
| 2.2.2.2 Door Sweeps |
| 2.2.3 Aluminum Alloy for Doors and Frames |
| 2.2.4 Fasteners |
| 2.2.5 Structural Steel |
| 2.2.6 Aluminum Paint |
| 2.3 FABRICATION |
| 2.3.1 Aluminum Frames |
| 2.3.2 Aluminum Doors |
| 2.3.2.1 Full Glazed Stile and Rail Doors |
| 2.3.3 Welding and Fastening |
| 2.3.4 Weatherstripping |
| 2.3.5 Anchors |
| 2.3.6 Provisions for Hardware |
| 2.3.7 Provisions for Glazing |
| 2.3.8 Finishes |
| 2.3.8.1 Organic Coating |
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.1.1 Weather Stripping Installation |
| 3.1.1.1 Stop-Applied Weather Stripping |
3.1.2 Threshold Installation
| 3.2 PROTECTION FROM DISSIMILAR MATERIALS |
| 3.2.1 Dissimilar Metals |
| 3.2.1.1 Protection |
| 3.2.2 Drainage from Dissimilar Metals |
| 3.2.3 Masonry and Concrete |
| 3.2.4 Absorptive Materials |
| 3.3 CLEANING |
| 3.4 PROTECTION |
| 08 14 00 |
| WOOD DOORS |
| 08 14 00 - WOOD DOORS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 CERTIFICATIONS |
| 1.3.1 Certified Wood Grades |
| 1.4 DELIVERY, STORAGE, AND HANDLING |
| 1.5 WARRANTY |
| PART 2 PRODUCTS |
| 2.1 DOORS |
| 2.1.1 Flush Doors |
| 2.1.1.1 Interior Flush Doors |
| 2.1.2 Acoustical Doors |
| 2.1.3 Fire Doors |
| 2.2 ACCESSORIES |
| 2.2.1 Door Louvers |
| 2.2.2 Additional Hardware Reinforcement |
| 2.3 FABRICATION |
| 2.3.1 Marking |
| 2.3.2 Quality and Construction |
| 2.3.3 Preservative Treatment |
| 2.3.4 Adhesives and Bonds |
| 2.3.5 Prefitting |
| 2.3.6 Finishes |
| 2.3.6.1 Factory Finish |
| 2.3.6.2 Color |
2.3.7 Water-Resistant Sealer
2.4 SOURCE QUALITY CONTROL
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.1.1 Fire and Smoke Doors |
| 08 31 00 |
| ACCESS DOORS AND PANELS |
| 08 31 00 - ACCESS DOORS AND PANELS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 MISCELLANEOUS REQUIREMENTS |
| 1.3.1 Shop Drawings |
| 1.3.2 Product Data |
| 1.3.3 Test Reports |
| 1.4 PERFORMANCE REQUIREMENTS |
| 1.4.1 Fire-Rating Requirements |
1.5 DELIVERY, STORAGE, AND PROTECTION
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 Sheet Steel |
| 2.1.2 Stainless Steel |
| 2.1.3 Metallic Coated Steel Sheet |
| 2.1.4 Hinges |
| 2.1.5 Locks |
| 2.1.6 Accessories |
| 2.2 FABRICATION |
| 2.2.1 Thickness, Size, Edges |
| 2.2.2 Welding |
| 2.3 ACCESS ASSEMBLY TYPES |
| 2.3.1 Fire-rated Doors |
| 2.3.1.1 Door Construction |
| 2.3.1.2 Labels |
| 2.3.1.3 Door Panel and Frame |
2.4 FINISHES
| PART 3 EXECUTION |
| 3.1 PREPARATION |
| 3.2 GENERAL INSTALLATION REQUIREMENTS |
| 3.3 ACCESS LOCATIONS |
| 3.4 FIELD PAINTING |
| 3.5 DISSIMILAR MATERIALS |
| 3.6 ADJUSTMENT |
| 08 34 73 |
| SOUND CONTROL DOOR ASSEMBLIES |
| 08 34 73 - SOUND CONTROL DOOR ASSEMBLIES |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 QUALITY CONTROL |
| 1.3.1 Compliance and Labeling |
| 1.3.1.1 Category A Positive Pressure Fire Door Construction |
1.4 DELIVERY, STORAGE, AND HANDLING
| PART 2 PRODUCTS |
| 2.1 SYSTEM DESCRIPTION |
| 2.1.1 Design Requirements |
| 2.1.1.1 Door Design |
| 2.1.1.2 Frame Design |
| 2.1.2 Performance Requirements |
| 2.1.2.1 STC Sound Transmission Classification Rating |
| 2.2 FABRICATION |
| 2.2.1 Wood Sound Retardant Doors |
| 2.3 COMPONENTS |
| 2.3.1 Frames |
| 2.3.2 Hardware Reinforcements |
| 2.3.3 Anchors |
| 2.3.4 Door Hardware |
| 2.3.5 Thresholds |
| 2.4 TESTS, INSPECTIONS, AND VERIFICATIONS |
| 2.4.1 Sound Transmission Classification |
| 2.4.2 Cam Lift Hinges |
| 2.4.3 Guarantee |
| PART 3 EXECUTION |
| 3.1 PREPARATION |
| 3.1.1 Frame Painting and Cleaning |
| 3.2 INSTALLATION |
| 3.2.1 Frame |
| 3.2.2 Door |
| 08 41 13 |
| ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS |
| 08 41 13 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 ADMINISTRATIVE REQUIREMENTS |
| 1.2.1 Pre-Installation Meetings |
| 1.3 SUBMITTALS |
| 1.4 QUALITY CONTROL |
| 1.4.1 Qualifications |
| 1.4.1.1 Installer Qualifications |
| 1.4.1.2 Manufacturer Qualifications |
1.4.2 Single-Source Responsibility
| 1.5 DELIVERY, STORAGE, AND HANDLING |
| 1.5.1 Ordering |
| 1.5.2 Packing, Shipping, Handling and Unloading |
| 1.5.3 Storage and Protection |
| 1.6 PROJECT / SITE CONDITIONS |
| 1.6.1 Field Measurements |
1.7 WARRANTY
| PART 2 PRODUCTS |
| 2.1 SYSTEM DESCRIPTION |
| 2.1.1 Design Requirements for Aluminum Entrances and Components |
| 2.1.1.1 Material Standard |
| 2.1.1.2 Sealants |
| 2.1.1.3 Thermal Barrier |
| 2.2 FABRICATION |
| 2.2.1 Entrance System Fabrication |
| 2.2.2 Shop Assembly |
| 2.2.2.1 Welding |
| 2.2.3 Finish |
| 2.2.4 Fabrication Tolerance |
| 2.2.4.1 Material Cuts |
| 2.2.4.2 Maximum Offset at Consecutive Members |
| 2.2.4.3 Maximum Offset at Glazing Pocket Corners |
| 2.2.4.4 Joints |
| 2.2.4.5 Variation |
| 2.2.4.6 Flatness |
| 2.3 MATERIALS |
| 2.3.1 Sealants |
| 2.3.2 Glass |
| 2.4 ACCESSORIES |
| 2.4.1 Fasteners |
| 2.4.2 Perimeter Anchors |
| 2.4.2.1 Inserts and Anchorage Devices |
| 2.4.3 Standard Entrance Hardware |
| 2.4.3.1 Weatherstripping |
| 2.4.3.2 Threshold |
| 2.4.3.3 Offset Pivots |
| 2.4.3.4 Panic Device |
| 2.4.3.5 Closer |
| 2.4.3.6 Security Lock or Dead Lock |
| 2.4.3.7 CylindersThumb-turn |
| 2.4.3.8 Cylinder Guard |
| PART 3 EXECUTION |
| 3.1 EXAMINATION |
| 3.1.1 Site Verification of Conditions |
| 3.2 PREPARATION |
| 3.2.1 Adjacent Surfaces Protection |
| 3.2.2 Aluminum Surface Protection |
| 3.3 INSTALLATION |
| 3.3.1 Tolerances |
| 3.3.2 Adjusting |
| 3.3.3 Related Products Installation Requirements |
| 3.3.3.1 Sealants Perimeter |
| 3.3.3.2 Glass |
| 3.4 FIELD QUALITY CONTROL |
| 3.4.1 Air Infiltration |
| 3.4.2 Wind Loads |
| 3.4.3 Deflection |
| 3.4.4 Condensation Resistance and Thermal Transmittance |
| 3.4.5 Water Infiltration |
| 3.5 ADJUSTING AND CLEANING |
| 3.5.1 Protection |
| 3.5.2 Cleaning |
3.6 WARRANTY
| 08 51 13 |
| ALUMINUM WINDOWS |
| 08 51 13 - ALUMINUM WINDOWS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 CERTIFICATION |
| 1.3 SUBMITTALS |
| 1.4 QUALITY ASSURANCE |
| 1.4.1 Shop Drawing Requirements |
| 1.4.2 Sample Requirements |
| 1.4.2.1 Finish Sample Requirements |
| 1.4.2.2 Window Sample Requirements |
| 1.4.3 Design Data Requirements |
| 1.4.4 Test Report Requirements |
| 1.5 DELIVERY AND STORAGE |
| 1.6 PROTECTION |
| 1.7 FIELD MEASUREMENTS |
| 1.8 PERFORMANCE REQUIREMENTS |
| 1.8.1 Wind Loading Design Pressure |
| 1.8.2 Tests |
| 1.9 DRAWINGS |
| 1.10 WINDOW PERFORMANCE |
| 1.10.1 Structural Performance |
| 1.10.2 Minimum Antiterrorism Performance |
| 1.10.2.1 Computational Design Analysis Method |
| 1.10.3 Windborne-Debris-Impact Performance |
| 1.10.4 Air Infiltration |
| 1.10.5 Water Penetration |
| 1.10.6 Thermal Performance |
| 1.11 QUALIFICATION |
| 1.12 WARRANTY |
| PART 2 PRODUCTS |
| 2.1 WINDOWS |
| 2.1.1 Awning Windows AP |
| 2.1.2 Fixed Windows F |
| 2.1.3 Forced Entry Resistant Windows |
| 2.1.4 Glass and Glazing |
| 2.1.5 Caulking and Sealing |
| 2.1.6 Weatherstripping |
| 2.2 FABRICATION |
| 2.2.1 Provisions for Glazing |
| 2.2.2 Weatherstripping |
| 2.2.3 Fasteners |
| 2.2.4 Adhesives |
| 2.2.5 Drips and Weep Holes |
| 2.2.6 Combination Windows |
| 2.2.7 Mullions and Transom Bars |
| 2.2.8 Accessories |
| 2.2.8.1 Hardware |
| 2.2.8.2 Fasteners |
| 2.2.9 Finishes |
| 2.2.9.1 Organic Coating |
2.2.10 Screens
| 2.3 THERMAL-BARRIER WINDOWS |
| 2.4 MULLIONS |
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.1.1 Method of Installation |
| 3.1.2 Dissimilar Materials |
| 3.1.3 Anchors and Fastenings |
| 3.1.4 Adjustments After Installation |
3.2 CLEANING
| 08 71 00 |
| DOOR HARDWARE |
| 08 71 00 - DOOR HARDWARE |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 SHOP DRAWINGS |
| 1.4 PRODUCT DATA |
| 1.5 HARDWARE SCHEDULE |
| 1.6 KEY BITTING CHART REQUIREMENTS |
| 1.6.1 Requirements |
| 1.7 QUALITY ASSURANCE |
| 1.7.1 Hardware Manufacturers and Modifications |
| 1.7.2 Key Shop Drawings Coordination Meeting |
1.8 DELIVERY, STORAGE, AND HANDLING
| PART 2 PRODUCTS |
| 2.1 TEMPLATE HARDWARE |
| 2.2 HARDWARE FOR FIRE DOORS AND EXIT DOORS |
| 2.3 HARDWARE ITEMS |
| 2.3.1 Hinges |
| 2.3.2 Pivots |
| 2.3.3 Locks and Latches |
| 2.3.3.1 Mortise Locks and Latches |
| 2.3.3.2 Bored Locks and Latches |
| 2.3.3.3 Auxiliary Locks |
| 2.3.3.4 Exterior & Interior Locksets - Programmable Contactless Electronic |
| 2.3.3.5 Exterior Locksets - Keyless Electronic Locksets |
| 2.3.3.6 Interior Lockset - Mechanical Cipher Locksets |
| 2.3.4 Exit Devices |
| 2.3.5 Cylinders and Cores |
| 2.3.6 Keying System |
| 2.3.7 Lock Trim |
| 2.3.7.1 Knobs and Roses |
| 2.3.7.2 Lever Handles |
| 2.3.8 Keys |
| 2.3.9 Door Bolts |
| 2.3.10 Closers |
| 2.3.10.1 Identification Marking |
| 2.3.11 Overhead Holders |
| 2.3.12 Door Protection Plates |
| 2.3.12.1 Sizes of Kick Plates |
| 2.3.13 Door Stops and Silencers |
| 2.3.14 Padlocks |
| 2.3.15 Thresholds |
| 2.3.16 Weatherstripping Gasketing |
| 2.3.17 Soundproofing Gasketing |
| 2.3.18 Rain Drips |
| 2.3.18.1 Door Shoe Drips |
| 2.3.19 Auxiliary Hardware Other than locks |
| 2.3.20 Special Tools |
| 2.4 FASTENERS |
| 2.5 FINISHES |
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.1.1 Weatherstripping Installation |
| 3.1.2 Soundproofing Installation |
| 3.1.3 Threshold Installation |
| 3.2 FIRE DOORS AND EXIT DOORS |
| 3.3 HARDWARE LOCATIONS |
| 3.4 FIELD QUALITY CONTROL |
| 3.5 HARDWARE SETS |
| HARDWARE SETS |
| 08 81 00 |
| GLAZING |
| 08 81 00 - GLAZING |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 SYSTEM DESCRIPTION |
| 1.3.1 Windborne Debris Performance Requirements |
| 1.4 DELIVERY, STORAGE, AND HANDLING |
| 1.5 ENVIRONMENTAL REQUIREMENTS |
| 1.6 WARRANTY |
| 1.6.1 Warranty for Insulating Glass Units |
| PART 2 PRODUCTS |
| 2.1 GLASS |
| 2.1.1 Clear Glass |
| 2.1.2 Laminated Glass |
| 2.1.3 Tempered Glass |
| 2.1.4 Fire/Safety Rated Glass |
| 2.2 INSULATING GLASS UNITS |
| 2.2.1 Buildings |
| 2.2.2 Low Emissivity Insulating Glass |
| 2.3 SETTING AND SEALING MATERIALS |
| 2.3.1 Sealants |
| 2.3.1.1 Elastomeric Sealant |
| 2.3.1.2 Structural Sealant |
| 2.3.2 Preformed Channels |
| 2.3.3 Preformed Vinyl Extrusions |
| 2.3.4 Setting Blocks and Edge Blocks |
| 2.3.5 Glazing Gaskets |
| 2.3.5.1 Fixed Glazing Gaskets |
| 2.3.5.2 Wedge Glazing Gaskets |
| 2.3.5.3 Aluminum Framing Glazing Gaskets |
2.3.6 Accessories
| PART 3 EXECUTION |
| 3.1 PREPARATION |
| 3.2 GLASS SETTING |
| 3.2.1 Insulating Glass Units |
| 3.2.2 Installation of Fire/Safety Rated Glass |
| 3.2.3 Installation of Laminated Glass |
| 3.3 CLEANING |
| 3.4 PROTECTION |
| 08 91 00 |
| METAL WALL AND DOOR LOUVERS |
| 08 91 00 - METAL WALL AND DOOR LOUVERS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DELIVERY, STORAGE, AND PROTECTION |
| 1.4 DETAIL DRAWINGS |
| 1.5 COLOR SAMPLES |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 Aluminum Sheet |
| 2.1.2 Extruded Aluminum |
| 2.2 METAL WALL LOUVERS |
| 2.2.1 Extruded Aluminum Louvers |
| 2.2.2 Mullions and Mullion Covers |
| 2.2.3 Screens and Frames |
| 2.3 DOOR LOUVERS |
| 2.3.1 Formed Metal Door Louvers |
| 2.3.2 Screens and Frames |
| 2.4 FASTENERS AND ACCESSORIES |
| 2.5 FINISHES |
| 2.5.1 Aluminum |
| 2.5.1.1 Organic Coating |
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.1.1 Wall Louvers |
| 3.1.2 Door Louvers |
| 3.1.3 Screens and Frames |
| 3.2 PROTECTION FROM CONTACT OF DISSIMILAR MATERIALS |
| 3.2.1 Copper or Copper-Bearing Alloys |
| 3.2.2 Aluminum |
| 3.2.3 Metal |
| 09 22 00 |
| SUPPORTS FOR GYPSUM BOARD |
| 09 22 00 - SUPPORTS FOR GYPSUM BOARD |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DELIVERY, STORAGE, AND HANDLING |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 Materials for Attachment of Gypsum Wallboard |
| 2.1.1.1 Suspended and Furred Ceiling Systems |
| 2.1.1.2 Nonload-Bearing Wall Framing and Furring |
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.1.1 Systems for Attachment of Gypsum Wallboard |
| 3.1.1.1 Suspended and Furred Ceiling Systems |
| 3.1.1.2 Non-loadbearing Wall Framing and Furring |
3.2 ERECTION TOLERANCES
| 09 29 00 |
| GYPSUM BOARD |
| 09 29 00 - GYPSUM BOARD |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DELIVERY, STORAGE, AND HANDLING |
| 1.3.1 Delivery |
| 1.3.2 Storage |
| 1.3.3 Handling |
| 1.4 QUALIFICATIONS |
| 1.5 ENVIRONMENTAL REQUIREMENTS |
| 1.6 FIRE RESISTIVE CONSTRUCTION |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 Gypsum Board |
| 2.1.1.1 Regular |
| 2.1.1.2 Type X Special Fire-Resistant |
| 2.1.2 Regular Water-Resistant Gypsum Board |
| 2.1.2.1 Regular |
| 2.1.2.2 Type X Special Fire-Resistant |
| 2.1.3 Glass Mat Water-Resistant Gypsum Tile Backing Board |
| 2.1.3.1 Regular |
| 2.1.3.2 Type X Special Fire-Resistant |
| 2.1.4 Glass Mat Covered or Reinforced Gypsum Sheathing |
| 2.1.4.1 Glass Mat Covered or Reinforced Gypsum Sheathing Sealant |
| 2.1.5 Impact Resistant Gypsum Board |
| 2.1.5.1 Soft Body Impact Test |
| 2.1.5.2 Hard Body Impact Test |
| 2.1.5.3 Surface Abrasion Test |
| 2.1.5.4 Indentation Test |
| 2.1.6 Joint Treatment Materials |
| 2.1.6.1 Embedding Compound |
| 2.1.6.2 Finishing or Topping Compound |
| 2.1.6.3 All-Purpose Compound |
| 2.1.6.4 Setting or Hardening Type Compound |
| 2.1.6.5 Joint Tape |
| 2.1.7 Fasteners |
| 2.1.7.1 Screws |
| 2.1.8 Accessories |
| 2.1.9 Water |
| PART 3 EXECUTION |
| 3.1 EXAMINATION |
| 3.1.1 Framing and Furring |
| 3.1.2 Building Construction Materials |
| 3.2 APPLICATION OF GYPSUM BOARD |
| 3.2.1 Application of Gypsum Board to Steel Framing and Furring |
| 3.2.2 Glass Mat Covered or Fiber Reinforced Gypsum Sheathing |
| 3.2.3 Control Joints |
| 3.2.4 Application of Impact Resistant Gypsum Board |
| 3.3 FINISHING OF GYPSUM BOARD |
| 3.3.1 Uniform Surface |
| 3.4 SEALING |
| 3.4.1 Sealing for Glass Mat or Reinforced Gypsum Board Sheathing |
| 3.5 FIRE-RESISTANT ASSEMBLIES |
| 3.6 PATCHING |
| 09 30 10 |
| CERAMIC TILING |
| 09 30 10 - CERAMIC TILING |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 QUALITY ASSURANCE |
| 1.4 DELIVERY, STORAGE, AND HANDLING |
| 1.5 WARRANTY |
| 1.6 EXTRA MATERIALS |
| PART 2 PRODUCTS |
| 2.1 TILE |
| 2.1.1 Porcelain Tile |
| 2.2 SETTING-BED |
| 2.2.1 Aggregate for Concrete Fill |
| 2.2.2 Portland Cement |
| 2.2.3 Sand |
| 2.2.4 Hydrated Lime |
| 2.2.5 Reinforcing Wire Fabric |
| 2.3 WATER |
| 2.4 MORTAR AND GROUT |
| 2.4.1 Latex-Portland Cement Mortar |
| 2.4.2 Ceramic Tile Grout |
| 2.4.3 Sealants |
| 2.5 TRANSITION STRIPS |
| 2.6 MEMBRANE MATERIALS |
| 2.7 COLOR, TEXTURE, AND PATTERN |
| PART 3 EXECUTION |
| 3.1 PREPARATORY WORK AND WORKMANSHIP |
| 3.2 GENERAL INSTALLATION REQUIREMENTS |
| 3.3 INSTALLATION OF WALL TILE |
| 3.3.1 Latex-Portland Cement Mortar |
| 3.3.2 Ceramic Tile Grout |
| 3.4 INSTALLATION OF FLOOR TILE |
| 3.4.1 Workable or Cured Mortar Bed |
| 3.4.2 Latex-Portland Cement |
| 3.4.3 Ceramic Tile Grout |
| 3.4.4 Waterproofing |
| 3.4.5 Concrete Fill |
| 3.5 INSTALLATION OF TRANSITION STRIPS |
| 3.6 EXPANSION JOINTS |
| 3.6.1 Walls |
| 3.6.2 Floors |
3.7 CLEANING AND PROTECTING
| 09 51 00 |
| ACOUSTICAL CEILINGS |
| 09 51 00 - ACOUSTICAL CEILINGS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 CERTIFICATIONS |
| 1.3.1 Indoor Air Quality Certifications |
| 1.3.1.1 Ceiling Tiles |
| 1.3.1.2 Sealants |
| 1.4 DELIVERY, STORAGE. AND HANDLING |
| 1.5 ENVIRONMENTAL REQUIREMENTS |
| 1.6 SCHEDULING |
| 1.7 WARRANTY |
| 1.8 EXTRA MATERIALS |
| PART 2 PRODUCTS |
| 2.1 SYSTEM DESCRIPTION |
| 2.2 ACOUSTICAL UNITS |
| 2.2.1 Units for Exposed-Grid System ACT 1 |
| 2.2.1.1 Flame Spread |
| 2.2.1.2 Pattern |
| 2.2.1.3 Minimum NRC |
| 2.2.1.4 Minimum Light Reflectance Coefficient |
| 2.2.1.5 Nominal Size |
| 2.2.1.6 Edge Detail |
| 2.2.1.7 Finish |
| 2.2.1.8 Minimum CAC |
| 2.3 SUSPENSION SYSTEM |
| 2.4 HANGERS |
| 2.4.1 Wires |
| 2.4.2 Eyebolts |
| 2.4.3 Anchorage Devices |
| 2.5 FINISHES |
| 2.6 COLORS AND PATTERNS |
| 2.7 ACOUSTICAL SEALANT |
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.1.1 Suspension System |
| 3.1.1.1 Plumb Hangers |
| 3.1.1.2 Splayed Hangers |
| 3.1.2 Wall Molding |
| 3.1.3 Acoustical Units |
| 3.1.4 Caulking |
3.2 CLEANING
| 09 62 38 |
| STATIC-CONTROL FLOORING |
| 09 62 38 - STATIC-CONTROL FLOORING |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SCHEDULING |
| 1.3 SUBMITTALS |
| 1.3.1 Samples |
| 1.3.1.1 Static-Control Resilient Flooring |
| 1.3.1.2 Operations and Maintenance Data |
| 1.4 EXTRA MATERIALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 DELIVERY, STORAGE, AND HANDLING |
| 1.6.1 Static-Control Resilient Flooring |
| 1.7 ENVIRONMENTAL CONDITIONS |
| 1.7.1 Static-Control Resilient Flooring |
| 1.8 WARRANTY |
| 1.8.1 Static-Control Resilient Flooring |
| PART 2 PRODUCTS |
| 2.1 STATIC-CONTROL RESILIENT FLOORING |
| 2.1.1 Static-Dissipative Resilient Flooring |
| 2.1.1.1 Static-Dissipative Vinyl TileRFT6 |
| 2.2 ADHESIVES |
| 2.3 ACCESSORIES |
| 2.4 ELECTRICAL GROUND CONNECTION |
| 2.5 MANUFACTURER'S COLOR, PATTERN AND TEXTURE |
| PART 3 EXECUTION |
| 3.1 SURFACE PREPARATION |
| 3.2 MOISTURE, ALKALINITY AND BOND TESTS |
| 3.3 GENERAL INSTALLATION |
This is the start of the file's text. The full file is on GovTribe.