W9128A-19-R-0014_Drawings_-_Package_1_(Part_2_of_11).pdf
PDF 10 MB Posted
- Attached to
- Quad A, Building 131 and Central Utility Plant (CUP), and Buildings 130 and 132, Schofield Barracks, Hawaii
- Solicitation number
- W9128A-19-R-0014
About this file
W9128A-19-R-0014 Drawings - Package 1 (Part 2 of 11)
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11.26'0.41
17.00' 9.00' 18.00' 6.22'
T
BUILDING 132
CENTRAL UTILITY PLANT
(CUP)
FFE=863.70
AA
B B
863.1± (EXIST)
F
L
O
W
F L O
W
GRADING LIMITS
K
U
N
I
A
R
O
D
S
T
A
T
E
863.6± C
863.2± C
863.7± C
863.55± C
863.68 C
863.55± C
863.68 C
5.00%
863.20 FG
863.10 FG
862.87 FG
863.6± C
862.9± C 862.8± C
863.5± C
863.39 FG
863.2± C
863.6± C
864.46 BOT.
MATCH EXIST. GRADE
T
862.50 C/AC
862.50 C/AC
863.15 AC
862.7± C/AC
863.68 C
863.05 AC
863.68 C
862.6± AC
862.2± C/AC
861.99 TC
861.9± BC
862.08 TC
862.0± BC
863.63 C/AC
863.68 C/AC
863.68 C/AC
863.68 C/AC
862.7± C/AC
862.4± C/AC
862.37 TC
861.9± BC
862.54 TC
862.0± BC
862.6± TC
862.1± BC
862.8± TC
862.3± BC
862.41 C
862.60 C
862.44 C
862.44 C
0.90% 0.80%0.80%
0.00%
7.33%
1.00%
863.15 AC
863.09 AC
1.00%
863.68 C/AC
863.68 C
863.68 C
862.45 C/AC
5.60%
862.75 C/AC
11.26'0.41
863.68 C
863.62 C/AC
863.62 C/AC
862.50 AC
862.50 AC
862.3± C/AC
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C T
N
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
%PRODUCTION DATA 1%
%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P
F
E
N G
I N
E E
R S
R E
G I O
N A
L
E
N G
I N
E E
R I N
G
C
E N
T E
R
H O
N O
L U
L U
E
G
I N
E E
R
D
I S
T R
I C
T
H O
N O
L U
L U
H
I
H O
N O
L U
S
T R
I C
T
H A
F T
E R
H
A W
A I I
W A
D
J U
U
O P
T I O
N
U
O P
T I O
N
A N
S I
X
F Y
Q
U A
P
A
B
D
G
D
C
O N
S T
R U
N
T R
A L
U
T I L I T
I E
S
P
L A
N
S C
H O
F I E
R
R A
C K
S
O
A H
U
H
A W
A I I
RTA
R
S
A N
T O
R R
B
R O
W N
R R
B
R O
W N
This drawing was prepared by me or under my direct supervision.
EXP. DATE 4/30/2020
G
A D
I N
G
P
L A
N
CG102
MATCHLINE
SEE SHEET CG101
N
SCALE: 1" = 20'
GRADING PLAN
A1
20' 40'0
LEGEND:
ANTI-TERRORISM (AT) STANDOFF DISTANCE
CENTRAL UTILITY PLANT (CUP) BUILDING
PROJECT LIMITS
CG102
CG101
KEYMAP
SCALE: NTS
N
SCALE: 1" = 5'
INSET "A"
B7
N
FOR DETAILED GRADING,
SEE INSET "A"
123.45 AC
AC PAVEMENT ELEV.
123.45 C
CONC. PAVEMENT ELEV.
123.45 TC
123.45 BC
TOP OF CURB ELEV.
BOTTOM OF CURB ELEV.
GRADING LIMITS
123.45 FG
FINISH GRADE ELEV.
0 5' 10'
FFE=863.70
NOTE:
SIDEWALK RESTORATION SHALL
MATCH BACK TO EXISTING GRADE.
EXISTING GROUND
FFE = 863.70
EXIST.
WALKWAY
CENTRAL UTILITY PLANT EXIST. PLAYCOURT
EXIST. PLANTER
AREA
FFE = 863.70
2%
15%
13.80%
EXISTING GROUND
EXIST. AC PAVEMENT
(PARKING AREA)
DRIVEWAY
RAMP
CENTRAL UTILITY PLANT WALKWAY
3'
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
%PRODUCTION DATA 1%
%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R E
G I O
N A
L
E
N G
I N
E E
R I N
G
C
E N
T E
R
H O
N O
L U
G
I N
E E
R
D
I S
T R
I C
T
H O
N O
L U
L U
H
I
H O
N O
L U
S
T R
I C
T
A
F T
E R
H
A W
A I I
W A
D
J U
U
O P
T I O
N
U
O P
T I O
N
A N
S I
X
F Y
Q
U A
P
A
D
G
D
C
O N
S T
R U
N
T R
A L
U
T I L I T
I E
S
P
L A
N
S C
H O
F I E
R
R A
C K
S
O
A H
U
H
A W
A I I
RTA
R
S
A N
T O
R R
B
R O
W N
R R
B
R O
W N
This drawing was prepared by me
N T
R A
L
U
T I L I T
Y
P
L A
C
T I O
N S
CG301
SCALE: HORIZONTAL: 1" = 20' VERTICAL: 1"=2'
SECTION A-A
E3
SCALE: HORIZONTAL: 1" = 20' VERTICAL: 1"=2'
SECTION B-B
B3
1+000+500+00
1+50 2+00
1+000+500+00
1+50 2+00
2' 4'0 20' 40'0
2' 4'0 20' 40'0
F6 F6
W
W
F
F
F
W
W
F6
F6 F6 F6
W6 W6 W6 W6
W
W
W
W
W
W
W
W
WW
W
W
6" PVC SEWERLINE
FL "A" STA. 2+21
6" BACKFLOW PREVENTER
SEE DET.
FIRELINE "A"
FOR PROFILE,
SEE SHT. CU202
WATERLINE "C"
FOR PROFILE,
SEE SHT. CU201
WATERLINE "A"
SEE PROFILE,
SHT. CU201
TRANSFORMER,
SEE ELEC.
SITE PLAN
PROJECT
LIMITS
WATERLINE "B"
FOR PROFILE,
SEE SHT. CU201
FIRELINE "A"
FOR PROFILE,
SEE SHT. CU202
SEWERLINE "C"
FOR PROFILE, SEE SHT. CU204
109°31'30"
38.84'
304°07'50"
23.06'
0+00
1+00
1+00 2+00
0+00
2.59'
1+81
259°07'50"
16.26'
349°07'50"
11.32'
349°07'50"
11.31'
328°34'50"
14.00'
347°58'31"
11.17'
WATERLINE "B"
FOR PROFILE,
SEE SHT. CU201
124°07'50"
70.00'
H W
C W
W
W
A
IA
N A
E A
V E
K
U
N
T
A
T
E
STA. 0+00
BEGIN WATERLINE "A"
CONNECT TO EXIST. W12
1- 12" x 12" TEE
1- 12" GATE VALVE AND BOX
1- CONC BLOCK
WL "A"
304°07'24"
68.72'
214°07'50"
3.99'
304°07'50"
131.04'
304°07'50"
164.66'
E
E
T
214°06'53"
25.34'
CU502
F6
32°58'31"
10.74'
S A
N
S A
N
S A
N
S A
N
S
SAN6SAN6
C
O
C
O
S
S
SMH #3
STA. 0+00
TOP= 866.19 ±
SL "C"
INV. IN= 855.18 (6")
INV. IN= 855.02 (8")
INV. OUT= 855.0± (8")
304°07'47"
49.28'
STA. 0+97.55
1- 12" 1/8 BEND
1- CONC. BLOCK
WL "A"
STA. 0+70.00
1- 6" 1/4 BEND
1- CONC. BLOCK
FL "C"
STA. 0+25.17
1- 12" x 12" TEE
2- 12" x 6" ECCENTRIC REDUCER
2- 6" GATE VALVE AND BOX
1- CONC. BLOCK
=WL "B"
WL "A" STA. 1+08.29
STA. 0+00
1- 12" x 6" TEE
1- 6" GATE VALVE AND BOX
1- CONC BLOCK
=FL "A"
WL "A" STA. 1+04.29
0+00
0+00
3" CONDENSATE DRAINLINE
CONNECT TO EXIST. D6
INV.= 863.00
44.02'
53.28'
17.63'
STA. 0+76
1- FH ASSEMBLY
FL "C"
214°07'50"
6.00'
WL "A" STA. 0+63
1- 3/4" ARV
1- ARV BOX
WL "B" STA. 0+08
1- 3/4" ARV
1- ARV BOX
STA. 0+00
CONNECT TO
EXIST 4" WATERLINE
1- 6" x 4" ECCENTRIC REDUCER
1- 4" 1/4 BEND
1- CONC. BLOCK
WL "B"
STA. 0+00
1- 6" x 6" TEE
2- 6" GATE VALVE AND BOX
1- CONC. BLOCK
=WL "C"
WL "B" STA. 0+54.33
STA. 0+49.28
1- 6" 1/8 BEND
1- CONC. BLOCK
FL "A"
STA. 0+60.59
1- 6" 1/8 BEND
1- CONC. BLOCK
FL "A"
STA. 1+91.63
1- 6" 1/8 BEND
1- CONC. BLOCK
FL "A"
STA. 2+07.89
1- 6" 1/8 BEND
1- CONC. BLOCK
FL "A"
STA. 2+30.95
1- 6" 1/4 BEND
1- CONC. BLOCK
FL "A"
STA. 0+84.03
1- 6" 1/8 BEND
1- CONC. BLOCK
WL "B"
STA. 2+48.69
1- 6" 1/4 BEND
1- 6" x 3" ECCENTRIC REDUCER
1- CONC. BLOCK
WL "B"
FL "A" STA. 2+05
1- 6" PIV
EXIST. FH
FDC, SEE FIRE
PROTECTION PLANS
STA. 3+56.18
CONNECT TO
EXIST. FIRE RISER
SEE MECH FOR CONN.
TO BLDG 131
FL "A"
STA. 3+58.42
CONNECT TO
BLDG. 131
SEE PLBG. DWGS.
WL "B"
WL "B" STA. 3+56
4" REDUCED PRESSURE
PRINCIPLE BFP,
SEE DET.
SMH #2A
STA. 3+14.06
TOP= 864.44 ±
SL "A"
INV. IN= 857.00 (6")
INV. IN= 857.90 (6")
INV. OUT= 857.00 (6")
STA. 2+57.31
CONNECT TO BLDG.
SEE MECH. DWGS.
CHWS/CHWR "1"
COTG #1
STA. 0+43.31
1- 6" WYE
1- 6" 1/8 BEND
1- 6" CAP
SL "A-2"
INV.= 860.73 (6")
SEE DET.
CU503
A6
FIRELINE "C"
FOR PROFILE,
SEE SHT. CU202
WL "C" STA. 0+12
1- 3/4" ARV
1- ARV BOX
CU502
C4
STA. 0+45.31
CONNECT TO BLDG. 131
SEE PLBG. DWGS.
1- 6" x 4" REDUCER
SL "A-2"
INV.= 860.77 (6")
INV.= 860.85 (4")
HOSE BIBB WATER
LATERAL CONNECT
TO BLDG 131
SEE PLBG. DWGS
HOSE BIBB WATER
LATERAL CONNECT
TO BLDG 131
SEE PLBG. DWGS
STA. 2+50.87
CONNECT TO BLDG.
SEE MECH. DWGS.
HW "A"
COTG #2
STA. 3+14.06
6" COTG DROP
1- 6" WYE
1- 6" 1/8 BEND
1- 6" CAP
SL "A-1"
INV.= 858.75 (6")
INV.= 861.95 (6")
SMH #4
STA. 1+79.17
CONNECT TO BLDG.
SEE PLBG. DWGS.
TOP= 865.40 ±
SL "C"
INV. IN= 860.00 (4")
INV. OUT= 859.90 (6")
6.5'
STA. 0+54.91
CONNECT TO BLDG. 131
SEE PLBG. DWGS.
SL "A-1"
INV.= 862.00 (6")
BUILDING 131
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
%PRODUCTION DATA 1%
%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R E
G I O
N A
L
E
N G
I N
E E
R I N
G
C
E N
T E
R
H O
N O
L U
G
I N
E E
R
D
I S
T R
I C
T
H O
N O
L U
L U
H
I
H O
N O
L U
S
T R
I C
T
A
F T
E R
H
A W
A I I
W A
D
J U
U
O P
T I O
N
U
O P
T I O
N
A N
S I
X
F Y
Q
U A
P
A
D
G
D
C
O N
S T
R U
N
T R
A L
U
T I L I T
I E
S
P
L A
N
S C
H O
F I E
R
R A
C K
S
O
A H
U
H
A W
A I I
RTA
R
S
A N
T O
R R
B
R O
W N
R R
B
R O
W N
This drawing was prepared by me or under my direct supervision.
EXP. DATE 4/30/2020
LEGEND:
CENTRAL UTILITY PLANT (CUP) BUILDING
SAN6
SEWERLINE
DOMESTIC WATERLINE
CHILLED WATERLINES SUPPLY/RETURN(TYPE K COPPER WITH
INSULATION JACKET AND SOLDERED JOINTS)
EXISTING SEWERLINE
EXISTING DRAINLINE
EXISTING WATERLINE
PROJECT LIMITS
HW2 HOT WATERLINE (TYPE K COPPER WITH INSULATION
JACKET AND SOLDERED JOINTS)
I L I T
Y
P
L A
N
CU101
WATER VALVE
N
SCALE: 1" = 20'
SITE UTILITY PLAN
A1
MATCHLINE SEE SHEET CU102
20' 40'0
KEYMAP
NOT TO SCALE
N
STA. 27
IRON PIN
ELEV.=862.89
STA. 12
"Y" CUT
ELEV.=866.20
W6
CW
CU102
CU101
WL "A" STA. 0+71.38
= FL "C" STA. 0+00
1- 12" x 6" TEE
1- 6" GATE VALVE AND BOX
1- CONC. BLOCK
WL "A" STA. 0+86.38
1- 12" 1/8 BEND
1- CONC. BLOCK
WL "B" STA.0+03.99
1- 6" 1/4 BEND
1- CONC. BLOCK
WL "B" STA. 0+72.71
1- 6" 1/8 BEND
1- CONC. BLOCK
W
S
SEWER MANHOLE
NOTES:
1. FOR SEWER AND WATER TRENCH DETAIL, SEE
2. FOR HORIZONTAL THRUST BLOCK DETAILS, SEE
3. FOR SEWER MANHOLE DETAIL, SEE
4. FOR SEWER CLEAN-OUT TO GRADE (COTG) DETAIL, SEE
5. FOR GATE VALVE AND BOX DETAIL, SEE
6. FOR FIRE HYDRANT DETAIL, SEE
7. FOR AIR RELIEF VALVE DETAIL, SEE
8. FOR VERTICAL THRUST BLOCK DETAILS, SEE
9. FOR SEWER COTG DROP DETAIL, SEE
CU505
D1
CU502
A1
CU504
D5
CU505
A7
CU501
C6
CU501
A1
CU501
D1
CU503
D6
214°06'31"
19.92'
214°06'31"
18.42'
214°03'57"
216.00'
SEWERLINE "A-1"
FOR PROFILE,
SEE SHT. CU204
SEWERLINE "A-2"
FOR PROFILE, SEE SHT. CU204
1" WATER CONNECT
TO BLDG. 131
SEE MECH. DWGS.
CU505
A1
W
W
W
W6W6
F
CW4 CW4
CW4 CW4
HW4
HW4 HW4 HW4 HW4
W
W
W
W
W
W
W
W
W
W
W
T
4" COPPER DOMESTIC
HOT WATERLINE
6" PVC SEWERLINE "B"
SEE PROFILE, SHT. CU204
4" CHILLED
WATER SUPPLY
& RETURN
4" COPPER DOMESTIC
HOT WATERLINE
TRANSFORMER,
SEE ELEC. SITE PLAN
WATERLINE "C"
FOR PROFILE,
SEE SHT. CU201
0+04
0+00
H W
H W
0+00
1+00 2+00
0+00
2+00
0+00
2+00
263°22'24"
56.05'
260°09'15"
52.69'
222°34'25"
90.85'
-1+00
-0+00
304°07'50"
100.00'
SEWERLINE "A"
FOR PROFILE, SEE SHT. CU204
CHWS/CHWR "1" STA. 2+38.89
2- 6" 1/4 BEND
1" WATER LATERAL FOR
DRINKING FOUNTAIN
K
U
N
T
A
T
E
4+00
FIRELINE "B"
FOR PROFILE,
SEE SHT. CU202
6" CHILLED WATER SUPPLY
AND RETURN LINES
6" CHWS/CHWR "2"
FOR PROFILE, SEE SHT. CU203
CHWS AND CHWR "1"
FOR PROFILE, SEE
SHT. CU203
303°57'09"
98.06'
WATERLINE "D"
FOR PROFILE,
SEE SHT. CU201
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
SAN8
SAN8
S S
C
O
S
STA. 0+96.91
CONN. TO CUP BLDG.
SEE PLBG. DWGS
COTG #4
COTG DROP
2- 6" WYE
2- 6" 1/8 BEND
1- 6" CAP
SL"B"
INV.= 858.10 (4")
INV.= 854.90 (6")
304°06'53" 147.30'
304°06'53" 132.29'
214°06'52"
40.68'
304°09'50"
26.19'
259°09'50"
8.80'
SMH #1
STA. -0+00
BEGIN SEWERLINE "A" AND "B"
CONNECT TO EXIST. S8
TOP= 860.64 ±
SL "A"
INV. IN= 851.58 (8")
INV. IN= 851.75 (6")
= SL"B" STA. 0+00
INV. OUT= 851.6± (8")
SMH #2
STA. 0+98.06
TOP= 859.82 ±
SL "A"
INV. IN= 852.24 (6")
INV. OUT= 852.07 (8")
214°06'52"
64.30'
124°07'50"
2.56'
124°06'52"
5.56'
1" WATER LATERAL
CONNECT TO
DRINKING FOUNTAIN
CONNECT TO CUP BLDG.
SEE MECH. DWGS.
CHWS/CHWR "1" STA. 0+00
CONNECT TO CUP BLDG.
SEE MECH. DWGS.
HW "A" STA. 0+00
CONNECT TO CUP BLDG.
SEE MECH. DWGS.
WL "C" STA. 2+64.31 O/S 8.61' LT.
STA. 4+89
1- FH ASSEMBLY
WL "C"
STA. 4+59
1- 6" 1/4 BEND
1- CONC. BLOCK
WL "C"
STA. 0+00
1- 6" x 6" TEE
1- 6" GATE VALVE AND BOX
1- CONC. BLOCK
=FL "B"
WL "C" STA. 3+92.40
STA. 3+59
1- 6" 1/4 BEND
1- CONC. BLOCK
WL "B"
STA. 2+25.53
1- 4" 1/4 BEND
HW "A"
CONNECT TO CUP BLDG.
SEE MECH. DWGS.
FL "B" STA. 0+42.14
WL "C" STA. 3+15
1- 3/4" ARV
1- ARV BOX
FL "B" STA. 0+40.50
1- 6" PIV
SEE DET.
CU503
A6
STA. 2+91.38
5 LF PIPE
1- 6" x 6" TEE
1- 6" CAP
2- CONC. BLOCK
WL "C"
214°06'06"
42.14'
8.491'16.379'
4" REDUCED PRESSURE
PRINCIPLE BFP, SEE DET.
CU502
C4
SMH #1A
STA. 0+82
CONNECT TO BLDG.
SEE PLBG. DWGS.
TOP= 861.74 ±
SL "C"
INV. IN= 854.58 (6")
INV. OUT= 854.58 (6")
HW "A"
FOR PROFILE,
SEE SHT. CU203
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
%PRODUCTION DATA 1%
%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R E
G I O
N A
L
E
N G
I N
E E
R I N
G
C
E N
T E
R
H O
N O
L U
G
I N
E E
R
D
I S
T R
I C
T
H O
N O
L U
L U
H
I
H O
N O
L U
S
T R
I C
T
A
F T
E R
H
A W
A I I
W A
D
J U
U
O P
T I O
N
U
O P
T I O
N
A N
S I
X
F Y
Q
U A
P
A
D
G
D
C
O N
S T
R U
N
T R
A L
U
T I L I T
I E
S
P
L A
N
S C
H O
F I E
R
R A
C K
S
O
A H
U
H
A W
A I I
RTA
R
S
A N
T O
R R
B
R O
W N
R R
B
R O
W N
This drawing was prepared by me
I L I T
Y
P
L A
N
CU102
N
SCALE: 1" = 20'
SITE UTILITY PLAN
A1
MATCHLINE
SEE SHEET CU101
KEYMAP
NOT TO SCALE
N
LEGEND:
CENTRAL UTILITY PLANT (CUP) BUILDING
SAN6
SEWERLINE
DOMESTIC WATERLINE
CHILLED WATERLINES SUPPLY/RETURN
(TYPE K COPPER WITH INSULATION JACKET
AND SOLDERED JOINTS)
EXISTING SEWERLINE
EXISTING DRAINLINE
EXISTING WATERLINE
PROJECT LIMITS
HW2 HOT WATERLINE (TYPE K COPPER WITH
INSULATION JACKET AND SOLDERED JOINTS)
WATER VALVE
W6
CW
CU102
CU101
STA. 27
MAG NAIL
ELEV.=861.69
20' 40'0
CHWS/CHWR "1" STA. 0+69.86
2- 4" 1/4" BENDS
CHWS/CHWR "1" STA. 0+29.72
= CHWS/CHWR "2" STA. 0+13.50
2- 6" X 6" TEES
2- 6" x 4" REDUCER
2- 6" GATE VALVE AND BOX
2- 4" GATE VALVE AND BOX
2- 6" CAP
WL "C" STA. 2+64.33
WATER LATERAL CONN.
1- 6" x 4" TEE
1- 4" GATE VALVE AND BOX
1- CONC. BLOCK
CHWS/CHWR "1" STA. 0+05.56
2- 6" 1/4 BENDS
WL "C" STA. 3+50.16
1- 6" x 6" TEE
1- 6" GATE VALVE AND BOX
1- CONC. BLOCK
WL "D" STA. 0+00
CONNECT TO EXIST. W6
1- 6" 1/4 BEND
1- CONC. BLOCK
HW "A" STA. 0+21.45
1- 4" x 4" TEE
1- 4" GATE VALVE AND BOX
HW "A" STA. 0+43.24
1- 4" 1/4 BEND
CHWS/CHWR "1" STA. 0+97.81
2- 4" 1/8 BENDS
HW "A" STA. 0+69.43
1- 4" 1/8 BEND
HW "A" STA. 0+83.10
1- 4" 1/8 BEND
CHWS/CHWR "1" STA. 1+06.60
2- 4" 1/8 BENDS
HW "A" STA. 0+21.45 O/S 16.50' LT.
1- 4" GATE VALVE AND BOX
1- 4" CAP
BUILDING 132
W
S
SEWER MANHOLE
NOTES:
1. FOR SEWER AND WATER TRENCH DETAIL, SEE
2. FOR HORIZONTAL THRUST BLOCK DETAILS, SEE
3. FOR SEWER MANHOLE DETAIL, SEE
4. FOR SEWER CLEAN-OUT TO GRADE (COTG) DETAIL, SEE
5. FOR GATE VALVE AND BOX DETAIL, SEE
6. FOR FIRE HYDRANT DETAIL, SEE
7. FOR AIR RELIEF VALVE DETAIL, SEE
8. FOR VERTICAL THRUST BLOCK DETAILS, SEE
CU505
D1
CU502
A1
CU504
D5
CU505
A7
CU501
C6
CU501
A1
CU501
D1
CU503
D6
259°09'50"
8.79'
304°09'50"
27.95'
HW "A" STA. 0+2.56
1- 4" x 4" TEE
1- 4" x 3" REDUCER
HW "A" STA. 0+00 O/S 16.50' LT.
1- 3" GATE VALVE AND BOX
1- 3" CAP
EXIST
AC PAVEMENT
(PARKING AREA)
EXIST LANDSCAPE AREA EXIST
WALKWAY
EXIST LANDSCAPE AREA EXIST AC PAVEMENT
(PARKING AREA)
EXIST
LANDSCAPE
AREA
M
I N
C O
V E
R
INVERT OF 6" DI CL52
WATERLINE, TYP.
M
I N
C L R
T
Y P
EXIST GROUND ALONG
CENTERLINE OF WATERLINE
E
E
E
E
E
CW6 CW4
S4
D18
GAS
(IRR)
COMM
HW3
M
I N
C L R
FIRE
HYDRANT
EXIST
LANDSCAPE
AREA
EXIST
WALKWAY
(IRR)
(IRR)
FINISH GRADE ALONG
CENTERLINE OF WATERLINE
EXIST. WALKWAY
E
E
S T
A
W
L
B
S
E L E
V
S T
A
B
E N
D
C
O N
C
B
L O
C K
E L E
V
S T
A
B
E N
D
C
O N
C
B
L O
C K
E L E
V
S T
A
B
E N
D
C
O N
C
B
L O
C K
E L E
V
S T
A
B
E N
D
C
O N
C
B
L O
C K
E L E
V
S=0.00%
S=108.81%
S=0.00%
S=-99.00%
S=-0.00%
S T
A
D E
F L E
P
E
E L E
V
S=-0.70%
S=0.00%
S T
A
B
E N
D
C
O N
C
B
L O
C K
E L E
V
S T
A
B
E N
D
C
O N
C
B
L O
C K
E L E
V
S T
A
B
E N
D
C
O N
C
B
L O
C K
E L E
V
S=20.00%
S=0.00%
S=-24.44%
S T
A
F
H
A
S S
E M
B L Y
E L E
V
ARV
S T
A
W
L
D
S
E L E
V
S T
A
B
E N
D
C
O N
C
B
L O
C K
E L E
V
S T
A
F
L
B
S
E L E
V
S T
A
D E
F L E
P
E
E L E
V
S=0.00%
ARV
HW4
S T
A
E L E
V
S T
A
W A
T E
R
L A
T E
R A
L
C
U P
E L E
V
EXIST
AC PAVEMENT
EXIST AC PAVEMENT
(PARKING AREA)
S=0.00%
S T
A
C O
N N
E C
T
T
O
E X
I S
T
W
A T
E R
L I N
E
E L
E V
M
I N
C O
V E
R
INVERT OF 12" DI CL52
WATERLINE, TYP.
EXIST GROUND ALONG
CENTERLINE OF WATERLINE
E
EXIST
LANDSCAPE
AREA
COMM
S
-1 .9
M
I N
C L R
T
Y P
S T
A
F
L
A
S
E L
E V
S T
A
B
E N
D
C
O N
C
B
L O
C K
E L
E V
S T
A
B
E N
D
C
O N
C
B
L O
C K
E L
E V
S T
A
B
E N
D
C
O N
C
B
L O
C K
E L
E V
S T
A
B
E N
D
C
O N
C
B
L O
C K
E L
E V
S=45.24%
S=0.00%
S=-41.25%
S T
A
F
L
C
S
E L
E V
ARV
E
S T
A
W
L
B
S
E L
E V
E L
E V
EXIST AC PAVEMENT
(PARKING AREA)
EXIST LANDSCAPE AREA
INVERT OF 6" DI CL52
WATERLINE, TYP.
INVERT OF 3" DI CL52
WATERLINE, TYP.
M
I N
C O
V E
R
EXIST GROUND ALONG
CENTERLINE OF WATERLINE
E
E
EXIST WALKWAY
(IRR)
(IRR)
M
I N
C L
R T
Y P
W12x
ARV
S T
A
C O
N N
E C
T
T
O
E X
I S
T
W
A T
E R
L I N
E
E L E
V
S T
A
B
E N
D
C
O N
C
B
L O
C K
E L E
V
S T
A
B
E N
D
C
O N
C
B
L O
C K
E L E
V
S T
A
B
E N
D
C
O N
C
B
L O
C K
E L E
V
S T
A
B
E N
D
C
O N
C
B
L O
C K
E L E
V
S T
A
W
L
C
S
E L E
V
S T
A
E L E
V
S T
A
D E
F L E
P
E
E L E
V
S T
A
C O
N N
E C
T
T
O
B U
I L D
I N
G
S
T U
B O
U T
E L E
V
S=-0.50%
S=-0.97%
S=98.52%
S=0.00%
S=-94.12%
S=-0.50%
S
E
S T
A
W
L
A
S
E L E
V
E L E
V
S T
A
E L E
V
GATE VALVE, TYP.
M
I N
S T
A
E L E
V
EXIST AC PAVEMENT
(PARKING AREA)
INVERT OF 6" DI CL52
WATERLINE, TYP.
M
I N
C O
V E
R
S T
A
W
L
C
S
E L E
V
S T
A
C O
N N
E C
T
T
O
E X
I S
T
W
A T
E R
L I N
E
E L E
V
S=7.46%
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
%PRODUCTION DATA 1%
%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R E
G I O
N A
L
E
N G
I N
E E
R I N
G
C
E N
T E
R
H O
N O
L U
G
I N
E E
R
D
I S
T R
I C
T
H O
N O
L U
L U
H
I
H O
N O
L U
S
T R
I C
T
A
F T
E R
H
A W
A I I
W A
D
J U
U
O P
T I O
N
U
O P
T I O
N
A N
S I
X
F Y
Q
U A
P
A
D
G
D
C
O N
S T
R U
N
T R
A L
U
T I L I T
I E
S
P
L A
N
S C
H O
F I E
R
R A
C K
S
O
A H
U
H
A W
A I I
RTA
R
S
A N
T O
R R
B
R O
W N
R R
B
R O
W N
This drawing was prepared by me
T E
R L I N
E
P
R O
F I L E
S
CU201
SCALE: HORIZONTAL: 1" = 20' VERTICAL: 1"=4'
WATERLINE "C" PROFILE
C1
1+000+500+00 1+50 2+00 2+50
SCALE: HORIZONTAL: 1" = 20' VERTICAL: 1"=4'
WATERLINE "A" PROFILE
E1
0+500+00 1+000+500+00 1+50 2+00
SCALE: HORIZONTAL: 1" = 20' VERTICAL: 1"=4'
WATERLINE "B" PROFILE
E4
8'0 4'
1+00 2+50 3+00 3+50
3+00 3+50 4+00
4+50 5+00
SCALE: HORIZONTAL: 1" = 10' VERTICAL: 1"=5'
WATERLINE "D" PROFILE
A1
850850
0+250+00
860860
0+25 0+50
0 10' 20' 0 5' 10'
20' 40'0 8'0 4' 20' 40'0
8'0 4' 20' 40'0
INVERT OF 6" DI CL52
FIRELINE, TYP.
EXISTING GROUND ALONG
CENTERLINE OF FIRELINE
BFP
EXIST AC PAVEMENT
(PARKING AREA)
EXIST AC PAVEMENT
(PARKING AREA)
EXIST
LANDSCAPE
AREA
EXIST
LANDSCAPE
AREA
S T
A
W
L
A
S
E L
E V
E L
E V
M
I N
C O
V E
R
E
(IRR)
(IRR)
EXIST LANDSCAPE AREA
EXIST
WALKWAY
M
I N
C L
R
T
Y P
S=-0.59%
S=-0.51%
S T
A
E L
E V
S T
A
E L
E V
S T
A
C O
N N
E C
T
T
O
B U
I L
D I N
G
S
T U
B O
U T
E L
E V
M
I N
M
A X
PIV
GATE VALVE, TYP.
EXISTING GROUND ALONG
CENTERLINE OF FIRELINE
INVERT OF 6" DI CL52
FIRELINE, TYP.
M
I N
C O
V E
R
EXIST AC PAVEMENT
(PARKING AREA)
DRIVEWAY
WALKWAY
AC PAVT.
AREA
M
I N
C L R
E
FINISH GRADE ALONG
CENTERLINE OF FIRELINE
S
S T
A
W
L
C
S
E L E
V
S T
A
C O
N N
E C
T
T
O
B U
I L D
I N
G
S
T U
B O
U T
E L E
V
PIV
S T
A
W
L
A
S
E L
E V
E L
E V
S
S T
A
F
H
A
S S
E M
B L
Y
E L
E V
INVERT OF 6" DI CL52
FIRELINE, TYP.
M
I N
C O
V E
R
EXISTING GROUND ALONG
CENTERLINE OF FIRELINE
EXIST
AC PAVEMENT
EXIST LANDSCAPE AREA
COMM
E
M
I N
C L
R T
Y P
W12X
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
%PRODUCTION DATA 1%
%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R E
G I O
N A
L
E
N G
I N
E E
R I N
G
C
E N
T E
R
H O
N O
L U
G
I N
E E
R
D
I S
T R
I C
T
H O
N O
L U
L U
H
I
H O
N O
L U
S
T R
I C
T
A
F T
E R
H
A W
A I I
W A
D
J U
U
O P
T I O
N
U
O P
T I O
N
A N
S I
X
F Y
Q
U A
P
A
D
G
D
C
O N
S T
R U
N
T R
A L
U
T I L I T
I E
S
P
L A
N
S C
H O
F I E
R
R A
C K
S
O
A H
U
H
A W
A I I
RTA
R
S
A N
T O
R R
B
R O
W N
R R
B
R O
W N
This drawing was prepared by me
R
E L I N
E
P
R O
F I L E
S
CU202
SCALE: HORIZONTAL: 1" = 20' VERTICAL: 1"=4'
FIRELINE "A" PROFILE
E1
2+00
1+501+000+500+00 2+50
3+00
3+50
8'0 4' 20' 40'0
SCALE: HORIZONTAL: 1" = 20' VERTICAL: 1"=4'
FIRELINE "B" PROFILE
C1
0+500+00
0+500+00
SCALE: HORIZONTAL: 1" = 20' VERTICAL: 1"=4'
FIRELINE "C" PROFILE
C5
1+00
8'0 4'
20' 40'0
8'0 4'
20' 40'0
EXISTING GROUND
ALONG CENTERLINE
OF CHWS / CHWR
INVERT OF 6" COPPER WITH
INSULATION JACKET AND SOLDERED
JOINTS CHWS 2 AND CHWR 2, TYP.
6" WELDED
STEEL CHWS 2
CENTRAL
UTILITY PLANT
BLDG
FFE=863.90
EXIST LANDSCAPE AREA
W6
M
I N
C O
V E
R
S T
A
B E
G
W
S
A N
D
C
H W
R
E L E
V
S T
A
B
E N
D
E L E
V
S T
A
B
E N
D
E L E
V
S T
A
B
E N
D
E L E
V
S T
A
B
E N
D
E L E
V
S=-1.56%
S T
A
E L E
V
W6
M
I N
C L
R
T
Y P
INVERT OF 4" COPPER WITH
INSULATION JACKET AND
SOLDERED JOINTS CHWS 1
AND CHWR 1, TYP.
EXIST. LANDSCAPE AREA EXIST.
WALKWAY
EXIST. LANDSCAPE AREA EXIST.
WALKWAY
EXIST. LANDSCAPE AREA EXIST. WALKWAY
EXIST. LANDSCAPE AREA EXIST. WALKWAY
EXIST
LANDSCAPE
AREA
CENTRAL UTILITY PLANT
BLDG
EXISTING GROUND ALONG
CENTERLINE OF CHWS / CHWR
INVERT OF 6" COPPER WITH INSULATION JACKET
AND SOLDERED JOINTS CHWS 1 AND CHWR 1,
TYP.
M
I N
C O
V E
R
E
E
M
I N
C L R
T
Y P
W3
HW2
E
W1
BLDG. 131
SAN6
SAN6
M
I N
C L R
T
Y P
COMM
COMM
COMM
E
E
W6
S=0.68%
S=0.68%
S=0.00%
S=-100.00%
S T
A
C O
N N
E C
T
T
O
C
U P
B U
I L D
I N
G
S
T U
B O
U T
E L E
V
S T
A
E L E
V
S T
A
D E
F L E
P
E
E L E
V
S T
A
B
E N
D
E L E
V
S T
A
B
E N
D
E L E
V
S T
A
C O
N N
E C
T
T
O
B U
I L D
I N
G
S
T U
B O
U T
E L E
V
S=-2.08%
E
E
HW2
S T
A
C O
N N
E C
T
T
O
C
U P
S E
E
M
E C
H
D
W G
S
E L E
V
S T
A
D E
F L E
P
E
E L E
V
S
S=-0.16%
S T
A
C O
N N
E C
T
T
O
B
L D
G
S E
E
M
E C
H
D
W G
S
E L E
V
INVERT OF 4" COPPER WITH
INSULATION JACKET AND SOLDERED
JOINTS HOT WATER, TYP.
EXISTING GROUND ALONG
CENTERLINE OF CHWS / CHWR
BLDG. 131
CENTRAL UTILITY PLANT
BLDG
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
%PRODUCTION DATA 1%
%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R E
G I O
N A
L
E
N G
I N
E E
R I N
G
C
E N
T E
R
H O
N O
L U
G
I N
E E
R
D
I S
T R
I C
T
H O
N O
L U
L U
H
I
H O
N O
L U
S
T R
I C
T
A
F T
E R
H
A W
A I I
W A
D
J U
U
O P
T I O
N
U
O P
T I O
N
A N
S I
X
F Y
Q
U A
P
A
D
G
D
C
O N
S T
R U
N
T R
A L
U
T I L I T
I E
S
P
L A
N
S C
H O
F I E
R
R A
C K
S
O
A H
U
H
A W
A I I
RTA
R
S
A N
T O
R R
B
R O
W N
R R
B
R O
W N
This drawing was prepared by me
I L L E
D
W
A T
P
P L Y
R
E T
U R
N
P
R O
F I L E
S
CU203
SCALE: HORIZONTAL: 1" = 10' VERTICAL: 1"=5'
CHWS AND CHWR 2 PROFILE
E7
850850
0+250+00
0 10' 20' 0 5' 10'
870870
0+25 0+50
SCALE: HORIZONTAL: 1" = 20' VERTICAL: 1"=4'
CHWS AND CHWR "1" PROFILE
E1
8'0 4' 20' 40'0
1+501+000+500+00
3+002+00 2+50
SCALE: HORIZONTAL: 1" = 20' VERTICAL: 1"=4'
HW "A" PROFILE
A1
8'0 4' 20' 40'0
1+501+000+500+00
3+002+00 2+50
EXISTING GROUND ALONG
CENTERLINE OF SEWERLINE
INVERT OF EXIST
8" SEWERLINE, TYP.
INVERT OF 8" PVC
SEWERLINE, TYP.
EXIST AC PAVEMENT
(PARKING AREA)
EXIST
WALKWAY
EXIST
LANDSCAPE
AREA
EXIST PLAYING
COURT
EXIST
LANDSCAPE
AREA
EXIST
WALKWAY
EXIST
LANDSCAPE
AREA
D18
INVERT OF 6" PVC
SEWERLINE, TYP.
INV. OUT= 852.07
SMH #2
STA. 0+98.06
TOP = 859.82
INV. IN= 852.24
INV. OUT= 851.6± (8")
SMH #1
STA. 0+00
TOP = 860.64
INV. IN= 851.58 (8")
INV. IN= 851.75 (6")
(IRR)
(IRR)
E
E
W1
CHW4
M
I N
C O
V E
R
M
I N
C L R
T Y
P
M
I N
C L
R
INV. OUT= 857.00
SMH #2A
STA. 3+14.06
TOP = 864.44
INV. IN= 857.00
INV. IN= 857.90
HW2
S=0.72±%
L
.0
S
.2
L=98.06' S =0.50%
EXISTING GROUND ALONG
CENTERLINE OF SEWERLINE
INVERT OF 6" PVC
SEWERLINE, TYP.
CHW4
HW2
M
I N
C L R
T Y
P
EXIST. LANDSCAPE AREA
INV. OUT= 857.00
SMH #2A
STA. 0+00
TOP = 864.44
INV. IN= 857.00
INV. IN= 857.90
W1
C O
S T
A
I N
V
I N
V
L
S
C O
N N
E C
T
T
O
B
L D
G
S E
E
P
L B
G
D
W G
S
S T
A
I N
V
L=2.63' S=2.00%
EXISTING GROUND
ALONG CENTERLINE
OF SEWERLINE
INVERT OF 6" PVC
SEWERLINE, TYP.
INV. OUT= 857.00
SMH #2A
STA. 0+00
TOP = 864.44
INV. IN= 857.00
INV. IN= 857.90
EXIST. LANDSCAPE AREA
C O
S T
A
I N
V
L
L=2.00' S=2.00%
C O
N N
E C
T
T
O
B
L D
S E
E
P
L B
G
D
W G
S x
R
E D
U C
E R
S T
A
I N
I N
EXISTING GROUND
ALONG CENTERLINE
OF SEWERLINE
INVERT OF 6" PVC
SEWERLINE, TYP.
EXIST. AC PAVEMENT
(PARKING AREA)
DRIVEWAY
WALKWAY
AC PAVMT. AREA
M
I N
C O
V E
R
W6
INV. OUT= 851.6± (8")
SMH #1
STA. 0+00
TOP = 860.64
INV. IN= 851.58 (8")
INV. IN= 851.75 (6")
C O
S T
A
C O
N N
E C
T
T
O
C
U P
S E
E
P
L B
G
D
W G
S
I N
V
I N
V
(IRR)
M
I N
C L R
T Y
P
FINISHED GROUND
ALONG CENTERLINE
OF SEWERLINE
SMH #1A
STA. 0+82
TOP = 861.74
INV.= 854.58 (6")
L
S
L
.9
S
.1
EXISTING GROUND ALONG
CENTERLINE OF SEWERLINE
INVERT OF 6" PVC
SEWERLINE, TYP.
(IRR)
EXIST. LANDSCAPE AREA
EXIST.
WALKWAY
EXIST. LANDSCAPE AREA
INV. OUT= 855.0± (8")
SMH #3
STA. 0+00
TOP = 866.19
INV. IN= 855.18 (6")
INV. IN= 855.02 (8")
(IRR)
M
I N
C O
V E
R
M
I N
C L R
T
Y P
L
S
SMH #4
STA. 1+79.17
TOP = 865.40
CONNECT TO BLDG.
SEE PLBG. DWGS.
INV. IN= 860.00 (4")
INV. OUT= 859.90 (6")
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
%PRODUCTION DATA 1%
%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R E
G I O
N A
L
E
N G
I N
E E
R I N
G
C
E N
T E
R
H O
N O
L U
G
I N
E E
R
D
I S
T R
I C
T
H O
N O
L U
L U
H
I
H O
N O
L U
S
T R
I C
T
A
F T
E R
H
A W
A I I
W A
D
J U
U
O P
T I O
N
U
O P
T I O
N
A N
S I
X
F Y
Q
U A
P
A
D
G
D
C
O N
S T
R U
N
T R
A L
U
T I L I T
I E
S
P
L A
N
S C
H O
F I E
R
R A
C K
S
O
A H
U
H
A W
A I I
RTA
R
S
A N
T O
R R
B
R O
W N
R R
B
R O
W N
This drawing was prepared by me
W E
R L I N
E
P
R O
F I L E
S
CU204
SCALE: HORIZONTAL: 1" = 20' VERTICAL: 1"=4'
SEWERLINE "A" PROFILE
E1
3+50
1+501+000+500+00
8'0 4' 20' 40'0
2+00 2+50 3+00
SCALE: HORIZONTAL: 1" = 20' VERTICAL: 1"=4'
SEWERLINE "A-1" PROFILE
E6
0+500+00
SCALE: HORIZONTAL: 1" = 20' VERTICAL: 1"=4'
SEWERLINE "A-2" PROFILE
A1
0+500+00
SCALE: HORIZONTAL: 1" = 20' VERTICAL: 1"=4'
SEWERLINE "B" PROFILE
A2
1+000+500+00
SCALE: HORIZONTAL: 1" = 20' VERTICAL: 1"=4'
SEWERLINE "C" PROFILE
A6
1+000+500+00
1+50 2+00
20' 40'0
8'0 4'
20' 40'0
8'0 4'
20' 40'0
8'0 4'
8'0 4' 20' 40'0
880880
880880
M
N
8'-0" MIN.
1. PROVIDE ONLY WET TYPE HYDRANTS
2. PROVIDE "TRAFFIC TYPE" HYDRANTS NEXT TO ROADS AND
PARKING AREAS AND SHALL HAVE BREAKABLE FEATURES
PER AWWA C503.
3. PAINT HYDRANT BODY BROWN PER BOARD OF WATER
SUPPLY (BWS) SPECIFICATIONS.
4. EXISTING FIRE HYDRANT TO REMAIN IN SERVICE UNTIL
NEW FIRE HYDRANT IS ACTIVE.
X
4 1/2" DIA. PUMPER
NOZZLE (FACING STREET)
CONC. BLOCK
6" DIA. PIPE
NEW WATER MAIN
CONC. BLOCK
GATE VALVE
SEE DET.
GROUND
SURFACE
ELEVATION
PLAN
NOTES:
STANDARD LENGTH
OF HYDRANT ELBOW
REFER TO PLAN SHEETS
CU501
C6
CAST IRON FRAME
R= 1"
15 1/2"
1/8" RAISED LETTERS
ALL CASTINGS SHALL BE MADE ACCURATELY TO THE DIMENSIONS
SHOWN. SEAT AND COVER SHALL BE MACHINED, NOT GROUND TO
SECURE FLAT AND TRUE SURFACES. THE COVER SHALL NOT RATTLE
IN ANY POSITION.
12"
10 1/4"
3/4"
3/4" SQUARE HOLE
1 3/4" 1"
14"
13 3/4"
12 1/4"
3/4"
R=1 1/2"
10"
9 7/8"
9 3/8"
8 5/8"
3/4"
1/2"
1/2"
5 5/8"
1/2"
COVER
NOTE:
/8
MORTAR
14" DIA.
BRICK LEVELING COURSE
WHERE REQUIRED
8" NOMINAL STANDPIPE
4- #4 DIAGONAL
3' x 3' x 4" CONC.
SYMMETRICAL SLAB
6" GATE VALVE
2- #4 E.S., TYP.
12" DIA.
M
A X
D E
P T
H
V
A R
I E
S
3/4" ELBOW (BRONZE)
3/4"x 2" NIPPLE (BRASS)
3/4"x 2" NIPPLE (BRASS)
3/4"x 2" NIPPLE (BRASS)
CLR.
3/4" BRASS COUPLING
#4 BARS AS SHOWN
3/4" BRASS PIPE CUT TO FIT
3-WAY 3/4" STOPCOCK, 3 PORT
OR PVC C-905 PIPE
20" I.D STANDPIPE - D.I., C.I.,
4-#4 DIAGONAL BAR
BRICK
C O
N C
S
L A
B
F O
R
D
I R
T
A
R E
A
4'-0" X 4'-0" SQ.
3/4" UNION
BRICK
MORTAR
CONC. SLAB
FINISH GRADE
16" AND SMALLER WATER MAINS
3/4" AIR VALVE (FISHER A.V.-H.P.
DIMENSIONS USED)
MORTAR
1"
M
I N
C
O V
E R
STREET ELBOW TO FIT IPT
VERTICAL CHECK VALVE
(SEE NOTE 3)
90° ELBOW, BRONZE
1. CONCRETE SHALL BE 3,000 PSI MIN. AT 28 DAYS, REINFORCING STEEL
SHALL BE GRADE 60.
2. DESIGN IS BASED ON: HS-20 LOADING; 5 FEET SURCHARGE; 60 PCT/FT AT
REST PRESSURE; AND 2 FEET OF WATER ABOVE BOTTOM OF STANDPIPE
PER AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS (1998).
3. VERTICAL CHECK VALVE IS REQUIRED WHEN AIR VALVE IS IMMERSED IN
WATER.
4. PROVIDE S.S. FABRIC SCREEN COVER FOR OUTLET PIPE.
NOTES:
SADDLE CLAMP
PLAN
SECTION "A-A"
PLAN
SECTION "B-B"
PLAN
3/4"
2'-0 1/4"1"
1/4"
2 1/4"
1"
2 1/4"
1/4"
22"
30 3/4"
24" DIAMETER
3"
3 1/2"
3/4"
3/4"
1/4"
3/4"
23 1/2"
7 AT 1 1/2"=10 1/2"
6 5/16"
B B
A A
BLUE
REFLECTIVE
MARKER
4" SPACING
HYDRANT
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
%PRODUCTION DATA 1%
%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R E
G I O
N A
L
E
N G
I N
E E
R I N
G
C
E N
T E
R
H O
N O
L U
G
I N
E E
R
D
I S
T R
I C
T
H O
N O
L U
L U
H
I
H O
N O
L U
S
T R
I C
T
A
F T
E R
H
A W
A I I
W A
D
J U
U
O P
T I O
N
U
O P
T I O
N
A N
S I
X
F Y
Q
U A
P
A
D
G
D
C
O N
S T
R U
N
T R
A L
U
T I L I T
I E
S
P
L A
N
S C
H O
F I E
R
R A
C K
S
O
A H
U
H
A W
A I I
RTA
R
S
A N
T O
R R
B
R O
W N
R R
B
R O
W N
This drawing was prepared by me
T E
R
D
E T
A I L S
CU501
NOT TO SCALE
GATE VALVE AND BOX DETAIL
C6
NOT TO SCALE
AIR RELIEF VALVE BOX - FOR 3/4" AIR RELIEF VALVE DETAIL
D1
NOT TO SCALE
TYPICAL HYDRANT CONNECTION DETAIL
A1
NOT TO SCALE
MANHOLE FRAME AND COVER
D4
ALL CASTING SHALL BE MADE ACCURATELY
TO THE DIMENSIONS SHOWN. SEAT AND
COVER SHALL BE MACHINED, NOT GROUND
TO SECURE FLAT AND TRUE SURFACES.
THE COVER SHALL NOT RATTLE IN ANY
POSITION.
NOTE:
CU501
D4
NOT TO SCALE
BLUE RPM DETAIL
C7
FINISH GRADE
OR FLOOR
GATE VALVES
(2 REQ'D)
DOUBLE CHECK VALVE
PREVENTION ASSEMBLY
NOTES:
TO BUILDING
CONNECTION
1. ANY CONNECTIONS OR TEES BETWEEN METER AND
BACKFLOW PREVENTION ASSEMBLY MUST HAVE
WRITTEN APPROVAL.
2. A DC BACKFLOW PREVENTION ASSEMBLY SHALL BE
INSTALLED WHENEVER DEEMS NECESSARY TO
PREVENT POTENTIAL CONTAMINATION TO THE PUBLIC
WATER SYSTEM.
3. AT NO TIME SHALL THE BOTTOM OF THE BACKFLOW
PREVENTION ASSEMBLY BE LESS THAN 12" ABOVE
GROUND FLOOR, OR FLOOD LEVEL NOR MORE THAN
48" ABOVE AFOREMENTIONED GRADED.
4. PROVIDE THRUST BLOCKS AT BOTTOM VERTICAL
BENDS.
TYPICAL SECTION
PLAN
A
A
T R
E N
C H
TRENCH
TRENCH
B
B
CONCRETE
REACTION BLOCK
CONCRETE
REACTION BLOCK
CONCRETE
REACTION BLOCK
UNDISTURBED
EARTH
CONCRETE
REACTION BLOCK
BOTTOM
OF TRENCH
1. CONCRETE REACTION BLOCKS SHALL BE INSTALLED AT ALL TEES, PLUGS,
WYES AND BENDS.
2. CONCRETE SHALL BE 3000 PSI MINIMUM 28-DAY STRENGTH AND SHALL BE
POURED AGAINST UNDISTURBED EARTH.
3. ALL CONCRETE REACTION AND THRUST BLOCKS ARE DESIGNED FOR A
MAXIMUM OPERATING PRESSURE 150 PSI.
NOTES:
1/8
1/4
1/32
1/4
BEND
12"
6"
4"
PIPE
SIZE
PRESSURE
CAPS
TEES,
CAPS
TEES,
DIMENSION TABLE FOR
HORIZONTAL THRUST BLOCKS
INCHES
A B C
C
C
150 PSI
27 27 101/8
C
B B
6" x 4" REDUCER 11 11 8
12" x 6" REDUCER 13 13 8
6"
7 1/2"
HOSE BIBB WITH 1/2" MALE IRON PIPE
THREADS (MIPT) INLET THREAD AND
HOSE CONNECTION VACUUM BREAKER
1/2" ONCE, FEMALE IRON PIPE
THREADS (FIPT) X FIPT BRASS 90
DEGREE THREADED ELBOW
1" x 1/2" FIPT X
FIPT BRASS
COUPLER
1/2" BRASS PIPE
1/2" STAI STRAPS
W/ 2- 3/16" HOLES
1" COPPER
90° ELBOW
PRECAST
CONCRETE POST,
SEE DET.
FRONT ELEVATION
1/8" DIA
STAINLESS
STEEL ADHESIVE
ANCHORS
1. All EMBEDDED ANCHORS SHALL BE BRASS
EXPANSION TYPE. INSTALLATION SHALL
BE PER MANUFACTURER'S INSTRUCTIONS.
2. DRILLED HOLES SHALL BE CLEANED AND
FILLED WITH EPOXY (ASTM C881) PRIOR
TO INSTALLING EXPANSION ANCHOR.
NOTES:
HEAVY DUTY STEEL SURFACE
MOUNT HOSE HANGAR WITH TWO
1-7/16" LONG CONCRETE SLEEVES
WITH 304 STAINLESS STEEL SCREWS
(SIZE PER MANUFACTURER
RECOMMENDATION)
HEAVY DUTY STEEL
SURFACE MOUNT HOSE
HANGAR WITH TWO
1-7/16" LONG CONCRETE
SLEEVES WITH 304
STAINLESS STEEL
SCREWS (SIZE PER
MANUFACTURER
RECOMMENDATION)
7 1/2"
3/4" TYP.6"
PRECAST CONCRETE
POST, LIGHT
SANDBLAST FINISH
TYP.
FINISH GROUND
90% COMPACTED
SUBGRADE AT POST
PRECAST
CONCRETE POST
ELEVATION
3/4" CHAMFER TYP.
SIDES 1" CHAMFER
TOP
PRECAST
CONCRETE
POST
PLAN
VARIES
COUPLING
MECHANICAL JOINT
FLOW
POTABLE WATER
REDUCED PRESSURE
PRINCIPLE BACKFLOW
PREVENTER
PLAN
ELEVATION
USE 4" THRUST BLOCK
FOR 3" BOTTOM
VERTICAL BENDS
SEE DET
CU502
A1
4" TEE (TYP)
90° ELBOW (TYP)
GATE VALVE
(2 REQ'D)
THRUST
BLOCK (TYP)
20"
4" TEE (TYP)
4" x 3" REDUCER (TYP)
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
%PRODUCTION DATA 1%
%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R E
G I O
N A
L
E
N G
I N
E E
R I N
G
C
E N
T E
R
H O
N O
L U
G
I N
E E
R
D
I S
T R
I C
T
H O
N O
L U
L U
H
I
H O
N O
L U
S
T R
I C
T
A
F T
E R
H
A W
A I I
W A
D
J U
U
O P
T I O
N
U
O P
T I O
N
A N
S I
X
F Y
Q
U A
P
A
D
G
D
C
O N
S T
R U
N
T R
A L
U
T I L I T
I E
S
P
L A
N
S C
H O
F I E
R
R A
C K
S
O
A H
U
H
A W
A I I
RTA
R
S
A N
T O
R R
B
R O
W N
R R
B
R O
W N
This drawing was prepared by me
T E
R
D
E T
A I L S
CU502
NOT TO SCALE
BACKFLOW PREVENTER DETAIL-FIRELINE
F6
NOT TO SCALE
THRUST BLOCK DETAIL
A1
NOT TO SCALE
BACKFLOW PREVENTER DETAIL-DOMESTIC
C4
C
L
ELECTRONIC
MARKER
- ELECTRONIC MARKERS
20'
P I P
E
C U
S H
I O
N
T R
E N
C
K F
I L L
PIPE
10'
DEFLECTION (HORIZ.)
REINFORCED
CONC. JACKET
END OF MAIN
VALVE
TEE (BRANCHES
4-INCHES AND
LARGER)
BEND (HORIZ.)
PLAN VIEW
SECTION VIEW
1. INSTALL ELECTRONIC MARKER
OVER CENTER LINE OF PIPE AT
MINIMUM DEPTH OF 2 FEET AND
A MAXIMUM DEPTH OF 3 FEET
FROM FINISH GRADE.
2. INSTALL TRENCH BACKFILL AND
PIPE CUSHION MATERIAL IN
ACCORDANCE TO THE PLANS
AND SPECIFICATIONS.
3. INSTALL ELECTRONIC MARKER
AT MINIMUM CLEARANCE OR
6-INCHES ABOVE THE PIPE OR
CONCRETE JACKET.
S E
E
N O
E
E
N O
NOTES:
NOT TO SCALE
ELECTRONIC BALL MARKER DETAIL
A7
NOT TO SCALE
HOSE BIBB DETAIL
C1
NOT TO SCALE
CONCRETE POST DETAIL
C7
CU502
C7
REDUCED PRESSURE (RP)
POST INDICATOR VALVE
FINISH GRADE
T
O
INDICATOR POST
NOTE:
PROVIDE TAMPER SWITCH ON PIV,
COORDINATE CONNECTION WITH
ELECTRICAL DRAWINGS
B
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
%PRODUCTION DATA 1%
%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R E
G I O
N A
L
E
N G
I N
E E
R I N
G
C
E N
T E
R
H O
N O
L U
G
I N
E E
R
D
I S
T R
I C
T
H O
N O
L U
L U
H
I
H O
N O
L U
S
T R
I C
T
A
F T
E R
H
A W
A I I
W A
D
J U
U
O P
T I O
N
U
O P
T I O
N
A N
S I
X
F Y
Q
U A
P
A
D
G
D
C
O N
S T
R U
N
T R
A L
U
T I L I T
I E
S
P
L A
N
S C
H O
F I E
R
R A
C K
S
O
A H
U
H
A W
A I I
RTA
R
S
A N
T O
R R
B
R O
W N
R R
B
R O
W N
This drawing was prepared by me
T E
R
D
E T
A I L S
CU503
NOT TO SCALE
POST INDICATOR VALVE (PIV) DETAIL
A6
BEND
6"
D
C
A/2 A/2
A
16"
DIA.
V A
R I E
S
V
A
R
I
E
S
BEND
6"
PIPE
SIZE
PRESSURE 150 PSI
CONCRETE BLOCK
A B C D
1/8
1/32
1/16
HANGER "X" BAR
4'-6"
2'-6"
5'-0"
3'-9"
2'-3"
4'-6"
1'-6"
2'-0"
3'-6"
2'-6"
2'-0"
3'-6"
2 - #4
2 - #3
2 - #5
2 - #4
2 - #3
2 - #5
ELEVATION SECTION "A-A"
NOT TO SCALE
VERTICAL THRUST BLOCK DETAIL
D6
A
A
HANGERS
#4
"X" BAR
C
PIPE
L
#4 TIE, 8" O.C.
SLOPE
HANGER
"X" BAR#4 , 12"
O.C., E.W.
12"
8-RIBS SPACED
EQUALLY
CAST IRON
3/4"
1"24-1/4"
1/4"
1"
22"
30-3/4"
PLAN OF MANHOLE FRAME
SECTION "A-A"
MANHOLE FRAME-TYPE SA
CAST IRON
1" DIA.
HOLE
3 1/2"
2"
23-1/2"
24" DIAMETER
1/4"
3"
7 @ 1
"=10.5"
3"
1/2"
3/4"
3/4"
3/4"3/4"
PLAN OF MANHOLE COVER PLAN OF MANHOLE COVER
SECTION "B-B"
SECTION "C-C"
MANHOLE COVER-TYPE SA
5'-10" MIN.
" 5
5"
5"
P I P
E
D I A
C O
C
T I O
N
V A
R I E
S
M A
X I M
I G
2'-0"
6"
MIN
H E
I G
T
H
C
T I O
N
A
D J U
S T
E D
Q
U I R
E D
SEE DETAIL "A"
ON THIS SHEET
P I P
E
D
I A
TYPE SA MANHOLE
FRAME AND COVER
SEE DET.
MORTAR
PRE-CAST
MANHOLE RISER
SEE DET.
#5 BARS 12" O.C.,
BOTHWAYS
CU504
D8
CU504
D1
CU504
A1
FOR PIPE
CONNECTION
SEE DET.
CU504
A7
1 3/4" 1 1/2" 1 3/4"
1/4"
1/4"
1"
1/8"
1 1/8"
1/4" 1/4"
1 3/4" 1 1/2" 1 3/4"
5"
1"
1/4"1/4"
1 3/4"
1 1/2"
1 3/4"
5"
FLOW DIRECTION
NEW LINE
SEWER
EXISTING/NEW
SEWER LINE
MANHOLE
BASE
EXISTING/NEW
SEWER LINE
PLAN
DD
2'-0"
DIAMETER
5" 4'-0"
DIAMETER
3'-0" CONE
4'-0"
DIAMETER
O
R
AS = 0.16 IN²/L.F.
AS = 0.16 IN²/L.F.
RISER
5" 4'-0"
DIAMETER
BASE SLAB
6"
#5 BARS
@12" O.C., E.W.
1. PRE-CAST SECTIONS SHALL CONFORM TO
ASTM C478 AND THE AASHTO LRFD BRIDGE
DESIGN SPECIFICATIONS.
2. PRIOR TO MANUFACTURING, DESIGNS
OTHER THAN THOSE SHOWN ON THIS
SHEET SHALL BE SUBMITTED TO THE
CONTRACTING OFFICER'S
REPRESENTATIVE FOR APPROVAL.
3. INSTALL PRE-CAST FLEXIBLE SEALING
GASKET CONFORMING TO ASTM C990 AT
ALL MANHOLE JOINTS.
4. TOP SLAB SHALL BE DESIGNED FOR
AASHTO HS-20 WHEEL LOAD.
5. MINIMUM AREA OF STEEL (AS) SHALL BE
0.16 SQUARE INCHES PER LINEAR FOOT.
5"
5" 5"
5"
NOTES:
V A
R I E
S
D
PRE-CAST
MANHOLE
MANHOLE
BASE
SECTION "D-D"
RESILIENT
CONNECTOR
12" MINIMUM
24" MAXIMUM
FLEXIBLE
COUPLING
DO NOT
GROUT
OPENING
MANHOLE
CHANNEL
MANHOLE
RISER
MANHOLE
BASE
SEWER
PIPE
NOTES:
1. RESILIENT CONNECTOR SHALL CONFORM WITH ASTM C923.
2. RESILIENT CONNECTOR SHALL BE INSTALLED IN ACCORDANCE
WITH MANUFACTURERS RECOMMENDATIONS.
3. FOR PIPE CONNECTIONS AT EXISTING MANHOLES, THE
CONTRACTOR MAY CORE OR DRILL AN OPENING IN THE MANHOLE
WALL AND GROUT IN THE RESILIENT CONNECTOR PER THE
RESILIENT CONNECTOR MANUFACTURER'S RECOMMENDATIONS.
FLOW
W E
R
D
E T
A I L S
CU504
NOT TO SCALE
PRE-CAST SMH DETAIL
D5
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
%PRODUCTION DATA 1%
%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R E
G I O
N A
L
E
N G
I N
E E
R I N
G
C
E N
T E
R
H O
N O
L U
G
I N
E E
R
D
I S
T R
I C
T
H O
N O
L U
L U
H
I
H O
N O
L U
S
T R
I C
T
A
F T
E R
H
A W
A I I
W A
D
J U
U
O P
T I O
N
U
O P
T I O
N
A N
S I
X
F Y
Q
U A
P
A
D
G
D
C
O N
S T
R U
N
T R
A L
U
T I L I T
I E
S
P
L A
N
S C
H O
F I E
R
R A
C K
S
O
A H
U
H
A W
A I I
RTA
R
S
A N
T O
R R
B
R O
W N
R R
B
R O
W N
This drawing was prepared by me or under my direct supervision.
EXP. DATE 4/30/2020
NOT TO SCALE
CHANNELIZATION DETAIL
A4
NOT TO SCALE
PRE-CAST MANHOLE SECTIONS
D8
NOT TO SCALE
DETAIL "A"
D3
NOT TO SCALE
SMH COVER DETAIL-TYPE SA
A1
NOT TO SCALE
SMH FRAME DETAIL-TYPE SA
D1
C
C
B B
A A
NOT TO SCALE
PIPE CONNECTION DETAIL
A7
FINISH
GRADE
1" CHAMFER
4" BRASS
COUNTERSUNK PLUG
FLUSH
PAVEMENT
BASE COURSE
12" x 12"
CONC. PAD
4" PIPE (LENGTH
AS REQUIRED)
4" 1/8 BEND
PLUG FOR TERMINAL
LINE CONDITION WYE
FLOW
C
COTG
L
M
A X
18" SQ. x 6" THK
CONC. BLOCK
1" CHAMFER
FINISH
GRADE
BRASS
COUNTERSUNK
HEAD
6" 1/8 BEND
4" OR 6" CAST IRON
BODY (IPT)
2% MIN. FLOW
6" WYE
6" SEWER LATERAL
PER PLAN
6" CAP
TO SEWER MAIN
C COTG
L
6" 1/8 BEND
6" WYE
6" RISER
M
A X
18" SQ. x 6" THK
CONC. BLOCK
1" CHAMFER
FINISH
GRADE
BRASS
COUNTERSUNK
HEAD
4" 1/8 BEND
4" OR 6" CAST IRON
BODY (IPT)
2% MIN. FLOW
4" WYE
4" SEWER LATERAL
PER PLAN
6" CAP
TO SEWER MAIN
C COTG
L
4" 1/8 BEND
6" x 6" x 4" WYE
4" RISER
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
%PRODUCTION DATA 1%
%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R E
G I O
N A
L
E
N G
I N
E E
R I N
G
C
E N
T E
R
H O
N O
L U
G
I N
E E
R
D
I S
T R
I C
T
H O
N O
L U
L U
H
I
H O
N O
L U
S
T R
I C
T
A
F T
E R
H
A W
A I I
W A
D
J U
U
O P
T I O
N
U
O P
T I O
N
A N
S I
X
F Y
Q
U A
P
A
D
G
D
C
O N
S T
R U
N
T R
A L
U
T I L I T
I E
S
P
L A
N
S C
H O
F I E
R
R A
C K
S
O
A H
U
H
A W
A I I
RTA
R
S
A N
T O
R R
B
R O
W N
R R
B
R O
W N
This drawing was prepared by me
W E
R
D
E T
A I L S
CU505
NOT TO SCALE
CLEANOUT TO GRADE (COTG) DETAIL
A7
1'-0" 1'-0"
4" AC PAVEMENT
EXIST. AC
PAVEMENT
EXIST. BASE COURSE
C O
V E
R
V A
R I E
S
M I N
F
T
E R
M I N
F
W
E R
P I P
E
O D
3'-0"
COMPACTED
SAND FILL
PIPE LINE
COMPACTED
BACKFILL
ELECTRONIC
BALL MARKER FOR
WATER LINE
PRIME COAT
6" BASE COURSE OR
MATCHING EXISTING,
WHICHEVER IS GREATER
SAW CUT &
PROVIDE
TACK COAT
SAW CUT &
PROVIDE
TACK COAT
C O
V E
R
V A
R I E
S
M I N
F
T
E R
H
T
E R
M I N
F
W
E R
COMPACTED
SAND FILL
PIPE LINE
COMPACTED
BACKFILL
BASE COURSE,
MATCH EXIST
CONC. PAVEMENT,
MATCH EXIST
EXIST. CONC.
PAVEMENT AND
BASE COURSE
SAW CUT (TYP)
3'-0"
3'-0"
C O
V E
R
V A
R I E
S
M I N
F
T
E R
H
T
E R
M I N
F
W
E R
P I P
E
O D
COMPACTED
SAND FILL
COMPACTED
BACKFILL
SOD AND TOP SOIL
P I P
E
O D
8" MIN. 8" MIN.
8"
MIN.
8"
MIN.
8"MIN. 8"MIN.
NOT TO SCALE
TYPICAL TRENCH DETAIL
D1
SECTION - UNDER PAVEMENT SECTION - CONCRETE PAVED AREA SECTION - UNDER GRASSED AREA
C O
V E
R
V
A R
I E
S
M I N
COMPACTED
SAND FILL
PIPE LINE WITH
INSULATION
JACKET
COMPACTED
BACKFILL
BASE COURSE,
MATCH EXIST
CONC. PAVEMENT,
MATCH EXIST
EXIST. CONC.
PAVEMENT AND
BASE COURSE
SAW CUT (TYP)
3'-0"
P I P
E
O D
8" MIN. 8" MIN.
CONCRETE PAVED AREA UNDER GRASSED AREA
8" MIN.
SECTION - CHWS/R LINE
SOD AND TOP SOIL
NOT TO SCALE
CLEANOUT TO GRADE DROP (COTG) DETAILS
A1
CU502
A7
1. FOR ELECTRONIC BALL MARKER TO WATER LINE DETAIL, SEE
2. PROVIDE ROOT BARRIER ON THE FOLLOWING SEWERLINES.
SEE LANDSCAPE DWGS. FOR ROOT BARRIER DETAIL.
2.1. SEWERLINE "A" STA. 1+75 TO STA. 3+14
2.2. SEWERLINE "A-1"
2.3. SEWERLINE "A-2"
2.4. SEWERLINE "C"
NOTE:
4'-6"
P I P
E
O D
18" 18"
CW4 CW4 HW2CW CW
SECTION - CHWS/R AND HW LINE
ELECTRONIC
BALL MARKER FOR
WATER LINE
ELECTRONIC
BALL MARKER FOR
WATER LINE
PIPE LINE
4" SEWER LATERAL 6" SEWER LATERAL
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
%PRODUCTION DATA 1%
%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R E
G I O
N A
L
E
N G
I N
E E
R I N
G
C
E N
T E
R
H O
N O
L U
G
I N
E E
R
D
I S
T R
I C
T
H O
N O
L U
L U
H
I
H O
N O
L U
S
T R
I C
T
A
F T
E R
H
A W
A I I
J U
A N
S I
D
F Y
Q
U A
P
A
D
G
A N
D
C
O N
S T
R U
N
T R
A L
U
T I L I T
Y
P
L A
N T
S C
H O
F I E
R
R A
C K
S
O
A H
U
H
A W
A I I
RTA
This drawing was prepared by me or under my direct supervision.
EXP. DATE 4/30/2020
J
K
U R
O K
A W
A
K
S
A S
A K
I
K
S
A S
A K
I
LD601
T R
R
V E
Y
A
S
E S
S M
E N
T
B131 / CUP
NOTES:
1. PALM HEIGHT IS TRUNK
HEIGHT
2. ONLY TREES IN THE
PROJECT LIMITS ARE
LISTED.
3. GAPS IN TREE NUMBERS
ARE DUE TO TREES
PREVIOUSLY REMOVED OR
ARE NOT IN THE PROJECT
LIMITS.
4. LA - LANDSCAPE
ARCHITECT COMMENT
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
%PRODUCTION DATA 1%
%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R E
G I O
N A
L
E
N G
I N
E E
R I N
G
C
E N
T E
R
H O
N O
L U
G
I N
E E
R
D
I S
T R
I C
T
H O
N O
L U
L U
H
I
H O
N O
L U
S
T R
I C
T
A
F T
E R
H
A W
A I I
J U
A N
S I
D
F Y
Q
U A
P
A
D
G
A N
D
C
O N
S T
R U
N
T R
A L
U
T I L I T
Y
P
L A
N T
S C
H O
F I E
R
R A
C K
S
O
A H
U
H
A W
A I I
RTA
This drawing was prepared by me or under my direct supervision.
EXP. DATE 4/30/2020
J
K
U R
O K
A W
A
K
S
A S
A K
I
K
S
A S
A K
I
LD602
T R
R
V E
Y
A
S
E S
S M
E N
T
B131 / CUP
NOTES:
1. PALM HEIGHT IS TRUNK
HEIGHT
2. ONLY TREES IN THE
PROJECT LIMITS ARE
LISTED.
3. GAPS IN TREE NUMBERS
ARE DUE TO TREES
PREVIOUSLY REMOVED OR
ARE NOT IN THE PROJECT
LIMITS.
4. LA - LANDSCAPE
ARCHITECT COMMENT
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
II
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
IL
E N
A M
E
12:49:17 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
GENERAL NOTES
REMOVAL AND RELOCATION WORK
DEMOLITION
DESIGN CRITERIA ABBREVIATIONS
FOUNDATION
C
ORIGINAL CONDITION AT THE CONTRACTORS OWN EXPENSE.
PLANS SHALL BE RECONSTRUCTED, REPLACED OR RESTORED TO THE
OTHERWISE DISTURBED TO ACCOMPLISH THIS WORK CALLED FOR ON THE
ANY PORTION OF THE EXISTING UTILITIES THAT MUST BE REMOVED OR5.
PART OF THE WORK ACCEPTABLE TO THE CONTRACTING OFFICER.
ITEMS, PATCH AND RESTORE SURROUNDING SURFACES AS REQUIRED AS
PERFORMED. THE CONTRACTOR SHALL ALSO INSTALL ANY OR ALL OF THE
THAT ANY EXISTING ITEM IS NOT DAMAGED WHEN FUTURE WORK IS
NECESSARY SO THAT FUTURE WORK CAN BE PERFORMED AND ALSO, SO
THE CONTRACTOR SHALL REMOVE EXISTING ITEMS AS DEEMED4.
DAMAGE TO EXISTING ITEMS AND FEATURES REMAINING IN PLACE.
ALL NECESSARY PRECAUTIONS SHALL BE TAKEN TO ENSURE AGAINST3.
WITHOUT ADDITIONAL COST TO THE GOVERNMENT.
EXTENT THAT CONSTRUCTION CAN BE PERFORMED AND COMPLETED
ETC. SHALL BE COMPLETE AND INCLUDE ALL RELATED ITEMS TO THE
THE REMOVAL OR DEMOLITION OF MATERIALS, ACCESSORIES, FIXTURES,
TO BID) TO DETERMINE THE EXTENT OF ALL REQUIRED DEMOLITION WORK.
THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS (PRIOR2.
PLUMBING AND ELECTRICAL DRAWINGS FOR DEMOLITION DRAWINGS.
REQUIRED DEMOLITION AND REMOVAL WORK. SEE ARCHITECTURAL
THE CONSTRUCTION DRAWINGS INDICATE THE GENERAL EXTENT OF1.
L
15 PSF
50 PSF
125 PSF
125 PSF
20 PSF
100 PSF
40 PSF
SPECIFICATIONS FOR RESPONSIBILITY OF BRACING DESIGN.
SUSPENDED EQUIPMENT WITH APPROVED LATERAL OR SWAY BRACING. SEE
SHALL BE APPROVED BY ICC OR EQUIVALENT TESTING PROCEDURES. PROVIDE
FASTENERS AND OTHER ELEMENTS PROVIDING STABILITY FOR COMPONENTS
SEE DESIGN CRITERIA FOR SEISMIC DESIGN CATEGORY. ISOLATORS,
SUPPORTS AND ATTACHMENTS SHALL CONFORM WITH ASCE 7, CHAPTER 13.
ARCHITECTURAL, MECHANICAL, AND ELECTRICAL COMPONENTS, 9.
OFFICER BEFORE PROCEEDING WITH THE WORK.
WRITTEN NOTIFICATION OF ANY DISCREPANCIES TO THE CONTRACTING
BE FIELD VERIFIED BY THE CONTRACTOR BEFORE WORK IS BEGUN. PROVIDE
EXISTING CONDITIONS ARE FOR GENERAL INFORMATION ONLY AND SHALL 8.
DETAILS OF THE STRUCTURAL DRAWINGS.
DIMENSIONS SHALL NOT BE SCALED FROM THE PLANS, SECTIONS AND/OR 7.
CONTRACTING OFFICER PRIOR TO PROCEEDING WITH ANY WORK INVOLVED.
CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TO THE
DRAWINGS, SPECIFICATIONS, BUILDING CODES, OR STANDARDS,
WHERE DISCREPANCIES, OMISSIONS AND/OR CONFLICTS ARISE BETWEEN6.
THE REQUIREMENTS OF ACI 318.
CONDUITS AND PIPES TO BE EMBEDDED IN CONCRETE SHALL SATISFY D.
NOTIFICATION OF THE CONTRACTING OFFICER.
STRUCTURAL DRAWINGS SHALL NOT BE PLACED WITHOUT WRITTEN
OPENINGS OR POCKETS LARGER THAN 6 INCHES NOT INDICATED IN C.
PIPE SLEEVES.
AND LOCATION OF ALL OPENINGS REQUIRED FOR DUCTS, PIPES AND
SEE MECHANICAL, PLUMBING AND ELECTRICAL, DRAWINGS FOR SIZE B.
FLOOR AND WALL OPENINGS.
SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL A.
DRAWING AND/OR SUPPLIER BEFORE CONSTRUCTION.
FOR INFORMATION ONLY AND SHALL BE VERIFIED WITH THE APPROPRIATE
OPENING SIZES AND LOCATIONS WHEN INDICATED ON DRAWINGS ARE 5.
PRIOR TO SUBMITTAL TO THE CONTRACTING OFFICER.
SPECIFICATIONS SHALL BE REVIEWED AND APPROVED BY THE CONTRACTOR
PRIOR TO FABRICATION SHOP, DRAWINGS REQUIRED BY THE 4.
PROCEEDING WITH THE WORK.
ATTENTION OF THE CONTRACTING OFFICER AND BE RESOLVED BEFORE
EXISTING STRUCTURES. ALL DISCREPANCIES SHALL BE CALLED TO
THE WORK OF ALL TRADES AND SHALL CHECK ALL DIMENSIONS INCLUDING
THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR COORDINATING 3.
OF HIS/HER OBLIGATIONS, DUTIES AND RESPONSIBILITIES.
INCLUDE INSPECTION OF THE ABOVE ITEMS NOR RELIEVE THE CONTRACTOR
TO THE SITE BY THE CONTRACTING OFFICER AND GOVERNMENT A/E SHALL NOT
ENGINEER HIRED AND PAID FOR BY THE CONTRACTOR. OBSERVATIONS VISITS
BRACING SYSTEMS SHALL BE DESIGNED BY A LICENSED STRUCTURAL
CONSTRUCTION EQUIPMENT, WIND AND SEISMIC LOADING. ALL SHORING AND
BUT NOT BE LIMITED TO BRACING. SHORING FOR LOADS DUE TO
THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE
BE RESPONSIBLE FOR AND PROVIDE ALL MEASURES NECESSARY TO PROTECT
DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL
THE STRUCTURAL DRAWINGS REPRESENT THE FINISHED STRUCTURE AND 2.
BUILDING CODE 2015 EDITION.
CONFORM TO THE DRAWING SPECIFICATIONS, AND THE INTERNATIONAL
ALL MATERIALS AND WORKMANSHIP, DESIGN AND CONSTRUCTION SHALL 1.
W.P.
W.W.M.
VERT
U.O.N.
TYP
TRANS
TOC
T.O.
THK
STL
STD
SPA
SIM
REINF
PJF
PSI
P
OPP
OC
N.T.S.
MIN
MFR
MECH'L
MAX
LONG.
LLV
LLH
KSI
I.A.W.
HORIZ
GSN
GR.
GALV
GA
FRP
FTG
EQ
EL
EJ
EA
E.W.
E.F.
(E)
DWG
DO
DIA
DCJ
CWB
CTRD
CSJ
COORD
CONT
CONN
CONC
COL.
CLR
CJ
CIP
BRG
BOT
BAL
ARCH
APPROX
ALT
A.B.
WORK POINT
WELDED WIRE MESH
VERTICAL
UNLESS OTHERWISE NOTED
TYPICAL
TRANSVERSE
TOP OF CONCRETE
TOP OF
THICK
STEEL
STANDARD
SPACES
SIMILAR
REINFORCING
PREMOLDED JOINT FILLER
POUNDS PER SQUARE INCH
PLATE
OPPOSITE
ON CENTER
NOT TO SCALE
MINIMUM
MANUFACTURER
MECHANICAL
MAXIMUM
LONGITUDINAL
LONG LEG VERTICAL
LONG LEG HORIZONTAL
KIPS PER SQUARE INCH
IN ACCORDANCE WITH
HORIZONTAL
GENERAL STRUCTURAL NOTE
GRADE
GALVANIZED
GAGE
FIBER-REINFORCED POLYMER
FOOTING
EQUAL
ELEVATION
EXPANSION JOINT
EACH
EACH WAY
EACH FACE
EXISTING
DRAWING
DITTO (REPEAT)
DIAMETER
DOWELED CONSTRUCTION JOINT
CAPILLARY WATERBARRIER
CENTERED
CONSTRUCTION JOINT
COORDINATE
CONTINUOUS
CONNECTION
CONCRETE
COLUMN
CLEARANCE
CONTROL JOINT
CAST-IN-PLACE
CENTERLINE
BEARING
BOTTOM
BALANCE
ARCHITECTURAL
APPROXIMATELY
ALTERNATE
ANCHOR BOLT
0.480.31COEFFICIENT OF FRICTION
275180PASSIVE, (PCF)
CONDITION
SEISMIC
CONDITION
STATIC
TO THE CONTRACTING OFFICER PRIOR TO ANY ACTION.
PLANNED CHANGE IN TYPE, SIZE, LOCATION OR NUMBER OF EQUIPMENT
WEIGHTS ON CONCRETE PADS, WHERE INDICATED. REPORT ANY
EQUIPMENT AS INDICATED ON MECHANICAL DRAWINGS, INCLUDING
LOADING OF MECHANICAL ROOMS ARE BASED ON WEIGHTS OF ASSUMEDC.
EQUIPMENT. PLACE VIBRATORY EQUIPMENT ON VIBRATION ISOLATORS.
STRUCTURAL COMPONENTS ARE NOT DESIGNED FOR VIBRATORY B.
IMPACT PER IBC 1607.9.
WHERE APPLICABLE, EQUIPMENT LOADS HAVE BEEN INCREASED FORA.
EQUIPMENT LOADS:6.
F. SEISMIC DESIGN CATEGORY: ---------------------------------------- C
ii. SD1: -------------------------------------------------------------------------- 0.170g
i. SDS: -------------------------------------------------------------------------- 0.435g
E. DESIGN SPECTRAL RESPONSE ACCELERATION PARAMETERS
D. SITE CLASS: --------------------------------------------------------------- C
ii. S1: -------------------------------------------------------------------------- 0.155g
i. SS: -------------------------------------------------------------------------- 0.553g
C. MAPPED SPECTRAL RESPONSE ACCELERATION PARAMETERS
B. SEISMIC IMPORTANCE FACTOR, IE: ------------------------------- 1.0
A. RISK CATEGORY: --------------------------------------------------------- II
5. SEISMIC DESIGN DATA:
G. COMPONENTS AND CLADDING WIND PRESSURE: ---------- PER ASCE 7-10
F. INTERNAL PRESSURE COEFFICIENT, GCpi: --------------------- +/- 0.18
E. BUILDING ENCLOSURE CLASSIFICATION: ----------------------- ENCLOSED
D. WIND EXPOSURE: -------------------------------------------------------- B
C. RISK CATEGORY: --------------------------------------------------------- II
B. NOMINAL DESIGN WIND SPEED, Vasd: ---------------------------- 101 MPH
A. ULTIMATE DESIGN WIND SPEED, Vult: ---------------------------- 130 MPH
WIND DATA PER ASCE 7-10:4.
PARTITIONS----------------------------------------------------------------G.
OFFICE-----------------------------------------------------------------------F.
LIGHT STORAGE---------------------------------------------------------E.
MECHANICAL EQUIPMENT ROOM, GENERAL-----------------D.
ROOF LIVE LOAD:--------------------------------------------------------C.
CORRIDORS, STAIRS AND EXITS:---------------------------------B.
----------------------------------------------------------------BARRACKS:A.
FLOOR LIVE LOAD3.
UFC 4-010-01, "DOD MINIMUM ANTI-TERRORISM STANDARDS FOR BUILDINGS"
UFC 3-310-04, "SEISMIC DESIGN FOR BUILDINGS"
UFC 3-301-01, "STRUCTURAL ENGINEERING"
UFC 1-200-01,"GENERAL BUILDING REQUIREMENTS"
FOLLOWING GOVERNMENT STANDARDS:
THE STRUCTURAL DESIGN AND CONSTRUCTION SHALL COMPLY WITH THE2.
INTERNATIONAL BUILDING CODE (IBC) 2015
THE STRUCTURAL DESIGN AND CONSTRUCTION SHALL COMPLY WITH THE1.
COMPACTED TO A MINIMUM OF 90 PERCENT RELATIVE COMPACTION.
OVER-EXCAVATION MAY BE BACKFILLED WITH THE ON-SITE SOILS
OVER-EXCAVATED TO EXPOSE THE UNDERLYING FIRM MATERIALS. THE
ENCOUNTERED AT THE BOTTOM OF FOOTING EXCAVATIONS SHALL BE
THE MAXIMUM DRY DENSITY. SOFT AND/OR LOOSE MATERIALS
THE WATER CONTENT (PERCENTAGE BY WEIGHT) CORRESPONDING TO
ESTABLISHED IN ACCORDANCE WITH ASTM D1557. OPTIMUM MOISTURE IS
PERCENTAGE OF THE MAXIMUM DRY DENSITY OF THE SAME SOIL
REFERS TO THE IN-PLACE DRY DENSITY OF SOIL EXPRESSED AS A
LEAST 90 PERCENT RELATIVE COMPACTION. RELATIVE COMPACTION
BOTTOM OF THE FOOTING EXCAVATIONS SHALL BE RECOMPACTED TO AT 5.
LATERAL TRANSLATION.
PROTECTING THE FOOTING OR FOUNDATION AGAINST SETTLEMENT OR
FROM ANY FOOTING OR FOUNDATION WITHOUT FIRST UNDERPINNING OR
EXCAVATIONS FOR ANY PURPOSE SHALL NOT REMOVE LATERAL SUPPORT 4.
SURFACE WATER, GROUND WATER OR SEEPAGE.
CONTRACTOR SHALL PROVIDE FOR DE-WATERING OF EXCAVATION FROM 3.
31 23 00.00 20 EXCAVATION AND FILL.
SHALL COMPLY WITH THE RECOMMENDATIONS OF SPECIFICATION SECTION
MATERIALS, EXCAVATION, BACKFILL, AND COMPACTION REQUIREMENTS 2.
7729-00, BY GEOLABS, INC. ON JUNE 14, 2019.
BUILDINGS 130, 131, AND 132, SCHOFIELD BARRACKS, OAHU, HAWAII, W.O.
A.GEOTECHNICAL ENGINEERING EXPLORATION. FY18 RENOVATE QUAD A
INVESTIGATION REPORT.
FOUNDATION DESIGN IS BASED ON THE FOLLOWING GEOTECHNICAL 1.
C. MODULS OF SUBGRADE REACTION:--------------- 250 PCI
B. ALLOWABLE SOIL BEARING PRESSURE:--------- 3,000 PSF
A. SITE CLASS:------------------------------------------------- C
13. GEOTECHNICAL DESIGN PARAMETERS:
CLEAN FOOTING TRENCHES PRIOR TO POURING CONCRETE.12.
BEARING CONDITIONS AND REQUIRED EMBEDMENT DEPTHS.
OF CONCRETE AND REINFORCING STEEL TO CONFIRM FOUNDATION
BY THE CONTRACTOR'S GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT
EXCAVATIONS FOR FOUNDATIONS SHALL BE MONITORED AND APPROVED 11.
FROM THE SLAB.
SLAB WITH THE ON-SITE SOILS AND GRADED TO DIVERT WATER AWAY
ADJACENT TO THE SLAB SHOULD BE BACKFILLED TIGHTLY AGAINST THE
LEAST 18 INCHES BELOW THE LOWEST ADJACENT FINISHED GRADE. AREAS
THE BOTTOM OF THICKENED EDGES OF SLABS SHALL BE EMBEDDED AT 10.
COMPACTION.
AGGREGATES COMPACTED TO A MINIMUM OF 95 PERCENT RELATIVE
THE AGGREGATE SUBBASE SHALL CONSIST OF CRUSHED BASALTIC
PROVIDE A 6-INCH LAYER OF AGGREGATE SUBBASE BELOW THE SLABS.
SLABS SUBJECTED TO VEHICULAR TRAFFIC OR MACHINERY VIBRATION, 9.
THE OPEN-GRADED GRAVEL CUSHION FILL LAYER.
67 GRADATION). PROVIDE AN IMPERVIOUS MOISTURE BARRIER ON TOP OF
FREE-DRAINING MATERIALS, SUCH AS NO. 3 FINE GRAVEL (ASTM C33, NO.
FILL BELOW THE CONCRETE SLAB. THE CUSHION FILL SHALL CONSIST OF
MACHINERY VIBRATION), PROVIDE A MINIMUM 4-INCH LAYER OF CUSHION
INTERIOR BUILDING SLABS (NOT SUBJECTED TO VEHICULAR TRAFFIC OR
COMPACTED TO AT LEAST 90 PERCENT RELATIVE COMPACTION. FOR
TO AT LEAST 2 PERCENT ABOVE THE OPTIMUM MOISTURE CONTENT AND
SCARIFIED TO A MINIMUM DEPTH OF 8 INCHES, MOISTURE-CONDITIONED
FILL MATERIAL, THE SOIL SUBGRADE BELOW THE SLABS SHALL BE
LAYER. PRIOR TO PLACEMENT OF THE NON-EXPANSIVE SELECT GRANULAR
SELECT GRANULAR FILL MATERIAL BELOW THE BUILDING SLAB CUSHION
SLAB SUBGRADES. PROVIDE A MINIMUM 12-INCH THICK NON-EXPANSIVE, 8.
FINISHED GRADE.
EMBEDDED A MINIMUM OF 18 INCHES BELOW THE LOWEST ADJACENT
UNLESS NOTED OTHERWISE, THE BOTTOM OF FOOTINGS SHALL BE 7.
TO REDUCE THE POTENTIAL FOR APPRECIABLE FOUNDATION SETTLEMENT.
BELOW GRADE STRUCTURES WITH ADDITIONAL STRUCTURAL LOADS AND
THIS REQUIREMENT IS NECESSARY TO AVOID SURCHARGING ADJACENT
EXTENDED TO A DEPTH AS DEEP AS THE INVERTS OF THE UTILITY LINES.
FROM THE BOTTOM…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.