W9128A-19-R-0014_Am-0007.pdf
PDF 3 MB Posted
- Attached to
- Quad A, Building 131 and Central Utility Plant (CUP), and Buildings 130 and 132, Schofield Barracks, Hawaii
- Solicitation number
- W9128A-19-R-0014
About this file
W9128A-19-R-0014 Am-0007
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PN94631 Repair Building 131 and Construction Central Utility Plant, Schofield Barracks, Oahu, Haw aii and PN95082/95265 Repair Buildings 130 and 132, Schofield Barracks, Oahu, Haw aii
See Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128A19R0014
X 9B. DATED (SEE ITEM 11)
29-Jul-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
Am-0007
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Aug-2019
CODE
CECT - CONTRACTING DIVISION
USACE, HONOLULU DISTRICT
BLDG 252 (CECT-POH)
FT. SHAFTER HI 96858-5440
W9128A 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128A19R0014 Am-0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications. The revision mark “(Am-0007)” is shown on each revised page.
a. REVISED SECTIONS. The following are revised pages to the solicitation. Changes are marked in “*” asterisks.
Section 00 22 16 – Page 5
b. REPLACED SECTIONS. The following sections have been deleted from the solicitation in its entirety and replaced with new sections. Changes are annotated in Bold lettering.
Package 1: FY18 Quad A Repair Bldg. 131 and Construct Central Utility Plant
Submittal Register (added submittal to Page 29 of 86) Section 08 41 13 Aluminum-Framed Entrances and Storefronts
c. NEW SECTIONS. The following are new pages to the solicitation.
Section 00 60 00, Attachment B – Requests for Information (#6 updated, 13 through 16) Section 00 60 00, Attachment C – Geotechnical Boring Site Plan and Boring Logs Section 00 60 00, Attachment D – Site Photos: Building 131, Mechanical Room, Crawl Space
2. CHANGES TO DRAWINGS.
a. REVISED DRAWINGS. The following revised drawings replace like-numbered drawings and are issued
Package 1: FY18 Quad A Repair Bldg. 131 and Construct Central Utility Plant
Sheet ID Mark Revision Date G-002 7 08/14/19 S-003 7 08/14/19
SD511 7 08/14/19
Package 2: FY18 Quad A Repair Bldg. 130 and 132
Sheet ID Mark Revision Date G-002 7 08/14/19 S-003 7 08/14/19
SD511 7 08/14/19
A-152 7 08/14/19 A-451 7 08/14/19
3. The proposal due date and time remain unchanged.
PN94631 Repair Building 131 and Central Utility Plant, Schofield Barracks, Oahu, Hawaii PN95082/95265 Repair Buildings 130 and 132, Schofield Barracks, Oahu, Hawaii
RFI # References Question Government Response 6 RFP Section 00 22 16, Please confirm that key personnel resumes will not be included as part of the page count under volume 1, Factor 3.
See Section 00 22 16, Paragraph 3.4.4, per the original solicitation.
See Revised Section 00 22 16, Paragraph 3.4.4, per Am-0007.
13 Reference BLD 131 Drawings SD401 and detail F1/SD511. Please confirm that detail
E8/SD511 also applies for detail F1/SD511 and temporary shoring is required at where F1/SD511 happens.
See Package 1 AND Package 2, Sheet SD511, Elevation F1, per Am-0007.
14 Please provide photos of existing crawl space conditions and location of access to crawl space.
See New Section 00 60 00, Attachment D, per Am-0007 for photos of crawl space at Building 131, Mechanical Room. Photos of Building 130 and 132 crawl spaces are not available.
See Package 1, Sheet AD101, Keynote E1, per the original solicitation, for crawl space location at existing Mechanical Room; and Sheet A-201, Keynote CS, per the original solicitation, for crawl space locations at existing exterior louvers.
See Package 2, Sheets AD101 and AD151, Keynote E1, per the original solicitation, for crawl space location at existing Mechanical Rooms; and Sheet A-201, Keynote CS, per the original solicitation, for crawl space locations at existing exterior louvers.
15 A-602/3 Per Buildings 130, 131, and 132, sheet A-602/3, all windows shall comply with antiterrorism standards. What is the standoff distance required for these windows?
What is the explosive weight required? What level of protection will be required?
See Package 1 AND Package 2, Sheet S-003, Section "AT DESIGN CRITERIA", Note 6.B, per the original solicitation.
See the following Package 1 Specification Sections, per the original solicitation, for additional Glazing, Window, and Door Antiterrorism requirements:
08 11 13 Steel Doors and Frames 08 11 16 Aluminum Doors and Frames 08 51 13 Aluminum Windows 08 81 00 Glazing
See Section 08 41 13 Aluminum-Framed Entrances and Storefronts, per Am-0007, for additional Glazing, Window, and Door Antiterrorism requirements.
16 Please confirm if there is a geotechnical report for this project. If there is, please provide.
See New Section 00 60 00, Attachment C, per Am-0007 for Geotechnical Boring Site Plan and Boring Logs.
Section 00 60 00, Attachment B (Am‐0007)
APPROXIMATE BORING LOCATION
LEGEND:
APPROXIMATE BULK SAMPLE LOCATION
BUILDINGS 130, 131, AND 132
SCHOFIELD BARRACKS, OAHU, HAWAII
GEOLABS, INC.
Geotechnical Engineering
7729-00
DRAWN BY
HYC
FY18 RENOVATE QUAD A
1" = 80'
OCTOBER 2018
SCALE
DATE
W.O.
SITE PLAN
PLATE
GRAPHIC SCALE
400 80 160 240 FT.
C A
D
U s e r
H
E N
R Y
F i l e
L a s t
U p d a t e d
N o v e m b e r p m
P o t
D a t e
N o v e m b e r p m
F i l e
T
D r a f t i n g W o r k i n g
F Y
R e n o v a t e
Q u a d
A
S i t e
P l a n d w g
S
P
P l o t t e r
D
W G
T o
P
D F
G
E O p c o t s t y l e
G
E O
N o D i t h e r i n g B l u e B o r i n g c t b
REFERENCE: SITE LAYOUT PLAN TRANSMITTED BY SSFM
INTERNATIONAL, INC. ON JUNE 12, 2018.
B-1
B-2(SW) & BULK-1
B-3
B-5
B-4
SEISMIC SHEAR WAVE VELOCITY TESTINGSW
j3ec9jma Text Box
NOTES:
1. SITE PLAN FOR BORING LOCATIONS ONLY.
2. GROUND WATER ELEVATIONS INDICATED ON THE BORING LOGS WERE THOSE EXISTING AT THE TIME OF THE FIELD EXPLORATIONS AND DO NOT NECESSARILY REPRESENT GROUND WATER ELEVATIONS AT THE TIME OF CONSTRUCTION. LOCAL PERCHED SUBSURFACE SEEPAGE ZONES AND GROUNDWATER TABLE SHOULD BE ANTICIPATED WITHIN THE PROJECT LIMITS DURING OR AFTER RAINY PERIODS. EXISTING UTILITY TRENCHES BACKFILLED WITH GRANULAR MATERIALS MAY ALSO CREATE PATHS FOR GROUNDWATER AND PERCHED WATER SEEPAGE WITHIN THE PROJECT LIMITS.
3. THE BORING LOGS DEPICT THE SUBSURFACE CONDITIONS ENCOUNTERED ONLY AT THE SPECIFIC CONDITIONS AND AT THE TIME OF THE FIELD EXPLORATIONS INDICATED. VARIATIONS OF SUBSURFACE CONDITIONS FROM THOSE DEPICTED ON THE LOGS MAY OCCUR AT, BETWEEN, AND BEYOND THE BORINGS.
4. ALTHOUGH NOT INDICATED ON ALL BORING LOGS, MANY COBBLES AND BOULDERS MAY EXIST IN THE SOIL MATRIX AND SHOULD BE EXPECTED.
A-0.1
UNCONSOLIDATED UNDRAINED TRIAXIAL
COMPRESSION (ksf)
MORE THAN 50%
OF COARSE
FRACTION
RETAINED ON
NO. 4 SIEVE
50% OR MORE OF
COARSE FRACTION
PASSING
THROUGH NO. 4
SIEVE
MORE THAN 50%
OF MATERIAL
RETAINED ON NO.
200 SIEVE
50% OR MORE OF
MATERIAL PASSING
THROUGH NO. 200
SIEVE
TORVANE SHEAR (tsf)
(2-INCH) O.D. STANDARD PENETRATION TEST
(3-INCH) O.D. MODIFIED CALIFORNIA SAMPLE
INORGANIC SILTS AND VERY FINE SANDS,
ROCK FLOUR, SILTY OR CLAYEY FINE SANDS
OR CLAYEY SILTS WITH SLIGHT PLASTICITY
POORLY-GRADED GRAVELS, GRAVEL-SAND
MIXTURES, LITTLE OR NO FINES
CLAYEY GRAVELS, GRAVEL-SAND-CLAY
MIXTURES
WELL-GRADED SANDS, GRAVELLY SANDS,
LITTLE OR NO FINES
POORLY-GRADED SANDS, GRAVELLY
SANDS, LITTLE OR NO FINES
SILTY SANDS, SAND-SILT MIXTURES
CLAYEY SANDS, SAND-CLAY MIXTURES
LIQUID LIMIT
50 OR MORE CH
NOTE: DUAL SYMBOLS ARE USED TO INDICATE BORDERLINE SOIL CLASSIFICATIONS
MH
SILTS
AND
CLAYS
SILTS
AND
CLAYS
LIQUID LIMIT
LESS THAN 50
USCS
TYPICAL
DESCRIPTIONS
GW
MORE THAN 12%
FINES
WATER LEVEL OBSERVED IN BORING OVERNIGHT
HIGHLY ORGANIC SOILS
SILTY GRAVELS, GRAVEL-SAND-SILT
MIXTURES
OL
PEAT, HUMUS, SWAMP SOILS WITH HIGH
ORGANIC CONTENTS
INORGANIC CLAYS OF LOW TO MEDIUM
PLASTICITY, GRAVELLY CLAYS, SANDY
CLAYS, SILTY CLAYS, LEAN CLAYS
Soil Log Legend
ORGANIC CLAYS OF MEDIUM TO HIGH
PLASTICITY, ORGANIC SILTS
SC
Plate
GM
FINE-
GRAINED
SOILS
COARSE-
GRAINED
SOILS
CLEAN SANDS
SANDS WITH
FINES
SP
SANDS
GRAVELS
WELL-GRADED GRAVELS, GRAVEL-SAND
MIXTURES, LITTLE OR NO FINES
ML
CL
OH
LESS THAN 5%
FINES
GRAVELS WITH
FINES
CLEAN
GRAVELS
GRAB SAMPLE
PLASTICITY INDEX (NP=NON-PLASTIC)
TV
LEGEND
WATER LEVEL OBSERVED IN BORING AT TIME OF
DRILLING
WATER LEVEL OBSERVED IN BORING AFTER DRILLING
SM
MAJOR DIVISIONS
GP
MORE THAN 12%
FINES
PT
LESS THAN 5%
FINES
UNIFIED SOIL CLASSIFICATION SYSTEM (USCS)
ORGANIC SILTS AND ORGANIC SILTY
CLAYS OF LOW PLASTICITY
SW
GC
INORGANIC SILT, MICACEOUS OR
DIATOMACEOUS FINE SAND OR SILTY
SOILS
INORGANIC CLAYS OF HIGH PLASTICITY
PI
LL
TXUU
UNCONFINED COMPRESSION
OR UNIAXIAL COMPRESSIVE STRENGTH
CORE SAMPLE
SHELBY TUBE SAMPLE
LIQUID LIMIT (NP=NON-PLASTIC)
UC
GEOLABS, INC.
Geotechnical Engineering
L O
G L
E G
E N
D F
O R
S O
IL
-0
.G
J
E
O L
A B
S .G
D
/4
/1
A-0.2
Medium Sand
Fine Sand
#4 to #200 (4.75-mm to 0.075-mm)
#4 to #10 (4.75-mm to 2-mm)
> 12 inches (305-mm)
3-inch to #4 (75-mm to 4.75-mm)
Sieve Number and / or Size
Gravel
#10 to #40 (2-mm to 0.425-mm)
#40 to #200 (0.425-mm to 0.075-mm)
3 to 12 inches (75-mm to 305-mm)
Description
PP Readings (tsf)
2.0 - 4.0
> 4.0
N-Value (Blows/Foot)
MCS
0 - 4
RELATIVE DENSITY / CONSISTENCY
GRAIN SIZE DEFINITION
ABBREVIATIONS
N-Value (Blows/Foot)
0 - 7
Dry: Absence of moisture, dry to the touch
Moist: Damp but no visible water
Wet: Visible free water, usually soil is below water table
WOH: Weight of Hammer
WOR: Weight of Drill Rods
SPT: Standard Penetration Test Split-Spoon Sampler
MCS: Modified California Sampler
PP: Pocket Penetrometer
4 - 7
7 - 15
15 - 27
27 - 55
SPT
0 - 2
> 55> 30
4 - 8
15 - 30
MOISTURE CONTENT DEFINITIONS
SPT
0 - 4
4 - 10
10 - 30
30 - 50
> 50
MCS
Loose
EXAMPLE: Soil Containing 60% Gravel, 25% Sand, 15% Fines. Described as: SILTY GRAVEL with some sand
Plate
GRANULAR SOIL (- #200 <50%)
2 - 4
8 - 15
Relative Density
Very Loose
Dense
Very Dense
COHESIVE SOIL (- #200 50%)
PRIMARY constituents are composed of the largest percent of the soil mass. Primary constituents are capitalized and bold (i.e., GRAVEL, SAND)
PRIMARY constituents are based on plasticity. Primary constituents are capitalized and bold (i.e., CLAY, SILT)
SECONDARY constituents are composed of a percentage less than the primary constituent. If the soil mass consists of 12 percent or more fines content, a cohesive constituent is used (SILTY or CLAYEY);
otherwise, a granular constituent is used (GRAVELLY or SANDY) provided that the secondary constituent consists of 20 percent or more of the soil mass.
Secondary constituents are capitalized and bold (i.e., SANDY GRAVEL, CLAYEY SAND) and precede the primary constituent.
SECONDARY constituents are composed of a percentage less than the primary constituent, but more than 20 percent of the soil mass. Secondary constituents are capitalized and bold (i.e., SANDY CLAY, SILTY CLAY, CLAYEY SILT) and precede the primary constituent.
Sand
Boulders
Cobbles
Coarse Gravel 3-inch to 3/4-inch (75-mm to 19-mm)
Fine Gravel 3/4-inch to #4 (19-mm to 4.75-mm)
GEOLABS, INC. CLASSIFICATION*
Granular Soils Cohesive Soils
Consistency accessory descriptions compose of the following:
with some: >12% with a little: 5 - 12% with traces of: <5% accessory descriptions are lower cased and follow the Primary and Secondary Constituents (i.e., SILTY CLAY with some sand)
Very Soft
Soft
Medium Stiff
Stiff
Very Stiff
Hard
< 0.5
0.5 - 1.0
1.0 - 2.0
7 - 18
18 - 55
55 - 91
> 91
Medium Dense
Coarse Sand
(with deviations from ASTM D2488)
Soil Classification Log Key
*Soil descriptions are based on ASTM D2488-09a, Visual-Manual Procedure, with the above modifications by Geolabs, Inc. to the Unified Soil Classification System (USCS).
accessory descriptions compose of the following:
with some: >12% with a little: 5 - 12% with traces of: <5% accessory descriptions are lower cased and follow the Primary and Secondary Constituents (i.e., SILTY GRAVEL with a little sand)
S O
IL
C L
A S
S
L O
G
K
Y
-0
.G
O L
A B
S .G
/4
/1
GEOLABS, INC.
Geotechnical Engineering
A-0.3
ROCK DESCRIPTIONS
Plate
BRECCIA
CLINKER
COBBLES
CORAL
BASALT
ROCK DESCRIPTION SYSTEM
Greater than 24 inches apart
12 to 24 inches apart
6 to 12 inches apart
3 to 6 inches apart
Less than 3 inches apart
Rock shows no sign of discoloration or loss of strength.
Slight discoloration inwards from open fractures.
Discoloration throughout and noticeably weakened though not able to break by hand.
Most minerals decomposed with some corestones present in residual soil mass. Can be broken by hand.
Saprolite. Mineral residue completely decomposed to soil but fabric and structure preserved.
The following terms describe general fracture spacing of a rock:
The following terms describe the chemical weathering of a rock:
ROCK FRACTURE CHARACTERISTICS
DEGREE OF WEATHERING
HARDNESS
BOULDERS
VOID/CAVITY
TUFF
SILTSTONE
LIMESTONE
Unweathered:
Slightly Weathered:
Moderately Weathered:
Highly Weathered:
Extremely Weathered:
Very Hard:
Hard:
Medium Hard:
Soft:
Very Soft:
SANDSTONE
Massive:
Slightly Fractured:
Moderately Fractured:
Closely Fractured:
Severely Fractured:
Rock Log Legend
The following terms describe the resistance of a rock to indentation or scratching:
Specimen breaks with difficulty after several "pinging" hammer blows.
Example: Dense, fine grain volcanic rock
Specimen breaks with some difficulty after several hammer blows.
Example: Vesicular, vugular, coarse-grained rock
Specimen can be broked by one hammer blow. Cannot be scraped by knife. SPT may penetrate by ~25 blows per inch with bounce.
Example: Porous rock such as clinker, cinder, and coral reef
Can be indented by one hammer blow. Can be scraped or peeled by knife. SPT can penetrate by ~100 blows per foot.
Example: Weathered rock, chalk-like coral reef
Crumbles under hammer blow. Can be peeled and carved by knife. Can be indented by finger pressure.
Example: Saprolite
CONGLOMERATE
GEOLABS, INC.
Geotechnical Engineering
L O
G L
E G
E N
D F
O R
R O
C K
-0
.G
O L
A B
S .G
/4
/1
MH
CH
MH
MH
LL=61
PI=33
LL=64
PI=29
LL=73
PI=31
4.5
4.0
4.5
Brown with gray mottling CLAYEY SILT with a little gravel (basaltic), moist (fill)
Dark reddish brown SILTY CLAY, very stiff, moist (residual soil)
Brown with multi-color mottling CLAYEY SILT, hard, moist (residual soil) grades to yellowish brown, very stiff
Light yellowish brown with orange mottling CLAYEY SILT with traces of highly weathered gravel (basaltic), very stiff, moist (saprolite) grades to hard
O th e r
T e s ts
Plate
P o c k e t P e n
(t s f)
Date Started:
Date Completed:
Logged By:
Total Depth:
Work Order:
D ry
D e n s it y
(p c f)
CME-75DR
4" Solid Stem Auger
140 lb. wt., 30 in. drop
C o re R e c o v e ry
Laboratory
U S
C S
D e p th fe e t)
G ra p h ic
Drill Rig:
Drilling Method:
Driving Energy:
M o is tu re C o n te n t
R Q
D
Description
Water Level:
A - 1.1
Log of Boring
P e n e tr a ti o n R e s is ta n c e
(b lo w s /f o o t)
S a m p le
Field
August 6, 2018
August 7, 2018
S. Latronic
31.5 feet
7729-00
(Energy Transfer Ratio = 74.1%)
Latitude: 21.4861° N Longitude: 158.04459° W
Approximate Ground Surface Elevation(feet ): 867 *
B O
R
IN
G
L O
G
W
L A
T A
N D
L O
N G
-0
.G
O L
A B
S .G
/1
/1
Not Encountered
GEOLABS, INC.
Geotechnical Engineering
FY18 RENOVATE QUAD A
BUILDINGS 130, 131, AND 132
SCHOFIELD BARRACKS, OAHU, HAWAII
Boring terminated at 31.5 feet
* Elevations estimated from ©2018 GOOGLE™EARTH PRO. Imagery dated January 29, 2013.
O th e r
T e s ts
Plate
P o c k e t P e n
(t s f)
Date Started:
Date Completed:
Logged By:
Total Depth:
Work Order:
D ry
D e n s it y
(p c f)
CME-75DR
4" Solid Stem Auger
140 lb. wt., 30 in. drop
C o re R e c o v e ry
(Continued from previous plate)
Laboratory
U S
C S
D e p th fe e t)
G ra p h ic
Drill Rig:
Drilling Method:
Driving Energy:
M o is tu re C o n te n t
R Q
D
Description
Water Level:
A - 1.2
Log of Boring
P e n e tr a ti o n R e s is ta n c e
(b lo w s /f o o t)
S a m p le
Field
August 6, 2018
August 7, 2018
S. Latronic
31.5 feet
7729-00
(Energy Transfer Ratio = 74.1%)
B O
R
IN
G
L O
G
W
L A
T A
N D
L O
N G
-0
.G
O L
A B
S .G
/1
/1
Not Encountered
GEOLABS, INC.
Geotechnical Engineering
FY18 RENOVATE QUAD A
MH
CH
MH
MH
Direct Shear
4.5
1.5
4.0
46/6" +50/5" Ref.
Reddish brown with traces of gray mottling CLAYEY SILT with traces of gravel (basaltic), moist (fill)
Dark reddish brown SILTY CLAY, very stiff, moist (residual soil)
Brown with multi-color mottling CLAYEY SILT, hard, moist (residual soil)
Light orangish brown with gray mottling CLAYEY SILT, very stiff, moist (saprolite) grades to stiff
O th e r
T e s ts
Plate
P o c k e t P e n
(t s f)
Date Started:
Date Completed:
Logged By:
Total Depth:
Work Order:
D ry
D e n s it y
(p c f)
CME-75DR
4" Solid Stem Auger
140 lb. wt., 30 in. drop
C o re R e c o v e ry
Laboratory
U S
C S
D e p th fe e t)
G ra p h ic
Drill Rig:
Drilling Method:
Driving Energy:
M o is tu re C o n te n t
R Q
D
Description
Water Level:
A - 2.1
Log of Boring
P e n e tr a ti o n R e s is ta n c e
(b lo w s /f o o t)
S a m p le
Field
August 7, 2018
August 9, 2018
S. Latronic
101.5 feet
7729-00
(Energy Transfer Ratio = 74.1%)
Latitude: 21.48596° N Longitude: 158.04445° W
Approximate Ground Surface Elevation(feet ): 868 *
B O
R
IN
G
L O
G
W
L A
T A
N D
L O
N G
-0
.G
O L
A B
S .G
/1
/1
Not Encountered
GEOLABS, INC.
Geotechnical Engineering
FY18 RENOVATE QUAD A
MH
LL=83
PI=38
4.0
3.0
4.0
3.0 grades with purplish mottling and vesicular structure locally grades with highly weathered basalt corestones locally, hard grades to very stiff grades to stiff
O th e r
T e s ts
Plate
P o c k e t P e n
(t s f)
Date Started:
Date Completed:
Logged By:
Total Depth:
Work Order:
D ry
D e n s it y
(p c f)
CME-75DR
4" Solid Stem Auger
140 lb. wt., 30 in. drop
C o re R e c o v e ry
(Continued from previous plate)
Laboratory
U S
C S
D e p th fe e t)
G ra p h ic
Drill Rig:
Drilling Method:
Driving Energy:
M o is tu re C o n te n t
R Q
D
Description
Water Level:
A - 2.2
Log of Boring
P e n e tr a ti o n R e s is ta n c e
(b lo w s /f o o t)
S a m p le
Field
August 7, 2018
August 9, 2018
S. Latronic
101.5 feet
7729-00
(Energy Transfer Ratio = 74.1%)
B O
R
IN
G
L O
G
W
L A
T A
N D
L O
N G
-0
.G
O L
A B
S .G
/1
/1
Not Encountered
GEOLABS, INC.
Geotechnical Engineering
FY18 RENOVATE QUAD A
MH
LL=85
PI=37
3.0
2.5
3.5 grades to very stiff grades with highly weathered gravel (basaltic), hard
Brownish gray vesicular BASALT, moderately to highly weathered, soft to medium hard
Boring terminated at 101.5 feet
O th e r
T e s ts
Plate
P o c k e t P e n
(t s f)
Date Started:
Date Completed:
Logged By:
Total Depth:
Work Order:
D ry
D e n s it y
(p c f)
CME-75DR
4" Solid Stem Auger
140 lb. wt., 30 in. drop
C o re R e c o v e ry
(Continued from previous plate)
Laboratory
U S
C S
D e p th fe e t)
G ra p h ic
Drill Rig:
Drilling Method:
Driving Energy:
M o is tu re C o n te n t
R Q
D
Description
Water Level:
A - 2.3
Log of Boring
P e n e tr a ti o n R e s is ta n c e
(b lo w s /f o o t)
S a m p le
Field
August 7, 2018
August 9, 2018
S. Latronic
101.5 feet
7729-00
(Energy Transfer Ratio = 74.1%)
B O
R
IN
G
L O
G
W
L A
T A
N D
L O
N G
-0
.G
O L
A B
S .G
/1
/1
Not Encountered
GEOLABS, INC.
Geotechnical Engineering
FY18 RENOVATE QUAD A
SP
MH
CH
MH
MH
Consol.
Consol.
4.5
4.5
3.5
3-inch ASPHALTIC CONCRETE
Gray GRAVELLY SAND (BASALTIC), moist (fill)
Reddish brown with gray mottling CLAYEY SILT with a little gravel (basaltic), very stiff, moist (fill)
Dark reddish brown SILTY CLAY, very stiff, moist (residual soil)
Brown with multi-color mottling CLAYEY SILT, very stiff, moist (residual soil) grades to orangish brown, hard
Light orangish brown with multi-color mottling CLAYEY SILT, stiff, moist (saprolite) grades to very stiff grades to hard
Boring terminated at 31.5 feet
O th e r
T e s ts
Plate
P o c k e t P e n
(t s f)
Date Started:
Date Completed:
Logged By:
Total Depth:
Work Order:
D ry
D e n s it y
(p c f)
CME-75DR
4" Solid Stem Auger
140 lb. wt., 30 in. drop
C o re R e c o v e ry
Laboratory
U S
C S
D e p th fe e t)
G ra p h ic
Drill Rig:
Drilling Method:
Driving Energy:
M o is tu re C o n te n t
R Q
D
Description
Water Level:
A - 3
Log of Boring
P e n e tr a ti o n R e s is ta n c e
(b lo w s /f o o t)
S a m p le
Field
August 6, 2018
August 6, 2018
S. Latronic
31.5 feet
7729-00
(Energy Transfer Ratio = 74.1%)
Latitude: 21.48569° N Longitude: 158.04449° W
Approximate Ground Surface Elevation(feet ): 864 *
B O
R
IN
G
L O
G
W
L A
T A
N D
L O
N G
-0
.G
O L
A B
S .G
/1
/1
Not Encountered
GEOLABS, INC.
Geotechnical Engineering
FY18 RENOVATE QUAD A
MH
CH
MH
MH
Swell
TXUU
Su=4.8 ksf
4.0
4.5
4.5
4.0
Reddish brown CLAYEY SILT with traces of gravel (basaltic), moist (fill)
Dark reddish brown SILTY CLAY, very stiff, moist (residual soil) grades to hard
Brown with some multi-color mottling CLAYEY SILT, hard, moist (residual soil) grades to orangish brown, very stiff
Light yellowish brown with multi-color mottling CLAYEY SILT, very stiff, moist (saprolite) grades with gray mottling
Boring terminated at 31.5 feet
O th e r
T e s ts
Plate
P o c k e t P e n
(t s f)
Date Started:
Date Completed:
Logged By:
Total Depth:
Work Order:
D ry
D e n s it y
(p c f)
CME-75DR
4" Solid Stem Auger
140 lb. wt., 30 in. drop
C o re R e c o v e ry
Laboratory
U S
C S
D e p th fe e t)
G ra p h ic
Drill Rig:
Drilling Method:
Driving Energy:
M o is tu re C o n te n t
R Q
D
Description
Water Level:
A - 4
Log of Boring
P e n e tr a ti o n R e s is ta n c e
(b lo w s /f o o t)
S a m p le
Field
August 6, 2018
August 6, 2018
S. Latronic
31.5 feet
7729-00
(Energy Transfer Ratio = 74.1%)
Latitude: 21.48536° N Longitude: 158.04387° W
Approximate Ground Surface Elevation(feet ): 863 *
B O
R
IN
G
L O
G
W
L A
T A
N D
L O
N G
-0
.G
O L
A B
S .G
/1
/1
Not Encountered
GEOLABS, INC.
Geotechnical Engineering
FY18 RENOVATE QUAD A
SP
MH
CH
Swell
4.536
3-inch ASPHALTIC CONCRETE
Gray GRAVELLY SAND (BASALTIC), moist (fill)
Dark reddish brown with gray mottling CLAYEY SILT with traces of gravel (basaltic), very stiff, moist (fill)
Dark reddish brown SILTY CLAY, hard, moist (residual soil)
Boring terminated at 5 feet
O th e r
T e s ts
Plate
P o c k e t P e n
(t s f)
Date Started:
Date Completed:
Logged By:
Total Depth:
Work Order:
D ry
D e n s it y
(p c f)
CME-75DR
4" Solid Stem Auger
140 lb. wt., 30 in. drop
C o re R e c o v e ry
Laboratory
U S
C S
D e p th fe e t)
G ra p h ic
Drill Rig:
Drilling Method:
Driving Energy:
M o is tu re C o n te n t
R Q
D
Description
Water Level:
A - 5
Log of Boring
P e n e tr a ti o n R e s is ta n c e
(b lo w s /f o o t)
S a m p le
Field
August 6, 2018
August 6, 2018
S. Latronic
5 feet
7729-00
(Energy Transfer Ratio = 74.1%)
Latitude: 21.48554° N Longitude: 158.04452° W
Approximate Ground Surface Elevation(feet ): 864 *
B O
R
IN
G
L O
G
W
L A
T A
N D
L O
N G
-0
.G
O L
A B
S .G
/1
/1
Not Encountered
GEOLABS, INC.
Geotechnical Engineering
FY18 RENOVATE QUAD A
W9128A-19-R-0014
Section 00 60 00, Attachment D – Page 1 (Am-0007)
Site Photos: Building 131, Mechanical Room, Crawl Space
Section 00 60 00, Attachment D – Page 2
Section 00 60 00, Attachment D – Page 3
Section 00 22 16 – Page 5 (Am-0007)
Offerors shall submit all price proposal documentation in Adobe PDF format on:
One (1) CD ROM; and Five (5) hard copies each for each proposal (1 original and 4 copies)
The Price Proposal and Technical Proposal shall be submitted on “separate” single CDs in sealed envelopes, clearly marked “SOLICITATION NO. W9128A-19-R-0014, PN94631 Repair Building 131 and Construct Central Utility Plant, Schofield Barracks, Hawaii and PN95082/95265 Repair Buildings 130 and 132, Schofield Barracks, Oahu, Hawaii.”
Each disc shall be externally labeled with the solicitation number, volume number, date, and the Offeror’s name. If the hard-copy proposal differs from the electronic version, the hard copy will govern. If the electronic files are of a size at which it must be compressed (zipped), it shall be compressed into one file using WinZip version 6.2 or later.
3.4.3 Format and Contents of the Technical Proposal and List of Tabs. The technical proposal will be appropriately organized using the tabs specified in the chart below. The proposals shall contain a detailed table of contents. A cover sheet identifying the Offeror (name, address, and point of contact), contract description, and solicitation number shall be provided. The second sheet shall be a Table of Contents.
Offers that violate these rules unnecessarily delay the evaluation process and may be rejected by the Government after the initial evaluation without receiving any further consideration. The Government will not evaluate any information beyond the page limitation noted in paragraph 3.4.4.
TAB CONTENTS OF THE TECHNICAL PROPOSAL – Volume 1
A The Proposal Cover Sheet
B Experience
C Past Performance
D Organization and Management Plan
E Small Business Participation Plan
3.4.4 Page Limitations. The following page limitations are established for each Factor:
Factor 1 – Experience – 2 single sided pages per contract (not to exceed 10 pages total).
Factor 2 – Past Performance – No page limitation.
Factor 3 – Organization and Management Plan – A total of seven (7) single-sided pages. Of the seven (7) pages, one (1) single-sided no larger than 11”x17” shall be for the Organizational Chart in accordance with paragraph 7.1.b. Key Personnel Resumes will not count towards the page limitation. However, each resume shall not exceed two (2) single-sided pages.
Factor 4 – Small Business Participation Plan – No page limitation.
Factor 5 – Price – No page limitation.
For submissions with page limitations, the pages will be counted as follows: One side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages. Where authorized, fold-out pages (11” x 14” or 11” x 17”) will count as one page. Pages furnished for
| 19-R-0014 - 00 60 00, Att C - Boring Site Plan and Boring Logs.pdf |
| Geotechnical Report Site Plan |
| Geo Report Legend |
| Geo Report Logs |
File details come from the government source that posted it.