W9128A-19-R-0014_Specifications_-_Package_2_(Part_2_of_3).pdf

PDF 10 MB Posted

Attached to
Quad A, Building 131 and Central Utility Plant (CUP), and Buildings 130 and 132, Schofield Barracks, Hawaii
Solicitation number
W9128A-19-R-0014
Issued by

About this file

W9128A-19-R-0014 Specifications - Package 2 (Part 2 of 3)

View the file

Other files

File Type Posted
W9128A-19-R-0014_-_Section_00_22_16,_Attachment_A.docx DOCX document
W9128A-19-R-0014_Am-0007_Drawings_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0007_Drawings_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0007_Specifications_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0007.pdf PDF
W9128A-19-R-0014_Am-0006.pdf PDF
W9128A-19-R-0014_Am-0006_Drawings_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0006_Drawings_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0005.pdf PDF
W9128A-19-R-0014_Am-0004_Specifications_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0004_Drawings_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0004.pdf PDF
W9128A-19-R-0014_Am-0004_Drawings_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0003.pdf PDF
W9128A-19-R-0014_Am-0002.pdf PDF
W9128A-19-R-0014_Am-0001_Specifications_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0001_Drawings_-_Package_2_(Part_1_of_2).pdf PDF
W9128A-19-R-0014_Am-0001_Specifications_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0001_Drawings_-_Package_2_(Part_2_of_2).pdf PDF
W9128A-19-R-0014_Am-0001.pdf PDF
W9128A-19-R-0014_Am-0001_Drawings_-_Package_1.pdf PDF
W9128A-19-R-0014_Request_for_Proposal.pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_11_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_6_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_1_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_5_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_13_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_11_of_14).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_1_(Part_3_of_3).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_2_(Part_3_of_3).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_7_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_12_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_9_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_3_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_4_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_10_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_2_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_10_of_11).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_1_(Part_2_of_3).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_2_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_8_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_7_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_14_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_6_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_3_of_11).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_1_(Part_1_of_3).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_9_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_1_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_4_of_11).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_2_(Part_1_of_3).pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COVERSHEET

00010 BIDDING SCHEDULE
PROJECT TABLE OF CONTENTS
PROJECT TABLE OF CONTENTS
REGISTER
02 09 20
EXPOSURE ASSESSMENT FOR WORKERS EXPOSED TO LEAD-CONTAINING PAINT
02 09 20 - EXPOSURE ASSESSMENT FOR WORKERS EXPOSED TO LEAD-CONTAINING PAINT
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Action Level
1.2.2 Area Monitoring
1.2.3 Industrial Hygienist IH:
1.2.4 Industrial Hygiene Technician IHT:
1.2.5 Eight-Hour Time Weighted Average TWA
1.2.6 Lead
1.2.7 Lead Control Area
1.2.8 Lead Permissible Exposure Limit PEL
1.2.9 Personal Monitoring
1.2.10 Exposure Assessment
1.3 Quality ASSURANCE
1.3.1 Medical Examinations
1.3.2 IH Responsibilities
1.3.3 IHT Responsibilities
1.3.4 Training
1.3.5 Respiratory Protection Program
1.3.6 Pre-Construction Conference
1.4 SUBMITTALS
1.5 REMOVAL
1.6 QUALIFICATIONS OF IH
1.7 LEAD-CONTAINING PAINT WORK PLAN
1.8 TESTING LABORATORY
1.9 EQUIPMENT
1.9.1 Respirators
1.9.2 Special Protective Clothing
1.9.3 Hygiene Facilities
1.9.4 Change Area
1.9.5 Hand Washing Facilities
PART 2 PRODUCTS Not applicable
PART 3 EXECUTION
3.1 PROTECTION
3.1.1 Lead Control Area Requirements
3.1.2 Protection of Existing Work to Remain
3.1.3 Boundary Requirements
3.1.4 Furnishings
3.1.5 Personnel Protection
3.1.6 Warning Signs
3.1.7 Monitoring
3.2 CLEANUP AND DISPOSAL
3.2.1 Cleanup
3.2.2 Certification
3.2.3 Disposal

3.3 TOXICITY CHARACTERISTIC LEACHING PROCEDURE TCLP

OUAD A BUILDING 130, 131 & 132 HAZARDOUS MATERIAL SURVEY REPORT
02 09 30
EXPOSURE ASSESSMENT FOR WORKERS EXPOSED TO RODENT DROPPING
02 09 30 - EXPOSURE ASSESSMENT FOR WORKERS EXPOSED TO RODENT DROPPING
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Industrial Hygienist IH:
1.2.2 Industrial Hygiene Technician IHT:
1.3 Quality ASSURANCE
1.3.1 Medical Examinations
1.3.2 IH Responsibilities
1.3.3 IHT Responsibilities
1.3.4 Training
1.3.5 Respiratory Protection Program
1.3.6 Pre-Construction Conference
1.4 SUBMITTALS
1.5 REMOVAL
1.6 QUALIFICATIONS OF IH
1.7 CLEANUP WORK PLAN
1.8 EQUIPMENT
1.8.1 Respirators
1.8.2 Special Protective Clothing
1.8.3 Hygiene Facilities
1.8.4 Change Area
1.8.5 Hand Washing Facilities
PART 2 PRODUCTS Not applicable
PART 3 EXECUTION
3.1 PROTECTION
3.1.1 Control Area Requirements
3.1.2 Protection of Existing Work to Remain
3.1.3 Boundary Requirements
3.1.4 Furnishings
3.1.5 Personnel Protection
3.1.6 Warning Signs
3.2 CLEANUP AND DISPOSAL
3.2.1 Cleanup
3.2.2 Certification
3.2.3 Disposal
02 41 00
DEMOLITION
02 41 00 - DEMOLITION
PART 1 GENERAL
1.1 REFERENCES
1.2 PROJECT DESCRIPTION
1.2.1 Demolition Plan
1.2.2 General Requirements
1.3 ITEMS TO REMAIN IN PLACE
1.3.1 Existing Construction Limits and Protection
1.3.2 Weather Protection
1.3.3 Trees
1.3.4 Utility Service
1.3.5 Facilities
1.4 BURNING
1.5 SUBMITTALS
1.6 QUALITY ASSURANCE
1.6.1 Hawaii Requirements
1.6.2 Dust and Debris Control
1.7 PROTECTION
1.7.1 Traffic Control Signs
1.7.2 Protection of Personnel
1.8 RELOCATIONS
1.9 EXISTING CONDITIONS
PART 2 PRODUCTS
2.1 FILL MATERIAL
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
3.1.1 Structures
3.1.2 Utilities and Related Equipment
3.1.2.1 General Requirements
3.1.2.2 Disconnecting Existing Utilities
3.1.3 Chain Link Fencing
3.1.4 Paving and Slabs
3.1.5 Roofing
3.1.6 Masonry
3.1.7 Concrete
3.1.8 Structural Steel
3.1.9 Miscellaneous Metal
3.1.10 Carpentry
3.1.11 Carpet
3.1.12 Acoustic Ceiling Tile
3.1.13 Patching
3.1.14 Air Conditioning Equipment
3.1.15 Locksets on Swinging Doors
3.1.16 Mechanical Equipment and Fixtures
3.1.16.1 Preparation for Storage
3.1.16.2 Piping
3.1.16.3 Ducts
3.1.16.4 Fixtures, Motors and Machines
3.1.17 Electrical Equipment and Fixtures
3.1.17.1 Fixtures
3.1.17.2 Electrical Devices
3.1.17.3 Wiring Ducts or Troughs
3.1.17.4 Conduit and Miscellaneous Items
3.2 CONCURRENT EARTH-MOVING OPERATIONS
3.3 DISPOSITION OF MATERIAL
3.3.1 Title to Materials
3.3.2 Reuse of Materials and Equipment
3.3.3 Disposal of Ozone Depleting Substance ODS
3.3.3.1 Special Instructions
3.3.4 Transportation Guidance
3.3.5 Unsalvageable and Non-Recyclable Material
3.4 CLEANUP
3.5 DISPOSAL OF REMOVED MATERIALS
3.5.1 Regulation of Removed Materials
3.5.2 Burning on Government Property
3.5.3 Removal to Spoil Areas on Government Property
3.5.4 Removal from Government Property

3.6 REUSE OF SALVAGED ITEMS

02 85 00
MOLD REMEDIATION
02 85 00 - MOLD REMEDIATION
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 AIHA
1.2.2 AIHA EMLAP
1.2.3 AFU
1.2.4 Categories of Water
1.2.5 Certified Industrial Hygienist CIH
1.2.6 Complete Interior Building Demolition Complete Gut
1.2.7 Containment
1.2.7.1 Source Containment
1.2.7.2 Unoccupied Building Containment
1.2.7.3 Cleaning Containment
1.2.8 Decontamination Unit Airlock
1.2.9 Dehumidifier
1.2.10 Disinfectants or Biocide Sanitizing Solutions
1.2.11 EPA
1.2.12 Fungal Growth Structures
1.2.13 Fungicidal Agents, EPA
1.2.14 HEPA Filter
1.2.15 HVAC
1.2.16 Industrial Hygienist IH
1.2.17 Microbial Remediation Supervisor
1.2.18 Non-Porous Material
1.2.19 Occupied Spaces Areas
1.2.20 Personal Protective Equipment PPE
1.2.21 Poly
1.2.22 Porous Material
1.2.23 Pressure Differential Measuring Instrument
1.2.24 Semi-porous Material
1.2.25 Ventilation System Mold Remediator Qualifications VSMR
1.2.26 Work Area
1.3 REQUIREMENTS
1.3.1 Description of Work
1.4 SUBMITTALS
1.4.1 Preconstruction Submittals
1.4.1.1 Preliminary Visual Assessment Report
1.4.1.2 Microbial Remediation Plan
1.4.1.3 Respiratory Protection Program
1.4.1.4 Worker Records
1.4.1.5 Certified Industrial Hygienist CIHIndustrial Hygienist IH
1.4.1.6 Microbial Remediation Supervisor Qualifications
1.4.2 Product Data
1.4.3 IH Daily Reports
1.4.4 Submittals at Completion of Remediation Work
1.5 RECORD KEEPING
1.5.1 Daily Project Log
PART 2 PRODUCTS
2.1 DISINFECTANTS, BIOCIDES, SANITIZING SOLUTIONS AND FUNGICIDAL AGENTS,
2.2 HAZARD COMMUNICATION
PART 3 EXECUTION
3.1 EQUIPMENT
3.1.1 Respirators
3.1.2 Protective Clothing
3.1.3 Warning Signs and Labels
3.1.4 Dehumidifiers
3.1.5 Air Filtration Units AFU
3.1.6 Vacuum Cleaners Equipped with HEPA Filters
3.2 GENERAL REQUIREMENTS
3.2.1 Pre-Microbial Remediation Work Conference
3.2.2 Containment Entry / Exit Procedure
3.3 REMOVAL PROCEDURES
3.3.1 Protection of Existing Work Areas
3.3.2 Remediation of Fungally Contaminated Building Materials
3.3.3 Remediation Procedures
3.3.3.1 Remediation of Non-Porous Materials
3.3.3.2 Porous Materials
3.4 DETAILED SEQUENCE OF WORK FOR MOLD REMOVAL UNDER CONTAINMENT
3.4.1 Preparation for Remediation Work
3.4.2 Demolition
3.4.3 Post-Demolition Inspection
3.4.4 Cleaning after Demolition, and Cleaning of Settled Spores from Porous
3.5 FIRE PROTECTION
3.6 CONSTRUCTION BARRIERS
3.7 QUALITY ASSURANCE / QUALITY CONTROL REQUIREMENTS
3.7.1 Contractor Qualifications
3.7.2 Waste Management and Removal
3.7.3 Post-Remediation Inspection
3.7.3.1 Clearance
3.8 CLEAN-UP AND DISPOSAL
3.8.1 Disposal of Material
3.8.2 Material Packaging
3.8.3 Building Exit Waste Disposal
3.8.4 Hazardous Material

3.9 APPENDICES

03 01 00
REHABILITATION OF CONCRETE
03 01 00 - REHABILITATION OF CONCRETE
PART 1 GENERAL
1.1 SCOPE
1.2 DEFINITIONS
1.2.1 Bracing
1.2.2 Delamination
1.2.3 Rehabilitation
1.2.4 Repair
1.2.5 Shoring
1.2.6 Termination Joint
1.2.7 Unsound Concrete
1.3 REFERENCES
1.4 SUBMITTALS
1.5 QUALITY ASSURANCE
1.5.1 General Requirements
1.5.2 Quality Control Plan
1.5.3 Qualifications
1.5.3.1 Testing Agencies
1.5.3.2 Quality Control Personnel
1.5.3.3 Contractor Qualifications
1.5.3.4 Worker Qualifications
1.5.4 Work Plan
1.5.5 Applicators
1.5.5.1 Training
1.5.5.2 Experience
1.5.6 Regulatory Requirements
1.5.7 Pre-installation Meetings
1.6 System Manufacturer
1.7 ACCEPTANCE OF REHABILITATION WORK
1.7.1 General Requirements
1.7.2 Tolerances
1.7.3 Appearance
1.8 DELIVERY, STORAGE, AND HANDLING
1.8.1 Labeling
1.8.2 Storage
1.9 PROJECT/SITE CONDITIONS
1.9.1 Environmental Requirements
1.9.1.1 Application Temperature
1.9.1.2 Wet or Damp Surfaces

1.9.2 Work Coordination

1.10 PROTECTION OF COMPLETED REHABILITATION WORK
1.11 WARRANTY
PART 2 PRODUCTS
2.1 MATERIALS FOR SHORING AND BRACING
2.1.1 Shoring and Bracing Systems
2.1.2 Design Requirements
2.2 EQUIPMENT FOR CONCRETE PREPARATION
2.2.1 Equipment for Concrete Removal
2.2.2 Surface preparation and cleaning equipment
2.3 MATERIALS FOR FORMWORK AND EMBEDDED ITEMS
2.4 REINFORCEMENT AND REINFORCEMENT SUPPORTS
2.4.1 Fiber-Reinforced Polymers
2.5 POLYMERS
2.5.1 Epoxies
2.6 MIXTURE PROPORTIONING
2.7 COMPONENTS
2.7.1 FRP Composite System
2.7.1.1 Wet Lay-up System
2.7.1.2 Precured System
2.7.2 Use of Primer/Filler
2.7.3 Finish and Coating
2.8 ACCESSORIES
2.8.1 Anchors
2.8.2 Miscellaneous

2.9 MIXES

PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.1.1 Protection
3.1.2 Formwork and Shoring
3.1.2.1 Formwork
3.1.2.2 Shoring
3.1.3 Concrete preparation
3.1.4 Quality Control
3.1.4.1 Quality control of surface preparation
3.1.5 Clean up
3.1.6 Safety
3.2 CRACK REPAIR
3.2.1 Preparation
3.2.1.1 General Requirements
3.2.1.2 Crack routing
3.2.1.3 Sealing
3.2.2 Application
3.2.2.1 Epoxy injection
3.2.2.2 Gravity fill

3.2.3 Quality Control

3.3 CORROSION AND SURFACE REPAIR
3.3.1 Preparation
3.3.1.1 Preparation of Concrete Substrate Surface
3.3.2 Application
3.3.2.1 Placement of Other Repair Materials

3.3.3 Quality Control

3.4 CONCRETE STRENGTHENING
3.4.1 SUBSTRATE, TEMPERATURE, AND ENVIRONMENT
3.4.1.1 Examination
3.4.1.2 Environmental Temperature
3.4.1.3 Other Environmental Factors
3.4.2 Preparation
3.4.2.1 Materials Testing
3.4.2.2 Worksite Ventilation
3.4.2.3 Substrate Repair
3.4.2.3.1 Surface
3.4.2.3.2 Sub-surface
3.4.2.4 Surface Preparation
3.4.2.4.1 Surface Cleaning

3.4.2.5 Cleaned Surface Protection

3.4.3 Surface Plane Variation Tolerance
3.4.4 Obstructions, Corners and Non-Planar Surfaces
3.4.5 Surface Moisture
3.4.6 Application
3.4.6.1 Externally bonded systems
3.4.6.1.1 Fiber-reinforced Polymer Laminates
3.4.6.1.2 Primer
3.4.6.1.3 Putty/Filler
3.4.6.1.4 Wet Lay-Up and Prepreg Systems
3.4.6.1.5 Precured Systems
3.4.6.1.6 Lap Splices
3.4.6.1.7 Curing of Resins
3.4.6.1.8 Surface Finish - Coating Application
3.4.6.1.8.1 Preparation
3.4.6.1.8.2 Multiple Coats
3.4.6.1.9 Installation Procedure Modification
3.4.6.1.10 System Placement Tolerances
3.5 Quality Control
3.5.1 Independent Special Inspector
3.5.2 Laboratory Qualifications
3.6 Laboratory Testing
3.6.1 Witness Panels
3.6.1.1 Wet Lay-Up Prepreg
3.6.1.2 Precured
3.6.2 Panel Testing
3.6.3 Report
3.7 Field Testing
3.7.1 Mixed Resin Hardness
3.7.1.1 Testing
3.7.1.2 Report
3.7.1.3 Remedial Measures
3.7.2 In-Place FRP Hardness
3.7.2.1 Testing
3.7.2.2 Report
3.7.2.3 Remedial Measures
3.7.3 Adhesion Strength
3.7.3.1 Testing
3.7.3.2 Report
3.7.3.3 Remedial Measures
3.7.3.4 Test Repair

3.7.4 Laminate Thickness and Number of Plies

3.8 QC/QA INSPECTION
3.8.1 Special Inspector Duties
3.8.2 Daily Inspection Records
3.8.3 Void Detection
3.8.4 Delaminations
3.8.4.1 Wet Lay-Up and Prepreg Systems
3.8.4.2 Pre-Cured Systems
3.8.5 Fiber Orientation
3.8.6 Record Retention
3.9 REPAIRS
3.9.1 Application Defects
3.9.2 Tears in the Reinforcing Fibers
3.9.3 Remedial Measures for Defects

3.10 WORK AREA CLEAN UP

03 30 00
CAST-IN-PLACE CONCRETE
03 30 00 - CAST-IN-PLACE CONCRETE
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.3 SUBMITTALS
1.4 MODIFICATION OF REFERENCES
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Reinforcement
1.6 QUALITY ASSURANCE
1.6.1 Design Data
1.6.1.1 Concrete Mix Design
1.6.2 Shop Drawings
1.6.2.1 Reinforcing Steel
1.6.3 Control Submittals
1.6.3.1 Concrete Curing Plan
1.6.3.2 Pumping Concrete
1.6.3.3 Safety Data Sheets
1.6.4 Quality Control Plan
1.6.5 Quality Control Personnel Certifications
1.6.5.1 Quality Manager Qualifications
1.6.5.2 Field Testing Technician and Testing Agency
1.6.6 Laboratory Qualifications for Concrete Qualification Testing
1.6.7 Laboratory Accreditation
1.7 ENVIRONMENTAL REQUIREMENTS
1.7.1 Submittals for Environmental Performance

1.8 QUALIFICATIONS FOR WELDING WORK

PART 2 PRODUCTS
2.1 MATERIALS FOR FORMS
2.1.1 Wood Forms
2.1.1.1 Concrete Form Plywood Standard Rough
2.1.1.2 Overlaid Concrete Form Plywood Standard Smooth

2.1.2 Steel Forms

2.2 FORM TIES AND ACCESSORIES
2.3 CONCRETE MIX DESIGN
2.3.1 Contractor-Furnished Mix Design
2.3.1.1 Footings
2.3.1.2 Foundation Walls
2.3.1.3 Slab-on-Grade
2.3.1.4 Suspended Slabs
2.3.1.5 Concrete Toppings
2.3.1.6 Building Walls
2.3.1.7 Other Concrete
2.3.1.8 Mix Proportions for Normal Weight Concrete
2.3.1.9 Required Average Strength of Mix Design
2.3.2 Ready-Mix Concrete
2.3.3 Concrete Curing Materials
2.4 MATERIALS
2.4.1 Cementitious Materials
2.4.1.1 Portland Cement
2.4.2 Water
2.4.3 Aggregates
2.4.4 Nonshrink Grout
2.4.5 Admixtures
2.4.5.1 High Range Water Reducer HRWR Superplasticizers
2.4.6 Vapor Retarder
2.4.7 Expansion/Contraction Joint Filler
2.4.8 Joint Sealants
2.4.8.1 Horizontal Surfaces, 3 Percent Slope, Maximum
2.4.8.2 Vertical Surfaces Greater Than 3 Percent Slope
2.5 REINFORCEMENT
2.5.1 Reinforcing Bars
2.5.2 Mechanical Reinforcing Bar Connectors
2.5.3 Wire
2.5.3.1 Welded Wire Reinforcement
2.5.3.2 Steel Wire

2.5.4 Reinforcing Bar Supports

2.6 FLOOR FINISH MATERIALS
2.6.1 Liquid Chemical Floor Hardener
PART 3 EXECUTION
3.1 EXAMINATION
3.2 PREPARATION
3.2.1 General
3.2.2 Subgrade Under Foundations and Footings
3.2.3 Subgrade Under Slabs on Ground
3.2.4 Edge Forms and Screed Strips for Slabs
3.2.5 Reinforcement and Other Embedded Items
3.3 FORMS
3.3.1 Coating
3.3.2 Reshoring
3.3.3 Reuse
3.3.4 Forms for Standard Rough Form Finish
3.3.5 Forms for Standard Smooth Form Finish
3.3.6 Form Ties
3.3.7 Forms for Concrete Pan Joist Construction
3.3.8 Tolerances for Form Construction
3.4 PLACING REINFORCEMENT AND MISCELLANEOUS MATERIALS
3.4.1 General
3.4.2 Vapor Retarder
3.4.3 Reinforcement Supports
3.4.4 Splicing
3.4.5 Future Bonding
3.4.6 Setting Miscellaneous Material
3.4.7 Fabrication
3.4.8 Placing Reinforcement
3.4.9 Spacing of Reinforcing Bars
3.4.10 Concrete Protection for Reinforcement
3.5 BATCHING, MEASURING, MIXING, AND TRANSPORTING CONCRETE
3.5.1 Measuring
3.5.2 Mixing
3.5.3 Transporting
3.6 PLACING CONCRETE
3.6.1 Footing Placement
3.6.2 Pumping
3.6.3 Hot Weather
3.6.4 Bonding
3.7 WASTE MANAGEMENT
3.7.1 Mixing Equipment
3.7.2 Reinforcing Steel
3.7.3 Other Waste
3.8 SURFACE FINISHES EXCEPT FLOOR, SLAB, AND PAVEMENT FINISHES
3.8.1 Defects
3.8.2 Not Against Forms Top of Walls
3.8.3 Formed Surfaces
3.8.3.1 Tolerances
3.8.3.2 As-Cast Rough Form
3.8.3.3 Standard Smooth Finish
3.9 FLOOR, SLAB, AND PAVEMENT FINISHES AND MISCELLANEOUS CONSTRUCTION
3.9.1 Finish
3.9.1.1 Scratched
3.9.1.2 Floated
3.9.1.3 Steel Troweled
3.9.1.4 Broomed
3.9.2 Concrete Walks
3.9.3 Splash Blocks
3.10 JOINTS
3.10.1 Construction Joints
3.10.1.1 Maximum Allowable Construction Joint Spacing
3.10.1.2 Construction Joints for Constructability Purposes
3.10.2 Isolation Joints in Slabs on Ground
3.10.3 Contraction Joints in Slabs on Ground
3.10.4 Sealing Joints in Slabs on Ground
3.11 CURING AND PROTECTION
3.11.1 Curing Periods
3.11.2 Curing Formed Surfaces
3.11.3 Curing Unformed Surfaces
3.11.4 Temperature of Concrete During Curing
3.11.5 Protection from Mechanical Injury
3.11.6 Protection After Curing
3.12 FIELD QUALITY CONTROL
3.12.1 Sampling
3.12.2 Testing
3.12.2.1 Slump Tests
3.12.2.2 Temperature Tests
3.12.2.3 Compressive Strength Tests
3.12.2.4 Strength of Concrete Structure
3.12.2.5 Non-Conforming Materials
3.12.2.6 Testing Concrete Structure for Strength
3.13 REPAIR, REHABILITATION AND REMOVAL
3.13.1 Crack Repair
3.13.2 Repair of Weak Surfaces
3.13.3 Failure of Quality Assurance Test Results
03 42 13.00 10
PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE CONSTRUCTION
03 42 13.00 10 - PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE CONSTRUCTION
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY ASSURANCE
1.3.1 NPCA and ACPA Plant Certification
1.3.2 Qualifications, Quality Control and Inspection
1.3.2.1 Qualifications
1.3.2.2 Quality Control Procedures
1.3.2.2.1 Slump
1.3.2.2.2 Temperature
1.3.2.2.3 Compressive Strength
1.3.2.2.4 Air Content
1.3.2.2.5 Unit Weight
1.3.2.3 Inspection
1.3.2.4 Test Reports
1.3.2.4.1 Material Certifications or Laboratory Test Reports
1.3.2.4.2 Mix Test
1.3.2.4.3 Self-Consolidating Concrete
1.3.2.4.4 In-Plant QA/QC Inspection Reports
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery
1.4.2 Storage
1.4.3 Handling
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.1.1 Standard Precast Units
2.1.2 Custom-Made Precast Units
2.1.3 Proprietary Precast Units
2.1.4 Joints and Sealants
2.1.5 Concrete Mix Design
2.1.5.1 Concrete Mix Proportions
2.1.5.2 Concrete Strength
2.1.5.3 Water-to-Cement Ratio
2.1.5.4 Air Content
2.1.5.5 Corrosion Control for Sanitary Sewer Systems
2.2 MATERIALS
2.2.1 Material Sustainability Criteria
2.2.2 Pigments
2.2.3 Reinforcement
2.2.3.1 Reinforcing Bars
2.2.3.2 Reinforcing Wire
2.2.3.3 Welded Wire Reinforcement
2.2.3.4 Epoxy Coated Reinforcement
2.2.3.5 Galvanized Reinforcement
2.2.4 Synthetic Fiber Reinforcement
2.2.5 Inserts and Embedded Metal
2.2.6 Accessories
2.2.7 Pipe Entry Connectors
2.2.8 Grout
PART 3 EXECUTION
3.1 FABRICATION AND PLACEMENT
3.1.1 Forms
3.1.2 Reinforcement
3.1.3 Embedded Items
3.1.4 Synthetic Fiber Reinforced Concrete
3.2 CONCRETE
3.2.1 Concrete Mixing
3.2.2 Concrete Placing
3.2.2.1 Cold Weather Concreting
3.2.2.2 Hot Weather Concreting
3.2.3 Concrete Curing
3.2.3.1 Curing by Moisture Retention
3.2.3.2 Curing with Heat and Moisture
3.2.4 Surface Finish
3.2.4.1 Formed Non-Architectural Surfaces
3.2.4.2 Unformed Surfaces
3.2.4.3 Special Finishes
3.2.5 Stripping Products from Forms
3.2.6 Patching and Repair
3.2.6.1 Repairing Minor Defects
3.2.6.2 Repairing Honeycombed Areas
3.2.6.3 Repairing Major Defects

3.2.7 Shipping Products

3.3 INSTALLATION
3.3.1 Site Access
3.3.2 General Requirements
3.3.3 Water Tightness
3.4 FIELD QUALITY CONTROL
3.4.1 Site Tests
3.4.2 Vacuum Testing
3.4.3 Water Testing
04 20 00
UNIT MASONRY
04 20 00 - UNIT MASONRY
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY ASSURANCE
1.3.1 Special Masonry Inspector Qualifications
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Masonry Units
1.4.2 Reinforcement, Anchors, and Ties
1.4.3 Cementitious Materials, Sand and Aggregates

1.5 PROJECT/SITE CONDITIONS

PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.1.1 Design - Specified Compressive Strength of Masonry
2.1.2 Performance - Verify Masonry Compressive Strength
2.2 MANUFACTURED UNITS
2.2.1 General Requirements
2.2.2 Concrete Units
2.2.2.1 Aggregates
2.2.2.2 Concrete Masonry Units CMU
2.2.2.2.1 Cement
2.2.2.2.2 Size
2.2.2.2.3 Surfaces
2.2.2.2.4 Weather Exposure
2.2.2.2.5 Unit Types
2.2.3 Precast Concrete Units
2.2.3.1 General
2.2.3.2 Precast Concrete Sills and Copings
2.3 EQUIPMENT
2.3.1 Vibrators
2.3.2 Grout Pumps
2.4 MATERIALS
2.4.1 Mortar Materials
2.4.1.1 Cementitious Materials
2.4.1.2 Hydrated Lime and Alternates
2.4.1.3 Aggregate and Water
2.4.2 Grout and Ready-Mix Grout Materials
2.4.2.1 Cementitious Materials for Grout
2.4.2.2 Aggregate and Water
2.5 MORTAR AND GROUT MIXES
2.5.1 Mortar Mix
2.5.2 Grout and Ready Mix Grout Mix
2.6 ACCESSORIES
2.6.1 Anchors, Ties, and Bar Positioners
2.6.1.1 General
2.6.1.2 Bar Positioners
2.6.2 Joint Reinforcement
2.6.3 Reinforcing Steel Bars
2.6.4 Concrete Masonry Control Joint Keys
PART 3 EXECUTION
3.1 EXAMINATION
3.2 PREPARATION
3.2.1 Stains
3.2.2 Loads
3.2.3 Concrete Surfaces
3.2.4 Shelf Angles
3.2.5 Bracing
3.3 ERECTION
3.3.1 General
3.3.1.1 Jointing
3.3.1.1.1 Tooled Joints
3.3.1.1.2 Flush Joints
3.3.1.1.3 Door and Window Frame Joints
3.3.1.1.4 Joint Widths
3.3.1.2 Cutting and Fitting
3.3.1.3 Unfinished Work
3.3.1.4 Control Joints
3.3.2 Reinforced, Single Wythe Concrete Masonry Units Walls
3.3.2.1 Concrete Masonry Unit Placement
3.3.2.2 Preparation for Reinforcement
3.3.3 ANCHORAGE
3.3.3.1 Anchorage at Intersecting Walls
3.3.4 Lintels
3.3.4.1 Masonry Lintels

3.3.5 Sills and Copings

3.4 INSTALLATION
3.4.1 Bar Reinforcement Installation
3.4.1.1 Preparation
3.4.1.2 Positioning Bars
3.4.1.3 Splices of Bar Reinforcement
3.4.2 Placing Grout
3.4.2.1 General
3.4.2.2 Grout Holes and Cleanouts
3.4.2.2.1 Grout Holes
3.4.2.2.2 Cleanouts for Hollow Unit Masonry Construction

3.4.2.3 Grout Placement

3.4.3 Joint Reinforcement Installation
3.4.4 Bond Beams
3.5 APPLICATION
3.5.1 Interface with Other Products
3.5.1.1 Built-In Items
3.5.1.2 Door and Window Frame Joints
3.5.1.3 Bearing Plates

3.5.2 Tolerances

3.6 FIELD QUALITY CONTROL
3.6.1 Tests
3.6.1.1 Prism Tests

3.6.2 Special Inspection

3.7 POINTING AND CLEANING
3.7.1 Dry-Brushing Concrete Masonry

3.8 PROTECTION

05 12 00
STRUCTURAL STEEL
05 12 00 - STRUCTURAL STEEL
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY ASSURANCE
1.3.1 Preconstruction Submittals
1.3.1.1 Erection Drawings
1.3.2 Fabrication Drawing Requirements
1.3.3 Certifications
1.3.3.1 Welding Procedures and Qualifications
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.2 STEEL
2.2.1 Structural Steel
2.3 BOLTS, NUTS, AND WASHERS
2.3.1 Common Grade Bolts
2.3.1.1 Bolts
2.3.1.2 Nuts
2.3.1.3 Washers
2.3.2 Foundation Anchorage
2.3.2.1 Anchor Rods
2.3.2.2 Anchor Nuts
2.3.2.3 Anchor Washers
2.3.2.4 Anchor Plate Washers
2.4 STRUCTURAL STEEL ACCESSORIES
2.4.1 Welding Electrodes and Rods
2.4.2 Non-Shrink Grout
2.4.3 Welded Shear Stud Connectors
2.5 GALVANIZING
2.6 FABRICATION
2.6.1 Markings
2.6.2 Shop Primer
2.6.2.1 Cleaning
PART 3 EXECUTION
3.1 ERECTION
3.1.1 STORAGE
3.2 CONNECTIONS
3.2.1 Common Grade Bolts
3.3 GAS CUTTING
3.4 WELDING
3.5 SHOP PRIMER REPAIR
3.5.1 Field Priming
3.6 GALVANIZING REPAIR
3.7 FIELD QUALITY CONTROL
3.7.1 Welds
3.7.1.1 Visual Inspection
05 50 13
MISCELLANEOUS METAL FABRICATIONS
05 50 13 - MISCELLANEOUS METAL FABRICATIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 QUALIFICATION OF WELDERS
1.3 DELIVERY, STORAGE, AND PROTECTION
1.4 MISCELLANEOUS REQUIREMENTS
1.4.1 Fabrication Drawings
1.4.2 Installation Drawings
PART 2 PRODUCTS
2.1 RECYCLED CONTENT
2.2 MATERIALS
2.2.1 Structural Carbon Steel
2.2.2 Structural Tubing
2.2.3 Steel Pipe
2.2.4 Expanded Metal
2.2.5 Anchor Bolts
2.2.5.1 Expansion Anchors, Sleeve Anchors
2.2.5.2 Lag Screws and Bolts
2.2.5.3 Toggle Bolts
2.2.5.4 Bolts, Nuts, Studs and Rivets
2.2.5.5 Powder Actuated Fasteners
2.2.5.6 Screws
2.2.5.7 Washers
2.3 FABRICATION FINISHES
2.3.1 Galvanizing
2.3.2 Galvanize
2.3.3 Shop Cleaning and Painting
2.3.3.1 Surface Preparation
2.3.3.2 Pretreatment, Priming and Painting
2.3.4 Aluminum Surfaces
2.3.4.1 Surface Condition
2.3.4.2 Aluminum Finishes
2.4 MISCELLANEOUS PLATES AND SHAPES
2.5 Metal Safety Nosing
PART 3 EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
3.2 WORKMANSHIP
3.3 ANCHORAGE, FASTENINGS, AND CONNECTIONS
3.4 BUILT-IN WORK
3.5 WELDING
3.6 DISSIMILAR METALS
3.7 PREPARATION
3.7.1 Material Coatings and Surfaces
3.7.2 Environmental Conditions
05 52 00
METAL RAILINGS
05 52 00 - METAL RAILINGS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY CONTROL
1.3.1 Welding Procedures
1.3.2 Welder Qualification
PART 2 PRODUCTS
2.1 FABRICATION
2.1.1 Aluminum Railings
2.2 COMPONENTS
2.2.1 Aluminum Railings And Handrails
PART 3 EXECUTION
3.1 PREPARATION
3.2 INSTALLATION
3.2.1 Aluminum Handrail
3.3 FIELD QUALITY CONTROL
3.3.1 Field Welding
06 10 00
ROUGH CARPENTRY
06 10 00 - ROUGH CARPENTRY
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY AND STORAGE
1.4 GRADING AND MARKING
1.4.1 Lumber
1.4.2 Plywood
1.4.3 Preservative-Treated Lumber and Plywood
1.5 SIZES AND SURFACING
1.6 MOISTURE CONTENT
1.7 PRESERVATIVE TREATMENT
1.8 CERTIFICATIONS
1.8.1 Certified Wood Grades
PART 2 PRODUCTS
2.1 LUMBER
2.1.1 Framing Lumber
2.2 OTHER MATERIALS
2.2.1 Miscellaneous Wood Members
2.2.1.1 Blocking
2.2.1.2 Rough Bucks and Frames
2.3 ROUGH HARDWARE
2.3.1 Bolts, Nuts, Studs, and Rivets
2.3.2 Anchor Bolts
2.3.3 Expansion Shields
2.3.4 Lag Screws and Lag Bolts
2.3.5 Wood Screws
2.3.6 Nails
2.3.7 Wire Nails
PART 3 EXECUTION
3.1 INSTALLATION
3.2 MISCELLANEOUS
3.2.1 Wood and Blocking
3.2.2 Wood Blocking
06 20 00
FINISH CARPENTRY
06 20 00 - FINISH CARPENTRY
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SHOP DRAWINGS
1.4 PRODUCT DATA
1.5 SAMPLES
1.6 DELIVERY, STORAGE, AND HANDLING
1.7 QUALITY ASSURANCE
1.7.1 Lumber
1.7.2 Plywood
1.7.3 Pressure Treated Lumber and Plywood
1.7.4 Non-Pressure Treated Woodwork and Millwork
1.7.5 Fire-Retardant Treated Lumber
PART 2 PRODUCTS
2.1 WOOD PRODUCTS
2.1.1 Sizes and Patterns of Wood Products
2.1.2 Species and Grades
2.1.3 Trim, Finish, and Frames
2.1.4 Softwood Plywood
2.1.5 Hardwood Plywood
2.1.6 Wood Seats
2.2 MOISTURE CONTENT OF WOOD PRODUCTS
2.3 PRESERVATIVE TREATMENT OF WOOD PRODUCTS
2.3.1 Non-Pressure Treatment
2.3.2 Pressure Treatment
2.4 FIRE-RETARDANT TREATMENT
2.4.1 Wood Products
2.5 HARDWARE AND ACCESSORIES
2.5.1 Wood Screws
2.5.2 Bolts, Nuts, Lag Screws, and Studs
2.5.3 Nails
2.5.4 Adjustable Shelf Standards
2.5.5 Closet Hanger Rods
2.6 FABRICATION
2.6.1 Quality Standards QS
2.6.1.1 Grades
2.6.1.2 Adhesives
2.6.2 Cabinets
2.6.2.1 Cabinet Hardware
2.6.2.2 Finish
2.6.3 Casework with Transparent Finish CTF
2.6.3.1 AWI Quality Grade
2.6.3.2 Construction
2.6.3.3 Exposed Parts
2.6.3.4 Semi-Exposed Parts
PART 3 EXECUTION
3.1 FINISH WORK
3.2 CLOTHES HANGER RODS
3.3 MISCELLANEOUS
3.3.1 Cabinets
3.3.2 Wood Seats
06 61 16
SOLID SURFACING FABRICATIONS
06 61 16 - SOLID SURFACING FABRICATIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 SYSTEM DESCRIPTION
1.3 SUBMITTALS
1.4 CERTIFICATIONS
1.4.1 Indoor Air Quality
1.4.1.1 Indoor Air Quality for Solid Surface Fabricated Products
1.5 QUALITY ASSURANCE
1.5.1 Qualifications
1.5.2 Shop Drawings
1.6 DELIVERY, STORAGE, AND HANDLING
1.7 WARRANTY
PART 2 PRODUCTS
2.1 MATERIAL
2.1.1 Cast, 100 Percent Acrylic Polymer Solid Surfacing Material SS1
2.1.2 Material Patterns and Colors
2.1.3 Surface Finish
2.2 ACCESSORY PRODUCTS
2.2.1 Seam Adhesive
2.2.2 Panel Adhesive
2.2.3 Silicone Sealant
2.2.4 Seam and Sealant Emissions
2.2.5 Mounting Hardware
2.3 FABRICATIONS
2.3.1 Joints and Seams
2.3.2 Edge Finishing
2.3.3 Counter and Vanity Top Splashes
2.3.3.1 Permanently Attached Backsplash
2.3.3.2 End Splashes
2.3.4 Window Stools
2.3.5 Counter and Vanity Tops
2.3.5.1 Counter Top With Sink
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Components
3.1.1.1 Loose Counter Top End Splashes
3.1.2 Silicone Sealant
3.1.3 Plumbing

3.2 CLEAN-UP

07 05 23
PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 05 23 - PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
PART 1 GENERAL
1.1 SUMMARY
1.2 REFERENCES
1.3 DEFINITIONS
1.3.1 Air Barrier Envelope
1.3.2 Air Leakage Rate
1.3.3 Bias Pressure
1.3.4 Blower Door
1.3.5 Environmental Separator
1.3.6 Pressure Test
1.3.6.1 Negative Pressure Test Depressurization Test
1.3.6.2 Positive Pressure Test Pressurization Test
1.4 WORK PLAN
1.5 SUBMITTALS
1.6 QUALITY ASSURANCE
1.6.1 Modification of References
1.6.2 Qualifications
1.6.2.1 Pressure Test Agency
1.6.2.2 Thermographer Qualifications

1.6.3 Test Instruments And Date Of Last Calibration

1.7 CLIMATE CONDITIONS SUITABLE FOR A PRESSURE TEST
1.7.1 Rain
1.7.2 Wind
PART 2 PRODUCTS
2.1 PRESSURE TEST EQUIPMENT
2.1.1 Blower Door Fans and Trailer Mounted Fans
2.1.2 Digital Gages as Test Instruments

2.2 THERMAL IMAGING CAMERA REQUIREMENTS

PART 3 EXECUTION
3.1 PRESSURE TEST AGENCY
3.1.1 Field Work
3.1.2 Reporting Work
3.2 ENVELOPE SURFACE AREA CALCULATION
3.3 PREPARING THE BUILDING ENVELOPE FOR THE PRESSURE TEST
3.3.1 Testing During Construction
3.3.2 Sealing The Air Barrier Envelope
3.3.3 Sealing Plumbing
3.3.4 Close and Lock Doors
3.3.5 Hold Excluded Building Areas at the Outdoor Pressure Level
3.3.6 Maintain an Even Pressure within the Envelope
3.3.7 Maintain Access to Mechanical and Electrical Rooms
3.3.8 Minimize Potential for Blowing Dust and Debris
3.3.9 De-energize Air Moving Devices
3.3.10 Installing Blower Door Equipment in a Door Opening
3.4 BUILDING ENVELOPE AIR TIGHTNESS REQUIREMENT
3.4.1 Architectural Only Test
3.4.1.1 Test Goal
3.4.1.2 Preparing The Envelope For The Pressure Test - Seal All Openings
3.4.2 Architectural Plus HVAC System Test
3.4.2.1 Test Goal
3.4.2.2 Preparing the Building for the Pressure Test
3.5 CONDUCTING THE PRESSURE TEST
3.5.1 Extend Pneumatic Tubes and Establish a Reference Differential
3.5.2 Bias Pressure Readings
3.5.3 Testing in Both Positive and Negative Directions
3.5.4 Single Direction Testing
3.5.5 Pressure Testing - Special Cases
3.5.5.1 Pressure Testing a Multiple Isolated Zoned Building
3.5.6 Failed Pressure Test
3.5.7 Air Leakage Test Report
3.6 LOCATING LEAKS BY DIAGNOSTIC TESTING
3.6.1 Find Test
3.6.2 Feel Test
3.6.3 Infrared Thermography Test
3.6.3.1 Thermography Test Methods
3.6.3.1.1 Thermography Testing of the Air Barrier
3.6.3.1.2 Thermography Testing of the Insulation Envelope to Find
3.6.3.1.3 Thermography Testing of Thermal Bridging

3.6.3.2 Thermography Test Results

3.6.4 Fog Test
3.6.5 Diagnostic Test Report
3.6.5.1 Thermographic Investigation Report
3.6.5.2 Fog Test Report
3.7 CALCULATION PROGRAM
3.8 AFTER COMPLETION OF THE PRESSURE AND/OR DIAGNOSTIC TEST
3.9 REPAIR AND PROTECTION
3.10 APPENDICES
07 21 16
07 24 00
EXTERIOR INSULATION AND FINISH SYSTEMS
07 24 00 - EXTERIOR INSULATION AND FINISH SYSTEMS
PART 1 GENERAL
1.1 REFERENCES
1.2 SYSTEM DESCRIPTION AND REQUIREMENTS
1.2.1 System Requirements and Tests
1.2.1.1 Water Penetration
1.2.1.2 Wind Load
1.2.1.3 Full scale or intermediate scale fire test
1.2.1.4 Mock-Up Installation of EIFS
1.2.2 Component Requirements and Tests
1.2.2.1 Surface Burning Characteristics
1.2.2.2 Radiant Heat
1.2.2.3 Impact Resistance
1.2.3 Sub-Component Requirements and Tests
1.2.3.1 Abrasion Resistance
1.2.3.2 Accelerated Weathering
1.2.3.3 Mildew Resistance
1.2.3.4 Salt Spray Resistance
1.2.3.5 Water Resistance
1.2.3.6 Absorption-Freeze/Thaw
1.2.3.7 Sample Boards

1.2.4 Moisture Analysis

1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Qualifications of EIFS Manufacturer
1.4.2 Qualification of EIFS Installer
1.4.3 Qualification of Sealant Applicator
1.4.4 Qualifications of Third Party Inspector
1.4.5 Insulation Board
1.4.6 Pre-Installation Conference
1.5 DELIVERY AND STORAGE
1.6 ENVIRONMENTAL CONDITIONS
1.7 WARRANTY
PART 2 PRODUCTS
2.1 COMPATIBILITY
2.2 SHEATHING BOARD
2.2.1 Glass Mat Gypsum Sheathing Board
2.3 ADHESIVE
2.4 LATHING AND FURRING
2.5 MECHANICAL FASTENERS
2.6 THERMAL INSULATION
2.6.1 Manufacturer's Recommendations
2.6.2 Insulation Board
2.7 BASE COAT
2.8 PORTLAND CEMENT
2.9 REINFORCING FABRIC
2.10 FINISH COAT
2.11 SEALANT PRIMER
2.12 ACCESSORIES
2.13 JOINT SEALANT
2.14 BOND BREAKER
2.15 BACKER ROD
PART 3 EXECUTION
3.1 EXAMINATION
3.2 SURFACE PREPARATION
3.3 INSTALLATION
3.3.1 Sheathing Board
3.3.2 Insulation Board
3.3.2.1 Mechanically Fastened Insulation Boards
3.3.2.2 Adhesively Fastened Insulation Boards
3.3.3 Base Coat and Reinforcing Fabric Mesh,
3.3.3.1 Class PB Systems

3.3.4 Finish Coat

3.4 JOINT SEALING
3.4.1 Surface Preparation, Backer Rod, and Primer
3.4.2 Sealant
3.5 FIELD QUALITY CONTROL
3.5.1 Inspection Check List

3.6 CLEANUP

07 27 10.00 10
BUILDING AIR BARRIER SYSTEM
07 27 10.00 10 - BUILDING AIR BARRIER SYSTEM
PART 1 GENERAL
1.1 SUMMARY
1.2 REFERENCES
1.3 DEFINITIONS
1.3.1 Air Barrier Accessory
1.3.2 Air Barrier Assembly
1.3.3 Air Barrier Component
1.3.4 Air Barrier Envelope
1.3.5 Air Barrier Material
1.3.6 Air Barrier System
1.3.7 Air Leakage Rate
1.3.8 Air Leakage
1.3.9 Air Permeance
1.3.10 Environmental Separator
1.4 PREPARATORY PHASE OR PRECONSTRUCTION CONFERENCE
1.5 SUBMITTALS
1.6 AIR BARRIER ENVELOPE SURFACE AREA AND LEAKAGE REQUIREMENTS
1.7 AIR BARRIER INSPECTOR
1.8 DESIGN REVIEW
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 QUALITY CONTROL
3.1.1 Documentation and Reporting
3.1.2 Quality Control Testing And Inspection

3.2 REPAIR AND PROTECTION

07 27 26
FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 26 - FLUID-APPLIED MEMBRANE AIR BARRIERS
PART 1 GENERAL
1.1 REFERENCES
1.2 RELATED REQUIREMENTS
1.3 SUBMITTALS
1.4 MISCELLANEOUS REQUIREMENTS
1.4.1 Shop Drawings
1.4.2 Product Data
1.4.3 Mockup
1.4.4 Test Reports
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
1.5.2 Storage
1.6 CAPILLARY MOISTURE TEST
1.7 FIELD PEEL ADHESION TEST
1.8 AIR BARRIER TESTING
1.9 QUALITY ASSURANCE
1.9.1 Qualifications of Manufacturer
1.9.2 Qualifications of Installer
1.10 PRECONSTRUCTION MEETING
1.11 ENVIRONMENTAL CONDITIONS
1.11.1 Temperature
1.11.2 Exposure to Weather
PART 2 PRODUCTS
2.1 FLUID-APPLIED MEMBRANE AIR BARRIER
2.1.1 Physical Properties
2.2 PRIMERS, ADHESIVES, AND MASTICS
2.3 SHEET METAL FLASHING
2.4 JOINT SEALANTS
2.5 REINFORCEMENT
PART 3 EXECUTION
3.1 EXAMINATION
3.2 PREPARATION
3.3 INSTALLATION
3.3.1 Installation of Flashing
3.3.2 Installation of Fluid-Applied Membrane Air Barrier
3.3.3 Installation of Reinforcement
3.4 FIELD QUALITY CONTROL
3.4.1 Site Inspections and Testing
3.5 PROTECTION AND CLEANING
3.5.1 Protection
3.5.2 Cleaning of Adjacent Surfaces

3.6 CLEANUP OF SPILLS

07 60 00
FLASHING AND SHEET METAL
07 60 00 - FLASHING AND SHEET METAL
PART 1 GENERAL
1.1 REFERENCES
1.2 GENERAL REQUIREMENTS
1.3 SUBMITTALS
1.4 MISCELLANEOUS REQUIREMENTS
1.4.1 Product Data
1.4.2 Finish Samples

1.5 DELIVERY, HANDLING, AND STORAGE

PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Exposed Sheet Metal Items
2.1.2 Steel Sheet, Zinc-Coated Galvanized
2.1.3 Solder
2.1.4 Fasteners
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Workmanship
3.1.2 Nailing
3.1.3 Cleats
3.1.4 Bolts, Rivets, and Screws
3.1.5 Seams
3.1.5.1 Flat-lock Seams
3.1.5.2 Lap Seams
3.1.5.3 Loose-Lock Expansion Seams
3.1.5.4 Flat Seams
3.1.6 Soldering
3.1.6.1 Edges
3.1.7 Protection from Contact with Dissimilar Materials
3.1.7.1 Metal Surfaces
3.1.8 Expansion and Contraction
3.1.9 Fasciae
3.1.9.1 Edge Strip
3.1.9.2 Joints
3.1.10 Metal Drip Edges
3.1.11 Gutters
3.1.12 Downspouts
3.1.12.1 Terminations

3.1.13 Eave Flashing

3.2 CLEANING
3.3 REPAIRS TO FINISH
3.4 FIELD QUALITY CONTROL
3.4.1 Procedure
07 84 00
FIRESTOPPING
07 84 00 - FIRESTOPPING
PART 1 GENERAL
1.1 SUMMARY
1.2 REFERENCES
1.3 SEQUENCING
1.4 SUBMITTALS
1.5 QUALITY ASSURANCE
1.5.1 Installer

1.6 DELIVERY, STORAGE, AND HANDLING

PART 2 PRODUCTS
2.1 FIRESTOPPING SYSTEM
2.2 FIRESTOPPING MATERIALS
2.2.1 Fire Hazard Classification
2.2.2 Toxicity
2.2.3 Fire Resistance Rating
2.2.3.1 Through-Penetrations
2.2.3.1.1 Penetrations of Fire Resistance Rated Walls and Partitions
2.2.3.1.2 Penetrations of Fire and Smoke Resistance Rated Walls

2.2.3.2 Construction Joints and Gaps

2.2.4 Material Certification

PART 3 EXECUTION
3.1 PREPARATION
3.2 INSTALLATION
3.2.1 Insulated Pipes and Ducts
3.2.2 Fire Dampers
3.2.3 Data and Communication Cabling
3.2.3.1 Re-Enterable Devices
3.2.3.2 Re-Sealable Products
3.3 INSPECTION
3.3.1 Inspection Standards
3.3.2 Inspection Reports
07 92 00
JOINT SEALANTS
07 92 00 - JOINT SEALANTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 PRODUCT DATA
1.4 CERTIFICATIONS
1.4.1 Indoor Air Quality Certifications
1.4.1.1 Adhesives and Sealants
1.5 ENVIRONMENTAL CONDITIONS
1.6 DELIVERY AND STORAGE
1.7 QUALITY ASSURANCE
1.7.1 Compatibility with Substrate
1.7.2 Joint Tolerance
1.7.3 Adhesion
PART 2 PRODUCTS
2.1 SEALANTS
2.1.1 Interior Sealants
2.1.2 Exterior Sealants
2.1.3 Floor Joint Sealants
2.1.4 Acoustical Sealants
2.1.5 Preformed Sealants
2.1.5.1 Tape
2.1.5.2 Foam Strip
2.2 PRIMERS
2.3 BOND BREAKERS
2.4 BACKSTOPS
2.4.1 Rubber
2.4.2 Synthetic Rubber
2.4.3 Neoprene
2.4.4 Silicone Rubber Base

2.5 CLEANING SOLVENTS

PART 3 EXECUTION
3.1 FIELD QUALITY CONTROL
3.2 SURFACE PREPARATION
3.2.1 Steel Surfaces
3.2.2 Aluminum Surfaces
3.2.3 Concrete and Masonry Surfaces
3.2.4 Wood Surfaces
3.3 SEALANT PREPARATION
3.4 APPLICATION
3.4.1 Joint Width-To-Depth Ratios
3.4.2 Unacceptable Sealant Use
3.4.3 Masking Tape
3.4.4 Backstops
3.4.5 Primer
3.4.6 Bond Breaker
3.4.7 Sealants
3.5 PROTECTION AND CLEANING
3.5.1 Protection
3.5.2 Final Cleaning
08 11 13
STEEL DOORS AND FRAMES
08 11 13 - STEEL DOORS AND FRAMES
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
1.4 Structural
1.4.1 Exterior Unglazed Doors and Glazed Doors
PART 2 PRODUCTS
2.1 STANDARD STEEL DOORS
2.1.1 Classification - Level, Performance, Model
2.1.1.1 Extra Heavy Duty Doors
2.1.1.2 Maximum Duty Doors

2.1.2 Wind Pressure Requirements

2.2 INSULATED STEEL DOOR SYSTEMS
2.3 ACCESSORIES
2.3.1 Louvers
2.3.2 Astragals
2.3.3 Moldings
2.4 INSULATION CORES
2.5 STANDARD STEEL FRAMES
2.5.1 Welded Frames
2.5.2 Anchors
2.5.2.1 Wall Anchors
2.5.2.2 Floor Anchors
2.6 FIRE AND SMOKE DOORS AND FRAMES
2.6.1 Labels
2.6.2 Oversized Doors
2.7 WEATHERSTRIPPING
2.8 HARDWARE PREPARATION
2.9 FINISHES
2.9.1 Hot-Dip Zinc-Coated and Factory-Primed Finish
2.10 FABRICATION AND WORKMANSHIP
2.10.1 Grouted Frames

2.11 PROVISIONS FOR GLAZING

PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Frames
3.1.2 Doors
3.1.3 Fire and Smoke Doors and Frames
3.2 PROTECTION
3.3 CLEANING
08 11 16
ALUMINUM DOORS AND FRAMES
08 11 16 - ALUMINUM DOORS AND FRAMES
PART 1 GENERAL
1.1 REFERENCES
1.2 PERFORMANCE REQUIREMENTS
1.2.1 Structural Calculations
1.2.1.1 Minimum Antiterrorism Performance
1.2.2 Wind Borne Debris
1.2.3 Air Infiltration
1.2.4 Water Penetration
1.2.5 Thermal Transmittance, Solar Heat Gain, Visible Light Transmittance
1.2.5.1 U-Factor
1.2.5.2 Solar Heat Gain Coefficient SHGC
1.2.5.3 Visible Light Transmittance VLT
1.3 SUBMITTALS
1.4 DELIVERY, STORAGE, AND HANDLING
1.5 QUALITY CONTROL
1.5.1 Shop Drawing
1.5.2 Finish Samples
1.5.3 Design Analysis
1.5.4 Operation and Maintenance Data
1.6 QUALITY ASSURANCE
1.6.1 Engineer Qualifications for Blast Design
PART 2 PRODUCTS
2.1 DOORS AND FRAMES
2.2 MATERIALS
2.2.1 Anchors
2.2.2 Thresholds, Gasketing, and Sweeps
2.2.2.1 Weather Stripping Gasketing
2.2.2.2 Door Sweeps
2.2.3 Aluminum Alloy for Doors and Frames
2.2.4 Fasteners
2.2.5 Structural Steel
2.2.6 Aluminum Paint
2.3 FABRICATION
2.3.1 Aluminum Frames
2.3.2 Aluminum Doors
2.3.2.1 Full Glazed Stile and Rail Doors
2.3.3 Welding and Fastening
2.3.4 Weatherstripping
2.3.5 Anchors
2.3.6 Provisions for Hardware
2.3.7 Provisions for Glazing
2.3.8 Finishes
2.3.8.1 Organic Coating
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Weather Stripping Installation
3.1.1.1 Stop-Applied Weather Stripping

3.1.2 Threshold Installation

3.2 PROTECTION FROM DISSIMILAR MATERIALS
3.2.1 Dissimilar Metals
3.2.1.1 Protection
3.2.2 Drainage from Dissimilar Metals
3.2.3 Masonry and Concrete
3.2.4 Absorptive Materials
3.3 CLEANING
3.4 PROTECTION
08 14 00
WOOD DOORS
08 14 00 - WOOD DOORS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 CERTIFICATIONS
1.3.1 Certified Wood Grades
1.4 DELIVERY, STORAGE, AND HANDLING
1.5 WARRANTY
PART 2 PRODUCTS
2.1 DOORS
2.1.1 Flush Doors
2.1.1.1 Interior Flush Doors
2.1.2 Acoustical Doors
2.1.3 Fire Doors
2.2 ACCESSORIES
2.2.1 Door Louvers
2.2.2 Additional Hardware Reinforcement
2.3 FABRICATION
2.3.1 Marking
2.3.2 Quality and Construction
2.3.3 Preservative Treatment
2.3.4 Adhesives and Bonds
2.3.5 Prefitting
2.3.6 Finishes
2.3.6.1 Factory Finish
2.3.6.2 Color

2.3.7 Water-Resistant Sealer

2.4 SOURCE QUALITY CONTROL

PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Fire and Smoke Doors
08 31 00
ACCESS DOORS AND PANELS
08 31 00 - ACCESS DOORS AND PANELS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 MISCELLANEOUS REQUIREMENTS
1.3.1 Shop Drawings
1.3.2 Product Data
1.3.3 Test Reports
1.4 PERFORMANCE REQUIREMENTS
1.4.1 Fire-Rating Requirements

1.5 DELIVERY, STORAGE, AND PROTECTION

PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Sheet Steel
2.1.2 Stainless Steel
2.1.3 Metallic Coated Steel Sheet
2.1.4 Hinges
2.1.5 Locks
2.1.6 Accessories
2.2 FABRICATION
2.2.1 Thickness, Size, Edges
2.2.2 Welding
2.3 ACCESS ASSEMBLY TYPES
2.3.1 Fire-rated Doors
2.3.1.1 Door Construction
2.3.1.2 Labels
2.3.1.3 Door Panel and Frame

2.4 FINISHES

PART 3 EXECUTION
3.1 PREPARATION
3.2 GENERAL INSTALLATION REQUIREMENTS
3.3 ACCESS LOCATIONS
3.4 FIELD PAINTING
3.5 DISSIMILAR MATERIALS
3.6 ADJUSTMENT
08 34 73
SOUND CONTROL DOOR ASSEMBLIES
08 34 73 - SOUND CONTROL DOOR ASSEMBLIES
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY CONTROL
1.3.1 Compliance and Labeling
1.3.1.1 Category A Positive Pressure Fire Door Construction

1.4 DELIVERY, STORAGE, AND HANDLING

PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.1.1 Design Requirements
2.1.1.1 Door Design
2.1.1.2 Frame Design
2.1.2 Performance Requirements
2.1.2.1 STC Sound Transmission Classification Rating
2.2 FABRICATION
2.2.1 Wood Sound Retardant Doors
2.3 COMPONENTS
2.3.1 Frames
2.3.2 Hardware Reinforcements
2.3.3 Anchors
2.3.4 Door Hardware
2.3.5 Thresholds
2.4 TESTS, INSPECTIONS, AND VERIFICATIONS
2.4.1 Sound Transmission Classification
2.4.2 Cam Lift Hinges
2.4.3 Guarantee
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Frame Painting and Cleaning
3.2 INSTALLATION
3.2.1 Frame
3.2.2 Door
08 41 13
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 41 13 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
PART 1 GENERAL
1.1 REFERENCES
1.2 ADMINISTRATIVE REQUIREMENTS
1.2.1 Pre-Installation Meetings
1.3 SUBMITTALS
1.4 QUALITY CONTROL
1.4.1 Qualifications
1.4.1.1 Installer Qualifications
1.4.1.2 Manufacturer Qualifications

1.4.2 Single-Source Responsibility

1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Ordering
1.5.2 Packing, Shipping, Handling and Unloading
1.5.3 Storage and Protection
1.6 PROJECT / SITE CONDITIONS
1.6.1 Field Measurements

1.7 WARRANTY

PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.1.1 Design Requirements for Aluminum Entrances and Components
2.1.1.1 Material Standard
2.1.1.2 Sealants
2.1.1.3 Thermal Barrier
2.2 FABRICATION
2.2.1 Entrance System Fabrication
2.2.2 Shop Assembly
2.2.2.1 Welding
2.2.3 Finish
2.2.4 Fabrication Tolerance
2.2.4.1 Material Cuts
2.2.4.2 Maximum Offset at Consecutive Members
2.2.4.3 Maximum Offset at Glazing Pocket Corners
2.2.4.4 Joints
2.2.4.5 Variation
2.2.4.6 Flatness
2.3 MATERIALS
2.3.1 Sealants
2.3.2 Glass
2.4 ACCESSORIES
2.4.1 Fasteners
2.4.2 Perimeter Anchors
2.4.2.1 Inserts and Anchorage Devices
2.4.3 Standard Entrance Hardware
2.4.3.1 Weatherstripping
2.4.3.2 Threshold
2.4.3.3 Offset Pivots
2.4.3.4 Panic Device
2.4.3.5 Closer
2.4.3.6 Security Lock or Dead Lock
2.4.3.7 CylindersThumb-turn
2.4.3.8 Cylinder Guard
PART 3 EXECUTION
3.1 EXAMINATION
3.1.1 Site Verification of Conditions
3.2 PREPARATION
3.2.1 Adjacent Surfaces Protection
3.2.2 Aluminum Surface Protection
3.3 INSTALLATION
3.3.1 Tolerances
3.3.2 Adjusting
3.3.3 Related Products Installation Requirements
3.3.3.1 Sealants Perimeter
3.3.3.2 Glass
3.4 FIELD QUALITY CONTROL
3.4.1 Air Infiltration
3.4.2 Wind Loads
3.4.3 Deflection
3.4.4 Condensation Resistance and Thermal Transmittance
3.4.5 Water Infiltration
3.5 ADJUSTING AND CLEANING
3.5.1 Protection
3.5.2 Cleaning

3.6 WARRANTY

08 51 13
ALUMINUM WINDOWS
08 51 13 - ALUMINUM WINDOWS
PART 1 GENERAL
1.1 REFERENCES
1.2 CERTIFICATION
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Shop Drawing Requirements
1.4.2 Sample Requirements
1.4.2.1 Finish Sample Requirements
1.4.2.2 Window Sample Requirements
1.4.3 Design Data Requirements
1.4.4 Test Report Requirements
1.5 DELIVERY AND STORAGE
1.6 PROTECTION
1.7 FIELD MEASUREMENTS
1.8 PERFORMANCE REQUIREMENTS
1.8.1 Wind Loading Design Pressure
1.8.2 Tests
1.9 DRAWINGS
1.10 WINDOW PERFORMANCE
1.10.1 Structural Performance
1.10.2 Minimum Antiterrorism Performance
1.10.2.1 Computational Design Analysis Method
1.10.3 Windborne-Debris-Impact Performance
1.10.4 Air Infiltration
1.10.5 Water Penetration
1.10.6 Thermal Performance
1.11 QUALIFICATION
1.12 WARRANTY
PART 2 PRODUCTS
2.1 WINDOWS
2.1.1 Awning Windows AP
2.1.2 Fixed Windows F
2.1.3 Forced Entry Resistant Windows
2.1.4 Glass and Glazing
2.1.5 Caulking and Sealing
2.1.6 Weatherstripping
2.2 FABRICATION
2.2.1 Provisions for Glazing
2.2.2 Weatherstripping
2.2.3 Fasteners
2.2.4 Adhesives
2.2.5 Drips and Weep Holes
2.2.6 Combination Windows
2.2.7 Mullions and Transom Bars
2.2.8 Accessories
2.2.8.1 Hardware
2.2.8.2 Fasteners
2.2.9 Finishes
2.2.9.1 Organic Coating

2.2.10 Screens

2.3 THERMAL-BARRIER WINDOWS
2.4 MULLIONS
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Method of Installation
3.1.2 Dissimilar Materials
3.1.3 Anchors and Fastenings
3.1.4 Adjustments After Installation

3.2 CLEANING

08 71 00
DOOR HARDWARE
08 71 00 - DOOR HARDWARE
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SHOP DRAWINGS
1.4 PRODUCT DATA
1.5 HARDWARE SCHEDULE
1.6 KEY BITTING CHART REQUIREMENTS
1.6.1 Requirements
1.7 QUALITY ASSURANCE
1.7.1 Hardware Manufacturers and Modifications
1.7.2 Key Shop Drawings Coordination Meeting

1.8 DELIVERY, STORAGE, AND HANDLING

PART 2 PRODUCTS
2.1 TEMPLATE HARDWARE
2.2 HARDWARE FOR FIRE DOORS AND EXIT DOORS
2.3 HARDWARE ITEMS
2.3.1 Hinges
2.3.2 Pivots
2.3.3 Locks and Latches
2.3.3.1 Mortise Locks and Latches
2.3.3.2 Bored Locks and Latches
2.3.3.3 Auxiliary Locks
2.3.3.4 Exterior & Interior Locksets - Programmable Contactless Electronic
2.3.3.5 Exterior Locksets - Keyless Electronic Locksets
2.3.3.6 Interior Lockset - Mechanical Cipher Locksets
2.3.4 Exit Devices
2.3.5 Cylinders and Cores
2.3.6 Keying System
2.3.7 Lock Trim
2.3.7.1 Knobs and Roses
2.3.7.2 Lever Handles
2.3.8 Keys
2.3.9 Door Bolts
2.3.10 Closers
2.3.10.1 Identification Marking
2.3.11 Overhead Holders
2.3.12 Door Protection Plates
2.3.12.1 Sizes of Kick Plates
2.3.13 Door Stops and Silencers
2.3.14 Padlocks
2.3.15 Thresholds
2.3.16 Weatherstripping Gasketing
2.3.17 Soundproofing Gasketing
2.3.18 Rain Drips
2.3.18.1 Door Shoe Drips
2.3.19 Auxiliary Hardware Other than locks
2.3.20 Special Tools
2.4 FASTENERS
2.5 FINISHES
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Weatherstripping Installation
3.1.2 Soundproofing Installation
3.1.3 Threshold Installation
3.2 FIRE DOORS AND EXIT DOORS
3.3 HARDWARE LOCATIONS
3.4 FIELD QUALITY CONTROL
3.5 HARDWARE SETS
HARDWARE SETS
08 81 00
GLAZING
08 81 00 - GLAZING
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SYSTEM DESCRIPTION
1.3.1 Windborne Debris Performance Requirements
1.4 DELIVERY, STORAGE, AND HANDLING
1.5 ENVIRONMENTAL REQUIREMENTS
1.6 WARRANTY
1.6.1 Warranty for Insulating Glass Units
PART 2 PRODUCTS
2.1 GLASS
2.1.1 Clear Glass
2.1.2 Laminated Glass
2.1.3 Tempered Glass
2.1.4 Fire/Safety Rated Glass
2.2 INSULATING GLASS UNITS
2.2.1 Buildings
2.2.2 Low Emissivity Insulating Glass
2.3 SETTING AND SEALING MATERIALS
2.3.1 Sealants
2.3.1.1 Elastomeric Sealant
2.3.1.2 Structural Sealant
2.3.2 Preformed Channels
2.3.3 Preformed Vinyl Extrusions
2.3.4 Setting Blocks and Edge Blocks
2.3.5 Glazing Gaskets
2.3.5.1 Fixed Glazing Gaskets
2.3.5.2 Wedge Glazing Gaskets
2.3.5.3 Aluminum Framing Glazing Gaskets

2.3.6 Accessories

PART 3 EXECUTION
3.1 PREPARATION
3.2 GLASS SETTING
3.2.1 Insulating Glass Units
3.2.2 Installation of Fire/Safety Rated Glass
3.2.3 Installation of Laminated Glass
3.3 CLEANING
3.4 PROTECTION
08 91 00
METAL WALL AND DOOR LOUVERS
08 91 00 - METAL WALL AND DOOR LOUVERS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND PROTECTION
1.4 DETAIL DRAWINGS
1.5 COLOR SAMPLES
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Aluminum Sheet
2.1.2 Extruded Aluminum
2.2 METAL WALL LOUVERS
2.2.1 Extruded Aluminum Louvers
2.2.2 Mullions and Mullion Covers
2.2.3 Screens and Frames
2.3 DOOR LOUVERS
2.3.1 Formed Metal Door Louvers
2.3.2 Screens and Frames
2.4 FASTENERS AND ACCESSORIES
2.5 FINISHES
2.5.1 Aluminum
2.5.1.1 Organic Coating
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Wall Louvers
3.1.2 Door Louvers
3.1.3 Screens and Frames
3.2 PROTECTION FROM CONTACT OF DISSIMILAR MATERIALS
3.2.1 Copper or Copper-Bearing Alloys
3.2.2 Aluminum
3.2.3 Metal
09 22 00
SUPPORTS FOR GYPSUM BOARD
09 22 00 - SUPPORTS FOR GYPSUM BOARD
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Materials for Attachment of Gypsum Wallboard
2.1.1.1 Suspended and Furred Ceiling Systems
2.1.1.2 Nonload-Bearing Wall Framing and Furring
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Systems for Attachment of Gypsum Wallboard
3.1.1.1 Suspended and Furred Ceiling Systems
3.1.1.2 Non-loadbearing Wall Framing and Furring

3.2 ERECTION TOLERANCES

09 29 00
GYPSUM BOARD
09 29 00 - GYPSUM BOARD
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Delivery
1.3.2 Storage
1.3.3 Handling
1.4 QUALIFICATIONS
1.5 ENVIRONMENTAL REQUIREMENTS
1.6 FIRE RESISTIVE CONSTRUCTION
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Gypsum Board
2.1.1.1 Regular
2.1.1.2 Type X Special Fire-Resistant
2.1.2 Regular Water-Resistant Gypsum Board
2.1.2.1 Regular
2.1.2.2 Type X Special Fire-Resistant
2.1.3 Glass Mat Water-Resistant Gypsum Tile Backing Board
2.1.3.1 Regular
2.1.3.2 Type X Special Fire-Resistant
2.1.4 Glass Mat Covered or Reinforced Gypsum Sheathing
2.1.4.1 Glass Mat Covered or Reinforced Gypsum Sheathing Sealant
2.1.5 Impact Resistant Gypsum Board
2.1.5.1 Soft Body Impact Test
2.1.5.2 Hard Body Impact Test
2.1.5.3 Surface Abrasion Test
2.1.5.4 Indentation Test
2.1.6 Joint Treatment Materials
2.1.6.1 Embedding Compound
2.1.6.2 Finishing or Topping Compound
2.1.6.3 All-Purpose Compound
2.1.6.4 Setting or Hardening Type Compound
2.1.6.5 Joint Tape
2.1.7 Fasteners
2.1.7.1 Screws
2.1.8 Accessories
2.1.9 Water
PART 3 EXECUTION
3.1 EXAMINATION
3.1.1 Framing and Furring
3.1.2 Building Construction Materials
3.2 APPLICATION OF GYPSUM BOARD
3.2.1 Application of Gypsum Board to Steel Framing and Furring
3.2.2 Glass Mat Covered or Fiber Reinforced Gypsum Sheathing
3.2.3 Control Joints
3.2.4 Application of Impact Resistant Gypsum Board
3.3 FINISHING OF GYPSUM BOARD
3.3.1 Uniform Surface
3.4 SEALING
3.4.1 Sealing for Glass Mat or Reinforced Gypsum Board Sheathing
3.5 FIRE-RESISTANT ASSEMBLIES
3.6 PATCHING
09 30 10
CERAMIC TILING
09 30 10 - CERAMIC TILING
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY ASSURANCE
1.4 DELIVERY, STORAGE, AND HANDLING
1.5 WARRANTY
1.6 EXTRA MATERIALS
PART 2 PRODUCTS
2.1 TILE
2.1.1 Porcelain Tile
2.2 SETTING-BED
2.2.1 Aggregate for Concrete Fill
2.2.2 Portland Cement
2.2.3 Sand
2.2.4 Hydrated Lime
2.2.5 Reinforcing Wire Fabric
2.3 WATER
2.4 MORTAR AND GROUT
2.4.1 Latex-Portland Cement Mortar
2.4.2 Ceramic Tile Grout
2.4.3 Sealants
2.5 TRANSITION STRIPS
2.6 MEMBRANE MATERIALS
2.7 COLOR, TEXTURE, AND PATTERN
PART 3 EXECUTION
3.1 PREPARATORY WORK AND WORKMANSHIP
3.2 GENERAL INSTALLATION REQUIREMENTS
3.3 INSTALLATION OF WALL TILE
3.3.1 Latex-Portland Cement Mortar
3.3.2 Ceramic Tile Grout
3.4 INSTALLATION OF FLOOR TILE
3.4.1 Workable or Cured Mortar Bed
3.4.2 Latex-Portland Cement
3.4.3 Ceramic Tile Grout
3.4.4 Waterproofing
3.4.5 Concrete Fill
3.5 INSTALLATION OF TRANSITION STRIPS
3.6 EXPANSION JOINTS
3.6.1 Walls
3.6.2 Floors

3.7 CLEANING AND PROTECTING

09 51 00
ACOUSTICAL CEILINGS
09 51 00 - ACOUSTICAL CEILINGS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 CERTIFICATIONS
1.3.1 Indoor Air Quality Certifications
1.3.1.1 Ceiling Tiles
1.3.1.2 Sealants
1.4 DELIVERY, STORAGE. AND HANDLING
1.5 ENVIRONMENTAL REQUIREMENTS
1.6 SCHEDULING
1.7 WARRANTY
1.8 EXTRA MATERIALS
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.2 ACOUSTICAL UNITS
2.2.1 Units for Exposed-Grid System ACT 1
2.2.1.1 Flame Spread
2.2.1.2 Pattern
2.2.1.3 Minimum NRC
2.2.1.4 Minimum Light Reflectance Coefficient
2.2.1.5 Nominal Size
2.2.1.6 Edge Detail
2.2.1.7 Finish
2.2.1.8 Minimum CAC
2.3 SUSPENSION SYSTEM
2.4 HANGERS
2.4.1 Wires
2.4.2 Eyebolts
2.4.3 Anchorage Devices
2.5 FINISHES
2.6 COLORS AND PATTERNS
2.7 ACOUSTICAL SEALANT
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Suspension System
3.1.1.1 Plumb Hangers
3.1.1.2 Splayed Hangers
3.1.2 Wall Molding
3.1.3 Acoustical Units
3.1.4 Caulking

3.2 CLEANING

09 62 38
STATIC-CONTROL FLOORING
09 62 38 - STATIC-CONTROL FLOORING
PART 1 GENERAL
1.1 REFERENCES
1.2 SCHEDULING
1.3 SUBMITTALS
1.3.1 Samples
1.3.1.1 Static-Control Resilient Flooring
1.3.1.2 Operations and Maintenance Data
1.4 EXTRA MATERIALS
1.5 QUALITY ASSURANCE
1.6 DELIVERY, STORAGE, AND HANDLING
1.6.1 Static-Control Resilient Flooring
1.7 ENVIRONMENTAL CONDITIONS
1.7.1 Static-Control Resilient Flooring
1.8 WARRANTY
1.8.1 Static-Control Resilient Flooring
PART 2 PRODUCTS
2.1 STATIC-CONTROL RESILIENT FLOORING
2.1.1 Static-Dissipative Resilient Flooring
2.1.1.1 Static-Dissipative Vinyl TileRFT6
2.2 ADHESIVES
2.3 ACCESSORIES
2.4 ELECTRICAL GROUND CONNECTION
2.5 MANUFACTURER'S COLOR, PATTERN AND TEXTURE
PART 3 EXECUTION
3.1 SURFACE PREPARATION
3.2 MOISTURE, ALKALINITY AND BOND TESTS
3.3 GENERAL INSTALLATION

This is the start of the file's text. The full file is on GovTribe.