W9128A-19-R-0014_Am-0007_Specifications_-_Package_1.pdf
PDF 1 MB Posted
- Attached to
- Quad A, Building 131 and Central Utility Plant (CUP), and Buildings 130 and 132, Schofield Barracks, Hawaii
- Solicitation number
- W9128A-19-R-0014
About this file
W9128A-19-R-0014 Am-0007 Specifications - Package 1
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL REGISTER
Legend: ● - Applies to both BASE BID and OPTION BID B - Applies to BASE BID Only O - Applies to OPTION BID Only
Section No. Section Name Bldg 131 &
CUP (BASE)
Bldg 130 &
132 (OPTION)
01 32 00 PROJECT SCHEDULE ● ●
01 33 00 SUBMITTAL PROCEDURES ● ●
01 33 29 SUSTAINABILITY REPORTING ● ●
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS ● ●
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS ● ●
01 45 00 RMS3 - CONTRACTOR MODE (RMS3/CM) ● ●
01 45 04 CONTRACTOR QUALITY CONTROL ● ●
01 45 35 SPECIAL INSPECTIONS ● ●
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS W/
ATTACHMENT ● ●
01 62 35 RECYCLED / RECOVERED MATERIALS ● ●
01 74 19 CONSTRUCTION AND DEMOLITION DEBRIS
RECYCLING ● ●
01 78 00 CLOSEOUT SUBMITTALS ● ●
01 78 23 OPERATION AND MAINTENANCE DATA ● ●
01 90 00 MISCELLANEOUS PROVISIONS ● ●
01 91 00.15 TOTAL BUILDING COMMISSIONING ● ●
02 09 20 EXPOSURE ASSESSMENT FOR WORKERS EXPOSED
TO LEAD-CONTAINING PAINT W/ ATTACHMENT ● ●
02 09 30 EXPOSED ASSESSMENT FOR WORKERS EXPOSED
TO RODENT DROPPING ● ●
02 41 00 DEMOLITION ● ●
02 85 00 MOLD REMEDIATION W/ ATTACHMENT ● ●
03 01 00 REHABILITATION OF CONCRETE ● ●
03 30 00 CAST-IN-PLACE CONCRETE ● ●
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR
BELOW GRADE CONSTRUCTION ● ●
04 20 00 UNIT MASONRY ● ●
05 12 00 STRUCTURAL STEEL ● ●
Note: All specification sections indicated with "●" in the table below have the same submittals for both BASE BID and OPTION BID. If the OPTION BID is awarded, the contractor may submit and process the submittals as a single transmittal in RMS3/CM. The specification sections indicated with "B" and "O" have submittals and/or other information specific to the BASE BID and OPTION BID, respectively. In the case where the OPTION BID is not awarded, the BASE BID submittals are to be submitted and processed normally in RMS3/CM. The contractor shall be responsible for coordinating and updating the submittal register throughout the project in
RMS3/CM.
DIVISION 03 - CONCRETE
DIVISION 04 - MASONRY
DIVISION 01 - GENERAL REQUIREMENTS
DIVISION 02 - EXISTING CONDITIONS
DIVISION 05 - METALS
Pages 1 of 5 (Am-0007)
Section No. Section Name Bldg 131 &
CUP (BASE)
Bldg 130 &
132 (OPTION)
05 30 00 STEEL DECKS B
05 40 00 COLD-FORMED METAL FRAMING B
05 50 13 MISCELLANEOUS METAL FABRICATIONS ● ●
05 52 00 METAL RAILINGS ● ●
06 10 00 ROUGH CARPENTRY ● ●
06 20 00 FINISH CARPENTRY ● ●
06 61 16 SOLID SURFACING FABRICATIONS ● ●
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM
FOR AIR TIGHTNESS ● ●
07 21 16 MINERAL FIBER BLANKET INSULATION ● ●
07 22 00 ROOF AND DECK INSULATION B
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS ● ●
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM ● ●
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS ● ●
07 60 00 FLASHING AND SHEET METAL ● ●
07 61 14.00 20 STEEL STANDING SEAM ROOFING B
07 84 00 FIRESTOPPING ● ●
07 92 00 JOINT SEALANTS ● ●
08 11 13 STEEL DOORS AND FRAMES ● ●
08 11 16 ALUMINUM DOORS AND FRAMES ● ●
08 14 00 WOOD DOORS ● ●
08 31 00 ACCESS DOORS AND PANELS ● ●
08 33 23 OVERHEAD COILING DOORS B
08 34 59 VAULT DOORS AND DAY GATES B
08 34 73 SOUND CONTROL DOOR ASSEMBLIES ● ●
08 41 13 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS ● ●
08 51 13 ALUMINUM WINDOWS ● ●
08 71 00 DOOR HARDWARE W/ ATTACHMENT B
08 71 00 DOOR HARDWARE W/ ATTACHMENT O
08 81 00 GLAZING ● ●
08 91 00 METAL WALL AND DOOR LOUVERS ● ●
09 22 00 SUPPORTS FOR GYPSUM BOARD ● ●
09 29 00 GYPSUM BOARD ● ●
09 30 10 CERAMIC TILING B
09 30 10 CERAMIC TILING O
09 51 00 ACOUSTICAL CEILINGS ● ●
09 62 38 STATIC-CONTROL FLOORING ● ●
09 65 00 RESILIENT FLOORING ● ●
09 68 00 CARPETING O
09 90 00 PAINTS AND COATINGS ● ●
10 11 00 VISUAL DISPLAY UNITS ● ●
10 14 00.10 EXTERIOR SIGNAGE ● ●
10 14 00.20 INTERIOR SIGNAGE ● ●
DIVISION 10 - SPECIALTIES
DIVISION 09 - FINISHES
DIVISION 08 - OPENINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
Pages 2 of 5
Bldg 131 &
CUP (BASE)
Bldg 130 &
132 (OPTION)
10 21 13 TOILET COMPARTMENTS B
10 21 13 TOILET COMPARTMENTS O
10 26 00 WALL PROTECTION ● ●
10 28 13 TOILET ACCESSORIES B
10 28 13 TOILET ACCESSORIES O
10 51 13 METAL LOCKERS ● ●
10 99 00 MISCELLANEOUS SPECIALTIES B
10 99 00 MISCELLANEOUS SPECIALTIES O
11 31 13 ELECTRIC KITCHEN EQUIPMENT ● ●
12 21 00 WINDOW BLINDS ● ●
13 48 00 SEISMIC BRACING FOR MISCELLANEOUS
EQUIPMENT ● ●
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE
PROTECTION ● ●
22 00 00 PLUMBING, GENERAL PURPOSE B
22 00 00 PLUMBING, GENERAL PURPOSE O
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION,
AND EXHAUST SYSTEMS B
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION,
AND EXHAUST SYSTEMS O
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS ● ●
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC
PIPING AND EQUIPMENT ● ●
23 05 48.19 SEISMIC BRACING FOR HVAC ● ●
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR
HVAC ● ●
23 07 00 THERMAL INSULATION FOR MECHANICAL
SYSTEMS ● ●
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC B
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC O
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR
HVAC ● ●
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS B
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS O
23 11 25 FACILITY GAS PIPING ● ●
23 21 23 HYDRONIC PUMPS B
23 23 00 REFRIGERANT PIPING B
23 25 00 CHEMICAL TREATMENT OF WATER FOR
MECHANICAL SYSTEMS B
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS ● ●
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE B
DIVISION 11 - EQUIPMENT
DIVISION 22 - PLUMBING
DIVISON 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
DIVISION 12 - FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
DIVISION 21 - FIRE SUPPRESSION
Pages 3 of 5
Bldg 131 &
CUP (BASE)
Bldg 130 &
132 (OPTION)
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS B
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS O
23 65 00 COOLING TOWERS AND REMOTE EVAPORATIVELY-
COOLED CONDENSERS B
25 05 11 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS B
25 05 11 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS O
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED FIRE
CONTROL SYSTEMS ● ●
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION B
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS ● ●
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT ● ●
26 08 00 APPARATUS INSPECTION AND TESTING ● ●
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS B
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS O
26 13 01 PAD-MOUNTED DEAD-FRONT AIR INSULATED
SWITCHGEAR B
26 20 00 INTERIOR DISTRIBUTION SYSTEM W/
ATTACHMENT B
26 20 00 INTERIOR DISTRIBUTION SYSTEM O
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION B
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER
600 VOLTS B
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER
600 VOLTS O
26 51 00 INTERIOR LIGHTING B
26 51 00 INTERIOR LIGHTING O
26 56 00 EXTERIOR LIGHTING B
26 56 00 EXTERIOR LIGHTING O
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION
SYSTEM ● ●
27 10 00 BUILDING TELECOMMUNICATIONS CABLING B
27 10 00 BUILDING TELECOMMUNICATIONS CABLING O
28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM,
ADDRESSABLE B
28 31 76 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM ● ●
31 23 00.00 20 EXCAVATION AND FILL ● ●
31 31 16.13 CHEMICAL TERMITE CONTROL ● ●
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
DIVISION 31 - EARTHWORK
DIVISION 25 - INTEGRATED AUTOMATION
DIVISION 26 - ELECTRICAL
DIVISION 27 - COMMUNICATIONS
Pages 4 of 5
Bldg 131 &
CUP (BASE)
Bldg 130 &
132 (OPTION)
31 31 16.19 TERMITE CONTROL BARRIERS ● ●
31 32 11 SOIL SURFACE EROSION CONTROL ● ●
32 05 33 LANDSCAPE ESTABLISHMENT ● ●
32 11 23 AGGREGATE BASE COURSES ● ●
32 12 13 BITUMINOUS TACK AND PRIME COATS ● ●
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS ● ●
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS ● ●
32 17 23 PAVEMENT MARKINGS ● ●
32 31 13 CHAIN LINK FENCES AND GATES B
32 92 19 SEEDING ● ●
32 93 00 EXTERIOR PLANTS ● ●
32 96 00 TRANSPLANTING EXTERIOR PLANTS ● ●
33 11 00 WATER UTILITY DISTRIBUTION PIPING ● ●
33 30 00 SANITARY SEWERAGE W/ ATTACHMENT ● ●
33 61 14 EXTERIOR BURIED PREINSULATED WATER ● ●
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION B
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION O
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP) ● ●
DIVISION 32 - EXTERIOR IMPROVEMENTS
DIVISION 33 - UTILITIES
Pages 5 of 5
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 86 PAGES
FY18 QUAD A REPAIR BLDG 131 & CONSTRUCT CENTRAL UTILITY PLANT
01 32 00 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
SD-06 Test Reports 3.5.2Narrative Report 3.5.3Schedule Reports 3.6.2Periodic Schedule Updates
01 33 00 SD-01 Preconstruction Submittals
3.1 GSubmittal Register
3.5.1Monthly Updates
01 33 29 SD-01 Preconstruction Submittals
1.5.3.1 GPreliminary High Performance
and Sustainable Building Checklist
1.4.1 GSustainability Action Plan
1.5.3.1 GPreliminary Sustainability
eNotebook SD-11 Closeout Submittals
1.5.3.1 GFinal High Performance and
Sustainable Building Checklist
1.5.3.1 GFinal Sustainability eNotebook
1.5.3.1 GAmended Final Sustainability
eNotebook
1.5.3.1 GAmended Final High
Performance and Sustainable Building Checklist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 86 PAGES
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates 1.6.1.5Crane Operators
1.7.2.2 GStandard Lift Plan
1.7.2.3 GCritical Lift Plan
1.8 GActivity Hazard Analysis (AHA)
1.12.4Certificate of Compliance
01 45 04 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control Plan
01 45 35 SD-06 Test Reports 3.1.2Daily Reports 3.1.1Biweekly Reports
SD-07 Certificates 2.1Fabrication Plant 2.1Certified Plant 2.1Certificate of Compliance 1.5Special Inspector
SD-11 Closeout Submittals 3.1.2Interim Final Report
3.1.2 GComprehensive Final Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 86 PAGES
01 57 19 SD-01 Preconstruction Submittals 1.6.1Preconstruction Survey
1.7 GEnvironmental Protection Plan
3.2.1.2Inspection Reports
SD-11 Closeout Submittals 3.2.1.3Stormwater Pollution Prevention
Plan Compliance Notebook 3.2.1.4Stormwater Notice of Termination
01 74 19 SD-01 Preconstruction Submittals 1.4Material dismantling sequence plan 1.4Schedule of removal 1.4Estimated quantity of recyclable materials SD-09 Manufacturer’s Field Reports
1.1Solid Waste Disposal and Diversion
01 78 00 SD-03 Product Data 1.5.1Warranty Management Plan 1.5.5Warranty Tags 1.2.5.1Spare Parts Data
SD-08 Manufacturer’s Instructions 1.3Preventative Maintenance 1.3Condition Monitoring (Predictive
Testing)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 86 PAGES
01 78 00 1.3Inspection 1.5.1Instructions
SD-10 Operation and Maintenance Data
1.7.1Operation and Maintenance Manuals
SD-11 Closeout Submittals 1.2.1Record Drawings 1.4Certification of EPA Designated
Items 01 78 23 SD-10 Operation and Maintenance
Data 1.3O&M Database 3.1.1Training Plan 3.1.3Training Outline 3.1.2Training Content
SD-11 Closeout Submittals 3.1.4Training Video Recording 3.1.6Validation of Training Completion
01 90 00 SD-01 Preconstruction Submittals 1.12.4.1Electrical Outage Permit 1.12.4.2Water Outage Permit 1.12.2.1Request for Temporary Water
Service 1.12.4.4Excavation and Traffic Control
Permit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 86 PAGES
01 90 00 1.12.4.3 GRoad Closure
1.13 GAlteration of the Original
Contractor's Operations or Storage Area
1.13Contractor's Operations or Storage Area
SD-06 Test Reports 1.7Inspection 1.8Dust Control
SD-07 Certificates 1.5Products Containing Recovered
Materials 01 91 00.15 SD-01 Preconstruction Submittals
1.7 G DOCommissioning Firm
1.7.1 G DOLead Commissioning Specialist
1.7.2 G DOTechnical Commissioning
Specialists
1.7 G DOCommissioning Firm's Contract
SD-06 Test Reports
3.1.3 G DODesign Review Report
3.1.2.1 G DOInterim Construction Phase
Commissioning Plan
3.1.2.1 G DOInterim Construction Phase
Commissioning Plan
3.1.2.2 G DOFinal Construction Phase
Commissioning Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 86 PAGES
01 91 00.15 3.1.2.1.2 G DOTemplate Building Envelope Inspection Checklists
3.1.5.2 G DOBuilding Envelope Inspection
Checklists
3.1.5.3 G DOPre-Functional Checklists
1.9Issues Log
3.2 G DOCommissioning Report
SD-07 Certificates
1.10 G DOCertificate of Readiness
SD-10 Operation and Maintenance Data
3.1.6 G ROTraining Plan
3.1.6 G ROTraining Attendance Rosters
3.1.7 G DOSystems Manual
3.1.8 G DOMaintenance and Service Life
Plans SD-11 Closeout Submittals
3.2 S DOFinal Commissioning Report
02 09 20 SD-03 Product Data
1.9.1Respirators SD-06 Test Reports
1.2.10 GExposure Assessment
SD-07 Certificates
1.6 GQualifications of IH
3.1.7 GQualifications of IH
1.8 GTesting Laboratory
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 86 PAGES
02 09 20 1.7 GLead-Containing Paint Work Plan 1.3.1Medical Examinations 1.3.4Employee Training Certificates 3.1.7Monitoring Results
02 09 30 SD-03 Product Data 1.8.1Respirators
SD-07 Certificates 3.2.2Visual Inspection
1.6 GQualifications of IH
1.7 GClean-up Work Plan
1.3.1Medical Examinations 1.3.4Employee Training Certificates
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
1.6.1Notification of Demolition and
Renovation Form SD-11 Closeout Submittals
3.3.3Receipts 02 85 00 SD-01 Preconstruction Submittals
1.2.25 GVentilation System Mold
Remediator Qualifications
1.4.1.1 GPreliminary Visual Assessment
Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 86 PAGES
02 85 00 1.4.1.2 GMicrobial Remediation Plan
1.4.1.3 GRespiratory Protection Program
1.4.1.4Worker Records
1.4.1.5 GCertified Industrial Hygienist
(CIH)/Industrial Hygienist (IH) Qualifications
1.4.1.6 GMicrobial Remediation
Supervisor Qualifications
SD-03 Product Data
1.2.10 GDisinfectants or Biocide
Sanitizing Solutions
1.2.13 GFungicidal Agents, (EPA)
1.2.20 GPersonal Protective Equipment
(PPE)
1.2.23Pressure Differential Measuring
Instrument
2.2 GSafety Data Sheets (SDS) for All
Materials 3.1.4Dehumidifiers 3.1.5Air Filtration Units
SD-06 Test Reports
1.4.3 GIH Daily Reports
SD-07 Certificates
3.4.4 GGovernment's Mold Abatement
Certification SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 86 PAGES
02 85 00 1.4.4 GSubmittals at Completion of Remediation Work
03 01 00 SD-01 Preconstruction Submittals
1.5.3 GQualifications
1.5.4 GWork Plan
1.7.1 GWork Plan
1.5.2 GQuality Control Plan
1.6 GSystem Manufacturer
SD-03 Product Data 2.5Polymers
SD-04 Samples 2.4Reinforcement And
Reinforcement Supports 2.5Polymers
SD-05 Design Data
3.1.2 GFormwork And Shoring
1.5.1 GRepair Procedures
2.6 GMixture Proportioning
SD-06 Test Reports 2.6Mixture Proportioning 3.1.4Quality Control 3.2.3Quality Control 3.3.3Quality Control 3.5Quality Control 2.5Polymers 3.6Laboratory Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 86 PAGES
03 01 00 3.7Field Testing 3.7.2.1Hardness Tests
SD-07 Certificates 1.5.3Qualifications 2.4Reinforcement And
Reinforcement Supports 2.5Polymers
1.5.3.3 GField Representative
1.5.5 GApplicators
1.5.6Regulatory Requirements
SD-08 Manufacturer’s Instructions 2.2Equipment For Concrete
Preparation 2.5Polymers
SD-10 Operation and Maintenance Data
3.8.6 GRecord Retention
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan 1.6.4Quality Control Plan 1.6.5Quality Control Personnel
Certifications 1.6.5Quality Control Organizational
Chart 1.6.7Laboratory Accreditation
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 86 PAGES
03 30 00 1.6.2.1Reinforcing Steel SD-03 Product Data
2.4.8Joint Sealants 2.4.7Joint Filler 2.4.1Cementitious Materials 2.4.6Vapor Retarder 2.3.3Concrete Curing Materials 2.5Reinforcement 2.6.1Liquid Chemical Floor Hardener 2.4.5Admixtures 1.6.3.2Pumping Concrete
SD-05 Design Data 2.3.1Mix Design
SD-06 Test Reports 1.6.1.1Concrete Mix Design 2.4.3Aggregates 3.12.2.3Compressive Strength Tests 3.12.2.1Slump Tests 2.4.2Water
SD-07 Certificates 2.5.1Reinforcing Bars 1.8Welder Qualifications 1.6.3.3Safety Data Sheets 1.6.5.2Field Testing Technician and
Testing Agency SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 86 PAGES
03 30 00 2.6.1Liquid Chemical Floor Hardener 2.3.3Curing Compound
03 42 13.00 10 SD-01 Preconstruction Submittals 1.3.2.2Quality Control Procedures
SD-02 Shop Drawings
2.1.1 GStandard Precast Units
2.1.2 GCustom-Made Precast Units
SD-03 Product Data 2.1.1Standard Precast Units 2.1.3Proprietary Precast Units 3.1.3Embedded Items 2.2.6Accessories
SD-05 Design Data 2.1.2Design Calculations 2.1.5.1Concrete Mix Proportions
SD-06 Test Reports 1.3.2.4Test Reports
SD-07 Certificates 1.3.2.2Quality Control Procedures
SD-11 Closeout Submittals
2.2.1 SRecycled content for fly ash and
pozzolan
2.2.1 SRecycled content for Ground Iron
Blast-Furnace Slag
2.2.1 SRecycled content for Silica Fume
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 86 PAGES
03 42 13.00 10 2.2.1 SRecycled content for Synthetic Fiber Reinforcement
2.2.1 SRecycled content for steel
04 20 00 SD-02 Shop Drawings
3.4.1.1Detail Drawings SD-03 Product Data
2.4.1.1Cementitious Materials 3.2.5Bracing Calculations
SD-06 Test Reports 3.6.1.1Prism Tests
SD-07 Certificates 1.3.1Special Masonry Inspector
Qualifications 2.2.2.2Concrete Masonry Units (CMU) 2.2.3Precast Concrete Units 2.4.1.1Cementitious Materials 2.6.1Anchors, Ties, and Bar
Positioners 2.6.2Joint Reinforcement
05 12 00 SD-01 Preconstruction Submittals 1.3.1.1Erection Drawings
SD-02 Shop Drawings 1.3.2Fabrication Drawings
SD-03 Product Data 2.6.2Shop Primer 2.4.1Welding Electrodes and Rods
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 86 PAGES
05 12 00 2.4.2Non-Shrink Grout SD-06 Test Reports
2.3Bolts, Nuts, and Washers SD-07 Certificates
2.2Steel 2.3Bolts, Nuts, and Washers 2.5Galvanizing 1.3.3.1Welding Procedures and
Qualifications 2.4.1Welding Electrodes and Rods
05 30 00 SD-02 Shop Drawings 1.3.5Fabrication Drawings
SD-03 Product Data 2.2Accessories 2.1Deck Units 2.1.3Galvanizing Repair Paint 2.2.12Mechanical Fasteners 2.1.3Touch-Up Paint 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories
SD-04 Samples 2.1.1Metal Roof Deck Units 2.2.3Flexible Closure Strips
SD-05 Design Data 2.1Deck Units
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 86 PAGES
05 30 00 1.3.2Powder-Actuated Tool Operator 1.3.3Welder Qualifications 1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.4.2Wind Storm Resistance 1.3.1Manufacturer's Certificate
05 40 00 SD-02 Shop Drawings 1.6.1Framing Components
SD-03 Product Data 2.1Studs, Joists
SD-05 Design Data 1.6.2Metal Framing Calculations
SD-07 Certificates 1.4Load-Bearing Cold-Formed Metal
Framing 3.2.1Welds
05 50 13 SD-02 Shop Drawings 2.4Bollards
05 52 00 SD-02 Shop Drawings 2.2.1Aluminum Railings And Handrails
SD-03 Product Data 2.2.1Aluminum Railings and Handrails 3.2Anchorage and Fastening
Systems SD-07 Certificates
1.3.1Welding Procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 86 PAGES
05 52 00 1.3.2Welder Qualification SD-08 Manufacturer’s Instructions
3.2Installation Instructions 06 10 00 SD-02 Shop Drawings
2.1.1Nailing Strips SD-06 Test Reports
1.4.3Preservative-treated SD-07 Certificates
1.8.1Certificates of Grade 1.7Preservative Treatment
06 20 00 SD-02 Shop Drawings 1.3Detail Drawings Indicating All
Wood Assemblies SD-03 Product Data
2.1Wood Products 1.4Treated Wood Products 2.5Hardware and Accessories
SD-04 Samples 1.5Complete wood cabinet door system 1.5Wood Millwork
06 61 16 SD-02 Shop Drawings 1.5.2Detail Drawings 3.1Installation
SD-03 Product Data 2.1Solid Polymer Material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 86 PAGES
06 61 16 1.5.1Qualifications 2.3Fabrications 2.2.4Indoor air quality for solid surface seam and sealant products SD-04 Samples
2.1Material 2.3.5Counter and Vanity Tops
SD-06 Test Reports 2.1Solid Polymer Material
SD-07 Certificates 2.3Fabrications 1.5.1Qualifications 2.1Indoor Air Quality for solid surface fabrication products SD-10 Operation and Maintenance Data
3.2Clean-up 07 05 23 SD-01 Preconstruction Submittals
1.4Work Plan SD-03 Product Data
2.2Thermal Imaging Camera SD-05 Design Data
3.2Envelope Surface Area Calculations
SD-07 Certificates 1.6.2.1Pressure Test Agency
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 86 PAGES
07 05 23 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments 1.6.3Date Of Last Calibration
SD-06 Test Reports 3.5Pressure Test Procedures 3.5.7Air Leakage Test Report 3.6.5Diagnostic Test Report
07 21 16 SD-03 Product Data 2.1Blanket Insulation 2.1.3Recycled Content for Insulation
Materials SD-08 Manufacturer’s Instructions
3.3.1Insulation 07 22 00 SD-02 Shop Drawings
1.3Insulation Board Layout 1.3Verification of Existing Conditions
SD-03 Product Data 2.1Insulation 1.4Cover Board 2.3Fasteners 2.1.2Recycled Content For Insulation
SD-06 Test Reports 1.7.1Flame Spread Rating
SD-07 Certificates 1.6Installer Qualifications
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 86 PAGES
07 22 00 2.3Fasteners 2.1Insulation
07 24 00 SD-02 Shop Drawings 3.3Shop Drawings
SD-03 Product Data 2.2Sheathing Board 2.6Thermal Insulation 2.3Adhesive 2.5Mechanical Fasteners 2.12Accessories 2.7Base Coat 2.8Portland Cement 2.9Reinforcing Fabric 2.10Finish Coat 2.13Joint Sealant 2.11Sealant Primer 2.14Bond Breaker 2.15Backer Rod 1.4.5Insulation Board 1.7Warranty
SD-04 Samples 1.2.3.7Sample Boards
1.2.1.4 GMock-up Installation of EIFS
SD-05 Design Data 1.2.1.2Wind Load 1.2.4Moisture Analysis
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 86 PAGES
07 24 00 SD-06 Test Reports 1.2.3.1Abrasion Resistance 1.2.3.2Accelerated Weathering 1.2.2.3Impact Resistance 1.2.3.3Mildew Resistance 1.2.3.4Salt Spray Resistance 1.2.4Vapor Transmission 1.2.3.6Absorption-Freeze-Thaw 1.2.1.3Wall Fire Test 1.2.1.1Water Penetration 1.2.3.5Water Resistance 1.2.1.3Full Scale or Intermediate Scale
Fire Test 1.2.2.1Surface Burning Characteristics 1.2.2.2Radiant Heat 3.1Substrate 1.2.1.2Wind Load
SD-07 Certificates 1.4.1Qualifications of EIFS
Manufacturer 1.4.2Qualification of EIFS Installer 1.4.3Qualification of Sealant
Applicator 1.4.4Qualifications of Third Party
Inspector
3.5.1 GInspection Check List
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 86 PAGES
07 24 00 SD-08 Manufacturer’s Instructions 3.3Installation
SD-10 Operation and Maintenance Data
1.7EIFS
07 27 10.00 10 SD-06 Test Reports
1.8Design Review Report 3.1.2Testing and Inspection
SD-07 Certificates 1.7Air Barrier Inspector
07 27 26 SD-01 Preconstruction Submittals 1.9.1Qualifications of Manufacturer 1.9.2Qualifications of Installer
SD-02 Shop Drawings
1.4 GFluid-Applied Membrane Air
Barrier SD-03 Product Data
1.4Fluid-Applied Membrane Air Barrier
2.2Primers, Adhesives, and Mastics 2.5Reinforcement 1.4.2Safety Data Sheets
SD-04 Samples 1.4.3Mockup
SD-06 Test Reports 1.6Capillary Moisture Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 86 PAGES
07 27 26 1.4.4Field Peel Adhesion Test 1.4.4Flame Propagation of Wall
Assemblies 1.4.4Flame Spread and Smoke
Developed Index Ratings 3.4.1Site Inspections
SD-07 Certificates 1.4Fluid-Applied Membrane Air
Barrier 1.9.1Qualifications of Manufacturer 1.9.2Qualifications of Installer
SD-08 Manufacturer’s Instructions 1.4Fluid-Applied Membrane Air
Barrier 2.2Primers, Adhesives, and Mastics
07 60 00 SD-02 Shop Drawings 3.1.11Gutters 3.1.12Downspouts 2.1.1Fasciae 3.1.10Drip Edges 3.1.13Eave Flashing
SD-04 Samples 1.4.2Finish Samples
SD-08 Manufacturer’s Instructions 3.4Quality Control Plan
07 61 14.00 20 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 86 PAGES
07 61 14.00 20 1.2.5Roofing SD-03 Product Data
2.1Roofing Panels 2.1Energy Star Label for Steel
Roofing Product 2.3Attachment Clips 2.4.1Closures 2.4Accessories 2.4.2Fasteners 2.4.3Sealants 2.5Insulation 1.7Warranty
SD-04 Samples 2.1Panel 2.4Accessories 2.4.3Sealants 2.2Intermediate Support
SD-05 Design Data 1.5Design Calculations
SD-06 Test Reports 3.6Field Inspection 1.3.3Structural Performance 1.6.6Finish
SD-07 Certificates 1.6.3Manufacturer's Technical
Representative
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 86 PAGES
07 61 14.00 20 1.6.4Installer's Qualifications 2.1Coil Stock
SD-08 Manufacturer’s Instructions 3.3Installation
SD-11 Closeout Submittals 3.8Information Card 1.7Warranty
07 84 00 SD-02 Shop Drawings 2.1Firestopping System
SD-03 Product Data 2.2Firestopping Materials
SD-06 Test Reports 3.3Inspection
SD-07 Certificates 2.2Firestopping Materials 1.5.1Installer Qualifications
07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond Breakers 2.4Backstops 3.1Field Adhesion
08 11 13 SD-02 Shop Drawings 2.1Doors 2.1Doors 2.5Frames
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 86 PAGES
08 11 13 2.5Frames 2.3Accessories 2.7Weatherstripping
SD-03 Product Data 2.1Doors 2.5Frames 2.3Accessories
SD-05 Design Data
1.4.1 GStructural Calculations For
Deflection 08 11 16 SD-02 Shop Drawings
1.5.1Door and Frame Assembly SD-03 Product Data
1.5.1Door and Frame Assembly SD-04 Samples
1.5.2Finish Samples SD-05 Design Data
1.5.3Design Analysis
1.2.1 GCalculations
1.2.3Air Infiltration 1.2.4Water Penetration 1.2.2Wind Borne Debris 1.2.5NFRC Project Label Certificates for Fenestration SD-08 Manufacturer’s Instructions
1.5.1Door and Frame Assembly
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 86 PAGES
08 11 16 1.5.4Adjustments, Cleaning, and Maintenance
1.2.5NFRC Project Label Certificates for Fenestration
08 14 00 SD-02 Shop Drawings 2.1Doors
SD-03 Product Data 2.1Doors 2.2Accessories 2.3.7Water-resistant Sealer 1.5Warranty 2.1.2Sound Transmission Class
Rating 2.1.3Fire Resistance Rating
SD-04 Samples 2.1Doors 2.3.6.2Door Finish Colors
SD-06 Test Reports 2.4Cycle-Slam 2.4Hinge Loading Resistance
SD-07 Certificates 1.3.1Certificates of Grade
SD-11 Closeout Submittals 1.5Warranty
08 31 00 SD-02 Shop Drawings 1.3Access Doors And Panels
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 86 PAGES
08 31 00 SD-03 Product Data 1.3Access Doors And Panels 1.3.2Hardware
SD-06 Test Reports 1.3.1Fire-rating(s) of Assemblies
08 33 23 SD-02 Shop Drawings 2.2.1Overhead Coiling Doors 2.2.3Counterbalancing Mechanism 2.2.4Electric Door Operators 2.2.1.3Bottom Bars 2.1.1.1Guides 2.2.3.1Mounting Brackets 2.2.1.8Overhead Drum 3.3.2Hood 2.1.1.1Installation Drawings
SD-03 Product Data 2.2.1Overhead Coiling Doors 2.2.2Hardware 2.2.3Counterbalancing Mechanism 2.2.4Electric Door Operators
SD-05 Design Data 2.2.1Overhead Coiling Doors 2.2.2Hardware 2.2.3Counterbalancing Mechanism 2.2.4Electric Door Operators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 86 PAGES
08 33 23 SD-10 Operation and Maintenance Data
3.3.2Operation and Maintenance Manuals
3.3.2Materials 3.3.2Devices 3.3.2Procedures 3.3.2Manufacture's Brochures 3.3.2Parts Lists
SD-11 Closeout Submittals 3.3.1Warranty
08 34 59 SD-02 Shop Drawings 2.1Vault Door Unit 2.3Day Gate
SD-03 Product Data 2.2Vault Door and Frame
SD-07 Certificates 2.2Vault Door and Frame
SD-08 Manufacturer’s Instructions 3.1Installation
08 34 73 SD-02 Shop Drawings 2.1Wood Sound Retardant Doors 2.1Door Frames
SD-03 Product Data 2.1Wood Sound Retardant Doors 2.1Door Frames
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 86 PAGES
08 34 73 2.1Door Hardware 2.1Thresholds
SD-06 Test Reports 2.4.3Acoustical Tests
SD-07 Certificates 2.1Wood Sound Retardant Doors 2.1Door Frames 2.1Door Hardware 2.1Thresholds
08 41 13 SD-02 Shop Drawings 3.3Installation Drawings 2.2Fabrication Drawings
SD-03 Product Data 1.2.1Manufacturer's Catalog Data 2.2.3Finish
SD-04 Samples 1.2.1Finish and Color Samples
SD-05 Design Data
1.4.3 GDesign Analysis
SD-06 Test Reports 1.2.1Certified Test Reports 3.4.3Deflection 3.4.1Air Infiltration 3.4.4Condensation Resistance and
Thermal Transmittance 3.4.5Water Infiltration
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 86 PAGES
08 41 13 SD-08 Manufacturer’s Instructions 3.3Manufacturer's Instructions
SD-11 Closeout Submittals 3.6Manufacturer's Product Warranty
08 51 13 SD-02 Shop Drawings 2.1Windows 1.9Fabrication Drawings
SD-03 Product Data 2.1Windows 2.2.8.1Hardware 2.2.3Fasteners 1.10Window Performance 2.3Thermal-Barrier Windows 2.4Mullions 2.2.10Screens 2.2.2Weatherstripping 2.2.8Accessories 1.10.6Thermal Performance
SD-04 Samples 1.4.2.1Finish Sample 1.4.2.2Window Sample
SD-05 Design Data 2.1Structural Calculations for
Deflection 1.4.3Design Analysis
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 86 PAGES
08 51 13 1.4.4Resistance to Forced Entry 1.10.3Windborne-Debris-Impact
Performance SD-10 Operation and Maintenance Data
2.1Windows 08 71 00 SD-02 Shop Drawings
1.3Manufacturer's Detail Drawings 1.3Verification of Existing Conditions 1.5Hardware Schedule 2.3.6Keying System
SD-03 Product Data 2.3Hardware Items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-10 Operation and Maintenance Data
1.5Hardware Schedule SD-11 Closeout Submittals
1.6.1Key Bitting 08 81 00 SD-03 Product Data
1.6.1Insulating Glass 1.3Glazing Accessories
SD-04 Samples 1.6.1Insulating Glass 2.3.3Tape
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 86 PAGES
08 81 00 2.3.1.1Sealant SD-07 Certificates
1.6.1Insulating Glass 1.3Glazing Accessories
SD-08 Manufacturer’s Instructions 2.3Setting and Sealing Materials 3.2Glass Setting
08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers
SD-03 Product Data 2.2Metal Wall Louvers
SD-04 Samples 1.4Wall louvers 1.5Wall louvers 1.5Door louvers 2.3Door louvers
09 22 00 SD-02 Shop Drawings 2.1Metal Support Systems
SD-03 Product Data 2.1Metal Support Systems
09 29 00 SD-03 Product Data 2.1.3Glass Mat Water-Resistant
Gypsum Tile Backing Board 2.1.2Water-Resistant Gypsum Board
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 86 PAGES
09 29 00 2.1.4Glass Mat Covered or Reinforced Gypsum Sheathing
2.1.4.1Glass Mat Covered or Reinforced Gypsum Sheathing Sealant
2.1.5Impact Resistant Gypsum Board 2.1.8Accessories 2.1.1Gypsum Board
SD-07 Certificates 2.1Asbestos Free Materials
09 30 10 SD-03 Product Data 2.1.1Porcelain Tile 2.2Setting-Bed 2.4Mortar and Grout
SD-04 Samples 2.1Tile 2.1Accessories 2.1Transition Strips 2.5Transition Strips 2.4.2Grout
SD-10 Operation and Maintenance Data
3.2Installation 09 51 00 SD-02 Shop Drawings
2.1Detail Drawings SD-04 Samples
2.2Acoustical Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 86 PAGES
09 51 00 SD-07 Certificates 2.7Indoor Air Quality for Sealants
09 62 38 SD-03 Product Data 2.1Static-Control Resilient Flooring 2.3Accessories 2.2Adhesives 1.8Warranty
SD-04 Samples 2.1Static-Control Resilient Flooring 2.3Accessories
SD-06 Test Reports 3.2Moisture, Alkalinity and Bond 3.6Testing
SD-07 Certificates 1.5Qualifications of Applicator
SD-08 Manufacturer’s Instructions 2.1Static-Control Resilient Flooring 2.3Accessories
SD-10 Operation and Maintenance Data
2.1Static-Control Resilient Flooring 2.3Accessories
09 65 00 SD-03 Product Data 2.11Resilient Flooring and
Accessories 2.8Adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 86 PAGES
09 65 00 SD-04 Samples 2.11Resilient Flooring and
Accessories SD-06 Test Reports
3.3Moisture, Alkalinity and Bond Tests
SD-08 Manufacturer’s Instructions 3.2Surface Preparation 3.1Installation
SD-10 Operation and Maintenance Data
2.11Resilient Flooring and Accessories
09 90 00 SD-03 Product Data 2.1Coating
SD-04 Samples 1.9Color
SD-07 Certificates 1.3Applicator's Qualifications 1.4.1.2Qualification Testing 2.1Indoor Air Quality for Paints and
Primers SD-08 Manufacturer’s Instructions
3.2.1Application Instructions 3.6.2Mixing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 86 PAGES
09 90 00 1.7.2Manufacturer's Safety Data Sheets
SD-10 Operation and Maintenance Data
2.1Coatings 10 11 00 SD-03 Product Data
1.2Visual Display Board 2.3Projection Screen
SD-04 Samples 2.1.2Aluminum 2.1.1Porcelain Enamel 2.1Materials
10 14 00.10 SD-02 Shop Drawings 3.1Approved Detail Drawings
SD-03 Product Data 2.1Modular Exterior Signage System 3.1Installation 1.2Exterior Signage 1.2.1Wind Load Requirements
SD-04 Samples 1.2Exterior Signage
SD-10 Operation and Maintenance Data
3.1.2Protection and Cleaning 10 14 00.20 SD-02 Shop Drawings
1.3.2Detail Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 86 PAGES
10 14 00.20 SD-03 Product Data 3.1Installation 1.5Warranty
SD-04 Samples 1.3.1Interior Signage
SD-10 Operation and Maintenance Data
3.1Approved Manufacturer's Instructions
3.1.2Protection and Cleaning 10 21 13 SD-02 Shop Drawings
2.1Fabrication Drawings 3.3Installation Drawings
SD-03 Product…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.