W9128A-19-R-0014_Specifications_-_Package_2_(Part_1_of_3).pdf
PDF 10 MB Posted
- Attached to
- Quad A, Building 131 and Central Utility Plant (CUP), and Buildings 130 and 132, Schofield Barracks, Hawaii
- Solicitation number
- W9128A-19-R-0014
About this file
W9128A-19-R-0014 Specifications - Package 2 (Part 1 of 3)
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers
SPECIFICATIONS
TITLE OF PROJECT:
FY18 QUAD A REPAIR BLDG. 130 AND 132
LOCATION:
SCHOFIELD BARRACKS
OAHU, HAWAII
DATE:
JUNE 2019
SUBMITTAL TYPE:
RTA
REGIONAL ENGINEERING CENTER
HONOLULU DISTRICT
FY18 QUAD A REPAIR BUILDINGS 130 AND 132 QUADA2
PROJECT TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
02 09 20 EXPOSURE ASSESSMENT FOR WORKERS EXPOSED TO
LEAD-CONTAINING PAINT
02 09 30 EXPOSURE ASSESSMENT FOR WORKERS EXPOSED TO RODENT DROPPING
02 41 00 DEMOLITION
02 85 00 MOLD REMEDIATION
DIVISION 03 - CONCRETE
03 01 00 REHABILITATION OF CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 21 16 MINERAL FIBER BLANKET INSULATION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
PROJECT TABLE OF CONTENTS Page 1
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL PROTECTION
10 28 13 TOILET ACCESSORIES
10 51 13 METAL LOCKERS
10 99 00 MISCELLANEOUS SPECIALTIES
DIVISION 11 - EQUIPMENT
11 31 13 ELECTRIC KITCHEN EQUIPMENT
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00 SEISMIC BRACING FOR MISCELLANEOUS EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 48.19 SEISMIC BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
DIVISION 25 - INTEGRATED AUTOMATION
PROJECT TABLE OF CONTENTS Page 2
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED FIRE CONTROL SYSTEMS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 23 00.00 20 EXCAVATION AND FILL
31 31 16.13 CHEMICAL TERMITE CONTROL
31 31 16.19 TERMITE CONTROL BARRIERS
31 32 11 SOIL SURFACE EROSION CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 92 19 SEEDING
32 93 00 EXTERIOR PLANTS
32 96 00 TRANSPLANTING EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 61 14 EXTERIOR BURIED PREINSULATED WATER PIPING
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 67 PAGES
FY18 QUAD A REPAIR BUILDINGS 130 AND 132
02 09 20 SD-03 Product Data 1.9.1Respirators
SD-06 Test Reports
1.2.10 GExposure Assessment
SD-07 Certificates
1.6 GQualifications of IH
3.1.7 GQualifications of IH
1.8 GTesting Laboratory
1.7 GLead-Containing Paint Work Plan
1.3.1Medical Examinations 1.3.4Employee Training Certificates 3.1.7Monitoring Results
02 09 30 SD-03 Product Data 1.8.1Respirators
SD-07 Certificates 3.2.2Visual Inspection
1.6 GQualifications of IH
1.7 GClean-up Work Plan
1.3.1Medical Examinations 1.3.4Employee Training Certificates
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 67 PAGES
02 41 00 1.6.1Notification of Demolition and Renovation Form
SD-11 Closeout Submittals 3.3.3Receipts
02 85 00 SD-01 Preconstruction Submittals
1.2.25 GVentilation System Mold
Remediator Qualifications
1.4.1.1 GPreliminary Visual Assessment
Report
1.4.1.2 GMicrobial Remediation Plan
1.4.1.3 GRespiratory Protection Program
1.4.1.4Worker Records
1.4.1.5 GCertified Industrial Hygienist
(CIH)/Industrial Hygienist (IH) Qualifications
1.4.1.6 GMicrobial Remediation
Supervisor Qualifications
SD-03 Product Data
1.2.10 GDisinfectants or Biocide
Sanitizing Solutions
1.2.13 GFungicidal Agents, (EPA)
1.2.20 GPersonal Protective Equipment
(PPE)
1.2.23Pressure Differential Measuring
Instrument
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 67 PAGES
02 85 00 2.2 GSafety Data Sheets (SDS) for All Materials
3.1.4Dehumidifiers 3.1.5Air Filtration Units
SD-07 Certificates
3.4.4 GGovernment's Mold Abatement
Certification SD-06 Test Reports
1.4.3 GIH Daily Reports
SD-11 Closeout Submittals
1.4.4 GSubmittals at Completion of
Remediation Work
03 01 00 SD-01 Preconstruction Submittals
1.5.3 GQualifications
1.5.4 GWork Plan
1.7.1 GWork Plan
1.5.2 GQuality Control Plan
1.6 GSystem Manufacturer
SD-03 Product Data 2.5Polymers
SD-04 Samples 2.4Reinforcement And
Reinforcement Supports 2.5Polymers
SD-05 Design Data
3.1.2 GFormwork And Shoring
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 67 PAGES
03 01 00 1.5.1 GRepair Procedures
2.6 GMixture Proportioning
SD-06 Test Reports 2.6Mixture Proportioning 3.1.4Quality Control 3.2.3Quality Control 3.3.3Quality Control 3.5Quality Control 2.5Polymers 3.6Laboratory Testing 3.7Field Testing 3.7.2.1Hardness Tests
SD-07 Certificates 1.5.3Qualifications 2.4Reinforcement And
Reinforcement Supports 2.5Polymers
1.5.3.3 GField Representative
1.5.5 GApplicators
1.5.6Regulatory Requirements
SD-08 Manufacturer’s Instructions 2.2Equipment For Concrete
Preparation 2.5Polymers
SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 67 PAGES
03 01 00 3.8.6 GRecord Retention 03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan 1.6.4Quality Control Plan 1.6.5Quality Control Personnel
Certifications 1.6.5Quality Control Organizational
Chart 1.6.7Laboratory Accreditation
SD-02 Shop Drawings 1.6.2.1Reinforcing Steel
SD-03 Product Data 2.4.8Joint Sealants 2.4.7Joint Filler 2.4.1Cementitious Materials 2.4.6Vapor Retarder 2.3.3Concrete Curing Materials 2.5Reinforcement 2.6.1Liquid Chemical Floor Hardener 2.4.5Admixtures 1.6.3.2Pumping Concrete
SD-05 Design Data 2.3.1Mix Design
SD-06 Test Reports 1.6.1.1Concrete Mix Design 2.4.3Aggregates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 67 PAGES
03 30 00 3.12.2.3Compressive Strength Tests 3.12.2.1Slump Tests 2.4.2Water
SD-07 Certificates 2.5.1Reinforcing Bars 1.8Welder Qualifications 1.6.3.3Safety Data Sheets 1.6.5.2Field Testing Technician and
Testing Agency SD-08 Manufacturer’s Instructions
2.6.1Liquid Chemical Floor Hardener 2.3.3Curing Compound
03 42 13.00 10 SD-01 Preconstruction Submittals 1.3.2.2Quality Control Procedures
SD-02 Shop Drawings
2.1.1 GStandard Precast Units
2.1.2 GCustom-Made Precast Units
SD-03 Product Data 2.1.1Standard Precast Units 2.1.3Proprietary Precast Units 3.1.3Embedded Items 2.2.6Accessories
SD-05 Design Data 2.1.2Design Calculations 2.1.5.1Concrete Mix Proportions
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 67 PAGES
03 42 13.00 10 1.3.2.4Test Reports SD-07 Certificates
1.3.2.2Quality Control Procedures SD-11 Closeout Submittals
2.2.1 SRecycled content for fly ash and
pozzolan
2.2.1 SRecycled content for Ground Iron
Blast-Furnace Slag
2.2.1 SRecycled content for Silica Fume
2.2.1 SRecycled content for Synthetic
Fiber Reinforcement
2.2.1 SRecycled content for steel
04 20 00 SD-02 Shop Drawings 3.4.1.1Detail Drawings
SD-03 Product Data 2.4.1.1Cementitious Materials 3.2.5Bracing Calculations
SD-06 Test Reports 3.6.1.1Prism Tests
SD-07 Certificates 1.3.1Special Masonry Inspector
Qualifications 2.2.2.2Concrete Masonry Units (CMU) 2.2.3Precast Concrete Units 2.4.1.1Cementitious Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 67 PAGES
04 20 00 2.6.1Anchors, Ties, and Bar Positioners
2.6.2Joint Reinforcement 05 12 00 SD-01 Preconstruction Submittals
1.3.1.1Erection Drawings SD-02 Shop Drawings
1.3.2Fabrication Drawings SD-03 Product Data
2.6.2Shop Primer 2.4.1Welding Electrodes and Rods 2.4.2Non-Shrink Grout
SD-06 Test Reports 2.3Bolts, Nuts, and Washers
SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers 2.5Galvanizing 1.3.3.1Welding Procedures and
Qualifications 2.4.1Welding Electrodes and Rods
05 52 00 SD-02 Shop Drawings 2.2.1Aluminum Railings And Handrails
SD-03 Product Data 2.2.1Aluminum Railings and Handrails 3.2Anchorage and Fastening
Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 67 PAGES
05 52 00 SD-07 Certificates 1.3.1Welding Procedures 1.3.2Welder Qualification
SD-08 Manufacturer’s Instructions 3.2Installation Instructions
06 10 00 SD-02 Shop Drawings 2.1.1Nailing Strips
SD-06 Test Reports 1.4.3Preservative-treated
SD-07 Certificates 1.8.1Certificates of Grade 1.7Preservative Treatment
06 20 00 SD-02 Shop Drawings 1.3Detail Drawings Indicating All
Wood Assemblies SD-03 Product Data
2.1Wood Products 1.4Treated Wood Products 2.5Hardware and Accessories
SD-04 Samples 1.5Complete wood cabinet door system 1.5Wood Millwork
06 61 16 SD-02 Shop Drawings 1.5.2Detail Drawings 3.1Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 67 PAGES
06 61 16 SD-03 Product Data 2.1Solid Polymer Material 1.5.1Qualifications 2.3Fabrications 2.2.4Indoor air quality for solid surface seam and sealant products SD-04 Samples
2.1Material 2.3.5Counter and Vanity Tops
SD-06 Test Reports 2.1Solid Polymer Material
SD-07 Certificates 2.3Fabrications 1.5.1Qualifications 2.1Indoor Air Quality for solid surface fabrication products SD-10 Operation and Maintenance Data
3.2Clean-up 07 05 23 SD-01 Preconstruction Submittals
1.4Work Plan SD-03 Product Data
2.2Thermal Imaging Camera SD-05 Design Data
3.2Envelope Surface Area Calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 67 PAGES
07 05 23 SD-07 Certificates 1.6.2.1Pressure Test Agency 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments 1.6.3Date Of Last Calibration
SD-06 Test Reports 3.5Pressure Test Procedures 3.5.7Air Leakage Test Report 3.6.5Diagnostic Test Report
07 21 16 SD-03 Product Data 2.1Blanket Insulation 2.1.3Recycled Content for Insulation
Materials SD-08 Manufacturer’s Instructions
3.3.1Insulation 07 24 00 SD-02 Shop Drawings
3.3Shop Drawings SD-03 Product Data
2.2Sheathing Board 2.6Thermal Insulation 2.3Adhesive 2.5Mechanical Fasteners 2.12Accessories 2.7Base Coat 2.8Portland Cement 2.9Reinforcing Fabric
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 67 PAGES
07 24 00 2.10Finish Coat 2.13Joint Sealant 2.11Sealant Primer 2.14Bond Breaker 2.15Backer Rod 1.4.5Insulation Board 1.7Warranty
SD-04 Samples 1.2.3.7Sample Boards
1.2.1.4 GMock-up Installation of EIFS
SD-05 Design Data 1.2.1.2Wind Load 1.2.4Moisture Analysis
SD-06 Test Reports 1.2.3.1Abrasion Resistance 1.2.3.2Accelerated Weathering 1.2.2.3Impact Resistance 1.2.3.3Mildew Resistance 1.2.3.4Salt Spray Resistance 1.2.4Vapor Transmission 1.2.3.6Absorption-Freeze-Thaw 1.2.1.3Wall Fire Test 1.2.1.1Water Penetration 1.2.3.5Water Resistance 1.2.1.3Full Scale or Intermediate Scale
Fire Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 67 PAGES
07 24 00 1.2.2.1Surface Burning Characteristics 1.2.2.2Radiant Heat 3.1Substrate 1.2.1.2Wind Load
SD-07 Certificates 1.4.1Qualifications of EIFS
Manufacturer 1.4.2Qualification of EIFS Installer 1.4.3Qualification of Sealant
Applicator 1.4.4Qualifications of Third Party
Inspector
3.5.1 GInspection Check List
SD-08 Manufacturer’s Instructions 3.3Installation
SD-10 Operation and Maintenance Data
1.7EIFS
07 27 10.00 10 SD-06 Test Reports
1.8Design Review Report 3.1.2Testing and Inspection
SD-07 Certificates 1.7Air Barrier Inspector
07 27 26 SD-01 Preconstruction Submittals 1.9.1Qualifications of Manufacturer 1.9.2Qualifications of Installer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 67 PAGES
07 27 26 SD-02 Shop Drawings
1.4 GFluid-Applied Membrane Air
Barrier SD-03 Product Data
1.4Fluid-Applied Membrane Air Barrier
2.2Primers, Adhesives, and Mastics 2.5Reinforcement 1.4.2Safety Data Sheets
SD-04 Samples 1.4.3Mockup
SD-06 Test Reports 1.6Capillary Moisture Test 1.4.4Field Peel Adhesion Test 1.4.4Flame Propagation of Wall
Assemblies 1.4.4Flame Spread and Smoke
Developed Index Ratings 3.4.1Site Inspections
SD-07 Certificates 1.4Fluid-Applied Membrane Air
Barrier 1.9.1Qualifications of Manufacturer 1.9.2Qualifications of Installer
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 67 PAGES
07 27 26 1.4Fluid-Applied Membrane Air Barrier
2.2Primers, Adhesives, and Mastics 07 60 00 SD-02 Shop Drawings
3.1.11Gutters 3.1.12Downspouts 2.1.1Fasciae 3.1.10Drip Edges 3.1.13Eave Flashing
SD-04 Samples 1.4.2Finish Samples
SD-08 Manufacturer’s Instructions 3.4Quality Control Plan
07 84 00 SD-02 Shop Drawings 2.1Firestopping System
SD-03 Product Data 2.2Firestopping Materials
SD-06 Test Reports 3.3Inspection
SD-07 Certificates 2.2Firestopping Materials 1.5.1Installer Qualifications
07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond Breakers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 67 PAGES
07 92 00 2.4Backstops 3.1Field Adhesion
08 11 13 SD-02 Shop Drawings 2.1Doors 2.1Doors 2.5Frames 2.5Frames 2.3Accessories 2.7Weatherstripping
SD-03 Product Data 2.1Doors 2.5Frames 2.3Accessories
SD-05 Design Data
1.4.1 GStructural Calculations For
Deflection 08 11 16 SD-02 Shop Drawings
1.5.1Door and Frame Assembly SD-03 Product Data
1.5.1Door and Frame Assembly SD-04 Samples
1.5.2Finish Samples SD-05 Design Data
1.5.3Design Analysis
1.2.1 GCalculations
1.2.3Air Infiltration
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 67 PAGES
08 11 16 1.2.4Water Penetration 1.2.2Wind Borne Debris 1.2.5NFRC Project Label Certificates for Fenestration SD-08 Manufacturer’s Instructions
1.5.1Door and Frame Assembly 1.5.4Adjustments, Cleaning, and
Maintenance 1.2.5NFRC Project Label Certificates for Fenestration 08 14 00 SD-02 Shop Drawings
2.1Doors SD-03 Product Data
2.1Doors 2.2Accessories 2.3.7Water-resistant Sealer 1.5Warranty 2.1.2Sound Transmission Class
Rating 2.1.3Fire Resistance Rating
SD-04 Samples 2.1Doors 2.3.6.2Door Finish Colors
SD-06 Test Reports 2.4Cycle-Slam 2.4Hinge Loading Resistance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 67 PAGES
08 14 00 SD-07 Certificates 1.3.1Certificates of Grade
SD-11 Closeout Submittals 1.5Warranty
08 31 00 SD-02 Shop Drawings 1.3Access Doors And Panels
SD-03 Product Data 1.3Access Doors And Panels 1.3.2Hardware
SD-06 Test Reports 1.3.1Fire-rating(s) of Assemblies
08 34 73 SD-02 Shop Drawings 2.1Wood Sound Retardant Doors 2.1Door Frames
SD-03 Product Data 2.1Wood Sound Retardant Doors 2.1Door Frames 2.1Door Hardware 2.1Thresholds
SD-06 Test Reports 2.4.3Acoustical Tests
SD-07 Certificates 2.1Wood Sound Retardant Doors 2.1Door Frames 2.1Door Hardware 2.1Thresholds
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 67 PAGES
08 41 13 SD-02 Shop Drawings 3.3Installation Drawings 2.2Fabrication Drawings
SD-03 Product Data 1.2.1Manufacturer's Catalog Data 2.2.3Finish
SD-04 Samples 1.2.1Finish and Color Samples
SD-06 Test Reports 1.2.1Certified Test Reports 3.4.3Deflection 3.4.1Air Infiltration 3.4.4Condensation Resistance and
Thermal Transmittance 3.4.5Water Infiltration
SD-08 Manufacturer’s Instructions 3.3Manufacturer's Instructions
SD-11 Closeout Submittals 3.6Manufacturer's Product Warranty
08 51 13 SD-02 Shop Drawings 2.1Windows 1.9Fabrication Drawings
SD-03 Product Data 2.1Windows 2.2.8.1Hardware 2.2.3Fasteners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 67 PAGES
08 51 13 1.10Window Performance 2.3Thermal-Barrier Windows 2.4Mullions 2.2.10Screens 2.2.2Weatherstripping 2.2.8Accessories 1.10.6Thermal Performance
SD-04 Samples 1.4.2.1Finish Sample 1.4.2.2Window Sample
SD-05 Design Data 2.1Structural Calculations for
Deflection 1.4.3Design Analysis
SD-06 Test Reports 1.4.4Resistance to Forced Entry 1.10.3Windborne-Debris-Impact
Performance SD-10 Operation and Maintenance Data
2.1Windows 08 71 00 SD-02 Shop Drawings
1.3Manufacturer's Detail Drawings 1.3Verification of Existing Conditions 1.5Hardware Schedule 2.3.6Keying System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 67 PAGES
08 71 00 SD-03 Product Data 2.3Hardware Items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-10 Operation and Maintenance Data
1.5Hardware Schedule SD-11 Closeout Submittals
1.6.1Key Bitting 08 81 00 SD-03 Product Data
1.6.1Insulating Glass 1.3Glazing Accessories
SD-04 Samples 1.6.1Insulating Glass 2.3.3Tape 2.3.1.1Sealant
SD-07 Certificates 1.6.1Insulating Glass 1.3Glazing Accessories
SD-08 Manufacturer’s Instructions 2.3Setting and Sealing Materials 3.2Glass Setting
08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 67 PAGES
08 91 00 2.2Metal Wall Louvers SD-04 Samples
1.4Wall louvers 1.5Wall louvers 1.5Door louvers 2.3Door louvers
09 22 00 SD-02 Shop Drawings 2.1Metal Support Systems
SD-03 Product Data 2.1Metal Support Systems
09 29 00 SD-03 Product Data 2.1.3Glass Mat Water-Resistant
Gypsum Tile Backing Board 2.1.2Water-Resistant Gypsum Board 2.1.4Glass Mat Covered or Reinforced
Gypsum Sheathing 2.1.4.1Glass Mat Covered or Reinforced
Gypsum Sheathing Sealant 2.1.5Impact Resistant Gypsum Board 2.1.8Accessories 2.1.1Gypsum Board
SD-07 Certificates 2.1Asbestos Free Materials
09 30 10 SD-03 Product Data 2.1.1Porcelain Tile 2.2Setting-Bed
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 67 PAGES
09 30 10 2.4Mortar and Grout SD-04 Samples
2.1Tile 2.1Accessories 2.1Transition Strips 2.5Transition Strips 2.4.2Grout
SD-10 Operation and Maintenance Data
3.2Installation 09 51 00 SD-02 Shop Drawings
2.1Detail Drawings SD-04 Samples
2.2Acoustical Units SD-07 Certificates
2.7Indoor Air Quality for Sealants 09 62 38 SD-03 Product Data
2.1Static-Control Resilient Flooring 2.3Accessories 2.2Adhesives 1.8Warranty
SD-04 Samples 2.1Static-Control Resilient Flooring 2.3Accessories
SD-06 Test Reports 3.2Moisture, Alkalinity and Bond
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 67 PAGES
09 62 38 3.6Testing SD-07 Certificates
1.5Qualifications of Applicator SD-08 Manufacturer’s Instructions
2.1Static-Control Resilient Flooring 2.3Accessories
SD-10 Operation and Maintenance Data
2.1Static-Control Resilient Flooring 2.3Accessories
09 65 00 SD-03 Product Data 2.11Resilient Flooring and
Accessories 2.8Adhesives
SD-04 Samples 2.11Resilient Flooring and
Accessories SD-06 Test Reports
3.3Moisture, Alkalinity and Bond Tests
SD-08 Manufacturer’s Instructions 3.2Surface Preparation 3.1Installation
SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 67 PAGES
09 65 00 2.11Resilient Flooring and Accessories
09 68 00 SD-02 Shop Drawings 3.4Installation Drawings 2.5Moldings
SD-03 Product Data 2.2Carpet 2.5Moldings
SD-04 Samples 2.2Carpet 2.5Moldings
SD-06 Test Reports 3.2Moisture and Alkalinity Tests
SD-08 Manufacturer’s Instructions 3.1Surface Preparation 3.4Installation
SD-10 Operation and Maintenance Data
2.2Carpet 3.5Cleaning and Protection
SD-11 Closeout Submittals 1.5Warranty
09 90 00 SD-03 Product Data 2.1Coating
SD-04 Samples 1.9Color
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 67 PAGES
09 90 00 SD-07 Certificates 1.3Applicator's Qualifications 1.4.1.2Qualification Testing 2.1Indoor Air Quality for Paints and
Primers SD-08 Manufacturer’s Instructions
3.2.1Application Instructions 3.6.2Mixing 1.7.2Manufacturer's Safety Data
Sheets SD-10 Operation and Maintenance Data
2.1Coatings 10 11 00 SD-03 Product Data
1.2Visual Display Board 2.3Projection Screen
SD-04 Samples 2.1.2Aluminum 2.1.1Porcelain Enamel 2.1Materials
10 14 00.10 SD-02 Shop Drawings 3.1Approved Detail Drawings
SD-03 Product Data 2.1Modular Exterior Signage System 3.1Installation 1.2Exterior Signage
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 67 PAGES
10 14 00.10 1.2.1Wind Load Requirements SD-04 Samples
1.2Exterior Signage SD-10 Operation and Maintenance Data
3.1.2Protection and Cleaning 10 14 00.20 SD-02 Shop Drawings
1.3.2Detail Drawings SD-03 Product Data
3.1Installation 1.5Warranty
SD-04 Samples 1.3.1Interior Signage
SD-10 Operation and Maintenance Data
3.1Approved Manufacturer's Instructions
3.1.2Protection and Cleaning 10 21 13 SD-02 Shop Drawings
2.1Fabrication Drawings 3.3Installation Drawings
SD-03 Product Data 2.1Cleaning and Maintenance
Instructions 2.7Colors And Finishes
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 67 PAGES
10 21 13 2.2.1Anchoring Devices and Fasteners
2.2.3Hardware and Fittings 2.2.2Brackets 2.2.4Door Hardware 2.3.1Toilet Enclosures 2.3.2Urinal Screens 2.5Pilaster Shoes 2.2.3.2Finishes
SD-04 Samples 2.7Colors and Finishes 2.2.3Hardware and Fittings 2.2.1Anchoring Devices and
Fasteners SD-07 Certificates
1.5Warranty 10 26 00 SD-02 Shop Drawings
2.2Corner Guards SD-03 Product Data
2.2Corner Guards SD-04 Samples
2.4Finish SD-06 Test Reports
2.2Corner Guards SD-07 Certificates
2.2Corner Guards
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 67 PAGES
10 28 13 SD-03 Product Data 2.1.2Finishes 2.2Accessory Items
SD-04 Samples 2.1.2Finishes 2.2Accessory Items
SD-07 Certificates 2.2Accessory Items
10 51 13 SD-02 Shop Drawings 1.4Location 3.1Installation 3.2Numbering system
SD-03 Product Data 2.2Material 2.3.1Locking Devices 2.3.1Lock Control Chart 2.3.3Handles 2.2.3Finish 2.3components 3.1Assembly
SD-04 Samples 1.5.1Color chips
10 99 00 SD-01 Preconstruction Submittals 1.2.1Installer Qualifications
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 67 PAGES
10 99 00 1.2.2USPS-Private Commercial Mailboxes
1.2.2Cell Phone Lockers SD-03 Product Data
1.2.2USPS-Private Commercial Mailboxes
1.2.3Cell Phone Locker 2.3Stainless Steel Folding Table 2.4Garment Rack
SD-10 Operation and Maintenance Data
1.2.3Postal Specialties and Finishes 1.2.3Cell Phone Locker
11 31 13 SD-03 Product Data 2.1Kitchen Equipment
SD-08 Manufacturer’s Instructions 2.1Kitchen Equipment
SD-10 Operation and Maintenance Data
2.1 GKitchen Equipment
SD-11 Closeout Submittals
3.3Manufacturer's Warranty 3.4Contractor's Warranty for
Installation 12 21 00 SD-02 Shop Drawings
3.3Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 67 PAGES
12 21 00 SD-03 Product Data 2.1Window Blinds 3.3Installation
SD-04 Samples 2.1Window Blinds
SD-08 Manufacturer’s Instructions 2.1Window Blinds
SD-10 Operation and Maintenance Data
2.1Window Blinds 13 48 00 SD-02 Shop Drawings
3.1Bracing 3.3Resilient Vibration Isolation
Devices 2.1Equipment Requirements
SD-03 Product Data 3.1Bracing 2.1Equipment Requirements 3.2Anchor Bolts 2.1.2Vibration Isolators 3.3.2Snubbers
SD-05 Design Data 1.2.3Design Calculations
SD-06 Test Reports 3.2Anchor Bolts
21 13 13.00 10 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 67 PAGES
21 13 13.00 10 1.4.3 GShop Drawings 3.9As-Built Drawings
SD-03 Product Data 1.4.1Fire Protection Related
Submittals
2.3 GMaterials and Equipment
1.6Spare Parts
3.8 GPreliminary Tests
3.9 GFinal Acceptance Test
3.10 GOnsite Training
1.4.1 GFire Protection Specialist
1.4.2 GSprinkler System Installer
SD-05 Design Data
1.4.3 GSway Bracing
1.2.1.3 GHydraulic Calculations
SD-06 Test Reports
3.8 GPreliminary Test Report
3.9 GFinal Acceptance Test Report
SD-07 Certificates
3.3 GInspection by Fire Protection
Specialist SD-10 Operation and Maintenance Data
3.10 GOperating and Maintenance
Manuals
22 00 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 67 PAGES
22 00 00 3.9.1 GPlumbing System SD-03 Product Data
2.5Fixtures 2.5.2Flush Valve Water Closets 2.5.3Flush Valve Urinals 2.5.5Wall Hung Lavatories 2.5.6Countertop Lavatories 2.5.7Kitchen Sinks 2.5.9Service Sinks
2.5.10 GDrinking-Water Coolers
2.5.13Cast Iron Bathtubs 2.5.11Laundry Trays 2.5.12Washer Box 2.5.14Ice Maker Box
2.9 GWater Heaters
2.11 GPumps
3.9.1.1 GBackflow Prevention Assemblies
2.7.2 GShower Faucets
2.12Domestic Water Service Meter 1.5.1Welding
3.4 GVibration-Absorbing Features
3.9.1Plumbing System
SD-06 Test Reports 3.9Tests, Flushing and Disinfection
3.9.1.1 GTest of Backflow Prevention
Assemblies
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 67 PAGES
22 00 00 SD-07 Certificates 1.3Materials and Equipment 2.2.1Bolts
SD-10 Operation and Maintenance Data
3.9.1 GPlumbing System
SD-11 Closeout Submittals
2.1.1 SWater-Efficient Products
2.1.2 SEnergy-Efficient Water Heaters
23 00 00 SD-02 Shop Drawings
1.4.5 GDetail Drawings
SD-03 Product Data 2.10.1.1Metallic Flexible Duct 2.10.1.2Insulated Nonmetallic Flexible
Duct Runouts 2.10.1.2Duct Connectors
2.10.2 GDuct Access Doors
2.10.3Fire Dampers
2.10.4 GManual Balancing Dampers
2.10.7Sound Attenuation Equipment 2.10.8.1Diffusers 2.10.8.2Registers and Grilles 2.10.9Louvers 2.10.10Air Vents, Wall Caps, and
Goosenecks 2.11.1.1In-Line Centrifugal Fans
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 67 PAGES
23 00 00 2.11.1.2Ceiling Exhaust Fans
2.12 GAir Handling Units
2.13.1 GRoom Fan-Coil Units
2.13.2.1 GVariable Volume, Single Duct
Terminal Units
2.14 GEnergy Recovery Devices
1.4.6Test Procedures
1.2.1.2 GDiagrams
SD-06 Test Reports
3.13 GPerformance Tests
3.11 GDamper Acceptance Test
SD-07 Certificates 1.4.1Bolts 1.4.7Certification 1.4.3Ozone Depleting Substances
SD-08 Manufacturer’s Instructions 3.3Manufacturer's Installation
Instructions 3.15.2Operation and Maintenance
Training SD-10 Operation and Maintenance Data
3.15.1 GOperation and Maintenance
Manuals
2.10.3 GFire Dampers
2.10.4 GManual Balancing Dampers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 67 PAGES
23 00 00 2.11.1.1 GIn-Line Centrifugal Fans
2.11.1.2 GCeiling Exhaust Fans
2.12 GAir Handling Units
2.13.1 GRoom Fan-Coil Units
2.13.2.1 GVariable Volume, Single Duct
Terminal Units
2.14 GEnergy Recovery Devices
SD-11 Closeout Submittals
2.1.1 SEnergy Efficient Equipment
2.1.2 SReduce Volatile Organic
Compounds (VOC)
3.1 SIndoor Air Quality During
Construction
2.1.3 SOzone Depleting Substances for
Refrigerants 23 03 00.00 20 SD-11 Closeout Submittals
2.1.1 SEnergy Efficient Equipment for
Motors
2.1.2 SReduce Volatile Organic
Compounds (VOC)
23 05 48.00 40 SD-02 Shop Drawings
1.2 GInstallation Drawings
1.2 GOutline Drawings
SD-03 Product Data
1.2 GEquipment and Performance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 67 PAGES
23 05 48.00 40 2.2.3 GIsolators SD-06 Test Reports
2.4 GType of Isolator
2.4 GType of Base
2.4 GAllowable Deflection
2.4 GMeasured Deflection
23 05 48.19 SD-02 Shop Drawings 3.1Coupling and Bracing 3.3Flexible Couplings or Joints 2.2Equipment Restraint
2.2.2 GVibration Isolators
SD-03 Product Data
3.1 GCoupling and Bracing
3.3 GFlexible Couplings Or Joints
2.2 GEquipment Restraint
2.2.2 GVibration Isolators
23 05 93 SD-01 Preconstruction Submittals
1.3.3 GRecords of Existing Conditions
1.5.4.1 GTAB Firm
1.2 GTAB Team Assistants
1.2 GTAB Team Engineer
1.5.4.2 GTAB Specialist
1.2 GTAB Team Field Leader
SD-02 Shop Drawings
1.3.3 GTAB Schematic Drawings and
Report Forms
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 67 PAGES
23 05 93 SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.4.4 GTAB Related HVAC Submittals
1.5.2 GTAB Procedures
1.5.2 GCalibration
1.3.3 GSystems Readiness Check
1.5.5 GTAB Execution
1.5.5.3 GTAB Verification
SD-06 Test Reports 1.5.6.2TAB Report
3.3.5 GCompleted Pre-Final Dalt Report
3.3.8 GCertified Final Dalt Report
1.6.2.1 GTab Design Review Report
SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.5.1 GIndependent TAB Agency and
Personnel Qualifications 1.5.4.1TAB Firm 1.6.2Dalt and TAB Submittal and Work
Schedule 1.3.3Design Review Report 1.6.2Advanced Notice for TAB Field
Work
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 67 PAGES
23 05 93 1.6.2Prerequisite HVAC Work Check Out List
1.6.2.3 GTab Pre-Field Engineering Report
1.6.2.2 GPre-Field Dalt Preliminary
Notification 23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.4Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems
SD-03 Product Data
2.4 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
SD-04 Samples
2.3.1.3 GThermal Insulation
3.1.1 GDisplay Samples
SD-08 Manufacturer’s Instructions
2.4 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 67 PAGES
23 07 00 2.1.1 SReduce Volatile Organic Compounds (VOC)
23 09 00 SD-02 Shop Drawings
3.3 GDDC Contractor Design Drawings
3.3 GDraft As-Built Drawings
3.3 GFinal As-Built Drawings
SD-03 Product Data
1.8.4 GCertificate of Networthiness
Documentation
1.8.2 GProgramming Software
1.8.3 GController Application Programs
1.8.1 GConfiguration Software
2.2 GManufacturer's Product Data
SD-05 Design Data 1.9Boiler Or Chiller Plant Gateway
Request SD-06 Test Reports
3.1.1Existing Conditions Report
3.5.2 GStart-Up Testing Report
3.6.1 GPVT Procedures
3.6.3 GPVT Report
1.10.1 GPre-Construction Quality Control
(QC) Checklist
1.10.2 GPost-Construction Quality Control
(QC) Checklist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 67 PAGES
23 09…